{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                            NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                REGION III
REGION III  
                                    2443 WARRENVILLE RD. SUITE 210
2443 WARRENVILLE RD. SUITE 210  
                                          LISLE, IL 60532-4352
LISLE, IL 60532-4352  
                                          October 17, 2019
October 17, 2019  
Mr. Dean Curtland
Mr. Dean Curtland  
Director of Site Operations
Director of Site Operations  
NextEra Energy Duane Arnold, LLC
NextEra Energy Duane Arnold, LLC  
3277 DAEC Road
3277 DAEC Road  
Palo, IA 52324-9785
Palo, IA 52324-9785  
SUBJECT: DUANE ARNOLD ENERGY CENTERREQUEST FOR INFORMATION FOR
              AN NRC TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION
SUBJECT: DUANE ARNOLD ENERGY CENTERREQUEST FOR INFORMATION FOR  
              (TEAM); INSPECTION REPORT 05000331/2020010
AN NRC TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION  
Dear Mr. Curtland:
(TEAM); INSPECTION REPORT 05000331/2020010  
On January 13, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial
Baseline Design Bases Assurance Inspection (Team) at Duane Arnold Energy Center.
Dear Mr. Curtland:  
This inspection will be performed in accordance with NRC Baseline Inspection
Procedure 71111.21M.
On January 13, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial  
The Design Bases Assurance Inspection focuses on the design, maintenance, and operation of
Baseline Design Bases Assurance Inspection (Team) at Duane Arnold Energy Center.
risk significant components with low margin, or associated with an accident scenario, or a
This inspection will be performed in accordance with NRC Baseline Inspection  
specific system. The inspection also monitors the implementation of modifications to structures,
Procedure 71111.21M.  
systems, and components as modifications to one system may also affect the design bases and
functioning of interfacing systems as well as introduce the potential for common cause failures.
The Design Bases Assurance Inspection focuses on the design, maintenance, and operation of  
The components and modifications to be reviewed during this baseline inspection will be
risk significant components with low margin, or associated with an accident scenario, or a  
identified as part of the preparation for the inspection and finalized during the inoffice
specific system. The inspection also monitors the implementation of modifications to structures,  
preparation week that occurs prior to the first onsite inspection week. In addition, operating
systems, and components as modifications to one system may also affect the design bases and  
experience issues, associated with the component samples, will also be selected for review.
functioning of interfacing systems as well as introduce the potential for common cause failures.
The inspection team may request scenarios to be performed on the simulator. This request
The components and modifications to be reviewed during this baseline inspection will be  
would require support from your simulator staff to validate scenarios, simulator time, and a crew
identified as part of the preparation for the inspection and finalized during the inoffice  
to perform the actions which would most likely occur during the second onsite week. The team
preparation week that occurs prior to the first onsite inspection week. In addition, operating  
will work closely with your staff early on during the inspection process to ensure this activity can
experience issues, associated with the component samples, will also be selected for review.
be accomplished with minimal impact.
The inspection team may request scenarios to be performed on the simulator. This request  
The inspection will include 2 weeks onsite. The inspection team will consist of four NRC
would require support from your simulator staff to validate scenarios, simulator time, and a crew  
inspectors who will focus on engineering/maintenance/operations of the selected components
to perform the actions which would most likely occur during the second onsite week. The team  
and modifications. The current inspection schedule is as follows:
will work closely with your staff early on during the inspection process to ensure this activity can  
    *   Preparation week:     January 6, 2020, through January 10, 2020
be accomplished with minimal impact.  
    *   Onsite weeks:         January 13, 2020 through January 17, 2020; and
                              January 27, 2020, through January 31, 2020
The inspection will include 2 weeks onsite. The inspection team will consist of four NRC  
inspectors who will focus on engineering/maintenance/operations of the selected components  
and modifications. The current inspection schedule is as follows:  
*  
Preparation week:  
January 6, 2020, through January 10, 2020  
*  
Onsite weeks:  
January 13, 2020 through January 17, 2020; and  
January 27, 2020, through January 31, 2020  


D. Curtland                                     -2-
D. Curtland  
Experience with previous baseline design/modification inspections of similar depth and length
-2-  
has shown that this type of inspection is extremely resource intensive, both for the NRC
inspectors and the licensee staff. In order to minimize the inspection impact on the site and to
Experience with previous baseline design/modification inspections of similar depth and length  
ensure a productive inspection for both parties, we have enclosed a request for information
has shown that this type of inspection is extremely resource intensive, both for the NRC  
needed for the inspection.
inspectors and the licensee staff. In order to minimize the inspection impact on the site and to  
It is important that all of these documents are up-to-date and complete in order to minimize the
ensure a productive inspection for both parties, we have enclosed a request for information  
number of additional documents requested during the preparation and/or the onsite portions of
needed for the inspection.  
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into three groups:
It is important that all of these documents are up-to-date and complete in order to minimize the  
    *   The first group lists information necessary for our initial inspection scoping activities.
number of additional documents requested during the preparation and/or the onsite portions of  
        This information should be provided to the lead inspector no later than November 29,
the inspection. Insofar as possible, this information should be provided electronically to the lead  
        2019. By December 13, 2019, the lead inspector will communicate the initial selected
inspector. The information request has been divided into three groups:  
        set of approximately ten components and ten modifications.
    *   The second group of documents requested is those items needed to support our
*  
        in-office preparation activities. This set of documents, including the calculations
The first group lists information necessary for our initial inspection scoping activities.
        associated with the initially selected components and the modification packages
This information should be provided to the lead inspector no later than November 29,  
        associated with the initially selected modifications, should be provided to the lead
2019. By December 13, 2019, the lead inspector will communicate the initial selected  
        inspector at the Regional Office no later than December 27, 2019. During the in-office
set of approximately ten components and ten modifications.  
        preparation activities, the team may identify additional information needed to support
        the inspection.
*  
    *   The last group includes the additional information above as well as plant specific
The second group of documents requested is those items needed to support our  
        reference material. This information should be available to the team onsite on
in-office preparation activities. This set of documents, including the calculations  
        January 13, 2020. It is also requested that corrective action documents and/or
associated with the initially selected components and the modification packages  
        questions developed during the inspection be provided to the lead inspector
associated with the initially selected modifications, should be provided to the lead  
        as the documents are generated.
inspector at the Regional Office no later than December 27, 2019. During the in-office  
The lead inspector for this inspection is Jamie Benjamin. We understand that our licensing
preparation activities, the team may identify additional information needed to support  
contact for this inspection is Tracy Weaver (319-851-7250) of your organization. If there are
the inspection.  
any questions about the inspection or the material requested in the enclosure, please contact
the lead inspector at 630-829-9747 or via e-mail at Jamie.Benjamin.@nrc.gov.
*  
This letter does not contain new or amended information collection requirements subject to
The last group includes the additional information above as well as plant specific  
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
reference material. This information should be available to the team onsite on  
requirements were approved by the Office of Management and Budget, Control Number
January 13, 2020. It is also requested that corrective action documents and/or  
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
questions developed during the inspection be provided to the lead inspector  
a request for information or an information collection requirement unless the requesting
as the documents are generated.  
document displays a currently valid Office of Management and Budget Control Number.
The lead inspector for this inspection is Jamie Benjamin. We understand that our licensing  
contact for this inspection is Tracy Weaver (319-851-7250) of your organization. If there are  
any questions about the inspection or the material requested in the enclosure, please contact  
the lead inspector at 630-829-9747 or via e-mail at Jamie.Benjamin.@nrc.gov.  
This letter does not contain new or amended information collection requirements subject to  
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, Control Number  
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,  
a request for information or an information collection requirement unless the requesting  
document displays a currently valid Office of Management and Budget Control Number.  


D. Curtland                                 -3-
D. Curtland  
This letter and its enclosure will be made available for public inspection and copying at
-3-  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public
This letter and its enclosure will be made available for public inspection and copying at  
Inspections, Exemptions, Requests for Withholding.
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
                                            Sincerely,
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public  
                                            /RA/
Inspections, Exemptions, Requests for Withholding.  
                                            Jamie Benjamin, Senior Reactor Engineer
                                            Engineering Branch 2
Sincerely,  
                                            Division of Reactor Safety
Docket No. 50-331
/RA/  
License No. DPR-49
Enclosure:
Design Bases Assurance Inspection
Jamie Benjamin, Senior Reactor Engineer  
   Document Request
Engineering Branch 2  
cc: Distribution via LISTSERV
Division of Reactor Safety
Docket No. 50-331  
License No. DPR-49  
Enclosure:  
Design Bases Assurance Inspection  
   Document Request  
cc: Distribution via LISTSERV


D. Curtland                                                               -4-
D. Curtland  
Letter to Dean Curtland from Jamie Benjamin dated October xx, 2019.
-4-  
SUBJECT: DUANE ARNOLD ENERGY CENTERREQUEST FOR INFORMATION FOR
                    AN NRC TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION
Letter to Dean Curtland from Jamie Benjamin dated October xx, 2019.  
                    (TEAM); INSPECTION REPORT 05000331/2020010
SUBJECT: DUANE ARNOLD ENERGY CENTERREQUEST FOR INFORMATION FOR  
DISTRIBUTION:
AN NRC TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION  
Jessie Quichocho
(TEAM); INSPECTION REPORT 05000331/2020010  
RidsNrrDorlLpl3
RidsNrrPMDuaneArnold Resource
DISTRIBUTION:  
RidsNrrDirsIrib Resource
Jessie Quichocho  
Darrell Roberts
RidsNrrDorlLpl3  
John Giessner
RidsNrrPMDuaneArnold Resource  
Jamnes Cameron
RidsNrrDirsIrib Resource  
Allan Barker
Darrell Roberts  
DRPIII
John Giessner  
DRSIII
Jamnes Cameron  
ADAMS ACCESSION: ML19290E548
Allan Barker  
DOCUMENT NAME: Ltr 10xx19 Duane Arnold 2020 010 DBA Inspection RFI (DRS-
DRPIII  
                                                                          J.Benjamin).docx
DRSIII  
    Publicly Available                       Non-Publicly Available                       Sensitive                 Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE               RIII
  NAME                 JBenjamin:jw
  DATE                 10/17/19
                                                          OFFICIAL RECORD COPY
ADAMS ACCESSION: ML19290E548  
DOCUMENT NAME: Ltr 10xx19 Duane Arnold 2020 010 DBA Inspection RFI (DRS-
J.Benjamin).docx  
Publicly Available  
Non-Publicly Available  
Sensitive  
Non-Sensitive  
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy  
OFFICE  
RIII  
   
NAME  
JBenjamin:jw  
   
DATE  
10/17/19  
OFFICIAL RECORD COPY  


              DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST  
Inspection Report:               05000331/2020010
Enclosure
  *   Inspection Dates:         January 13, 2020 through January 17, 2020; and
Inspection Report:  
                                January 27, 2020, through January 31, 2020
05000331/2020010  
Inspection Procedure:           IP 71111.21M, Design Bases Assurance Inspection (Team)
Lead Inspector:                 Jamie Benjamin, Senior Reactor Engineer, DRS
                                630-829-9747
*  
                                Jamie.benjamin@nrc.gov
Inspection Dates:  
I.     Information Requested for Selection of Components/Modifications
January 13, 2020 through January 17, 2020; and  
      The following information is requested by November 29, 2019, or sooner, to facilitate
January 27, 2020, through January 31, 2020  
      inspection preparation. If you have any questions regarding this information, please call
      the lead inspector as soon as possible. (Please provide the information electronically in
      pdf files, Excel, or other searchable formats, preferably on some portable electronic
Inspection Procedure:  
      media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain
IP 71111.21M, Design Bases Assurance Inspection (Team)  
      descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information
      in lists should contain enough information to be easily understood by someone who
      has knowledge of light water reactor technology).
Lead Inspector:  
      1. Risk-ranking of top 100 components (total) associated with spent fuel pool cooling,
Jamie Benjamin, Senior Reactor Engineer, DRS
            control room heating and ventilation and filtration, reactor building closed cooling
630-829-9747
            water, demineralized water, well water, instrument air and 4kV essential busses and
Jamie.benjamin@nrc.gov  
            switchgear systems from your site-specific probabilistic safety analysis (PSA) sorted
            by Risk-Achievement Worth (RAW). Include values for Birnbaum Importance, Risk-
            Reduction Worth, and Fussell-Veseley (as applicable).
I.  
      2. Provide copies of the emergency operating procedures.
Information Requested for Selection of Components/Modifications  
      3. Provide a list of the abnormal operating procedures.
      4. Any pre-existing evaluation or list of components and associated calculations with
The following information is requested by November 29, 2019, or sooner, to facilitate  
            low design margins, (i.e., pumps closest to the design limit for flow or pressure,
inspection preparation. If you have any questions regarding this information, please call  
            diesel generator close to design required output, heat exchangers close to rated
the lead inspector as soon as possible. (Please provide the information electronically in  
            design heat removal etc.).
pdf files, Excel, or other searchable formats, preferably on some portable electronic  
      5. List of available design (setup) margins in both the open and closed direction
media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain  
            (identify safety-related direction) for valves in the motor-operated valve and air-
descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information  
            operated valve programs. Identify the basis for how the margin was determined.
in lists should contain enough information to be easily understood by someone who  
      6. List of high-risk Maintenance Rule systems/components based on engineering
has knowledge of light water reactor technology).  
            or expert panel judgment (i.e., those systems/components not identified high risk
            in the PSA).
1. Risk-ranking of top 100 components (total) associated with spent fuel pool cooling,  
                                                                                          Enclosure
control room heating and ventilation and filtration, reactor building closed cooling  
water, demineralized water, well water, instrument air and 4kV essential busses and  
switchgear systems from your site-specific probabilistic safety analysis (PSA) sorted  
by Risk-Achievement Worth (RAW). Include values for Birnbaum Importance, Risk-
Reduction Worth, and Fussell-Veseley (as applicable).  
2. Provide copies of the emergency operating procedures.  
3. Provide a list of the abnormal operating procedures.  
4. Any pre-existing evaluation or list of components and associated calculations with  
low design margins, (i.e., pumps closest to the design limit for flow or pressure,  
diesel generator close to design required output, heat exchangers close to rated  
design heat removal etc.).  
5. List of available design (setup) margins in both the open and closed direction  
(identify safety-related direction) for valves in the motor-operated valve and air-
operated valve programs. Identify the basis for how the margin was determined.  
6. List of high-risk Maintenance Rule systems/components based on engineering  
or expert panel judgment (i.e., those systems/components not identified high risk  
in the PSA).  


      DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST  
7. Structures, systems, and components (SSCs) associated with the systems described
2
    in Item 1 in the Maintenance Rule (a)(1) category for the last 3 years.
7. Structures, systems, and components (SSCs) associated with the systems described  
8. Site top ten issues list (if applicable).
in Item 1 in the Maintenance Rule (a)(1) category for the last 3 years.  
9. A list of operating experience evaluations for the last 3 years associated with
    system/components described in Item 1.
8. Site top ten issues list (if applicable).  
10. Information of any common cause failure of components experienced in the last
    5 years at your facility.
9. A list of operating experience evaluations for the last 3 years associated with  
11. List of root cause evaluations associated with component failures or design issues
system/components described in Item 1.  
    initiated/completed in the last 5 years.
12. List of open operability evaluations.
10. Information of any common cause failure of components experienced in the last  
13. List of SSCs considered operable but degraded/nonconforming.
5 years at your facility.  
14. List of permanent plant modifications to SSCs that are field work complete in the
    last 3 years. (For the purpose of this inspection, permanent plant modifications
11. List of root cause evaluations associated with component failures or design issues  
    include permanent: plant changes, design changes, set point changes, equivalency
initiated/completed in the last 5 years.  
    evaluations, suitability analyses, and commercial grade dedications). The list should
    contain the number of each document, title, revision/date, and the affected system.
12. List of open operability evaluations.  
15. A list of calculation changes that have been issued for use in the last 3 years.
16. Copies of procedures addressing the following: modifications, design changes, set
13. List of SSCs considered operable but degraded/nonconforming.  
    point changes, equivalency evaluations or suitability analyses, commercial grade
    dedications, and post-modification testing.
14. List of permanent plant modifications to SSCs that are field work complete in the  
17. A list of corrective action documents (open and closed) in the last 3 years that
last 3 years. (For the purpose of this inspection, permanent plant modifications  
    address permanent plant modifications issues, concerns, or processes. These
include permanent: plant changes, design changes, set point changes, equivalency  
    documents should also include the corrective action documents associated with
evaluations, suitability analyses, and commercial grade dedications). The list should  
    the modification implementation.
contain the number of each document, title, revision/date, and the affected system.  
18. Current management and engineering organizational chart.
19. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,
15. A list of calculation changes that have been issued for use in the last 3 years.  
    Technical Specifications Bases, and Technical Requirements Manual.
20. Major one-line electrical drawings (ac and dc) and key diagrams (paper copies)
16. Copies of procedures addressing the following: modifications, design changes, set  
    associated with the systems described in Item 1.
point changes, equivalency evaluations or suitability analyses, commercial grade  
21. Electronic copy of Piping and Instrumentation Drawings (if available) associated with
dedications, and post-modification testing.  
    the systems described in Item 1.
                                            2
17. A list of corrective action documents (open and closed) in the last 3 years that  
address permanent plant modifications issues, concerns, or processes. These  
documents should also include the corrective action documents associated with  
the modification implementation.  
18. Current management and engineering organizational chart.  
19. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,  
Technical Specifications Bases, and Technical Requirements Manual.  
20. Major one-line electrical drawings (ac and dc) and key diagrams (paper copies)  
associated with the systems described in Item 1.  
21. Electronic copy of Piping and Instrumentation Drawings (if available) associated with  
the systems described in Item 1.  


          DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST  
II. Information Requested (for the approximate 10 selected components and
3
    10 selected modifications) to be Available by December 27, 2019, (will be
II.  
    reviewed by the team in the Regional office during the week of January 6, 2020).
Information Requested (for the approximate 10 selected components and  
    This information should be separated for each selected component or modification,
10 selected modifications) to be Available by December 27, 2019, (will be  
    especially if provided electronically (e.g., folder with component or modification name
reviewed by the team in the Regional office during the week of January 6, 2020).  
    that includes calculations, condition reports, maintenance history, etc.).
    1. List of condition reports (corrective action documents) associated with each of the
This information should be separated for each selected component or modification,  
        selected components for the last 3 years.
especially if provided electronically (e.g., folder with component or modification name  
    2. The maintenance history (corrective, preventive, and elective) associated with each
that includes calculations, condition reports, maintenance history, etc.).  
        of the selected components for the last 10 years. Identify frequency of preventive
        maintenance activities.
1. List of condition reports (corrective action documents) associated with each of the  
    3. Copies of calculations associated with each of the selected components
selected components for the last 3 years.  
        (if not previously provided), excluding data files. Please review the calculations and
        also provide copies of important referenced material (such as drawings, engineering
2. The maintenance history (corrective, preventive, and elective) associated with each  
        requests, and vendor letters). [Pipe stress calculations excluded from this request]
of the selected components for the last 10 years. Identify frequency of preventive  
    4. System Health Reports, System Descriptions, Design Basis Documents, and/or
maintenance activities.  
        Training Lesson Plans associated with each of the selected components.
    5. A list of modifications, including equivalency evaluations and setpoint changes,
3. Copies of calculations associated with each of the selected components  
        associated with each of the selected components. This list should include a
(if not previously provided), excluding data files. Please review the calculations and  
        descriptive paragraph on the purpose of the modification. Please ensure this
also provide copies of important referenced material (such as drawings, engineering  
        list only includes design completed (not canceled) modifications.
requests, and vendor letters). [Pipe stress calculations excluded from this request]  
    6. Copies of operability evaluations (open/closed for last 3 years) associated with each
        of the selected components and plans for restoring operability, if applicable.
4. System Health Reports, System Descriptions, Design Basis Documents, and/or  
    7. Copies of selected operator work-around evaluations associated with each of the
Training Lesson Plans associated with each of the selected components.  
        selected components and plans for resolution, if applicable.
    8. Copies of any open temporary modifications associated with each of the selected
5. A list of modifications, including equivalency evaluations and setpoint changes,  
        components, if applicable.
associated with each of the selected components. This list should include a  
    9. Trend data on the selected electrical/mechanical components performance for
descriptive paragraph on the purpose of the modification. Please ensure this  
        last 3 years (For example, pumps performance including in-service testing, other
list only includes design completed (not canceled) modifications.  
        vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate
        results, diagnostic trend data, etc.).
6. Copies of operability evaluations (open/closed for last 3 years) associated with each  
    10. Provide copies of the normal and abnormal operating procedures associated with
of the selected components and plans for restoring operability, if applicable.  
        the selected components and selected scenarios.
    11. List of time critical or risk significant operator actions associated with components.
7. Copies of selected operator work-around evaluations associated with each of the  
        Identify those actions that do not have job performance measures.
selected components and plans for resolution, if applicable.  
                                                  3
8. Copies of any open temporary modifications associated with each of the selected  
components, if applicable.  
9. Trend data on the selected electrical/mechanical components performance for  
last 3 years (For example, pumps performance including in-service testing, other  
vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate  
results, diagnostic trend data, etc.).  
10. Provide copies of the normal and abnormal operating procedures associated with  
the selected components and selected scenarios.  
11. List of time critical or risk significant operator actions associated with components.
Identify those actions that do not have job performance measures.  


          DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST  
    12. Copy of latest completed tests and surveillances for each component, for example:
4
        a. Pumps: comprehensive test, quarterly test, flow balance, etc.
12. Copy of latest completed tests and surveillances for each component, for example:  
        b. Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc.
        c. Heat Exchangers/room coolers: thermal performance, clean/inspect, fan flows,
a. Pumps: comprehensive test, quarterly test, flow balance, etc.  
            etc.
b. Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc.  
        d. Components: Technical Specification surveillances.
        e. Acceptance criteria basis calculations should also be included.
c. Heat Exchangers/room coolers: thermal performance, clean/inspect, fan flows,  
    13. For each of the selected modifications, copies of associated documents such as
etc.  
        modification package, engineering changes, 50.59 screening or evaluation,
        calculations, post-modification test packages, corrective action documents, design
d. Components: Technical Specification surveillances.  
        drawings, preventive maintenance requirements and procedures, etc.
    14. A copy of any internal/external self-assessments and associated corrective action
e. Acceptance criteria basis calculations should also be included.  
        documents generated in preparation for the inspection.
    15. A copy of engineering/operations related audits completed in the last 2 years.
13. For each of the selected modifications, copies of associated documents such as  
III. Additional Information to be Provided on January 13, 2020, Onsite (for final
modification package, engineering changes, 50.59 screening or evaluation,  
    selected components and modifications)
calculations, post-modification test packages, corrective action documents, design  
    1. During the in-office preparation activities, the team will be making final selections
drawings, preventive maintenance requirements and procedures, etc.  
        and may identify additional information needed to support the inspection. The lead
        inspector will provide a list of the additional information needed during the week of
14. A copy of any internal/external self-assessments and associated corrective action  
        January 6, 2020.
documents generated in preparation for the inspection.  
    2. Schedule of any testing/maintenance activities to be conducted on the selected
        components during the two onsite inspection weeks.
15. A copy of engineering/operations related audits completed in the last 2 years.  
IV. Information Requested to be Provided Throughout the Inspection
    1. Copies of any corrective action documents generated as a result of the teams
III.  
        questions or queries during this inspection.
Additional Information to be Provided on January 13, 2020, Onsite (for final  
    2. Copies of the list of questions submitted by the team members and the
selected components and modifications)  
        status/resolution of the information requested (provide daily by 2:00 p.m.
        during the inspection to each team member).
1. During the in-office preparation activities, the team will be making final selections  
    3. One complete set of Piping and Instrumentation Drawings (paper copies).
and may identify additional information needed to support the inspection. The lead  
    4. Reference materials. (make available if needed during all onsite weeks):
inspector will provide a list of the additional information needed during the week of  
        a. Individual Plant Examination/Probabilistic Risk Assessment report;
January 6, 2020.  
        b. Procurement documents for components and modifications selected
            (verify retrievable);
2. Schedule of any testing/maintenance activities to be conducted on the selected  
                                                4
components during the two onsite inspection weeks.  
IV.  
Information Requested to be Provided Throughout the Inspection  
1. Copies of any corrective action documents generated as a result of the teams  
questions or queries during this inspection.  
2. Copies of the list of questions submitted by the team members and the  
status/resolution of the information requested (provide daily by 2:00 p.m.  
during the inspection to each team member).  
3. One complete set of Piping and Instrumentation Drawings (paper copies).  
4. Reference materials. (make available if needed during all onsite weeks):  
a. Individual Plant Examination/Probabilistic Risk Assessment report;  
b. Procurement documents for components and modifications selected  
(verify retrievable);  


            DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST
DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST  
          c. Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
5
          d. Vendor manuals.
c. Plant procedures (normal, abnormal, emergency, surveillance, etc.); and  
d. Vendor manuals.  
If you have questions regarding the information requested, please contact the lead inspector.
If you have questions regarding the information requested, please contact the lead inspector.
                                                5
}}
}}

Latest revision as of 09:22, 2 January 2025

Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000331/2020010
ML19290E548
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 10/17/2019
From: Jamie Benjamin
NRC/RGN-III/DRS/EB2
To: Dean Curtland
NextEra Energy Duane Arnold
References
IR 2020010
Download: ML19290E548 (9)


See also: IR 05000331/2020010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

October 17, 2019

Mr. Dean Curtland

Director of Site Operations

NextEra Energy Duane Arnold, LLC

3277 DAEC Road

Palo, IA 52324-9785

SUBJECT: DUANE ARNOLD ENERGY CENTERREQUEST FOR INFORMATION FOR

AN NRC TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION

(TEAM); INSPECTION REPORT 05000331/2020010

Dear Mr. Curtland:

On January 13, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin a Triennial

Baseline Design Bases Assurance Inspection (Team) at Duane Arnold Energy Center.

This inspection will be performed in accordance with NRC Baseline Inspection

Procedure 71111.21M.

The Design Bases Assurance Inspection focuses on the design, maintenance, and operation of

risk significant components with low margin, or associated with an accident scenario, or a

specific system. The inspection also monitors the implementation of modifications to structures,

systems, and components as modifications to one system may also affect the design bases and

functioning of interfacing systems as well as introduce the potential for common cause failures.

The components and modifications to be reviewed during this baseline inspection will be

identified as part of the preparation for the inspection and finalized during the inoffice

preparation week that occurs prior to the first onsite inspection week. In addition, operating

experience issues, associated with the component samples, will also be selected for review.

The inspection team may request scenarios to be performed on the simulator. This request

would require support from your simulator staff to validate scenarios, simulator time, and a crew

to perform the actions which would most likely occur during the second onsite week. The team

will work closely with your staff early on during the inspection process to ensure this activity can

be accomplished with minimal impact.

The inspection will include 2 weeks onsite. The inspection team will consist of four NRC

inspectors who will focus on engineering/maintenance/operations of the selected components

and modifications. The current inspection schedule is as follows:

Preparation week:

January 6, 2020, through January 10, 2020

Onsite weeks:

January 13, 2020 through January 17, 2020; and

January 27, 2020, through January 31, 2020

D. Curtland

-2-

Experience with previous baseline design/modification inspections of similar depth and length

has shown that this type of inspection is extremely resource intensive, both for the NRC

inspectors and the licensee staff. In order to minimize the inspection impact on the site and to

ensure a productive inspection for both parties, we have enclosed a request for information

needed for the inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than November 29,

2019. By December 13, 2019, the lead inspector will communicate the initial selected

set of approximately ten components and ten modifications.

The second group of documents requested is those items needed to support our

in-office preparation activities. This set of documents, including the calculations

associated with the initially selected components and the modification packages

associated with the initially selected modifications, should be provided to the lead

inspector at the Regional Office no later than December 27, 2019. During the in-office

preparation activities, the team may identify additional information needed to support

the inspection.

The last group includes the additional information above as well as plant specific

reference material. This information should be available to the team onsite on

January 13, 2020. It is also requested that corrective action documents and/or

questions developed during the inspection be provided to the lead inspector

as the documents are generated.

The lead inspector for this inspection is Jamie Benjamin. We understand that our licensing

contact for this inspection is Tracy Weaver (319-851-7250) of your organization. If there are

any questions about the inspection or the material requested in the enclosure, please contact

the lead inspector at 630-829-9747 or via e-mail at Jamie.Benjamin.@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

D. Curtland

-3-

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jamie Benjamin, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-331

License No. DPR-49

Enclosure:

Design Bases Assurance Inspection

Document Request

cc: Distribution via LISTSERV

D. Curtland

-4-

Letter to Dean Curtland from Jamie Benjamin dated October xx, 2019.

SUBJECT: DUANE ARNOLD ENERGY CENTERREQUEST FOR INFORMATION FOR

AN NRC TRIENNIAL BASELINE DESIGN BASES ASSURANCE INSPECTION

(TEAM); INSPECTION REPORT 05000331/2020010

DISTRIBUTION:

Jessie Quichocho

RidsNrrDorlLpl3

RidsNrrPMDuaneArnold Resource

RidsNrrDirsIrib Resource

Darrell Roberts

John Giessner

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS ACCESSION: ML19290E548

DOCUMENT NAME: Ltr 10xx19 Duane Arnold 2020 010 DBA Inspection RFI (DRS-

J.Benjamin).docx

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE

RIII

NAME

JBenjamin:jw

DATE

10/17/19

OFFICIAL RECORD COPY

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report: 05000331/2020010

Inspection Dates:

January 13, 2020 through January 17, 2020; and

January 27, 2020, through January 31, 2020

Inspection Procedure:

IP 71111.21M, Design Bases Assurance Inspection (Team)

Lead Inspector:

Jamie Benjamin, Senior Reactor Engineer, DRS

630-829-9747

Jamie.benjamin@nrc.gov

I.

Information Requested for Selection of Components/Modifications

The following information is requested by November 29, 2019, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the lead inspector as soon as possible. (Please provide the information electronically in

pdf files, Excel, or other searchable formats, preferably on some portable electronic

media (e.g., CD-ROM, DVD, etc.). The portable electronic media should contain

descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information

in lists should contain enough information to be easily understood by someone who

has knowledge of light water reactor technology).

1. Risk-ranking of top 100 components (total) associated with spent fuel pool cooling,

control room heating and ventilation and filtration, reactor building closed cooling

water, demineralized water, well water, instrument air and 4kV essential busses and

switchgear systems from your site-specific probabilistic safety analysis (PSA) sorted

by Risk-Achievement Worth (RAW). Include values for Birnbaum Importance, Risk-

Reduction Worth, and Fussell-Veseley (as applicable).

2. Provide copies of the emergency operating procedures.

3. Provide a list of the abnormal operating procedures.

4. Any pre-existing evaluation or list of components and associated calculations with

low design margins, (i.e., pumps closest to the design limit for flow or pressure,

diesel generator close to design required output, heat exchangers close to rated

design heat removal etc.).

5. List of available design (setup) margins in both the open and closed direction

(identify safety-related direction) for valves in the motor-operated valve and air-

operated valve programs. Identify the basis for how the margin was determined.

6. List of high-risk Maintenance Rule systems/components based on engineering

or expert panel judgment (i.e., those systems/components not identified high risk

in the PSA).

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

2

7. Structures, systems, and components (SSCs) associated with the systems described

in Item 1 in the Maintenance Rule (a)(1) category for the last 3 years.

8. Site top ten issues list (if applicable).

9. A list of operating experience evaluations for the last 3 years associated with

system/components described in Item 1.

10. Information of any common cause failure of components experienced in the last

5 years at your facility.

11. List of root cause evaluations associated with component failures or design issues

initiated/completed in the last 5 years.

12. List of open operability evaluations.

13. List of SSCs considered operable but degraded/nonconforming.

14. List of permanent plant modifications to SSCs that are field work complete in the

last 3 years. (For the purpose of this inspection, permanent plant modifications

include permanent: plant changes, design changes, set point changes, equivalency

evaluations, suitability analyses, and commercial grade dedications). The list should

contain the number of each document, title, revision/date, and the affected system.

15. A list of calculation changes that have been issued for use in the last 3 years.

16. Copies of procedures addressing the following: modifications, design changes, set

point changes, equivalency evaluations or suitability analyses, commercial grade

dedications, and post-modification testing.

17. A list of corrective action documents (open and closed) in the last 3 years that

address permanent plant modifications issues, concerns, or processes. These

documents should also include the corrective action documents associated with

the modification implementation.

18. Current management and engineering organizational chart.

19. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,

Technical Specifications Bases, and Technical Requirements Manual.

20. Major one-line electrical drawings (ac and dc) and key diagrams (paper copies)

associated with the systems described in Item 1.

21. Electronic copy of Piping and Instrumentation Drawings (if available) associated with

the systems described in Item 1.

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

3

II.

Information Requested (for the approximate 10 selected components and

10 selected modifications) to be Available by December 27, 2019, (will be

reviewed by the team in the Regional office during the week of January 6, 2020).

This information should be separated for each selected component or modification,

especially if provided electronically (e.g., folder with component or modification name

that includes calculations, condition reports, maintenance history, etc.).

1. List of condition reports (corrective action documents) associated with each of the

selected components for the last 3 years.

2. The maintenance history (corrective, preventive, and elective) associated with each

of the selected components for the last 10 years. Identify frequency of preventive

maintenance activities.

3. Copies of calculations associated with each of the selected components

(if not previously provided), excluding data files. Please review the calculations and

also provide copies of important referenced material (such as drawings, engineering

requests, and vendor letters). [Pipe stress calculations excluded from this request]

4. System Health Reports, System Descriptions, Design Basis Documents, and/or

Training Lesson Plans associated with each of the selected components.

5. A list of modifications, including equivalency evaluations and setpoint changes,

associated with each of the selected components. This list should include a

descriptive paragraph on the purpose of the modification. Please ensure this

list only includes design completed (not canceled) modifications.

6. Copies of operability evaluations (open/closed for last 3 years) associated with each

of the selected components and plans for restoring operability, if applicable.

7. Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

8. Copies of any open temporary modifications associated with each of the selected

components, if applicable.

9. Trend data on the selected electrical/mechanical components performance for

last 3 years (For example, pumps performance including in-service testing, other

vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate

results, diagnostic trend data, etc.).

10. Provide copies of the normal and abnormal operating procedures associated with

the selected components and selected scenarios.

11. List of time critical or risk significant operator actions associated with components.

Identify those actions that do not have job performance measures.

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

4

12. Copy of latest completed tests and surveillances for each component, for example:

a. Pumps: comprehensive test, quarterly test, flow balance, etc.

b. Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc.

c. Heat Exchangers/room coolers: thermal performance, clean/inspect, fan flows,

etc.

d. Components: Technical Specification surveillances.

e. Acceptance criteria basis calculations should also be included.

13. For each of the selected modifications, copies of associated documents such as

modification package, engineering changes, 50.59 screening or evaluation,

calculations, post-modification test packages, corrective action documents, design

drawings, preventive maintenance requirements and procedures, etc.

14. A copy of any internal/external self-assessments and associated corrective action

documents generated in preparation for the inspection.

15. A copy of engineering/operations related audits completed in the last 2 years.

III.

Additional Information to be Provided on January 13, 2020, Onsite (for final

selected components and modifications)

1. During the in-office preparation activities, the team will be making final selections

and may identify additional information needed to support the inspection. The lead

inspector will provide a list of the additional information needed during the week of

January 6, 2020.

2. Schedule of any testing/maintenance activities to be conducted on the selected

components during the two onsite inspection weeks.

IV.

Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily by 2:00 p.m.

during the inspection to each team member).

3. One complete set of Piping and Instrumentation Drawings (paper copies).

4. Reference materials. (make available if needed during all onsite weeks):

a. Individual Plant Examination/Probabilistic Risk Assessment report;

b. Procurement documents for components and modifications selected

(verify retrievable);

DESIGN BASES ASSURANCE INSPECTION DOCUMENT REQUEST

5

c. Plant procedures (normal, abnormal, emergency, surveillance, etc.); and

d. Vendor manuals.

If you have questions regarding the information requested, please contact the lead inspector.