ML12363A065: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Exelon Nuclear - Nuclear Fuels                                                                 COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Core Operating Limits Report For Oyster Creek I Cycle 24 (This is a major rewrite; no annotations are used) 2012.11.08 Pron rmid                                      15:11:02 -05'00' RViewd 2012.11.08 16:30:58 -05'00' Reviewed:
{{#Wiki_filter:Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek I Cycle 24 (This is a major rewrite; no annotations are used) 2012.11.08 15:11:02 -05'00' Pron rmid RViewd Reviewed:
Reactor Engineering 2012.11.08 Reviewed:                                      16:5):55 -05'00' Engineerng fety       alysis Reviewed:
Reviewed:
Independent Review 2012.11.09 11:54:59 -05'00' Approved:
Reviewed:
GNF - BWR Design Manager 16:31:2012.11.08 16:31:25 -05'00' Station Qualified Review Page 1 of 57
Approved:
2012.11.08 16:30:58 -05'00' Reactor Engineering 2012.11.08 16:5):55 -05'00' Engineerng fety alysis Independent Review 2012.11.09 11:54:59 -05'00' GNF - BWR Design Manager 16:31:2012.11.08 16:31:25 -05'00' Station Qualified Review Page 1 of 57


Exelon Nuclear - Nuclear Fuels                                                                                                                             COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table of Contents 1 . List of T a b le s .............................................................................................................................................     3 2 . Re fe re n ce s ................................................................................................................................................     4
Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table of Contents 1. L ist o f T a b le s.............................................................................................................................................
: 3. Terms and Definitions ...............................................................................................................................                 5
3 2. R e fe re n ce s................................................................................................................................................
: 4. General Information ..................................................................................................................................                 6
4
: 5. Average Planar Linear Heat Generation Rate ....................................................................................                                       7
: 3. Terms and Definitions...............................................................................................................................
: 6. Minimum Critical Power Ratio ...........................................................................................................                             19 6.1. Manual Flow Control MCPR Limits .............................................................................................                                   19 6.2. Power Dependent MCPR Limits ................................................................................................                                   19 6 .3 . S c ra m T im e .....................................................................................................................................         19
5
: 7. Linear Heat Generation Rate ...........................................................................................................                               22
: 4. General Information..................................................................................................................................
: 8. Stability Protection Settings ...................................................................................................................                     22
6
: 9. Modes of Operation ...............................................................................................................................                   23
: 5. Average Planar Linear Heat Generation Rate....................................................................................
: 10. Methodology .........................................................................................................................................               23 Appendix A ..........................                         ...............................................................................                          24 Page 2 of 57
7
: 6. Minimum Critical Power Ratio...........................................................................................................
19 6.1. Manual Flow Control MCPR Limits.............................................................................................
19 6.2. Power Dependent MCPR Limits................................................................................................
19 6.3. S c ra m T im e.....................................................................................................................................
19
: 7. Linear Heat Generation Rate...........................................................................................................
22
: 8. Stability Protection Settings...................................................................................................................
22
: 9. Modes of Operation...............................................................................................................................
23
: 10. Methodology.........................................................................................................................................
23 Appendix A..........................
24 Page 2 of 57


Exelon Nuclear - Nuclear Fuels                                                                                                               COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390
Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390
: 1. List of Tables Table 5-1 MAPLHGR for bundle: GEl 1-P9DUB359-14GZ-100T-145-T6-3108 ................................................................                                               7 Table 5-2 MAPLHGR for bundle: GEl 1-P9DUB359-14GZ-100T-145-T6-3108                                                                         ................................     8 Table 5-3 MAPLHGR for bundle: GEl 1-P9DUB356-14GZ-100T-145-T6-3109 ................................................................                                               8 Table 5-4 MAPLHGR for bundle: GEl 1-P9DUB356-14GZ-100T-145-T6-3109 ................................................................                                               9 Table 5-5 MAPLHGR for bundle: GEl 1-P9DUB367-12GZ-100T-145-T6-3104 ................................................................                                               9 Table 5-6 MAPLHGR for bundle: GEl 1-P9DUB367-12GZ-100T-145-T6-3104 ................................................................                                               10 Table 5-7 MAPLHGR for bundle: GEl 1-P9DUB360-1 1GZ-100T-145-T6-3107 ................................................................                                             10 Table 5-8 MAPLHGR for bundle: GEl 1-P9DUB360-1 1GZ-100T-145-T6-3107 ...............................................................                                               11 Table 5-9 MAPLHGR for bundle: GEl 1-P9DUB365-10GZ-100T-145-T6-3105 ................................                                                                               11 Table 5-10 MAPLHGR for bundle: GEl 1-P9DUB365-10GZ-100T-145-T6-3105 ..............................................................                                               12 Table 5-11 MAPLHGR for bundle: GNF2-P10DG2B370-15GZ-100T2-145-T6-3355 .......................................................                                                     12 Table 5-12 MAPLHGR for bundle: GN F2-P10DG2B371-14GZ-100T2-145-T6-4136 .......................................................                                                   13 Table 5-13 MAPLHGR for bundle: GNF2-P10DG2B370-16GZ-100T2-145-T6-4137 .......................................................                                                     13 Table 5-14 MAPLHGR for bundle: GNF2-P10DG2B372-14GZ-100T2-145-T6-4138 .......................................................                                                     14 Table 5-15 MAPLHGR for bundle: GNF2-P10DG2B370-16GZ-100T2-145-T6-3356 .......................................................                                                     14 Table 5-16 MAPLHGR for bundle: GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD ..............................................                                                         15 Table 5-17 MAPLHGR for bundle: GEl 1-P9DUB367-1 1GZ-100T-145-T6-2921 .............................................................                                               15 Table 5-18 MAPLHGR for bundle: GEl 1-P9DUB367-1 1GZ-100T-145-T6-2921 .............................................................                                               16 Table 5-19 MAPLHGR for bundle: GEl 1-P9DUB361-14GZ-100T-145-T6-2922 .............................................................                                                 16 Table 5-20 MAPLHGR for bundle: GEl 1-P9DUB361-14GZ-100T-145-T6-2922 .............................................................                                                 17 Table 5-21 MAPLHGR for bundle: GEl 1-P9DUB366-12GZ-IOOT-145-T6-3106 .............................................................                                                 17 Table 5-22 MAPLHGR for bundle: GE11-P9DUB366-12GZ-100T-145-T6-3106 .............................................................                                                 18 Table 5-23 MAPLHGR Multiplier with One ISOLATED Loop ...........................................................................................                                 18 T able 6-1 MC P R Lim it - A ll Fuel Types ................................................................................................................................       20 T able 6-2 Kf Multiplier - A ll Fuel Types ................................................................................................................................       20 Table 6-3 Power Dependent MCPRp Limits and Multipliers - All Fuel Types .................................................................                                         21 Table 7-1 Power Dependent LHGR Multiplier LHGRFACp for PROOS ..........................................................................                                           22 Table 8-1 O ption II Stability Protection Settings ...................................................................................................................           22 T a ble 9-1 Mod es of O pe ratio n .............................................................................................................................................. 23 Page 3 of 57
: 1. List of Tables Table 5-1 MAPLHGR for bundle: GEl 1-P9DUB359-14GZ-100T-145-T6-3108................................................................
7 Table 5-2 MAPLHGR for bundle: GEl 1-P9DUB359-14GZ-100T-145-T6-3108  
................................ 8 Table 5-3 MAPLHGR for bundle: GEl 1-P9DUB356-14GZ-100T-145-T6-3109................................................................
8 Table 5-4 MAPLHGR for bundle: GEl 1-P9DUB356-14GZ-100T-145-T6-3109................................................................
9 Table 5-5 MAPLHGR for bundle: GEl 1-P9DUB367-12GZ-100T-145-T6-3104................................................................
9 Table 5-6 MAPLHGR for bundle: GEl 1-P9DUB367-12GZ-100T-145-T6-3104................................................................
10 Table 5-7 MAPLHGR for bundle: GEl 1-P9DUB360-1 1 GZ-100T-145-T6-3107................................................................
10 Table 5-8 MAPLHGR for bundle: GEl 1-P9DUB360-1 1 GZ-100T-145-T6-3107...............................................................
11 Table 5-9 MAPLHGR for bundle: GEl 1-P9DUB365-10GZ-100T-145-T6-3105................................
11 Table 5-10 MAPLHGR for bundle: GEl 1-P9DUB365-10GZ-100T-145-T6-3105..............................................................
12 Table 5-11 MAPLHGR for bundle: GNF2-P10DG2B370-15GZ-100T2-145-T6-3355.......................................................
12 Table 5-12 MAPLHGR for bundle: GN F2-P10DG2B371-14GZ-100T2-145-T6-4136.......................................................
13 Table 5-13 MAPLHGR for bundle: GNF2-P10DG2B370-16GZ-100T2-145-T6-4137.......................................................
13 Table 5-14 MAPLHGR for bundle: GNF2-P10DG2B372-14GZ-100T2-145-T6-4138.......................................................
14 Table 5-15 MAPLHGR for bundle: GNF2-P10DG2B370-16GZ-100T2-145-T6-3356.......................................................
14 Table 5-16 MAPLHGR for bundle: GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD.............................................. 15 Table 5-17 MAPLHGR for bundle: GEl 1-P9DUB367-1 1GZ-100T-145-T6-2921.............................................................
15 Table 5-18 MAPLHGR for bundle: GEl 1-P9DUB367-1 1GZ-100T-145-T6-2921.............................................................
16 Table 5-19 MAPLHGR for bundle: GEl 1-P9DUB361-14GZ-100T-145-T6-2922.............................................................
16 Table 5-20 MAPLHGR for bundle: GEl 1-P9DUB361-14GZ-100T-145-T6-2922.............................................................
17 Table 5-21 MAPLHGR for bundle: GEl 1-P9DUB366-12GZ-IOOT-145-T6-3106.............................................................
17 Table 5-22 MAPLHGR for bundle: GE11-P9DUB366-12GZ-100T-145-T6-3106.............................................................
18 Table 5-23 MAPLHGR Multiplier with One ISOLATED Loop...........................................................................................
18 T able 6-1 M C P R Lim it - A ll Fuel Types................................................................................................................................
20 T able 6-2 K f M ultiplier - A ll Fuel Types................................................................................................................................
20 Table 6-3 Power Dependent MCPRp Limits and Multipliers - All Fuel Types.................................................................
21 Table 7-1 Power Dependent LHGR Multiplier LHGRFACp for PROOS..........................................................................
22 Table 8-1 O ption II Stability Protection Settings...................................................................................................................
22 T a ble 9-1 M od es of O pe ratio n..............................................................................................................................................
2 3 Page 3 of 57


Exelon Nuclear - Nuclear Fuels                                                     COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390
Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390
: 2. References
: 2. References
: 1. Deleted.
: 1. Deleted.
: 2. GNF Document, 0000-01 38-9259-SRLR, Revision 2, "Supplemental Reload Licensing Report for Oyster Creek Reload 24 Cycle 24," October 2012.
: 2.
: 3. GNF Document, 0000-0138-9259-FBIR-P, Revision 0, "Fuel Bundle Information Report for Oyster Creek Reload 24 Cycle 24," September 2012.
GNF Document, 0000-01 38-9259-SRLR, Revision 2, "Supplemental Reload Licensing Report for Oyster Creek Reload 24 Cycle 24," October 2012.
: 4. Deleted.
: 3.
: 5. Deleted.
GNF Document, 0000-0138-9259-FBIR-P, Revision 0, "Fuel Bundle Information Report for Oyster Creek Reload 24 Cycle 24," September 2012.
: 6. GENE Letter, NSA02-247, "Oyster Creek APRM Flow-Biased Setpoint Margin Between Scram and Rod Block for Stability Option II Adjustment," January 23, 2002.
: 4.
: 7. Deleted.
Deleted.
: 8. Deleted.
: 5.
: 9. Deleted.
Deleted.
: 6.
GENE Letter, NSA02-247, "Oyster Creek APRM Flow-Biased Setpoint Margin Between Scram and Rod Block for Stability Option II Adjustment," January 23, 2002.
: 7.
Deleted.
: 8.
Deleted.
: 9.
Deleted.
: 10. EXELON GENERATION COMPANY, LLC OYSTER CREEK GENERATING STATION DOCKET NO. 50-219, Renewed License No. DPR-16
: 10. EXELON GENERATION COMPANY, LLC OYSTER CREEK GENERATING STATION DOCKET NO. 50-219, Renewed License No. DPR-16
: 11. Deleted.
: 11. Deleted.
Line 51: Line 102:
Page 4 of 57
Page 4 of 57


Exelon Nuclear - Nuclear Fuels                                                                         COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390
Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390
: 3. Terms and Definitions APLHGR                   Average Planar Linear Heat Generation Rate ARTS                     APRM, Rod Block Monitor, and Technical Specification (Improvement)
: 3. Terms and Definitions APLHGR Average Planar Linear Heat Generation Rate ARTS APRM, Rod Block Monitor, and Technical Specification (Improvement)
APRM                     Average Power Range Monitor BOC                       Beginning of Cycle BWROG                     Boiling Water Reactor Owner's Group Coastdown                 Coastdown occurs when full power is not achievable with all rods out, maximum allowable core flow and feedwater temperature reduction, and equilibrium xenon ELLLA                     Extended Load Line Limit Analysis EOC                       End of Cycle EOR                       End of Rated Conditions (i.e., cycle exposure at 100% power, 100% flow, all-rods-out, all feedwater heaters in service and equilibrium xenon)
APRM Average Power Range Monitor BOC Beginning of Cycle BWROG Boiling Water Reactor Owner's Group Coastdown Coastdown occurs when full power is not achievable with all rods out, maximum allowable core flow and feedwater temperature reduction, and equilibrium xenon ELLLA Extended Load Line Limit Analysis EOC End of Cycle EOR End of Rated Conditions (i.e., cycle exposure at 100% power, 100% flow, all-rods-out, all feedwater heaters in service and equilibrium xenon)
FWCF                     Feedwater Controller Failure GNF                       Global Nuclear Fuel ICF                       Increased Core Flow ISOLATED                 The recirculation loop suction, discharge and discharge bypass valves are in the closed position Kf                       MCPR flow dependent multiplier (i.e., adjustment to the MCPR limit when at core flow less than rated)
FWCF Feedwater Controller Failure GNF Global Nuclear Fuel ICF Increased Core Flow ISOLATED The recirculation loop suction, discharge and discharge bypass valves are in the closed position Kf MCPR flow dependent multiplier (i.e., adjustment to the MCPR limit when at core flow less than rated)
Kp                       MCPR power dependent multiplier (i.e., adjustment to the MCPR limit when at core powerless than rated)
Kp MCPR power dependent multiplier (i.e., adjustment to the MCPR limit when at core powerless than rated)
LHGR                     Linear Heat Generation Rate LHGRFACp                 LHGR power dependent multiplier (i.e.,'adjustment to the LHGR limit for the following coincident conditions:
LHGR Linear Heat Generation Rate LHGRFACp LHGR power dependent multiplier (i.e.,'adjustment to the LHGR limit for the following coincident conditions:
at core power less than rated and the pressure regulator is out of service)
at core power less than rated and the pressure regulator is out of service)
LPRM                     Local Power Range Monitor MAPLHGR                   Maximum Average Planar Linear Heat Generation Rate MCPR                     Minimum Critical Power Ratio MCPRp                     Off-rated power dependent Operating Limit MCPR OOS                       Out of Service Option A                 Option A refers to the Technical Specifications core average scram time speed that when applied results in a more restrictive MCPR limit Option B                 Option B refers to a specific core average scram time speed that when met allows the use of a lower MCPR limit PROOS                   Pressure Regulator Out of Service RWE                     Rod Withdrawal Error TBV                       Turbine Bypass Valve TIP                       Traversing In Core Probe Page 5 of 57
LPRM Local Power Range Monitor MAPLHGR Maximum Average Planar Linear Heat Generation Rate MCPR Minimum Critical Power Ratio MCPRp Off-rated power dependent Operating Limit MCPR OOS Out of Service Option A Option A refers to the Technical Specifications core average scram time speed that when applied results in a more restrictive MCPR limit Option B Option B refers to a specific core average scram time speed that when met allows the use of a lower MCPR limit PROOS Pressure Regulator Out of Service RWE Rod Withdrawal Error TBV Turbine Bypass Valve TIP Traversing In Core Probe Page 5 of 57


Exelon Nuclear - Nuclear Fuels                                                           COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted inAccordance with 10CFR2.390
Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390
: 4. General Information Oyster Creek is a non-ARTS plant. There are Oyster Creek specific flow-biased and power-biased MCPR operating limits for operation at less than rated flow and power. The flow-biased MCPR limits are discussed in Section 6.1. The power-biased MCPR limits are discussed in Section 6.2. There are power-biased LHGR limits for PROOS operating condition provided in Section 7. Rated core flow is 61 Mlb/hr and operation up to 110.7% of rated is licensed for this cycle.
: 4. General Information Oyster Creek is a non-ARTS plant. There are Oyster Creek specific flow-biased and power-biased MCPR operating limits for operation at less than rated flow and power. The flow-biased MCPR limits are discussed in Section 6.1. The power-biased MCPR limits are discussed in Section 6.2. There are power-biased LHGR limits for PROOS operating condition provided in Section 7. Rated core flow is 61 Mlb/hr and operation up to 110.7% of rated is licensed for this cycle.
Additionally, Oyster Creek utilizes an ELLLA operating domain, which has expanded the power/flow map to allow for greater operational flexibility.
Additionally, Oyster Creek utilizes an ELLLA operating domain, which has expanded the power/flow map to allow for greater operational flexibility.
Page 6 of 57
Page 6 of 57


Exelon Nuclear - Nuclear Fuels                                                             COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8
: 5. Average Planar Linear Heat Generation Rate The MAPLHGR limits are discussed in Technical Specifications Section 3.1 O.A. The MAPLHGR limits for the lattices in each fuel type as a function of average planar exposure are given in Tables 5-1 through 5-22 for operation with zero ISOLATED RECIRCULATION LOOPS (Reference 2). For operation with one ISOLATED RECIRCULATION LOOP, multiply the limits in Tables 5-1 through 5-22 by the ISOLATED Loop multiplier listed in Table 5-23 (Reference 2). All lattices are defined in Reference 3.
: 5. Average Planar Linear Heat Generation Rate The MAPLHGR limits are discussed in Technical Specifications Section 3.1 O.A. The MAPLHGR limits for the lattices in each fuel type as a function of average planar exposure are given in Tables 5-1 through 5-22 for operation with zero ISOLATED RECIRCULATION LOOPS (Reference 2). For operation with one ISOLATED RECIRCULATION LOOP, multiply the limits in Tables 5-1 through 5-22 by the ISOLATED Loop multiplier listed in Table 5-23 (Reference 2). All lattices are defined in Reference 3.
Table 5-1 MAPLHGR for bundle: GEl 1-P9DUB359-14GZ-1OOT-145-T6-3108 GNF Laftice #8527, #8528, #8508, #8525 Avg. Planar Exposure     MAPLHGR (GWd/ST)         (kW/ft) 0.0           9.64 0.2           9.64 1.0           9.57 5.0           9.39 10.0           9.18 15.0           8.93 20.0           8.95 25.0           8.52 35.0           7.78 45.0           7.59 55.0           7.55 65.0           7.51 Page 7of 57                                         ,' j
Table 5-1 MAPLHGR for bundle: GEl 1 -P9DUB359-14GZ-1OOT-145-T6-3108 GNF Laftice #8527, #8528, #8508, #8525 Avg. Planar Exposure MAPLHGR (GWd/ST)
(kW/ft) 0.0 9.64 0.2 9.64 1.0 9.57 5.0 9.39 10.0 9.18 15.0 8.93 20.0 8.95 25.0 8.52 35.0 7.78 45.0 7.59 55.0 7.55 65.0 7.51 Page 7of 57
,' j


Exelon Nuclear - Nuclear Fuels                                                         COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-2 MAPLHGR for bundle: GE11-P9DUB359-14GZ-1OOT-145-T6-3108 GNF Lattices #8507, #8526 Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0             9.62 0.2             9.62 1.0             9.56 5.0             9.44 10.0             9.17 15.0             8.87 20.0             8.93 25.0             8.52 35.0             7.76 45.0             7.59 55.0             7.55 65.0             7.48 Table 5-3 MAPLHGR for bundle: GEl1-P9DUB356-14GZ-10OT-145-T6-3109 GNF Lattices #8530, #8531, #8508, #8525 Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0             9.55 0.2             9.55 1.0             9.50 5.0             9.33 10.0             9.04 15.0             8.99 20.0             8.90 25.0             8.51 35.0           .7.78 45.0             7.50 55.0             7.55 65.0             7.47 Page 8. of 57
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-2 MAPLHGR for bundle: GE11-P9DUB359-14GZ-1OOT-145-T6-3108 GNF Lattices #8507, #8526 Avg. Planar Exposure MAPLHGR (GWd/ST)
(kW/ft) 0.0 9.62 0.2 9.62 1.0 9.56 5.0 9.44 10.0 9.17 15.0 8.87 20.0 8.93 25.0 8.52 35.0 7.76 45.0 7.59 55.0 7.55 65.0 7.48 Table 5-3 MAPLHGR for bundle: GEl1-P9DUB356-14GZ-10OT-145-T6-3109 GNF Lattices #8530, #8531, #8508, #8525 Avg. Planar Exposure MAPLHGR (GWd/ST)
(kW/ft) 0.0 9.55 0.2 9.55 1.0 9.50 5.0 9.33 10.0 9.04 15.0 8.99 20.0 8.90 25.0 8.51 35.0  
.7.78 45.0 7.50 55.0 7.55 65.0 7.47 Page 8. of 57


Exelon Nuclear - Nuclear Fuels                                                         COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-4 MAPLHGR for bundle: GEl 1-P9DUB356-14GZ-1OOT-145-T6-3109 GNF Lattices #8507, #8529 Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0             9.57 0.2             9.57 1.0           9.56 5.0           9.40 10.0           9.22 15.0           8.92 20.0           8.89 25.0           8.50 35.0             7.78 45.0             7.53 55.0             7.56 65.0             7.53 Table 5-5 MAPLHGR for bundle: GE11-P9DUB367-12GZ-100T-145-T6-3104 GNF Lattices #8510, #8511, #8508, #8512 Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0             9.55 0.2             9.55 1.0             9.51 5.0             9.31 10.0             9.10 15.0             8.93 20.0             9.01 25.0             8.68 35.0             7.80 45.0             7.63 55.0             7.60 65.0             7.54 Page 9-of 57
Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-4 MAPLHGR for bundle: GEl 1-P9DUB356-14GZ-1OOT-145-T6-3109 GNF Lattices #8507, #8529 Avg. Planar Exposure MAPLHGR (GWd/ST)
(kW/ft) 0.0 9.57 0.2 9.57 1.0 9.56 5.0 9.40 10.0 9.22 15.0 8.92 20.0 8.89 25.0 8.50 35.0 7.78 45.0 7.53 55.0 7.56 65.0 7.53 Table 5-5 MAPLHGR for bundle: GE11-P9DUB367-12GZ-100T-145-T6-3104 GNF Lattices #8510, #8511, #8508, #8512 Avg. Planar Exposure MAPLHGR (GWd/ST)
(kW/ft) 0.0 9.55 0.2 9.55 1.0 9.51 5.0 9.31 10.0 9.10 15.0 8.93 20.0 9.01 25.0 8.68 35.0 7.80 45.0 7.63 55.0 7.60 65.0 7.54 Page 9-of 57


Exelon Nuclear - Nuclear Fuels                                                         COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted inAccordance with 10CFR2.390 Table 5-6 MAPLHGR for bundle: GE1 -P9DUB367-12GZ-1OOT-145-T6-3104 GNF Lattices #8507, #8509 Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0           9.58 0.2           9.58 1.0           9.55 5.0           9.29 10.0           9.08 15.0           8.98 20.0           8.96 25.0           8.67 35.0           7.82 45.0           7.63 55.0           7.56 65.0           7.53 Table 5-7 MAPLHGR for bundle: GE11-P9DUB360-11GZ-10OT-145-T6-3107 GNF Lattices #8522, #8523, #8508, #8524 Avg. Planar Exposure       MAPLHGR.
Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-6 MAPLHGR for bundle: GE1 -P9DUB367-12GZ-1OOT-145-T6-3104 GNF Lattices #8507, #8509 Avg. Planar Exposure MAPLHGR (GWd/ST)
(GWd/ST)         (kW/ft) 0.0           9.14 0.2           9.14 1.0           9.10 5.0           9.13 10.0           9.04 15.0           8.93 20.0           8.97
(kW/ft) 0.0 9.58 0.2 9.58 1.0 9.55 5.0 9.29 10.0 9.08 15.0 8.98 20.0 8.96 25.0 8.67 35.0 7.82 45.0 7.63 55.0 7.56 65.0 7.53 Table 5-7 MAPLHGR for bundle: GE11-P9DUB360-11GZ-10OT-145-T6-3107 GNF Lattices #8522, #8523, #8508, #8524 Avg. Planar Exposure MAPLHGR.
                                                            -25.0           8.62 35.0           7.78 45.0           7.56 55.0           7.54 65.0           7.45 Page 10 of 57
(GWd/ST)
(kW/ft) 0.0 9.14 0.2 9.14 1.0 9.10 5.0 9.13 10.0 9.04 15.0 8.93 20.0 8.97
-25.0 8.62 35.0 7.78 45.0 7.56 55.0 7.54 65.0 7.45 Page 10 of 57


Exelon Nuclear - Nuclear Fuels                                                         COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 1GCFR2.390 Table 5-8 MAPLHGR for bundle: GEl1 -P9DUB36O-11GZ-10OT-145-T6-3107 GNF Lattices #8507, #8521 Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0             9.28 0.2             9.28 1.0             9.26 5.0             9.22 10.0             9.09 15.0             8.96 20.0             8.97 25.0             8.58 35.0             7.81 45.0             7.55 55.0             7.54 65.0             7.47 Table 5-9 MAPLHGR for bundle: GEl1 -P9DUB365-1 OGZ-1 OOT-145-T6-3105 GNF Lattices #8514, #8515, #8508, #8516 Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0             9.52 0.2             9.52 1.0             9.50 5.0             9.35 10.0             9.14 15.0             9.02 20.0             8.96 25.0             8.65 35.0             .7.82 45.0             7.63 55.0             7.58 65.0             7.54 P.-Ige
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 1GCFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-8 MAPLHGR for bundle: GEl 1 -P9DUB36O-11GZ-10OT-145-T6-3107 GNF Lattices #8507, #8521 Avg. Planar Exposure MAPLHGR (GWd/ST)
                                                                'f*
(kW/ft) 0.0 9.28 0.2 9.28 1.0 9.26 5.0 9.22 10.0 9.09 15.0 8.96 20.0 8.97 25.0 8.58 35.0 7.81 45.0 7.55 55.0 7.54 65.0 7.47 Table 5-9 MAPLHGR for bundle: GEl 1 -P9DUB365-1 OGZ-1 OOT-145-T6-3105 GNF Lattices #8514, #8515, #8508, #8516 Avg. Planar Exposure MAPLHGR (GWd/ST)
11Vof57
(kW/ft) 0.0 9.52 0.2 9.52 1.0 9.50 5.0 9.35 10.0 9.14 15.0 9.02 20.0 8.96 25.0 8.65 35.0  
.7.82 45.0 7.63 55.0 7.58 65.0 7.54 P.-Ige 11 Vof57
'f*


Exelon Nuclear - Nuclear Fuels                                                     COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-10 MAPLHGR for bundle: GE I1-P9DUB365-10GZ-10OT-145-T6-3105 GNF Lattices #8507, #8513 Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0             9.51 0.2             9.51 1.0             9.49 5.0             9.32 10.0             9.16 15.0             8.94 20.0             8.97 25.0             8.65 35.0             7.80 45.0             7.61 55.0             7.59 65.0             7.52 Table 5-11 MAPLHGR for-bundle: GNF2-P1ODG2B370-15GZ-100T2-145-T6-3355
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-10 MAPLHGR for bundle: GE I1-P9DUB365-10GZ-10OT-145-T6-3105 GNF Lattices #8507, #8513 Avg. Planar Exposure MAPLHGR (GWd/ST)
                                                                . All Lattices Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0             7.73 0.2             7.73 1.0           .7.75 5.0             7.67 10.0             7.64 15.0             7.72 20.0             6.96 25.0             6.46 35.0             6.26 45.0             6.13 55.0             6.03 65.0             5.91 Page.12 of 57
(kW/ft) 0.0 9.51 0.2 9.51 1.0 9.49 5.0 9.32 10.0 9.16 15.0 8.94 20.0 8.97 25.0 8.65 35.0 7.80 45.0 7.61 55.0 7.59 65.0 7.52 Table 5-11 MAPLHGR for-bundle: GNF2-P1ODG2B370-15GZ-100T2-145-T6-3355
. All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)
(kW/ft) 0.0 7.73 0.2 7.73 1.0  
.7.75 5.0 7.67 10.0 7.64 15.0 7.72 20.0 6.96 25.0 6.46 35.0 6.26 45.0 6.13 55.0 6.03 65.0 5.91 Page.12 of 57


Exelon Nuclear - Nuclear Fuels                                                       COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted inAccordance with 10CFR2.390 Table 5-12 MAPLHGR for bundle: GNF2-P1ODG2B371-14GZ-100T2-145-T6-4136 All Lattices Avg. Planar Exposure         MAPLHGR (GWd/ST)           (kW/ft) 0.0             7.75 0.2             7.75 1.0             7.72 5.0             7.63 10.0             7.53 15.0             7.40 20.0             6.86 25.0             6.34 35.0             6.21 45.0             6.06 55.0             5.95 65.0             5.86 Table 5-13 MAPLHGR for bundle: GNF2 'P1ODG2B370-16GZ-1OOT2-145-T6-4137 All Lattices Avg. Planar Exposure         MAPLHGR (GWd/ST)         :(kW/ft) ,
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-12 MAPLHGR for bundle: GNF2-P1ODG2B371-14GZ-100T2-145-T6-4136 All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)
S0.0             7.73 0.2             7.73 1.0             7.73
(kW/ft) 0.0 7.75 0.2 7.75 1.0 7.72 5.0 7.63 10.0 7.53 15.0 7.40 20.0 6.86 25.0 6.34 35.0 6.21 45.0 6.06 55.0 5.95 65.0 5.86 Table 5-13 MAPLHGR for bundle: GNF2 'P1ODG2B370-16GZ-1OOT2-145-T6-4137 All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)
                                                            .5.0             7.66 10.0             7.47 15.0             7.41 20.0             6.89 25.0             6.34 35.0             6.21 45.0             6.05 55.0             5.96 65.0             5.86 Page'13 of 57
:(kW/ft)
S0.0 7.73 0.2 7.73 1.0 7.73
.5.0 7.66 10.0 7.47 15.0 7.41 20.0 6.89 25.0 6.34 35.0 6.21 45.0 6.05 55.0 5.96 65.0 5.86 Page'13 of 57


Exelon Nuclear - Nuclear Fuels                                                     COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-14 MAPLHGR for bundle: GNF2-PI0DG2B372-14GZ-100T2-145-T6-4138 All Lattices Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0             7.74 0.2             7.74 1.0             7.72 5.0             7.62 10.0           7.50 15.0           7.40 20.0             6.85 25.0             6.36 35.0             6.21 45.0             6.05 55.0             5.98 65.0             5.86 Table 5-15 MAPLHGR for bundle: GNF2-P1ODG2B370-16GZ-100T2-145-T6-3356 I All Lattices Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0             7.83 0.2             7.83 1.0           7.78 5.0             7.73 10.0           7.65 15.0           7.62 20.0           7.76 25.0           6.88 35.0           6.30
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-14 MAPLHGR for bundle: GNF2-PI0DG2B372-14GZ-100T2-145-T6-4138 All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)
                                                            .45.0             6.17 55.0           6.04 65.0           5.91 Page; 14 of 57
(kW/ft) 0.0 7.74 0.2 7.74 1.0 7.72 5.0 7.62 10.0 7.50 15.0 7.40 20.0 6.85 25.0 6.36 35.0 6.21 45.0 6.05 55.0 5.98 65.0 5.86 Table 5-15 MAPLHGR for bundle: GNF2-P1ODG2B370-16GZ-100T2-145-T6-3356 I
All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)
(kW/ft) 0.0 7.83 0.2 7.83 1.0 7.78 5.0 7.73 10.0 7.65 15.0 7.62 20.0 7.76 25.0 6.88 35.0 6.30
.45.0 6.17 55.0 6.04 65.0 5.91 Page; 14 of 57


Exelon Nuclear - Nuclear Fuels                                                         COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted inAccordance with 10CFR2.390 Table 5-16 MAPLHGR for bundle: GN F2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD All Lattices Avg. Planar Exposure         MAPLHGR (GWd/ST)           (kW/ft) 0.0             7.87 0.2             7.87 1.0             7.85 5.0             7.75 10.0             7.70 15.0             7.60 20.0             7.76 25.0             6.83 35.0             6.30 45.0             6.16 55.0             6.03 65.0             5.91 Table 5-17 MAPLHGR for bundle: GE11-P9DUB367-11GZ-10OT-145-T6-2921 GNF Lattices #7313, #7314, #7315, #7316 Avg. Planar Exposure         MAPLHGR (GWd/ST)           (kW/ft) 0.0             8.84 0.2             8.84 1.0             8.87 5.0             8.89 10.0             8.93 15.0             8.91 20.0             8.84 25.0             8.18 35.0             7.84 45.0             7.80 55.0             7.86 65.0             7.90 Page 15 of 57
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-16 MAPLHGR for bundle: GN F2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)
(kW/ft) 0.0 7.87 0.2 7.87 1.0 7.85 5.0 7.75 10.0 7.70 15.0 7.60 20.0 7.76 25.0 6.83 35.0 6.30 45.0 6.16 55.0 6.03 65.0 5.91 Table 5-17 MAPLHGR for bundle: GE11-P9DUB367-11GZ-10OT-145-T6-2921 GNF Lattices #7313, #7314, #7315, #7316 Avg. Planar Exposure MAPLHGR (GWd/ST)
(kW/ft) 0.0 8.84 0.2 8.84 1.0 8.87 5.0 8.89 10.0 8.93 15.0 8.91 20.0 8.84 25.0 8.18 35.0 7.84 45.0 7.80 55.0 7.86 65.0 7.90 Page 15 of 57


Exelon Nuclear - Nuclear Fuels                                                         COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-18 MAPLHGR for bundle: GEl I-P9DUB367-1 1GZ-1 OOT-145-T6-2921 GNF Lattices #7311, #7312 Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0           9.17 0.2           9.17 1.0           9.20 5.0           9.06 10.0           9.02 15.0           8.91 20.0           8.83 25.0           8.16 35.0           7.84 45.0           7.79 55.0           7.84 65.0           7.91 Table 5-19 MAPLHGR for bundle: GE11-P9DUB361-14GZ-1OOT-145-T6-2922 GNF Lattices #7318, #7319, #7315, #7320 Avg. Planar Exposure     MAPLHGR (GWd/ST)         (kW/ft) 0.0           9.39 0.2           9.39 1.0           9.32 5.0           9.23 10.0           8.92 15.0           8.90 20.0           8.76
Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-18 MAPLHGR for bundle: GEl I-P9DUB367-1 1GZ-1 OOT-145-T6-2921 GNF Lattices #7311, #7312 Avg. Planar Exposure MAPLHGR (GWd/ST)
                                                              ,25.0           8.10 35.0           7.82 45.0           7.77
(kW/ft) 0.0 9.17 0.2 9.17 1.0 9.20 5.0 9.06 10.0 9.02 15.0 8.91 20.0 8.83 25.0 8.16 35.0 7.84 45.0 7.79 55.0 7.84 65.0 7.91 Table 5-19 MAPLHGR for bundle: GE11-P9DUB361-14GZ-1OOT-145-T6-2922 GNF Lattices #7318, #7319, #7315, #7320 Avg. Planar Exposure MAPLHGR (GWd/ST)
                                                            .55'.0 7.84 65:0           7.91 Page16. of 57
(kW/ft) 0.0 9.39 0.2 9.39 1.0 9.32 5.0 9.23 10.0 8.92 15.0 8.90 20.0 8.76
,25.0 8.10 35.0 7.82 45.0 7.77
.55'.0 7.84 65:0 7.91 Page16. of 57


Exelon Nuclear - Nuclear Fuels                                                         COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-20 MAPLHGR for bundle: GE11-P9DUB361-14GZ-1OOT-145-T6-2922 GNF Lattices #7311, #7317 Avg. Planar Exposure     MAPLHGR (GWd/ST)         (kW/ft) 0.0           9.39 0.2           9.39 1.0           9.33 5.0           9.18 10.0           8.92 15.0           8.88 20.0           8.72 25.0           8.08 35.0           7.83 45.0           7.80 55.0           7.86 65.0           7.91 Table 5-21 MAPLHGR for bundle: GEt1 -P9DUB366-'12GZ-10OT-145-T6-31106 GNF Lattices #8518, #8519, #8508, #8520 Avg. Planar               ]
Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-20 MAPLHGR for bundle: GE11-P9DUB361-14GZ-1OOT-145-T6-2922 GNF Lattices #7311, #7317 Avg. Planar Exposure MAPLHGR (GWd/ST)
Exposure     MAPLHGR (GWd/ST)       (kW/ft) 0.0           9.51 0.2           9.51.
(kW/ft) 0.0 9.39 0.2 9.39 1.0 9.33 5.0 9.18 10.0 8.92 15.0 8.88 20.0 8.72 25.0 8.08 35.0 7.83 45.0 7.80 55.0 7.86 65.0 7.91 Table 5-21 MAPLHGR for bundle: GEt1 -P9DUB366-'12GZ-10OT-145-T6-31106 GNF Lattices #8518, #8519, #8508, #8520 Avg. Planar  
1.0           9.49 5.0           9.31 10.0           9.08 15.0           8.92 20.0           9.01 25.0           8.68 35.0           7.80 45.0           7.63 55.0           7.57 65.0           7.52 Page 170of 57
]
Exposure MAPLHGR (GWd/ST)
(kW/ft) 0.0 9.51 0.2 9.51.
1.0 9.49 5.0 9.31 10.0 9.08 15.0 8.92 20.0 9.01 25.0 8.68 35.0 7.80 45.0 7.63 55.0 7.57 65.0 7.52 Page 170of 57


Exelon Nuclear - Nuclear Fuels                                                       COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted inAccordance with 10CFR2.390 Table 5-22 MAPLHGR for bundle: GE1 I -P9DUB366-12GZ-100T-145-T6-3106 GNF Lattices #8507, #8517 Avg. Planar Exposure       MAPLHGR (GWd/ST)         (kW/ft) 0.0           9.52 0.2           9.52 1.0           9.48 5.0           9.34 10.0           9.09 15.0           8.90 20.0           8.97 25.0           8.64 35.0           7.80 45.0           7.62 55.0           7.56 65.0           7.51 Table 5-23 MAPLHGR Multiplier with One ISOLATED Loop Fuel'Type   Isolated Loop Multiplier F GEl     [     0.98 GNF2           0.98 Page 18 of 57
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-22 MAPLHGR for bundle: GE1 I -P9DUB366-12GZ-100T-145-T6-3106 GNF Lattices #8507, #8517 Avg. Planar Exposure MAPLHGR (GWd/ST)
(kW/ft) 0.0 9.52 0.2 9.52 1.0 9.48 5.0 9.34 10.0 9.09 15.0 8.90 20.0 8.97 25.0 8.64 35.0 7.80 45.0 7.62 55.0 7.56 65.0 7.51 Table 5-23 MAPLHGR Multiplier with One ISOLATED Loop Fuel'Type Isolated Loop Multiplier F GEl
[
0.98 GNF2 0.98 Page 18 of 57


Exelon Nuclear - Nuclear Fuels                                                               COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390
Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390
: 6. Minimum Critical Power Ratio The MCPR limits are discussed in Technical Specifications Section 3.10.C. For all conditions, the more limiting of the flow adjusted MCPR and power adjusted MCPR is applied.
: 6. Minimum Critical Power Ratio The MCPR limits are discussed in Technical Specifications Section 3.10.C. For all conditions, the more limiting of the flow adjusted MCPR and power adjusted MCPR is applied.
6.1. Manual Flow Control MCPR Limits The flow adjusted MCPR is determined by multiplying the applicable rated condition MCPR limit shown in Table 6-1 by the applicable MCPR multiplier, Kf, given in Table 6-2. Table 6-1 MCPR limits are the maximum values obtained from analysis of pressurization and non-pressurization events. MCPR values are determined by the cycle-specific fuel reload analyses in Reference 2. Table 6-1 MCPR limits are bounding for both GEl 1 and GNF2 fuel. The Kf multipliers are documented in Reference 2. Table 6-1 limits are independent of APRM status changes since Reference 2 analyzes the Rod Withdrawal Error (RWE) as unblocked. The appropriate Kf value may be determined by linear interpolation. Table 6-2 is applicable to GEl 1 and GNF2 fuel types per Reference 2.
6.1. Manual Flow Control MCPR Limits The flow adjusted MCPR is determined by multiplying the applicable rated condition MCPR limit shown in Table 6-1 by the applicable MCPR multiplier, Kf, given in Table 6-2. Table 6-1 MCPR limits are the maximum values obtained from analysis of pressurization and non-pressurization events. MCPR values are determined by the cycle-specific fuel reload analyses in Reference 2. Table 6-1 MCPR limits are bounding for both GEl 1 and GNF2 fuel. The Kf multipliers are documented in Reference 2. Table 6-1 limits are independent of APRM status changes since Reference 2 analyzes the Rod Withdrawal Error (RWE) as unblocked. The appropriate Kf value may be determined by linear interpolation. Table 6-2 is applicable to GEl 1 and GNF2 fuel types per Reference 2.
Line 111: Line 191:
Table 6-3 provides two sets power dependent MCPR limits at off-rated conditions. One set is for nominal response function for the Turbine Bypass Valve (TBV) where the TBV fast opening to 80% of rated TBV flow has been demonstrated to be 1 second or less and has a TBVfast opening delay time of 200 msec or less (Reference 14). The other set, referred to as 'Slow to Open', represents power dependent MCPR limits which have taken no credit for the fast opening function of the TBV during a Feedwater Controller Failure (FWCF) event. The application of the (nominal versus 'slow to open') power dependent MCPR limits is dependent on the results of TBV testing.
Table 6-3 provides two sets power dependent MCPR limits at off-rated conditions. One set is for nominal response function for the Turbine Bypass Valve (TBV) where the TBV fast opening to 80% of rated TBV flow has been demonstrated to be 1 second or less and has a TBVfast opening delay time of 200 msec or less (Reference 14). The other set, referred to as 'Slow to Open', represents power dependent MCPR limits which have taken no credit for the fast opening function of the TBV during a Feedwater Controller Failure (FWCF) event. The application of the (nominal versus 'slow to open') power dependent MCPR limits is dependent on the results of TBV testing.
6.3. Scram Time Core average scram insertion times are determined per Technical Specifications 3.2.B. Based on the results of the scram time surveillance testing and calculation of the core average insertion time, a MCPR limit is chosen from Table 6-1 (Reference 2). If the core average scram insertion time does not meet the Option B criteria, but has met Option A criteria, then the appropriate MCPR value may be determined from a linear interpolation between the Option A and B limits with standard mathematical rounding to two decimal places. The scram time adjustment to MCPR only applies to MCPR limits that are set by pressurization transients (see Note 3 to Table 6-1 for further clarification).
6.3. Scram Time Core average scram insertion times are determined per Technical Specifications 3.2.B. Based on the results of the scram time surveillance testing and calculation of the core average insertion time, a MCPR limit is chosen from Table 6-1 (Reference 2). If the core average scram insertion time does not meet the Option B criteria, but has met Option A criteria, then the appropriate MCPR value may be determined from a linear interpolation between the Option A and B limits with standard mathematical rounding to two decimal places. The scram time adjustment to MCPR only applies to MCPR limits that are set by pressurization transients (see Note 3 to Table 6-1 for further clarification).
                                                              . Page 19 of 57
. Page 19 of 57


Exelon Nuclear - Nuclear Fuels                                                                         COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 6-1 MCPR Limit - All Fuel Types TBV                                           Cycle Exposure1 AlibilitY       2     Response                       BOC to < (EOR-4016)           > (EOR-4016) MWD/ST to Function         Option               MWD/ST                               EOC Four or Five           Nominal             A                   1.54                             1.60 Recirculation Loops in Service         Nominal             B                   1.453                             1.50 Three             Nominal             A                   1.56                             1.62 Recirculation 4                                                                                    -
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 6-1 MCPR Limit - All Fuel Types TBV Cycle Exposure1 AlibilitY 2  
Loops in Service Nominal             B                   1.473                             1.52 Four or Five           Slow to             A                   1.58                             1.64 Recirculation             Open Loops in Service Slow to Opn1.48   B                                                    1.54 Open Three               Slow to           A                   1.60                             1.66 Recirculation           Open Loops in Service 4 slowto             B                   1.50                             1.56 Open Table 6-2 Kf Multiplier - All Fuel Types 5 Flow             Kf
 
(% rated) 117.0           1.00 100.0           1.00 90.0           -1.00 80.0.           1.05 70.0           1.09 60.0           1.13 50.0           1.17 40.0           1.22 30.0           1.28 I The referenced MCPR cycle exposure breakpoint (EOR-4016) MWD/ST is conservative to the value (EOR-3716) MWD/ST in Reference 2 to allow for changes to the end of rated cycle exposure due to cycle operation.
===Response===
BOC to < (EOR-4016)  
> (EOR-4016) MWD/ST to Function Option MWD/ST EOC Four or Five Nominal A
1.54 1.60 Recirculation Loops in Service Nominal B
1.453 1.50 Three Nominal A
1.56 1.62 Recirculation Loops in Service 4
Nominal B
1.473 1.52 Four or Five Slow to A
1.58 1.64 Recirculation Open Loops in Service Slow to B
Opn1.48 1.54 Open Three Slow to A
1.60 1.66 Recirculation Open Loops in Service 4 slowto B
1.50 1.56 Open Table 6-2 Kf Multiplier - All Fuel Types 5 Flow Kf
(% rated) 117.0 1.00 100.0 1.00 90.0  
-1.00 80.0.
1.05 70.0 1.09 60.0 1.13 50.0 1.17 40.0 1.22 30.0 1.28 I The referenced MCPR cycle exposure breakpoint (EOR-4016) MWD/ST is conservative to the value (EOR-3716) MWD/ST in Reference 2 to allow for changes to the end of rated cycle exposure due to cycle operation.
2 MCPR limits are applicable to rated power operation for Equipment in Service and PROOS conditions per Reference 2.
2 MCPR limits are applicable to rated power operation for Equipment in Service and PROOS conditions per Reference 2.
3 The documented MCPR limit is based on the Rod Withdrawal Error (RWE) event, which is a non-pressurization event. The limiting pressurization event results in an Option B MCPR limit that is 0.01 less (BOC to (EOR-4016) MWD/ST) than the RWE event. Scram time adjustments are only required to be applied to MCPR limits that are set by pressurization transients.
3 The documented MCPR limit is based on the Rod Withdrawal Error (RWE) event, which is a non-pressurization event. The limiting pressurization event results in an Option B MCPR limit that is 0.01 less (BOC to (EOR-4016) MWD/ST) than the RWE event. Scram time adjustments are only required to be applied to MCPR limits that are set by pressurization transients.
Line 122: Line 216:
Page.20 of 57
Page.20 of 57


Exelon Nuclear - Nuclear Fuels                                                                       COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 6-3 Power Dependent MCPRp Limits and Multipliers               - All Fuel Types TBV         Core Flow                             Core Thermal Power (% of rated)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 6-3 Power Dependent MCPRp Limits and Multipliers - All Fuel Types TBV Core Flow Core Thermal Power (% of rat ed)
Applicability           Response         (% of Function         rated) 0       251       <40     >40 160     170       791     90     100 Operating Limit MCPR             Operating Limit MCPR Multiplier, Kp Four or Five                               < 60       2.52   2.52       2.20 Recirculation           Nominal Loopsin Service                             > 60       2.79   2.79       2.29     1.185 1.185   1.185     -    1.074     1.000 Three Recirculation         Nominal          < 60       2.54   2.54       2.22 Loops in Service                             > 60       2.81   2.81       2.31     1.185 1.185   1.185     -    1.074     1.000 PROOS - Four or Five                           < 60       2.52   2.52       2.20 Recirculation           Nominal Loops in Service                             > 60       2.79   2.79       2.29     1.517 1.375   1.345   1.265   1.0821   1.000 PROOS - Three                               < 60       2.54   2.54       2.22 Recirculation           Nominal Loops in Service                             > 60       2.81   2.81       2.31     1.517 1.375   1.345   1.265   1.0821   1.000 Four or Five             Slow to         < 60       2.67   2.67       2.20 Recirculation             Ow0.
Applicability  
Loopsin Service             Open           > 60       4.02   4.02       2.69     1.193 1.193   1.193     -    1.082     1.000 Three Recirculation           Slow to         <60         2:69   2.69       2.22 Loopsin Service             Open           > 60       4.04   4.04.     <i2.71   1.193 1.193   1.193     -    1.082     1.000 PROOS - Four or Five           Slow to         < 60       2.67   2.67       2.20 Recirculation Loops in Service             Open           > 60       4.02   4.02       2.69     1.517 1.375   1.345   1.265   1.082     1.000 PROOS - Three               Slow to         < 60       2.69   2.69       2.22 Recirculation Loops in Service             Open           > 60       4.04   4.04       2.71     1.517 1.375   1.345   1.265   1.082     1.000 Kp multiplier has been =conservatively set to 1.082 (compared tothe' Reference 2 value of'1.074) so the-PROOS "Nominal" curves can be used for the PROOS "Slow to Open" curves..
 
                                                                "Page 21 tof 57
===Response===
(% of Function rated) 0 251  
<40  
>40 160 170 791 90 100 Operating Limit MCPR Operating Limit MCPR Multiplier, Kp Four or Five  
< 60 2.52 2.52 2.20 Recirculation Nominal Loopsin Service  
> 60 2.79 2.79 2.29 1.185 1.185 1.185 1.074 1.000 Three Recirculation  
< 60 2.54 2.54 2.22 Nominal Loops in Service  
> 60 2.81 2.81 2.31 1.185 1.185 1.185 1.074 1.000 PROOS - Four or Five  
< 60 2.52 2.52 2.20 Recirculation Nominal Loops in Service  
> 60 2.79 2.79 2.29 1.517 1.375 1.345 1.265 1.0821 1.000 PROOS - Three  
< 60 2.54 2.54 2.22 Recirculation Nominal Loops in Service  
> 60 2.81 2.81 2.31 1.517 1.375 1.345 1.265 1.0821 1.000 Four or Five Slow to  
< 60 2.67 2.67 2.20 Recirculation Ow0.
Loopsin Service Open  
> 60 4.02 4.02 2.69 1.193 1.193 1.193 1.082 1.000 Three Recirculation Slow to  
<60 2:69 2.69 2.22 Loopsin Service Open  
> 60 4.04 4.04.  
<i2.71 1.193 1.193 1.193 1.082 1.000 PROOS - Four or Five Slow to  
< 60 2.67 2.67 2.20 Recirculation Loops in Service Open  
> 60 4.02 4.02 2.69 1.517 1.375 1.345 1.265 1.082 1.000 PROOS - Three Slow to  
< 60 2.69 2.69 2.22 Recirculation Loops in Service Open  
> 60 4.04 4.04 2.71 1.517 1.375 1.345 1.265 1.082 1.000 Kp multiplier has been =conservatively set to 1.082 (compared tothe' Reference 2 value of'1.074) so the-PROOS "Nominal" curves can be used for the PROOS "Slow to Open" curves..
"Page 21 tof 57


Exelon Nuclear - Nuclear Fuels                                                                 COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted inAccordance with 10CFR2.390
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8
: 7. Linear Heat Generation Rate The LHGR limits are discussed in Technical Specifications Section 3.10.B. The maximum LHGR shall not exceed the LHGR limits as specified in Reference 3, attached as Appendix A. The exposure dependent U0 2 and Gd 20 3 Thermal-Mechanical LHGR limits are contained in Appendix A and apply to all modes of operation as described in Table 9-1.
: 7. Linear Heat Generation Rate The LHGR limits are discussed in Technical Specifications Section 3.10.B. The maximum LHGR shall not exceed the LHGR limits as specified in Reference 3, attached as Appendix A. The exposure dependent U0 2 and Gd 20 3 Thermal-Mechanical LHGR limits are contained in Appendix A and apply to all modes of operation as described in Table 9-1.
Power dependent LHGR multipliers are listed in Table 7-1 for PROOS operating conditions and are applicable to GEl 1 and GNF2 fuel types (Reference 2). The power adjusted LHGR for PROOS operating conditions is determined by multiplying the applicable Reference 3 LHGR limit by the LHGR multiplier, LHGRFACp, given in Table 7-1. The appropriate LHGRFACp value may be determined by linear interpolation.
Power dependent LHGR multipliers are listed in Table 7-1 for PROOS operating conditions and are applicable to GEl 1 and GNF2 fuel types (Reference 2). The power adjusted LHGR for PROOS operating conditions is determined by multiplying the applicable Reference 3 LHGR limit by the LHGR multiplier, LHGRFACp, given in Table 7-1. The appropriate LHGRFACp value may be determined by linear interpolation.
Table 7-1 Power Dependent LHGR Multiplier LHGRFACp for PROOS Power       LHGRFACp
Table 7-1 Power Dependent LHGR Multiplier LHGRFACp for PROOS Power LHGRFACp
(% rated) 0.0           0.702 40.0           0.702 50.0           0.760 60.0           0.808 70.0           0.891 79.0           0.905 90.0           1.000 100.0           1.000
(% rated) 0.0 0.702 40.0 0.702 50.0 0.760 60.0 0.808 70.0 0.891 79.0 0.905 90.0 1.000 100.0 1.000
: 8. Stability Protection Settings The stability protection settings are discussed in Technical Specifications 2.3. Oyster Creek utilizes the BWROG Option II solution in the licensing stability calculations. Table 8-1 provides the analytical limit equations for APRM based stability protection settings and related Control Rod Block settings to support Option II implementation (References 2 and 6).
: 8. Stability Protection Settings The stability protection settings are discussed in Technical Specifications 2.3. Oyster Creek utilizes the BWROG Option II solution in the licensing stability calculations. Table 8-1 provides the analytical limit equations for APRM based stability protection settings and related Control Rod Block settings to support Option II implementation (References 2 and 6).
Table 8-1 Option IIStability Protection Settings Technical Specification 2.3.A.1 Neutron Flux, Scram - APRM ForW< 27.5x10 6 1b/hr:
Table 8-1 Option II Stability Protection Settings Technical Specification 2.3.A.1 Neutron Flux, Scram - APRM ForW< 27.5x10 6 1b/hr:
S   0(1.433 x 10-6) W+ 24.8 where:
S 0(1.433 x 10-6) W+ 24.8 where:
S = setting in percent of rated power W = recirculation flow (lb/hr)
S = setting in percent of rated power W = recirculation flow (lb/hr)
Technical Specification 2.3.B Neutron Flux, Control Rod Block ForW< 27.5x 106 lb/hr:
Technical Specification 2.3.B Neutron Flux, Control Rod Block ForW< 27.5x 106 lb/hr:
S*< (1.433 x 10, 6) W + 17.5 where:
S*< (1.433 x 10,6) W + 17.5 where:
S = setting in percent of rated power W = recirculation flow (lb/hr)
S = setting in percent of rated power W = recirculation flow (lb/hr)
                                                              . Page 22, of 57
.Page 22, of 57


Exelon Nuclear - Nuclear Fuels                                                         COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8
: 9. Modes of Operation The allowed Modes of Operation are as described in Table 9-1.
: 9. Modes of Operation The allowed Modes of Operation are as described in Table 9-1.
Table 9-1 Modes of Operation Operating Region Options '1 3                                               Standard   ELLLA   ICF 2 Five-loop Operation, Option A or B                         Yes       Yes   Yes Four-loop Operation, Option A or B                         Yes       Yes   Yes Three-loop Operation, Option A or B                       Yes       Yes   Yes PROOS, Five-loop Operation, Option A or B                 Yes       Yes   Yes PROOS, Four-loop Operation, Option A or B                 Yes       Yes   Yes PROOS, Three-loop Operation, Option A or B                 Yes       Yes   Yes 1 Each operational mode may be combined with up to a 100&deg;F reduction in feedwater temperature (Final Feedwater Temperature Reduction or Feedwater Heaters OOS) at any point in the cycle (Reference 2).
Table 9-1 Modes of Operation Operating Region Options1' 3 Standard ELLLA ICF 2 Five-loop Operation, Option A or B Yes Yes Yes Four-loop Operation, Option A or B Yes Yes Yes Three-loop Operation, Option A or B Yes Yes Yes PROOS, Five-loop Operation, Option A or B Yes Yes Yes PROOS, Four-loop Operation, Option A or B Yes Yes Yes PROOS, Three-loop Operation, Option A or B Yes Yes Yes 1 Each operational mode may be combined with up to a 100&deg;F reduction in feedwater temperature (Final Feedwater Temperature Reduction or Feedwater Heaters OOS) at any point in the cycle (Reference 2).
2 Operation up to 67.5 Mlb/hr core flow is licensed for this cycle (Reference 2).
2 Operation up to 67.5 Mlb/hr core flow is licensed for this cycle (Reference 2).
3 Each   operational mode may be coincident with coastdown Operation. The minimum coastdown power level is 40% per GESTAR II (Reference 13).
3 Each operational mode may be coincident with coastdown Operation. The minimum coastdown power level is 40% per GESTAR II (Reference 13).
: 10. Methodology
: 10. Methodology
: 1. GENE Document, NEDC-31462P and NEDE-31462, "Oyster Creek NGS SAFER/CORECOOL/GESTR-LOCA Loss-of-Coolant Accident Analysis," August 1987.
: 1. GENE Document, NEDC-31462P and NEDE-31462, "Oyster Creek NGS SAFER/CORECOOL/GESTR-LOCA Loss-of-Coolant Accident Analysis," August 1987.
: 2. GNF Document, NEDE-2401 1-P-A-19 and Supplement NEDE-2401 1-P-A-19-US, "General Electric Standard Application for Reactor Fuel," May 2012.
: 2. GNF Document, NEDE-2401 1-P-A-19 and Supplement NEDE-2401 1-P-A-19-US, "General Electric Standard Application for Reactor Fuel," May 2012.
: 3. GENE Document, NEDC-33065P, Rev. 0, "Application of Stability Long-Term Solution Option II to Oyster Creek,"
: 3.
GENE Document, NEDC-33065P, Rev. 0, "Application of Stability Long-Term Solution Option II to Oyster Creek,"
April 2002.
April 2002.
Page 23of 57
.4&#xfd; Page 23of 57
                                .4&#xfd;


Exelon Nuclear - Nuclear Fuels                                               COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Appendix A Page 24 of 57
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Appendix A Page 24 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                           COLR Oyster Creek 1 Rev. 8 Global Nuclear Fuel Global Nuclear Fuel A Joint Venture of GETjshiba, & Hitachi 0000-0138-9259-FBIR-NP Revision 0 September 2012 Non- ProprietaryInformation - Class I (Public)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Global Nuclear Fuel A Joint Venture of GETjshiba, & Hitachi Global Nuclear Fuel 0000-0138-9259-FBIR-NP Revision 0 September 2012 Non-Proprietary Information - Class I (Public)
Fuel Bundle Information Report for Oyster Creek Reload 24 Cycle 24 Copyright 2012 GlobalNuclear Fuel - Americas, LLC All Rights Reserved Page 25 of 57
Fuel Bundle Information Report for Oyster Creek Reload 24 Cycle 24 Copyright 2012 Global Nuclear Fuel - Americas, LLC All Rights Reserved Page 25 of 57


Exelon Nuclear- Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390               COLR Oyster Creek 1 Rev. 8 Oyster Creek                               Non- Proprietary Information     0000-0 138-9259-FBIR-NP Reload 24                                           Class I (Public)                           Revision 0 Important Notice Regarding Contents of This Report Please Read Carefully This report was prepared by Global Nuclear Fuel - Americas, LLC (GNF-A) solely for use by Exelon
Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Oyster Creek Non-Proprietary Information 0000-0 138-9259-FBIR-NP Reload 24 Class I (Public)
Revision 0 Important Notice Regarding Contents of This Report Please Read Carefully This report was prepared by Global Nuclear Fuel - Americas, LLC (GNF-A) solely for use by Exelon
("Recipient") in support of the operating license for Oyster Creek (the "Nuclear Plant"). The information contained in this report (the "Information") is believed by GNF-A to be an accurate and true representation of the facts known by, obtained by or provided to GNF-A at the time this report was prepared.
("Recipient") in support of the operating license for Oyster Creek (the "Nuclear Plant"). The information contained in this report (the "Information") is believed by GNF-A to be an accurate and true representation of the facts known by, obtained by or provided to GNF-A at the time this report was prepared.
The only undertakings of GNF-A respecting the Information are contained in the contract between Recipient and GNF-A for. nuclear fuel and related services for the Nuclear Plant (the "Fuel Contract") and nothing contained in this document shall be construed as amending or modifying the Fuel Contract. The use of the Information for any purpose other than that for which it was intended under the Fuel Contract, is not authorized by GNF-A. In the event of any such unauthorized use, GNF-A neither (a) makes any representation or warranty (either expressed or implied) as to the completeness, accuracy or usefulness of the Information or that such unauthorized use may not infringe privately owned rights, nor (b) assumes any responsibility for liability or damage of any kind which may result from such use of such information.
The only undertakings of GNF-A respecting the Information are contained in the contract between Recipient and GNF-A for. nuclear fuel and related services for the Nuclear Plant (the "Fuel Contract") and nothing contained in this document shall be construed as amending or modifying the Fuel Contract. The use of the Information for any purpose other than that for which it was intended under the Fuel Contract, is not authorized by GNF-A. In the event of any such unauthorized use, GNF-A neither (a) makes any representation or warranty (either expressed or implied) as to the completeness, accuracy or usefulness of the Information or that such unauthorized use may not infringe privately owned rights, nor (b) assumes any responsibility for liability or damage of any kind which may result from such use of such information.
Information Notice This is a non-proprietary version of the document 0000-0138-9259-FBIR-P, Revision 0, which has the proprietary information removed. Portions of the document that have been removed are indicated by an open and closed bracket as shown here [[                  ]].
Information Notice This is a non-proprietary version of the document 0000-0138-9259-FBIR-P, Revision 0, which has the proprietary information removed. Portions of the document that have been removed are indicated by an open and closed bracket as shown here ((
2
)).
                                                        'Page 26 of 57Page
'Page 26 of 57Page 2


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390             COLR Oyster Creek 1 Rev. 8 Oyster Creek                               Non- Proprietary Information   0000-0138-9259-FBIR-NP Reload 24                                           Class I (Public)                       Revision 0
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Oyster Creek Non-Proprietary Information 0000-0138-9259-FBIR-NP Reload 24 Class I (Public)
Revision 0
: 1. Introduction and Summary This report, which supplements the Supplemental Reload Licensing Report, contains thermal-mechanical linear heat generation rate (LHGR) limits for the GNF-A fuel designs to be loaded into Oyster Creek for Cycle 24. These LHGR limits are obtained from thermal-mechanical considerations only. Approved GNF-A calculation models documented in Reference 1 were used in performing this analysis.
: 1. Introduction and Summary This report, which supplements the Supplemental Reload Licensing Report, contains thermal-mechanical linear heat generation rate (LHGR) limits for the GNF-A fuel designs to be loaded into Oyster Creek for Cycle 24. These LHGR limits are obtained from thermal-mechanical considerations only. Approved GNF-A calculation models documented in Reference 1 were used in performing this analysis.
LHGR limits as a function of exposure for each bundle of the core design are given in Appendix A. The LHGR values provided in Appendix A provide upper and lower exposure dependent LHGR boundaries which envelope the actual gadolinia dependent LHGR limits. The LHGRs reported have been rounded to two places past the decimal.
LHGR limits as a function of exposure for each bundle of the core design are given in Appendix A. The LHGR values provided in Appendix A provide upper and lower exposure dependent LHGR boundaries which envelope the actual gadolinia dependent LHGR limits. The LHGRs reported have been rounded to two places past the decimal.
Line 172: Line 290:
Page 3 Page 27 of 57
Page 3 Page 27 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390         COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information 0000-01 38-9259-FBIR-NP Reload 24                                            Class I (Public)                    Revision 0
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0
: 2. References
: 2. References
: 1. General Electric StandardApplication for Reactor Fuel, NEDE-2401 l-P-A-19, May 2012; and the U.S. Supplement, NEDE-2401 I-P-A-19-US, May 2012.
: 1. General Electric Standard Application for Reactor Fuel, NEDE-2401 l-P-A-19, May 2012; and the U.S. Supplement, NEDE-2401 I-P-A-19-US, May 2012.
Page 4 Page 28 of 57
Page 28 of 57 Page 4


Exelon Nuclear- Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                     COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information          0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                                Revision 0 Appendix A UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB359-14GZ- 1OOT- 145-T6-3108 (GE 11)
Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
Bundle Number: 3108 Peak Pellet Exposure                 U0 2 LHGR Limit GWd/MT (GWd/ST)                           kW/ft 0.00 (0.00)                         12.00 20.00 (18.14)                       10.50 70.00 (63.50)                         6.00 Peak Pellet Exposure           Most Limiting Gadolinia LHGR Limit' GWd/MT (GWd/ST)                           kW/ft 0.00 (0.00)                       10.29 16.52 (14.99)                         9.00 63.65 (57.74)                         5.14 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Appendix A UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB359-14GZ-1OOT-145-T6-3108 (GE 11)
Bundle Number: 3108 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit' GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
Page 5 Page 29 of 57
Page 5 Page 29 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                       COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information            0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                                  Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB356-14GZ- lOOT- 145-T6-3109 (GE 11)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
Bundle Number: 3109 Peak Pellet Exposure                 U0 2 LHGR Limit GWd/MT (GWd/ST)                             kW/ft 0.00 (0.00)                         12.00 20.00 (18.14)                         10.50 70.00 (63.50)                           6.00 Peak Pellet Exposure             Most Limiting Gadolinia LHGR Limit 2 GWd/MT (GWd/ST)                             kW/ft 0.00 (0.00)                         10.29 16.52 (14.99)                         9.00 63.65 (57.74)                           5.14 2 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design.(7.0% Gd).
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB356-14GZ-lOOT-145-T6-3109 (GE 11)
Page 6 Page 30 of 57
Bundle Number: 3109 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 2 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 2 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design.(7.0% Gd).
Page 30 of 57 Page 6


Exelon Nuclear- Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                       COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information              0000-01 38-9259-FBIR-NP Reload 24                                            Class I (Public)                                  Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB367-12GZ- lOOT- 145-T6-3104 (GE 1I)
Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
Bundle Number: 3104 Peak Pellet Exposure                 U0 2 LHGR Limit GWd/MT (GWd/ST)                             kW/ft 0.00 (0.00)                         12.00 20.00 (18.14)                         10.50 70.00 (63.50)                         6.00 Peak Pellet Exposure           Most Limiting Gadolinia LHGR Limit 3 GWd/MT (GWd/ST)                             kW/ft 0.00 (0.00)                           10.29 16.52 (14.99)                           9.00 63.65 (57.74)                           5.14 3 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB367-12GZ-lOOT-145-T6-3104 (GE 1I)
Bundle Number: 3104 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 3 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 3 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
Page 7 Page 31 of 57,t
Page 7 Page 31 of 57,t


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                       COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information            0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                                  Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GEl I-P9DUB360-1 IGZ-1OOT-145-T6-3107 (GE 11)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
Bundle Number: 3107 Peak Pellet Exposure                 U0 2 LHGR Limit GWd/MT (GWd/ST)                             kW/ft 0.00 (0.00)                           12.00 20.00 (18.14)                           10.50 70.00 (63.50)                           6.00 Peak Pellet Exposure             Most Limiting Gadolinia LHGR Limit 4 GWd/MT (GWd/ST)                             kW/ft 0.00 (0.00)                           10.29 16.52 (14.99)                           9.00 63.65 (57.74)                           5.14 4 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GEl I-P9DUB360-1 IGZ-1OOT-145-T6-3107 (GE 11)
                      '*                              " Page 32 of 57 Page 8
Bundle Number: 3107 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 4 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 4 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
Page 8
" Page 32 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                       COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information              0000-01 38-9259-FBIR-NP Reload 24                                            Class I (Public)                                  Revision 0 evision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11-P9DUB365- 1OGZ- lOOT-145-T6-3105 (GE 11)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
Bundle Number: 3105 Peak Pellet Exposure                   U0 2 LHGR Limit GWd/MT (GWd/ST)                             kW/ft 0.00 ( 0.00)                           12.00 20.00 (18.14)                           10.50 70.00 (63.50)                             6.00 Peak Pellet Exposure               Most Limiting Gadolinia LHGR Limit 5 GWd/MT (GWd/ST)                             kW/ft 0.00 (0.00)                           10.29 16.52 (14.99)                           9.00 63.65 (57.74)                           5.14 5 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 evision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB365-1 OGZ-lOOT-145-T6-3105 (GE 11)
                                                        '    _....                                        Page 9 Page 33'of 57
Bundle Number: 3105 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 ( 0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 5 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 5 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
Page 9 Page 33'of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                       COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information              0000-0138-9259-FBIR-NP Reload 24                                            Class I (Puhlicr                                Revision 0 Reload 24 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 10DG2B370-16GZ- 100T2-145-T6-4137 (GNF2)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Puhlicr COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Reload 24 U02/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 10DG2B370-16GZ-100T2-145-T6-4137 (GNF2)
Bundle Number: 4137 Peak Pellet Exposure                 U0 2 LHGR Limit GWd/MT (GWd/ST)                             kW/ft Peak Pellet Exposure             Most Limiting Gadolinia LHGR Limit 6 GWd/MT (GWd/ST)                             kW/ft
Bundle Number: 4137 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 6 GWd/MT (GWd/ST) kW/ft
[[I 6 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design [[ ,
((I 6 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ((,
Page 10 Page 34 of 57
Page 10 Page 34 of 57


Exelon Nuclear- Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                       COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information            0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                                  Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P10DG2B370-15GZ-100T2-145-T6-3355 (GNF2)
Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Public)
Bundle Number: 3355 Peak Pellet Exposure                 U0 2 LHGR Limit GWd/MT (GWd/ST)                             kW/ft
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P10DG2B370-15GZ-100T2-145-T6-3355 (GNF2)
[[
Bundle Number: 3355 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft
Peak Pellet Exposure             Most Limiting Gadolinia LHGR Limit 7 GWd/MT (GWd/ST)                             kW/ft Er 7 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring'in this bundle design [[
((
Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 7 GWd/MT (GWd/ST) kW/ft Er 7 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring'in this bundle design ((
Page 11 Page 35:of 57
Page 11 Page 35:of 57


Exelon Nuclear- Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                       COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information            0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                                  Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P10DG2B370-16GZ-100T2-145-T6-3356 (GNF2)
Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Public)
Bundle Number: 3356 Peak Pellet Exposure                 U0 2 LHGR Limit GWd/MT (GWd/ST)                             kW/ft
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P10DG2B370-16GZ-100T2-145-T6-3356 (GNF2)
[[
Bundle Number: 3356 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft
Peak Pellet Exposure             Most Limiting Gadolinia LHGR Limit' GWd/MT (GWd/ST)                             kW/ft ER 8 Bounding gadoliniaLHGR limit for allgadolinium concentrations occurring in this bundle design [[
((
Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit' GWd/MT (GWd/ST) kW/ft ER 8 Bounding gadoliniaLHGR limit for allgadolinium concentrations occurring in this bundle design ((
Page 12 Page 36 of 57
Page 12 Page 36 of 57


Exelon Nuclear- Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                       COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information              0000-01 38-9259-FBIR-NP Reload 24                                            Class I (Public)                                  Revision 0 Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 10DG2B369-16GZ- 100T2-145-T6-3357-LTD (GNF2)
Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
Bundle Number: 3357 Peak Pellet Exposure                 U0 2 LHGR   Limit GWd/MT (GWd/ST)                             kW/ft Peak Pellet Exposure             Most Limiting Gadolinia LHGR Limit 9 E[____________________
COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 1 0DG2B369-16GZ-100T2-145-T6-3357-LTD (GNF2)
GWd/MT (GWd/ST)                             kW/ft 9 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this-bundle design [[
Bundle Number: 3357 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 9 GWd/MT (GWd/ST) kW/ft E[____________________
9 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this-bundle design ((
Page 13 Page 37 of 57
Page 13 Page 37 of 57


Exelon Nuclear- Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                       COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information              0000-01 38-9259-FBIR-NP Reloaid 24                                          Class I (Public)                                  Revision 0 Reload 24 U.O 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 10DG2B372-14GZ- 100T2-145-T6-4138 (GNF2)
Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reloaid 24 Non-Proprietary Information Class I (Public)
Bundle Number: 4138 Peak Pellet Exposure                   U0 2 LHGR Limit GWd/MT (GWd/ST)                             kW/ft
COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 Reload 24 U.O2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 1 0DG2B372-14GZ-100T2-145-T6-4138 (GNF2)
[[
Bundle Number: 4138 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft
Peak Pellet Exposure             Most Limiting Gadolinia LHGRLimit o GWd/MT (GWd/ST)                             kW/ft Er 10 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this. bundle design Page 14 Page 38 of 57
((
Peak Pellet Exposure Most Limiting Gadolinia LHGRLimit o GWd/MT (GWd/ST) kW/ft Er 10 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this. bundle design Page 14 Page 38 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                     COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information            0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                                Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GEl 1-P9DUB367-1 1GZ-I00T-145-T6-292.1 (GEl 1)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
Bundle Number: 2921 Peak Pellet Exposure                 U0 2 LHGR Limit GWd/MT (GWd/ST)                           kW/ft 0.00 (0.00)                       12.00 20.00 (18.14)                         10.50 70.00 (63.50)                           6.00 Peak-Pellet Exposure           Most Limiting Gadolinia LHGR Limit1 1 GWd/MT (GWd/ST)                           kW/ft 0.00 (0.00)                         10.29 16.52 (14.99)                           9.00 63.65 (57.74)                           5.14 "Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 U02/Gd Thermal-Mechanical LHGR Limits Bundle Type: GEl 1-P9DUB367-1 1GZ-I00T-145-T6-292.1 (GEl 1)
Bundle Number: 2921 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak-Pellet Exposure Most Limiting Gadolinia LHGR Limit1 1 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 "Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
Page 15 Page 39 of 57
Page 15 Page 39 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                       COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information              0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                                  Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB361-14GZ- 1 OT- 145-T6-2922 (GE 11)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
Bundle Number: 2922 Peak Pellet Exposure                   U0 2 LHGR Limit GWd/MT (GWd/ST)                             kW/ft 0.00(0.00)                             12.00 20.00 (18.1 4)                           10.50 70.00 (63.50)                             6.00 Peak Pellet Exposure             Most Limiting Gadolinia LHGR Limit' 2 GWd/MT (GWd/ST)                             kW/ft 0.00 (0.00)                           10.29 16.52 (14.99)                           9.00 63.65 (57.74)                             5.14 12Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB361-14GZ-1 OT-145-T6-2922 (GE 11)
Page 16 Page 40 .of 57
Bundle Number: 2922 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00(0.00) 12.00 20.00 (18.1 4) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit' 2 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 12 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
Page 40.of 57 Page 16


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                         COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information                0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                                    Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB366-12GZ-100T- 145-T6-3106 (GE 11)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
Bundle Number: 3106 Peak Pellet Exposure                   U0 2 LHGR Limit GWd/MT (GWd/ST)                               kW/ft 0.00 (0.00)                           12.00 20.00 (18.14)                           10.50 70.00 (63.50)                             6.00 Peak Pellet Exposure               Most Limiting Gadolinia LHGR Limit' 3 GWd/MT (GWd/ST)                               kW/ft 0.00 (0.00)                           10.29 16.52 (14.99)                           9.00 63.65 (57.74)                             5.14 13Bounding gadolinia-LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB366-12GZ-100T-145-T6-3106 (GE 11)
Pa-SPage 41. of 57
Bundle Number: 3106 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit' 3 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 13 Bounding gadolinia-LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).
                                                                                /o57Page
Pa-  
                                                                              ,-
/o57Page 17 SPage 41. of 57  
17


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                         COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information              0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                                    Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 10DG2B37 1- 14GZ- 100T2-145-T6-4136 (GNF2)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Public)
Bundle Number: 4136 Peak Pellet Exposure                   U0 2 LHGR Limit GWd/MT (GWd/ST)                             kW/ft
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 1 0DG2B37 1-14GZ-100T2-145-T6-4136 (GNF2)
[[I Peak Pellet Exposure             Most Limiting Gadolinia LHGR Limit 14 GWd/MT (GWd/ST)                             kW/ft
Bundle Number: 4136 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft
[[l 14 Bounding gadolinia LHGR limit for all gadolinium concentrations                 occurring in- this bundle design Page 18 Page 42 of 57
((I Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 14 GWd/MT (GWd/ST) kW/ft
((l 14 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in-this bundle design Page 18 7
Page 42 of 5


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390                           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information                0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                                        Revision 0 Appendix B Fuel Bundle Information Table B-1 Bundle Specific Information Max         Exposure Fuel                     Bundle Enrichment           of UO 2 Weight Weight     of U      k
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Public)
                                                                                              !f 20C at     at Max k,,
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Appendix B Fuel Bundle Information Table B-1 Bundle Specific Information Max Exposure Fuel Bundle Enrichment Weight Weight  
GdM 0
!f k at at Max k,,
Bundle                     Number (wt% U-235)             (g20                     C      GWd/MT (kg)     (kg)         15       (GWd/ST)
of UO 2 of U 20C GdM Bundle Number (wt% U-235)
GE1I-P9DUB359-14GZ-100T-                   3108 145-T6-3108 (GE 11)
(g20 0C GWd/MT (kg)
GEl 1-P9DUB356-14GZ- 100T-145-T6-3109 (GE 13)
(kg) 15 (GWd/ST)
GEl 1-P9DUB367-12GZ- 100T-                 3104 145-T6-3104 (GE 11)
GE1I-P9DUB359-14GZ-100T-3108 145-T6-3108 (GE 11)
GEl 1-P9DUB360-1 1GZ-100T-                 3107 145-T6-3107 (GE 11)
GEl 1-P9DUB356-14GZ-100T-145-T6-3109 (GE 13)
GEl 1-P9DUB365-1OGZ- 100T-145-T6-3105 (GE 13)
GEl 1-P9DUB367-12GZ-100T-3104 145-T6-3104 (GE 11)
GNF2-P 10DG2B3370-16GZ-                   4137 100T2-145-T6-4137 (GNF2)                 43 GNF2-P10DG2B370-15GZ-100T2-145-T6-3355 (GNF2)
GEl 1-P9DUB360-1 1GZ-100T-3107 145-T6-3107 (GE 11)
GNF2-P10DG2B370-16GZ-.                   3356 100T2-145-T6-3356 (GNF2)
GEl 1-P9DUB365-1OGZ-100T-145-T6-3105 (GE 13)
GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD                   3357 (GNF2)
GNF2-P 10DG2B3370-16GZ-4137 100T2-145-T6-4137 (GNF2) 43 GNF2-P10DG2B370-15GZ-100T2-145-T6-3355 (GNF2)
GNF2-P10DG2B370-16GZ-.
3356 100T2-145-T6-3356 (GNF2)
GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD 3357 (GNF2)
GNF2-P10DG2B372-14GZ-100T2-145-T6-4138 (GNF2)
GNF2-P10DG2B372-14GZ-100T2-145-T6-4138 (GNF2)
GEl 1-P9DUB367-1 1GZ-100T-                 2921 145-T6-2921 (GE 11)
GEl 1-P9DUB367-1 1GZ-100T-2921 145-T6-2921 (GE 11)
GEl 1-P9DUB361-14GZ- 100T-                 2922 145-T6-2922 (GEl 1)
GEl 1-P9DUB361-14GZ-100T-2922 145-T6-2922 (GEl 1)
GEl 1-P9DUB366-12GZ- 100T-                 3106 145-T6-3106 (GE 11_)
GEl 1-P9DUB366-12GZ-100T-3106 145-T6-3106 (GE 11_)
GNF2-P10DG2B3371-14GZ-100T2-145-T6-4136 (GNF2) 15 Maximum   lattice k. for the most reactive uncontrolled state plus a
GNF2-P10DG2B3371-14GZ-100T2-145-T6-4136 (GNF2) 15 Maximum lattice k. for the most reactive uncontrolled state plus a
                                                                                  ]] adder for uncertainties.
)) adder for uncertainties.
Page 19 Page 43 of 57
Page 19 Page 43 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information 0000-013 8-9259-FBIR-NP Reload 24                                            Class I (Public)                    Revision 0
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Public)
[[
COLR Oyster Creek 1 Rev. 8 0000-013 8-9259-FBIR-NP Revision 0
((
Figure B-1 Enrichment and Godolinium Distribution for EDB No. 3108 Fuel Bundle GE11-P9DUB359-14GZ-1O0T-145-T6-3108 (GEll)
Figure B-1 Enrichment and Godolinium Distribution for EDB No. 3108 Fuel Bundle GE11-P9DUB359-14GZ-1O0T-145-T6-3108 (GEll)
Page 20 Page.44 of 57
Page 20 Page.44 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information 0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                      Revision 0 Reload 24                                           Class I (Public)                     Revision 0 11 Figure B-2 Enrichment and Gadolinium Distribution for EDB No. 3109 Fuel Bundle GE11-P9DUB356:14GZ-100T=145-T6-3109 (GEIll)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Reload 24 Class I (Public)
Revision 0 11 Figure B-2 Enrichment and Gadolinium Distribution for EDB No. 3109 Fuel Bundle GE11-P9DUB356:14GZ-100T=145-T6-3109 (GEIll)
Page 21
Page 21
                                                        ,Page 45 of 57
,Page 45 of 57


Exelon Nuclear- Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information  0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                      Revision 0 Figure B-3 Enrichment and Gadoliniunt Distribution for EDB No. 3104
Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
                          . Fuel iBundle GEl1-P9DUB367-12GZ-100T-145-T6-3104 (GEl1)
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Figure B-3 Enrichment and Gadoliniunt Distribution for EDB No. 3104
. Fuel iBundle GEl1-P9DUB367-12GZ-100T-145-T6-3104 (GEl1)
Page 22 Page.46 of 57
Page 22 Page.46 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information  0000-0 138-9259-FBIR-NP Reload 24                                            Class I (Public)                      Revision 0 I'[
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
COLR Oyster Creek 1 Rev. 8 0000-0 138-9259-FBIR-NP Revision 0 I'[
Figure B-4 Enrichment and Gadolinium Distribution for EDB No. 3107 Fuel Bundle GEll-P9DUB360-IlGZ-10OT-145-T6-3107.(GEI[l)
Figure B-4 Enrichment and Gadolinium Distribution for EDB No. 3107 Fuel Bundle GEll-P9DUB360-IlGZ-10OT-145-T6-3107.(GEI[l)
Page 23 Page:47 of 57
Page 23 Page:47 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information  0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                      Revision 0 Revision 0 Figure B-5 Enrichment and Gadolinium Distribution for EDB No. 3105 Fuel Bundle GEl1-P9DUB365-10GZ-100T-145-T6-3105 (GEl1)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
Page 48 oft57              "P,       Page 24
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Revision 0 Figure B-5 Enrichment and Gadolinium Distribution for EDB No. 3105 Fuel Bundle GEl1-P9DUB365-10GZ-100T-145-T6-3105 (GEl1)
P, Page 24 Page 48 oft57


Exelon Nuclear- Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information 0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                      Revision 0
Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
[[l 1]
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0
((l 1]
Figure B-6 Enrichment and Gadolinium Distribution for EDB No. 4137 Fuel Bundle GNF2-PIODG2B370-16GZ-100T2-145-T6-4137 (GNF2)
Figure B-6 Enrichment and Gadolinium Distribution for EDB No. 4137 Fuel Bundle GNF2-PIODG2B370-16GZ-100T2-145-T6-4137 (GNF2)
Page 25/)
Page 25/)
Page 49of 57
Page 49of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information  0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                      Revision 0 Revision 0
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
[[
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Revision 0
((
1]
1]
Figure B-7 Enrichment and Gadolinium Distribution for EDB No. 3355 Fuel Bundle GNF2-P1ODG2B370-15GZ-100T2-145-T6-3355 (GNF2)
Figure B-7 Enrichment and Gadolinium Distribution for EDB No. 3355 Fuel Bundle GNF2-P1ODG2B370-15GZ-100T2-145-T6-3355 (GNF2)
Page 26 Page 50 of 5&#xfd;;
Page 50 of 5&#xfd;;
Page 26


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR C)yster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Ir iformation 0000-0138-9259-FBIR-NP Reload 24                                            Class I (Pub lic)                      Revision 0 Figure B-8 Enrichment and Gadolinium Distribution for EDB No. 3356 Fuel Bundle GNF2-P1ODG2B370-16GZ-100T2-145-T6-3356 (GNF2)
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Ir Reload 24 Class I (Pub iformation lic)
COLR C)yster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Figure B-8 Enrichment and Gadolinium Distribution for EDB No. 3356 Fuel Bundle GNF2-P1ODG2B370-16GZ-100T2-145-T6-3356 (GNF2)
Page 27 Page 51, of 57
Page 27 Page 51, of 57


Exelon Nuclear- Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information  0000-01 38-9259-FBIR-NP Reload 24                                            Class I (Public)                      Revision 0 Figure B-9 Enrichment and Gadolinium Distribution for EDB No. 3357 Fuel Bundle GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD (GNF2)
Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 Figure B-9 Enrichment and Gadolinium Distribution for EDB No. 3357 Fuel Bundle GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD (GNF2)
Page 28 Page 52 of 57
Page 28 Page 52 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information 0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                    Revision 0 r[
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 r[
Figure B-10 Enrichment and Gadolinium Distribution for EDB No. 4138 Fuel Bundle GNF2-P10DG2B372-14GZ-100T2-145-T6-4138 (GNF2)
Figure B-10 Enrichment and Gadolinium Distribution for EDB No. 4138 Fuel Bundle GNF2-P10DG2B372-14GZ-100T2-145-T6-4138 (GNF2)
Page 29 Page 53 of 57
Page 29 Page 53 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information 0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                      Revision 0
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
[[
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0
((
Figure B-11 Enrichment and Gadolinium Distribution for EDB No. 2921 Fuel Bundle GEl1-P9DUB367-11GZ-10OT-145-T6-2921 (GEl1)
Figure B-11 Enrichment and Gadolinium Distribution for EDB No. 2921 Fuel Bundle GEl1-P9DUB367-11GZ-10OT-145-T6-2921 (GEl1)
Page 30 Page 54 of 57
Page 30 Page 54 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information 0000-01 38-9259-FBIR-NP Reload 24                                            Class I (Public)                      Revision 0
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
[[
COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0
((
Figure B-12 Enrichmentand Gadolinium Distribution for EDB No. 2922
Figure B-12 Enrichmentand Gadolinium Distribution for EDB No. 2922
                      - -Fuel Bundle GEl-l-P9DUB361-14GZ-IOOT-145-T6-2922 (GEll)
-Fuel Bundle GEl-l-P9DUB361-14GZ-IOOT-145-T6-2922 (GEll)
        ,;1                                                                                   Page 31 Page 55 of 57
,; 1 Page 31 Page 55 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information 0000-0138-9259-FBIR-NP Reload 24                                            Class I (Public)                      Revision 0
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0
[E Figure B-13 Enrichment and Gadolinium Distribution for EDB No. 3106 Fuel Bundle GEl1-P9DUB366-12GZ-100T-145-T6-3106 (GEl1)
[E Figure B-13 Enrichment and Gadolinium Distribution for EDB No. 3106 Fuel Bundle GEl1-P9DUB366-12GZ-100T-145-T6-3106 (GEl1)
Page 32 Page 56 of 57
Page 32 Page 56 of 57


Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390           COLR Oyster Creek 1 Rev. 8 Oyster Creek                                Non- Proprietary Information 0000-01 38-9259-FBIR-NP Reload 24                                            Class I (Public)                      Revision 0 1[
Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)
COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 1[
Figure B-14 Enrichment and Gadolinium Distribution for EDB No. 4136 Fuel Bundle GNF2-P1ODG2B371-14GZ-100T2-145-T6-4136 (GNF2)
Figure B-14 Enrichment and Gadolinium Distribution for EDB No. 4136 Fuel Bundle GNF2-P1ODG2B371-14GZ-100T2-145-T6-4136 (GNF2)
Page 33 Page 57 of 57}}
Page 33 Page 57 of 57}}

Latest revision as of 19:31, 11 January 2025

Core Operating Limits Report for Oyster Creek 1 Cycle 24
ML12363A065
Person / Time
Site: Oyster Creek
Issue date: 11/08/2012
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML12363A065 (57)


Text

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek I Cycle 24 (This is a major rewrite; no annotations are used) 2012.11.08 15:11:02 -05'00' Pron rmid RViewd Reviewed:

Reviewed:

Reviewed:

Approved:

2012.11.08 16:30:58 -05'00' Reactor Engineering 2012.11.08 16:5):55 -05'00' Engineerng fety alysis Independent Review 2012.11.09 11:54:59 -05'00' GNF - BWR Design Manager 16:31:2012.11.08 16:31:25 -05'00' Station Qualified Review Page 1 of 57

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table of Contents 1. L ist o f T a b le s.............................................................................................................................................

3 2. R e fe re n ce s................................................................................................................................................

4

3. Terms and Definitions...............................................................................................................................

5

4. General Information..................................................................................................................................

6

5. Average Planar Linear Heat Generation Rate....................................................................................

7

6. Minimum Critical Power Ratio...........................................................................................................

19 6.1. Manual Flow Control MCPR Limits.............................................................................................

19 6.2. Power Dependent MCPR Limits................................................................................................

19 6.3. S c ra m T im e.....................................................................................................................................

19

7. Linear Heat Generation Rate...........................................................................................................

22

8. Stability Protection Settings...................................................................................................................

22

9. Modes of Operation...............................................................................................................................

23

10. Methodology.........................................................................................................................................

23 Appendix A..........................

24 Page 2 of 57

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390

1. List of Tables Table 5-1 MAPLHGR for bundle: GEl 1-P9DUB359-14GZ-100T-145-T6-3108................................................................

7 Table 5-2 MAPLHGR for bundle: GEl 1-P9DUB359-14GZ-100T-145-T6-3108

................................ 8 Table 5-3 MAPLHGR for bundle: GEl 1-P9DUB356-14GZ-100T-145-T6-3109................................................................

8 Table 5-4 MAPLHGR for bundle: GEl 1-P9DUB356-14GZ-100T-145-T6-3109................................................................

9 Table 5-5 MAPLHGR for bundle: GEl 1-P9DUB367-12GZ-100T-145-T6-3104................................................................

9 Table 5-6 MAPLHGR for bundle: GEl 1-P9DUB367-12GZ-100T-145-T6-3104................................................................

10 Table 5-7 MAPLHGR for bundle: GEl 1-P9DUB360-1 1 GZ-100T-145-T6-3107................................................................

10 Table 5-8 MAPLHGR for bundle: GEl 1-P9DUB360-1 1 GZ-100T-145-T6-3107...............................................................

11 Table 5-9 MAPLHGR for bundle: GEl 1-P9DUB365-10GZ-100T-145-T6-3105................................

11 Table 5-10 MAPLHGR for bundle: GEl 1-P9DUB365-10GZ-100T-145-T6-3105..............................................................

12 Table 5-11 MAPLHGR for bundle: GNF2-P10DG2B370-15GZ-100T2-145-T6-3355.......................................................

12 Table 5-12 MAPLHGR for bundle: GN F2-P10DG2B371-14GZ-100T2-145-T6-4136.......................................................

13 Table 5-13 MAPLHGR for bundle: GNF2-P10DG2B370-16GZ-100T2-145-T6-4137.......................................................

13 Table 5-14 MAPLHGR for bundle: GNF2-P10DG2B372-14GZ-100T2-145-T6-4138.......................................................

14 Table 5-15 MAPLHGR for bundle: GNF2-P10DG2B370-16GZ-100T2-145-T6-3356.......................................................

14 Table 5-16 MAPLHGR for bundle: GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD.............................................. 15 Table 5-17 MAPLHGR for bundle: GEl 1-P9DUB367-1 1GZ-100T-145-T6-2921.............................................................

15 Table 5-18 MAPLHGR for bundle: GEl 1-P9DUB367-1 1GZ-100T-145-T6-2921.............................................................

16 Table 5-19 MAPLHGR for bundle: GEl 1-P9DUB361-14GZ-100T-145-T6-2922.............................................................

16 Table 5-20 MAPLHGR for bundle: GEl 1-P9DUB361-14GZ-100T-145-T6-2922.............................................................

17 Table 5-21 MAPLHGR for bundle: GEl 1-P9DUB366-12GZ-IOOT-145-T6-3106.............................................................

17 Table 5-22 MAPLHGR for bundle: GE11-P9DUB366-12GZ-100T-145-T6-3106.............................................................

18 Table 5-23 MAPLHGR Multiplier with One ISOLATED Loop...........................................................................................

18 T able 6-1 M C P R Lim it - A ll Fuel Types................................................................................................................................

20 T able 6-2 K f M ultiplier - A ll Fuel Types................................................................................................................................

20 Table 6-3 Power Dependent MCPRp Limits and Multipliers - All Fuel Types.................................................................

21 Table 7-1 Power Dependent LHGR Multiplier LHGRFACp for PROOS..........................................................................

22 Table 8-1 O ption II Stability Protection Settings...................................................................................................................

22 T a ble 9-1 M od es of O pe ratio n..............................................................................................................................................

2 3 Page 3 of 57

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390

2. References
1. Deleted.
2.

GNF Document, 0000-01 38-9259-SRLR, Revision 2, "Supplemental Reload Licensing Report for Oyster Creek Reload 24 Cycle 24," October 2012.

3.

GNF Document, 0000-0138-9259-FBIR-P, Revision 0, "Fuel Bundle Information Report for Oyster Creek Reload 24 Cycle 24," September 2012.

4.

Deleted.

5.

Deleted.

6.

GENE Letter, NSA02-247, "Oyster Creek APRM Flow-Biased Setpoint Margin Between Scram and Rod Block for Stability Option II Adjustment," January 23, 2002.

7.

Deleted.

8.

Deleted.

9.

Deleted.

10. EXELON GENERATION COMPANY, LLC OYSTER CREEK GENERATING STATION DOCKET NO. 50-219, Renewed License No. DPR-16
11. Deleted.
12. Deleted.
13. GNF Document, NEDE-24011-P-A-19 and Supplement NEDE-24011-P-A-19-US, "General Electric Standard Application for Reactor Fuel," May 2012 (GESTAR II).
14. Exelon TODI, ES1200008, Revision 0, "Final Resolved OPL-3 Parameters for Oyster Creek Cycle 24," dated May 31,2012.

Page 4 of 57

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390

3. Terms and Definitions APLHGR Average Planar Linear Heat Generation Rate ARTS APRM, Rod Block Monitor, and Technical Specification (Improvement)

APRM Average Power Range Monitor BOC Beginning of Cycle BWROG Boiling Water Reactor Owner's Group Coastdown Coastdown occurs when full power is not achievable with all rods out, maximum allowable core flow and feedwater temperature reduction, and equilibrium xenon ELLLA Extended Load Line Limit Analysis EOC End of Cycle EOR End of Rated Conditions (i.e., cycle exposure at 100% power, 100% flow, all-rods-out, all feedwater heaters in service and equilibrium xenon)

FWCF Feedwater Controller Failure GNF Global Nuclear Fuel ICF Increased Core Flow ISOLATED The recirculation loop suction, discharge and discharge bypass valves are in the closed position Kf MCPR flow dependent multiplier (i.e., adjustment to the MCPR limit when at core flow less than rated)

Kp MCPR power dependent multiplier (i.e., adjustment to the MCPR limit when at core powerless than rated)

LHGR Linear Heat Generation Rate LHGRFACp LHGR power dependent multiplier (i.e.,'adjustment to the LHGR limit for the following coincident conditions:

at core power less than rated and the pressure regulator is out of service)

LPRM Local Power Range Monitor MAPLHGR Maximum Average Planar Linear Heat Generation Rate MCPR Minimum Critical Power Ratio MCPRp Off-rated power dependent Operating Limit MCPR OOS Out of Service Option A Option A refers to the Technical Specifications core average scram time speed that when applied results in a more restrictive MCPR limit Option B Option B refers to a specific core average scram time speed that when met allows the use of a lower MCPR limit PROOS Pressure Regulator Out of Service RWE Rod Withdrawal Error TBV Turbine Bypass Valve TIP Traversing In Core Probe Page 5 of 57

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390

4. General Information Oyster Creek is a non-ARTS plant. There are Oyster Creek specific flow-biased and power-biased MCPR operating limits for operation at less than rated flow and power. The flow-biased MCPR limits are discussed in Section 6.1. The power-biased MCPR limits are discussed in Section 6.2. There are power-biased LHGR limits for PROOS operating condition provided in Section 7. Rated core flow is 61 Mlb/hr and operation up to 110.7% of rated is licensed for this cycle.

Additionally, Oyster Creek utilizes an ELLLA operating domain, which has expanded the power/flow map to allow for greater operational flexibility.

Page 6 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8

5. Average Planar Linear Heat Generation Rate The MAPLHGR limits are discussed in Technical Specifications Section 3.1 O.A. The MAPLHGR limits for the lattices in each fuel type as a function of average planar exposure are given in Tables 5-1 through 5-22 for operation with zero ISOLATED RECIRCULATION LOOPS (Reference 2). For operation with one ISOLATED RECIRCULATION LOOP, multiply the limits in Tables 5-1 through 5-22 by the ISOLATED Loop multiplier listed in Table 5-23 (Reference 2). All lattices are defined in Reference 3.

Table 5-1 MAPLHGR for bundle: GEl 1 -P9DUB359-14GZ-1OOT-145-T6-3108 GNF Laftice #8527, #8528, #8508, #8525 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.64 0.2 9.64 1.0 9.57 5.0 9.39 10.0 9.18 15.0 8.93 20.0 8.95 25.0 8.52 35.0 7.78 45.0 7.59 55.0 7.55 65.0 7.51 Page 7of 57

,' j

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-2 MAPLHGR for bundle: GE11-P9DUB359-14GZ-1OOT-145-T6-3108 GNF Lattices #8507, #8526 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.62 0.2 9.62 1.0 9.56 5.0 9.44 10.0 9.17 15.0 8.87 20.0 8.93 25.0 8.52 35.0 7.76 45.0 7.59 55.0 7.55 65.0 7.48 Table 5-3 MAPLHGR for bundle: GEl1-P9DUB356-14GZ-10OT-145-T6-3109 GNF Lattices #8530, #8531, #8508, #8525 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.55 0.2 9.55 1.0 9.50 5.0 9.33 10.0 9.04 15.0 8.99 20.0 8.90 25.0 8.51 35.0

.7.78 45.0 7.50 55.0 7.55 65.0 7.47 Page 8. of 57

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-4 MAPLHGR for bundle: GEl 1-P9DUB356-14GZ-1OOT-145-T6-3109 GNF Lattices #8507, #8529 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.57 0.2 9.57 1.0 9.56 5.0 9.40 10.0 9.22 15.0 8.92 20.0 8.89 25.0 8.50 35.0 7.78 45.0 7.53 55.0 7.56 65.0 7.53 Table 5-5 MAPLHGR for bundle: GE11-P9DUB367-12GZ-100T-145-T6-3104 GNF Lattices #8510, #8511, #8508, #8512 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.55 0.2 9.55 1.0 9.51 5.0 9.31 10.0 9.10 15.0 8.93 20.0 9.01 25.0 8.68 35.0 7.80 45.0 7.63 55.0 7.60 65.0 7.54 Page 9-of 57

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-6 MAPLHGR for bundle: GE1 -P9DUB367-12GZ-1OOT-145-T6-3104 GNF Lattices #8507, #8509 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.58 0.2 9.58 1.0 9.55 5.0 9.29 10.0 9.08 15.0 8.98 20.0 8.96 25.0 8.67 35.0 7.82 45.0 7.63 55.0 7.56 65.0 7.53 Table 5-7 MAPLHGR for bundle: GE11-P9DUB360-11GZ-10OT-145-T6-3107 GNF Lattices #8522, #8523, #8508, #8524 Avg. Planar Exposure MAPLHGR.

(GWd/ST)

(kW/ft) 0.0 9.14 0.2 9.14 1.0 9.10 5.0 9.13 10.0 9.04 15.0 8.93 20.0 8.97

-25.0 8.62 35.0 7.78 45.0 7.56 55.0 7.54 65.0 7.45 Page 10 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 1GCFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-8 MAPLHGR for bundle: GEl 1 -P9DUB36O-11GZ-10OT-145-T6-3107 GNF Lattices #8507, #8521 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.28 0.2 9.28 1.0 9.26 5.0 9.22 10.0 9.09 15.0 8.96 20.0 8.97 25.0 8.58 35.0 7.81 45.0 7.55 55.0 7.54 65.0 7.47 Table 5-9 MAPLHGR for bundle: GEl 1 -P9DUB365-1 OGZ-1 OOT-145-T6-3105 GNF Lattices #8514, #8515, #8508, #8516 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.52 0.2 9.52 1.0 9.50 5.0 9.35 10.0 9.14 15.0 9.02 20.0 8.96 25.0 8.65 35.0

.7.82 45.0 7.63 55.0 7.58 65.0 7.54 P.-Ige 11 Vof57

'f*

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-10 MAPLHGR for bundle: GE I1-P9DUB365-10GZ-10OT-145-T6-3105 GNF Lattices #8507, #8513 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.51 0.2 9.51 1.0 9.49 5.0 9.32 10.0 9.16 15.0 8.94 20.0 8.97 25.0 8.65 35.0 7.80 45.0 7.61 55.0 7.59 65.0 7.52 Table 5-11 MAPLHGR for-bundle: GNF2-P1ODG2B370-15GZ-100T2-145-T6-3355

. All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 7.73 0.2 7.73 1.0

.7.75 5.0 7.67 10.0 7.64 15.0 7.72 20.0 6.96 25.0 6.46 35.0 6.26 45.0 6.13 55.0 6.03 65.0 5.91 Page.12 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-12 MAPLHGR for bundle: GNF2-P1ODG2B371-14GZ-100T2-145-T6-4136 All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 7.75 0.2 7.75 1.0 7.72 5.0 7.63 10.0 7.53 15.0 7.40 20.0 6.86 25.0 6.34 35.0 6.21 45.0 6.06 55.0 5.95 65.0 5.86 Table 5-13 MAPLHGR for bundle: GNF2 'P1ODG2B370-16GZ-1OOT2-145-T6-4137 All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft)

S0.0 7.73 0.2 7.73 1.0 7.73

.5.0 7.66 10.0 7.47 15.0 7.41 20.0 6.89 25.0 6.34 35.0 6.21 45.0 6.05 55.0 5.96 65.0 5.86 Page'13 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-14 MAPLHGR for bundle: GNF2-PI0DG2B372-14GZ-100T2-145-T6-4138 All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 7.74 0.2 7.74 1.0 7.72 5.0 7.62 10.0 7.50 15.0 7.40 20.0 6.85 25.0 6.36 35.0 6.21 45.0 6.05 55.0 5.98 65.0 5.86 Table 5-15 MAPLHGR for bundle: GNF2-P1ODG2B370-16GZ-100T2-145-T6-3356 I

All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 7.83 0.2 7.83 1.0 7.78 5.0 7.73 10.0 7.65 15.0 7.62 20.0 7.76 25.0 6.88 35.0 6.30

.45.0 6.17 55.0 6.04 65.0 5.91 Page; 14 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-16 MAPLHGR for bundle: GN F2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD All Lattices Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 7.87 0.2 7.87 1.0 7.85 5.0 7.75 10.0 7.70 15.0 7.60 20.0 7.76 25.0 6.83 35.0 6.30 45.0 6.16 55.0 6.03 65.0 5.91 Table 5-17 MAPLHGR for bundle: GE11-P9DUB367-11GZ-10OT-145-T6-2921 GNF Lattices #7313, #7314, #7315, #7316 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 8.84 0.2 8.84 1.0 8.87 5.0 8.89 10.0 8.93 15.0 8.91 20.0 8.84 25.0 8.18 35.0 7.84 45.0 7.80 55.0 7.86 65.0 7.90 Page 15 of 57

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-18 MAPLHGR for bundle: GEl I-P9DUB367-1 1GZ-1 OOT-145-T6-2921 GNF Lattices #7311, #7312 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.17 0.2 9.17 1.0 9.20 5.0 9.06 10.0 9.02 15.0 8.91 20.0 8.83 25.0 8.16 35.0 7.84 45.0 7.79 55.0 7.84 65.0 7.91 Table 5-19 MAPLHGR for bundle: GE11-P9DUB361-14GZ-1OOT-145-T6-2922 GNF Lattices #7318, #7319, #7315, #7320 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.39 0.2 9.39 1.0 9.32 5.0 9.23 10.0 8.92 15.0 8.90 20.0 8.76

,25.0 8.10 35.0 7.82 45.0 7.77

.55'.0 7.84 65:0 7.91 Page16. of 57

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Table 5-20 MAPLHGR for bundle: GE11-P9DUB361-14GZ-1OOT-145-T6-2922 GNF Lattices #7311, #7317 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.39 0.2 9.39 1.0 9.33 5.0 9.18 10.0 8.92 15.0 8.88 20.0 8.72 25.0 8.08 35.0 7.83 45.0 7.80 55.0 7.86 65.0 7.91 Table 5-21 MAPLHGR for bundle: GEt1 -P9DUB366-'12GZ-10OT-145-T6-31106 GNF Lattices #8518, #8519, #8508, #8520 Avg. Planar

]

Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.51 0.2 9.51.

1.0 9.49 5.0 9.31 10.0 9.08 15.0 8.92 20.0 9.01 25.0 8.68 35.0 7.80 45.0 7.63 55.0 7.57 65.0 7.52 Page 170of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 5-22 MAPLHGR for bundle: GE1 I -P9DUB366-12GZ-100T-145-T6-3106 GNF Lattices #8507, #8517 Avg. Planar Exposure MAPLHGR (GWd/ST)

(kW/ft) 0.0 9.52 0.2 9.52 1.0 9.48 5.0 9.34 10.0 9.09 15.0 8.90 20.0 8.97 25.0 8.64 35.0 7.80 45.0 7.62 55.0 7.56 65.0 7.51 Table 5-23 MAPLHGR Multiplier with One ISOLATED Loop Fuel'Type Isolated Loop Multiplier F GEl

[

0.98 GNF2 0.98 Page 18 of 57

Exelon Nuclear - Nuclear Fuels COLR Oyster Creek 1 Rev. 8 Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390

6. Minimum Critical Power Ratio The MCPR limits are discussed in Technical Specifications Section 3.10.C. For all conditions, the more limiting of the flow adjusted MCPR and power adjusted MCPR is applied.

6.1. Manual Flow Control MCPR Limits The flow adjusted MCPR is determined by multiplying the applicable rated condition MCPR limit shown in Table 6-1 by the applicable MCPR multiplier, Kf, given in Table 6-2. Table 6-1 MCPR limits are the maximum values obtained from analysis of pressurization and non-pressurization events. MCPR values are determined by the cycle-specific fuel reload analyses in Reference 2. Table 6-1 MCPR limits are bounding for both GEl 1 and GNF2 fuel. The Kf multipliers are documented in Reference 2. Table 6-1 limits are independent of APRM status changes since Reference 2 analyzes the Rod Withdrawal Error (RWE) as unblocked. The appropriate Kf value may be determined by linear interpolation. Table 6-2 is applicable to GEl 1 and GNF2 fuel types per Reference 2.

Table 6-1 provides two sets of MCPR limits. One set is for nominal response function for the Turbine Bypass Valve (TBV) where the TBV fast opening to 80% of rated TBV flow has been demonstrated to be 1 second or less and has a TBV fast opening delay time of 200 msec or less (Reference 14). The other set, referred to as 'Slow to Open', represents MCPR limits which have taken no credit for the fast opening function of the TBV during a Feedwater Controller Failure (FWCF) event. The application of the (nominal versus 'slow to open') MCPR limits is dependent on the results of TBV testing.

6.2. Power Dependent MCPR Limits The use of GNF2 fuel type requires the application of power dependent MCPR limits at off-rated conditions.

Power dependent limits are required because APRM Trip Setdown may not provide adequate protection for the MCPR Safety Limit. Use of these limits ensures that the MCPR Safety Limit is not violated as a result of any anticipated operational occurrence (AOO). Plant specific power dependent MCPR limits are presented in Table 6-3 and documented in Reference 2. When core thermal power is greater than or equal to 40% of rated, the Kp multiplier from Table 6-3 is applied to the applicable rated condition MCPR limitshown in Tables 6-1. The appropriate MCPRp or Kp value may be determined by linear interpolation. Below 40% of rated power, the MCPR limits in Table 6-3 are applied directly. Table 6-3 is applicable to both GEl 1 and GNF2 fuel types per Reference 2.

Table 6-3 provides two sets power dependent MCPR limits at off-rated conditions. One set is for nominal response function for the Turbine Bypass Valve (TBV) where the TBV fast opening to 80% of rated TBV flow has been demonstrated to be 1 second or less and has a TBVfast opening delay time of 200 msec or less (Reference 14). The other set, referred to as 'Slow to Open', represents power dependent MCPR limits which have taken no credit for the fast opening function of the TBV during a Feedwater Controller Failure (FWCF) event. The application of the (nominal versus 'slow to open') power dependent MCPR limits is dependent on the results of TBV testing.

6.3. Scram Time Core average scram insertion times are determined per Technical Specifications 3.2.B. Based on the results of the scram time surveillance testing and calculation of the core average insertion time, a MCPR limit is chosen from Table 6-1 (Reference 2). If the core average scram insertion time does not meet the Option B criteria, but has met Option A criteria, then the appropriate MCPR value may be determined from a linear interpolation between the Option A and B limits with standard mathematical rounding to two decimal places. The scram time adjustment to MCPR only applies to MCPR limits that are set by pressurization transients (see Note 3 to Table 6-1 for further clarification).

. Page 19 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 6-1 MCPR Limit - All Fuel Types TBV Cycle Exposure1 AlibilitY 2

Response

BOC to < (EOR-4016)

> (EOR-4016) MWD/ST to Function Option MWD/ST EOC Four or Five Nominal A

1.54 1.60 Recirculation Loops in Service Nominal B

1.453 1.50 Three Nominal A

1.56 1.62 Recirculation Loops in Service 4

Nominal B

1.473 1.52 Four or Five Slow to A

1.58 1.64 Recirculation Open Loops in Service Slow to B

Opn1.48 1.54 Open Three Slow to A

1.60 1.66 Recirculation Open Loops in Service 4 slowto B

1.50 1.56 Open Table 6-2 Kf Multiplier - All Fuel Types 5 Flow Kf

(% rated) 117.0 1.00 100.0 1.00 90.0

-1.00 80.0.

1.05 70.0 1.09 60.0 1.13 50.0 1.17 40.0 1.22 30.0 1.28 I The referenced MCPR cycle exposure breakpoint (EOR-4016) MWD/ST is conservative to the value (EOR-3716) MWD/ST in Reference 2 to allow for changes to the end of rated cycle exposure due to cycle operation.

2 MCPR limits are applicable to rated power operation for Equipment in Service and PROOS conditions per Reference 2.

3 The documented MCPR limit is based on the Rod Withdrawal Error (RWE) event, which is a non-pressurization event. The limiting pressurization event results in an Option B MCPR limit that is 0.01 less (BOC to (EOR-4016) MWD/ST) than the RWE event. Scram time adjustments are only required to be applied to MCPR limits that are set by pressurization transients.

4 For three recirculation loops in service, the MCPR operating limit is 0.02 greater than the four/five loop value perReference 2.

5 Kf multipliers are applicable for Equipment in Service and PROOS conditions per Reference, 2.

Page.20 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Table 6-3 Power Dependent MCPRp Limits and Multipliers - All Fuel Types TBV Core Flow Core Thermal Power (% of rat ed)

Applicability

Response

(% of Function rated) 0 251

<40

>40 160 170 791 90 100 Operating Limit MCPR Operating Limit MCPR Multiplier, Kp Four or Five

< 60 2.52 2.52 2.20 Recirculation Nominal Loopsin Service

> 60 2.79 2.79 2.29 1.185 1.185 1.185 1.074 1.000 Three Recirculation

< 60 2.54 2.54 2.22 Nominal Loops in Service

> 60 2.81 2.81 2.31 1.185 1.185 1.185 1.074 1.000 PROOS - Four or Five

< 60 2.52 2.52 2.20 Recirculation Nominal Loops in Service

> 60 2.79 2.79 2.29 1.517 1.375 1.345 1.265 1.0821 1.000 PROOS - Three

< 60 2.54 2.54 2.22 Recirculation Nominal Loops in Service

> 60 2.81 2.81 2.31 1.517 1.375 1.345 1.265 1.0821 1.000 Four or Five Slow to

< 60 2.67 2.67 2.20 Recirculation Ow0.

Loopsin Service Open

> 60 4.02 4.02 2.69 1.193 1.193 1.193 1.082 1.000 Three Recirculation Slow to

<60 2:69 2.69 2.22 Loopsin Service Open

> 60 4.04 4.04.

<i2.71 1.193 1.193 1.193 1.082 1.000 PROOS - Four or Five Slow to

< 60 2.67 2.67 2.20 Recirculation Loops in Service Open

> 60 4.02 4.02 2.69 1.517 1.375 1.345 1.265 1.082 1.000 PROOS - Three Slow to

< 60 2.69 2.69 2.22 Recirculation Loops in Service Open

> 60 4.04 4.04 2.71 1.517 1.375 1.345 1.265 1.082 1.000 Kp multiplier has been =conservatively set to 1.082 (compared tothe' Reference 2 value of'1.074) so the-PROOS "Nominal" curves can be used for the PROOS "Slow to Open" curves..

"Page 21 tof 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8

7. Linear Heat Generation Rate The LHGR limits are discussed in Technical Specifications Section 3.10.B. The maximum LHGR shall not exceed the LHGR limits as specified in Reference 3, attached as Appendix A. The exposure dependent U0 2 and Gd 20 3 Thermal-Mechanical LHGR limits are contained in Appendix A and apply to all modes of operation as described in Table 9-1.

Power dependent LHGR multipliers are listed in Table 7-1 for PROOS operating conditions and are applicable to GEl 1 and GNF2 fuel types (Reference 2). The power adjusted LHGR for PROOS operating conditions is determined by multiplying the applicable Reference 3 LHGR limit by the LHGR multiplier, LHGRFACp, given in Table 7-1. The appropriate LHGRFACp value may be determined by linear interpolation.

Table 7-1 Power Dependent LHGR Multiplier LHGRFACp for PROOS Power LHGRFACp

(% rated) 0.0 0.702 40.0 0.702 50.0 0.760 60.0 0.808 70.0 0.891 79.0 0.905 90.0 1.000 100.0 1.000

8. Stability Protection Settings The stability protection settings are discussed in Technical Specifications 2.3. Oyster Creek utilizes the BWROG Option II solution in the licensing stability calculations. Table 8-1 provides the analytical limit equations for APRM based stability protection settings and related Control Rod Block settings to support Option II implementation (References 2 and 6).

Table 8-1 Option II Stability Protection Settings Technical Specification 2.3.A.1 Neutron Flux, Scram - APRM ForW< 27.5x10 6 1b/hr:

S 0(1.433 x 10-6) W+ 24.8 where:

S = setting in percent of rated power W = recirculation flow (lb/hr)

Technical Specification 2.3.B Neutron Flux, Control Rod Block ForW< 27.5x 106 lb/hr:

S*< (1.433 x 10,6) W + 17.5 where:

S = setting in percent of rated power W = recirculation flow (lb/hr)

.Page 22, of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8

9. Modes of Operation The allowed Modes of Operation are as described in Table 9-1.

Table 9-1 Modes of Operation Operating Region Options1' 3 Standard ELLLA ICF 2 Five-loop Operation, Option A or B Yes Yes Yes Four-loop Operation, Option A or B Yes Yes Yes Three-loop Operation, Option A or B Yes Yes Yes PROOS, Five-loop Operation, Option A or B Yes Yes Yes PROOS, Four-loop Operation, Option A or B Yes Yes Yes PROOS, Three-loop Operation, Option A or B Yes Yes Yes 1 Each operational mode may be combined with up to a 100°F reduction in feedwater temperature (Final Feedwater Temperature Reduction or Feedwater Heaters OOS) at any point in the cycle (Reference 2).

2 Operation up to 67.5 Mlb/hr core flow is licensed for this cycle (Reference 2).

3 Each operational mode may be coincident with coastdown Operation. The minimum coastdown power level is 40% per GESTAR II (Reference 13).

10. Methodology
1. GENE Document, NEDC-31462P and NEDE-31462, "Oyster Creek NGS SAFER/CORECOOL/GESTR-LOCA Loss-of-Coolant Accident Analysis," August 1987.
2. GNF Document, NEDE-2401 1-P-A-19 and Supplement NEDE-2401 1-P-A-19-US, "General Electric Standard Application for Reactor Fuel," May 2012.
3.

GENE Document, NEDC-33065P, Rev. 0, "Application of Stability Long-Term Solution Option II to Oyster Creek,"

April 2002.

.4ý Page 23of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Appendix A Page 24 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Global Nuclear Fuel A Joint Venture of GETjshiba, & Hitachi Global Nuclear Fuel 0000-0138-9259-FBIR-NP Revision 0 September 2012 Non-Proprietary Information - Class I (Public)

Fuel Bundle Information Report for Oyster Creek Reload 24 Cycle 24 Copyright 2012 Global Nuclear Fuel - Americas, LLC All Rights Reserved Page 25 of 57

Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Oyster Creek Non-Proprietary Information 0000-0 138-9259-FBIR-NP Reload 24 Class I (Public)

Revision 0 Important Notice Regarding Contents of This Report Please Read Carefully This report was prepared by Global Nuclear Fuel - Americas, LLC (GNF-A) solely for use by Exelon

("Recipient") in support of the operating license for Oyster Creek (the "Nuclear Plant"). The information contained in this report (the "Information") is believed by GNF-A to be an accurate and true representation of the facts known by, obtained by or provided to GNF-A at the time this report was prepared.

The only undertakings of GNF-A respecting the Information are contained in the contract between Recipient and GNF-A for. nuclear fuel and related services for the Nuclear Plant (the "Fuel Contract") and nothing contained in this document shall be construed as amending or modifying the Fuel Contract. The use of the Information for any purpose other than that for which it was intended under the Fuel Contract, is not authorized by GNF-A. In the event of any such unauthorized use, GNF-A neither (a) makes any representation or warranty (either expressed or implied) as to the completeness, accuracy or usefulness of the Information or that such unauthorized use may not infringe privately owned rights, nor (b) assumes any responsibility for liability or damage of any kind which may result from such use of such information.

Information Notice This is a non-proprietary version of the document 0000-0138-9259-FBIR-P, Revision 0, which has the proprietary information removed. Portions of the document that have been removed are indicated by an open and closed bracket as shown here ((

)).

'Page 26 of 57Page 2

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 COLR Oyster Creek 1 Rev. 8 Oyster Creek Non-Proprietary Information 0000-0138-9259-FBIR-NP Reload 24 Class I (Public)

Revision 0

1. Introduction and Summary This report, which supplements the Supplemental Reload Licensing Report, contains thermal-mechanical linear heat generation rate (LHGR) limits for the GNF-A fuel designs to be loaded into Oyster Creek for Cycle 24. These LHGR limits are obtained from thermal-mechanical considerations only. Approved GNF-A calculation models documented in Reference 1 were used in performing this analysis.

LHGR limits as a function of exposure for each bundle of the core design are given in Appendix A. The LHGR values provided in Appendix A provide upper and lower exposure dependent LHGR boundaries which envelope the actual gadolinia dependent LHGR limits. The LHGRs reported have been rounded to two places past the decimal.

Appendix B contains a description of the fuel bundles. Table B-1 contains a summary of bundle-specific information, and the figures provide the enrichment distribution and gadolinium distribution for the fuel bundles included in this appendix. These bundles have been approved for use under the fuel licensing acceptance criteria of Reference 1.

Page 3 Page 27 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0

2. References
1. General Electric Standard Application for Reactor Fuel, NEDE-2401 l-P-A-19, May 2012; and the U.S. Supplement, NEDE-2401 I-P-A-19-US, May 2012.

Page 28 of 57 Page 4

Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Appendix A UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB359-14GZ-1OOT-145-T6-3108 (GE 11)

Bundle Number: 3108 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit' GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).

Page 5 Page 29 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB356-14GZ-lOOT-145-T6-3109 (GE 11)

Bundle Number: 3109 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 2 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 2 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design.(7.0% Gd).

Page 30 of 57 Page 6

Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB367-12GZ-lOOT-145-T6-3104 (GE 1I)

Bundle Number: 3104 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 3 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 3 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).

Page 7 Page 31 of 57,t

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GEl I-P9DUB360-1 IGZ-1OOT-145-T6-3107 (GE 11)

Bundle Number: 3107 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 4 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 4 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).

Page 8

" Page 32 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 evision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB365-1 OGZ-lOOT-145-T6-3105 (GE 11)

Bundle Number: 3105 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 ( 0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 5 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 5 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).

Page 9 Page 33'of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Puhlicr COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Reload 24 U02/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 10DG2B370-16GZ-100T2-145-T6-4137 (GNF2)

Bundle Number: 4137 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 6 GWd/MT (GWd/ST) kW/ft

((I 6 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design ((,

Page 10 Page 34 of 57

Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P10DG2B370-15GZ-100T2-145-T6-3355 (GNF2)

Bundle Number: 3355 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft

((

Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 7 GWd/MT (GWd/ST) kW/ft Er 7 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring'in this bundle design ((

Page 11 Page 35:of 57

Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P10DG2B370-16GZ-100T2-145-T6-3356 (GNF2)

Bundle Number: 3356 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft

((

Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit' GWd/MT (GWd/ST) kW/ft ER 8 Bounding gadoliniaLHGR limit for allgadolinium concentrations occurring in this bundle design ((

Page 12 Page 36 of 57

Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 1 0DG2B369-16GZ-100T2-145-T6-3357-LTD (GNF2)

Bundle Number: 3357 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 9 GWd/MT (GWd/ST) kW/ft E[____________________

9 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this-bundle design ((

Page 13 Page 37 of 57

Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reloaid 24 Non-Proprietary Information Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 Reload 24 U.O2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 1 0DG2B372-14GZ-100T2-145-T6-4138 (GNF2)

Bundle Number: 4138 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft

((

Peak Pellet Exposure Most Limiting Gadolinia LHGRLimit o GWd/MT (GWd/ST) kW/ft Er 10 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this. bundle design Page 14 Page 38 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 U02/Gd Thermal-Mechanical LHGR Limits Bundle Type: GEl 1-P9DUB367-1 1GZ-I00T-145-T6-292.1 (GEl 1)

Bundle Number: 2921 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak-Pellet Exposure Most Limiting Gadolinia LHGR Limit1 1 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 "Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).

Page 15 Page 39 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 UO2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB361-14GZ-1 OT-145-T6-2922 (GE 11)

Bundle Number: 2922 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00(0.00) 12.00 20.00 (18.1 4) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit' 2 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 12 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).

Page 40.of 57 Page 16

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GE 11 -P9DUB366-12GZ-100T-145-T6-3106 (GE 11)

Bundle Number: 3106 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 12.00 20.00 (18.14) 10.50 70.00 (63.50) 6.00 Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit' 3 GWd/MT (GWd/ST) kW/ft 0.00 (0.00) 10.29 16.52 (14.99) 9.00 63.65 (57.74) 5.14 13 Bounding gadolinia-LHGR limit for all gadolinium concentrations occurring in this bundle design (7.0% Gd).

Pa-

/o57Page 17 SPage 41. of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 U0 2/Gd Thermal-Mechanical LHGR Limits Bundle Type: GNF2-P 1 0DG2B37 1-14GZ-100T2-145-T6-4136 (GNF2)

Bundle Number: 4136 Peak Pellet Exposure U0 2 LHGR Limit GWd/MT (GWd/ST) kW/ft

((I Peak Pellet Exposure Most Limiting Gadolinia LHGR Limit 14 GWd/MT (GWd/ST) kW/ft

((l 14 Bounding gadolinia LHGR limit for all gadolinium concentrations occurring in-this bundle design Page 18 7

Page 42 of 5

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Appendix B Fuel Bundle Information Table B-1 Bundle Specific Information Max Exposure Fuel Bundle Enrichment Weight Weight

!f k at at Max k,,

of UO 2 of U 20C GdM Bundle Number (wt% U-235)

(g20 0C GWd/MT (kg)

(kg) 15 (GWd/ST)

GE1I-P9DUB359-14GZ-100T-3108 145-T6-3108 (GE 11)

GEl 1-P9DUB356-14GZ-100T-145-T6-3109 (GE 13)

GEl 1-P9DUB367-12GZ-100T-3104 145-T6-3104 (GE 11)

GEl 1-P9DUB360-1 1GZ-100T-3107 145-T6-3107 (GE 11)

GEl 1-P9DUB365-1OGZ-100T-145-T6-3105 (GE 13)

GNF2-P 10DG2B3370-16GZ-4137 100T2-145-T6-4137 (GNF2) 43 GNF2-P10DG2B370-15GZ-100T2-145-T6-3355 (GNF2)

GNF2-P10DG2B370-16GZ-.

3356 100T2-145-T6-3356 (GNF2)

GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD 3357 (GNF2)

GNF2-P10DG2B372-14GZ-100T2-145-T6-4138 (GNF2)

GEl 1-P9DUB367-1 1GZ-100T-2921 145-T6-2921 (GE 11)

GEl 1-P9DUB361-14GZ-100T-2922 145-T6-2922 (GEl 1)

GEl 1-P9DUB366-12GZ-100T-3106 145-T6-3106 (GE 11_)

GNF2-P10DG2B3371-14GZ-100T2-145-T6-4136 (GNF2) 15 Maximum lattice k. for the most reactive uncontrolled state plus a

)) adder for uncertainties.

Page 19 Page 43 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Reload 24 Non-Proprietary Information Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-013 8-9259-FBIR-NP Revision 0

((

Figure B-1 Enrichment and Godolinium Distribution for EDB No. 3108 Fuel Bundle GE11-P9DUB359-14GZ-1O0T-145-T6-3108 (GEll)

Page 20 Page.44 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Reload 24 Class I (Public)

Revision 0 11 Figure B-2 Enrichment and Gadolinium Distribution for EDB No. 3109 Fuel Bundle GE11-P9DUB356:14GZ-100T=145-T6-3109 (GEIll)

Page 21

,Page 45 of 57

Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Figure B-3 Enrichment and Gadoliniunt Distribution for EDB No. 3104

. Fuel iBundle GEl1-P9DUB367-12GZ-100T-145-T6-3104 (GEl1)

Page 22 Page.46 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0 138-9259-FBIR-NP Revision 0 I'[

Figure B-4 Enrichment and Gadolinium Distribution for EDB No. 3107 Fuel Bundle GEll-P9DUB360-IlGZ-10OT-145-T6-3107.(GEI[l)

Page 23 Page:47 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Revision 0 Figure B-5 Enrichment and Gadolinium Distribution for EDB No. 3105 Fuel Bundle GEl1-P9DUB365-10GZ-100T-145-T6-3105 (GEl1)

P, Page 24 Page 48 oft57

Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0

((l 1]

Figure B-6 Enrichment and Gadolinium Distribution for EDB No. 4137 Fuel Bundle GNF2-PIODG2B370-16GZ-100T2-145-T6-4137 (GNF2)

Page 25/)

Page 49of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Revision 0

((

1]

Figure B-7 Enrichment and Gadolinium Distribution for EDB No. 3355 Fuel Bundle GNF2-P1ODG2B370-15GZ-100T2-145-T6-3355 (GNF2)

Page 50 of 5ý;

Page 26

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Ir Reload 24 Class I (Pub iformation lic)

COLR C)yster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 Figure B-8 Enrichment and Gadolinium Distribution for EDB No. 3356 Fuel Bundle GNF2-P1ODG2B370-16GZ-100T2-145-T6-3356 (GNF2)

Page 27 Page 51, of 57

Exelon Nuclear-Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 Figure B-9 Enrichment and Gadolinium Distribution for EDB No. 3357 Fuel Bundle GNF2-P10DG2B369-16GZ-100T2-145-T6-3357-LTD (GNF2)

Page 28 Page 52 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0 r[

Figure B-10 Enrichment and Gadolinium Distribution for EDB No. 4138 Fuel Bundle GNF2-P10DG2B372-14GZ-100T2-145-T6-4138 (GNF2)

Page 29 Page 53 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0

((

Figure B-11 Enrichment and Gadolinium Distribution for EDB No. 2921 Fuel Bundle GEl1-P9DUB367-11GZ-10OT-145-T6-2921 (GEl1)

Page 30 Page 54 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0

((

Figure B-12 Enrichmentand Gadolinium Distribution for EDB No. 2922

-Fuel Bundle GEl-l-P9DUB361-14GZ-IOOT-145-T6-2922 (GEll)

,; 1 Page 31 Page 55 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-0138-9259-FBIR-NP Revision 0

[E Figure B-13 Enrichment and Gadolinium Distribution for EDB No. 3106 Fuel Bundle GEl1-P9DUB366-12GZ-100T-145-T6-3106 (GEl1)

Page 32 Page 56 of 57

Exelon Nuclear - Nuclear Fuels Core Operating Limits Report For Oyster Creek 1 Cycle 24 Non-Proprietary Information Submitted in Accordance with 10CFR2.390 Oyster Creek Non-Proprietary Information Reload 24 Class I (Public)

COLR Oyster Creek 1 Rev. 8 0000-01 38-9259-FBIR-NP Revision 0 1[

Figure B-14 Enrichment and Gadolinium Distribution for EDB No. 4136 Fuel Bundle GNF2-P1ODG2B371-14GZ-100T2-145-T6-4136 (GNF2)

Page 33 Page 57 of 57