ML13107B196: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Sus quehanna | {{#Wiki_filter:1 Sus quehanna Annual As s es s ment Meeting Nuclear Regulatory Commis s ion - Region I Berwick, PA April 10, 2013 | ||
2 Agenda | |||
* | * Introduction | ||
* | * Reactor Overs ight Proces s | ||
* Dis | * Dis cus s ion of Plant Performance Res ults | ||
* | * PPL Res pons e and Remarks | ||
* NRC | * NRC Clos ing Remarks | ||
* | * Break | ||
* NRC | * NRC available to addres s public ques tions | ||
3 Region I Organization William M. Dean Regional Administrator David C. Lew Deputy Regional Administrator Darrell J. Roberts Director Division of Reactor Projects Michael C. Layton Deputy Director Chris Miller Director Division of Reactor Safety James W. Clifford Deputy Director Mel Gray Branch Chief Regional Specialists Susquehanna Resident Inspectors Patrick Finney Jonathan Greives Project Engineers Scott Barber Juan Ayala Andrey Turilin | |||
NRC | 4 NRC Performance Goals | ||
* | * Safety: Ens ure adequate protection of public health and s afety and the environment | ||
* | * Security: Ens ure adequate protection in the s ecure us e and management of radioactive materials | ||
5 Regulatory Framework PUBLIC HEALTH AND SAFETY AS A RESULT OF CIVILIAN NUCLEAR REACTOR OPERATION NRCS Overall Safety Mission REACTOR SAFETY RADIATION SAFETY SAFEGAURDS INITIATING EVENTS Strategic Performance Area MITIGATING SYSTEMS BARRIER INTEGRITY EMERGENCY PREPAREDNESS PUBLIC RADIATION SAFETY OCCUPATIONAL RADIATION SAFETY SECURITY Cornerstones HUMAN PERFOMANCE SAFETY CONSCIOUS WORK ENVIRONMENT PROBLEM IDENTIFICATION AND RESOLUTION Cross-Cutting Areas | |||
6 Reactor Overs ight Proces s Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas | |||
NRC | NRC Action Matrix Concept 7 | ||
Licens ee Res pons e Regulatory Res pons e Degraded Corners tone Multiple Repetitive Degraded Corners tone Unacceptable Performance All Inputs are Green; Corners tone Objectives Fully Met 1 or 2 White Inputs (in different corners tones ); | |||
Corners tone Objectives Fully Met 2 White or 1 Yellow Input; Corners tone Objectives Met w/ | |||
Moderate Degradation in Safety Performance Multiple Yellow Inputs or 1 Red Input; Corners tone Objectives Met w/ | |||
Significant Degradation in Safety Performance Overall Unacceptable Performance; Plants not permitted to Operate w/in this Column; Unacceptable Margin to Safety Increas ing s afety s ignificance Increas ing NRC ins pection efforts Increas ing NRC/Licens ee management involvement Increas ing regulatory actions | |||
Subs tantive Cros s -Cutting Is s ues (SCCI) Proces s 8 | |||
Cross-Cutting Theme Does the NRC have a concern with the scope of the licensees efforts or progress in addressing the theme? | |||
NRC Finding Cross-Cutting Aspect (CCA) | |||
CCA CCA CCA CCA Open SCCI No SCCI Yes No | |||
9 Sus quehanna 2012 Ins pection Activities | |||
* | * Approximately 8500 hours of ins pection & | ||
related activities | |||
* 2 | * 2 res ident ins pectors on s ite | ||
* | * Team ins pections | ||
- 2 Supplemental (95002 Initial and Follow Up) | |||
- Problem Identification & Res olution | |||
- Permanent Plant Modifications | |||
- Others (Security, EP, Operator Licens ing) | |||
10 Sus quehanna Unit 1 2012 As s es s ment Res ults | |||
* | * Licens ee Res pons e column effective J anuary 25, 2013 | ||
- Clos ed White PI (2nd quarter 2012) | |||
* | * Unplanned Scrams per 7000 hours | ||
- Clos ed White finding (4th quarter of 2012) | |||
* 2010 | * 2010 flooding is s ue | ||
Unit 1 Action Matrix LICENSEE RESPONSE 11 Licens ee Res pons e Regulatory Res pons e Degraded Corners tone Multiple Repetitive Degraded Corners tone Unacceptable Performance All Inputs are Green; Corners tone Objectives Fully Met 1 or 2 White Inputs (in different corners tones ); | |||
Corners tone Objectives Fully Met 2 White or 1 Yellow Input; Corners tone Objectives Met w/ | |||
Moderate Degradation in Safety Performance Multiple Yellow Inputs or 1 Red Input; Corners tone Objectives Met w/ | |||
Significant Degradation in Safety Performance Overall Unacceptable Performance; Plants not permitted to Operate w/in this Column; Unacceptable Margin to Safety | |||
- White PI - Unplanned Scrams / 7000 hours | |||
- White Finding is s ued in 3rd quarter 2010 | |||
- All Green Findings | |||
- All Green PIs | |||
- Licens ee Res pons e column effective 1/25/2012 | |||
12 Sus quehanna Unit 2 As s es s ment Res ults | |||
* | * Regulatory Res pons e column | ||
- All Green Findings | |||
- After additional NRC ins pector ques tions PPL revis ed Unplanned Scrams with Complications PI on 3/20/13 to clas s ify the 12/16/12 s cram as complicated | |||
- NRC will follow-up with s upplemental ins pection (IP 95001) | |||
Unit 2 Action Matrix REGULATORY RESPONSE | Unit 2 Action Matrix REGULATORY RESPONSE 13 Licens ee Res pons e Regulatory Res pons e Degraded Corners tone Multiple Repetitive Degraded Corners tone Unacceptable Performance All Inputs are Green; Corners tone Objectives Fully Met 1 or 2 White Inputs (in different corners tones ); | ||
Corners tone Objectives Fully Met 2 White or 1 Yellow Input; Corners tone Objectives Met w/ | |||
Moderate Degradation in Safety Performance Multiple Yellow Inputs or 1 Red Input; Corners tone Objectives Met w/ | |||
* All | Significant Degradation in Safety Performance Overall Unacceptable Performance; Plants not permitted to Operate w/in this Column; Unacceptable Margin to Safety | ||
* White PI | |||
* Unplanned Scrams with Complications | |||
* All Green Findings | |||
* All Green PIs | |||
2012 | 2012 Sus quehanna Unit 1 & 2 Subs tantive Cros s -Cutting Is s ues | ||
* | * Human Performance - Documentation | ||
& Procedures ) | |||
- Clos ed at the end of 2012 | |||
* | * Problem Identification & Res olution - | ||
Evaluation Quality | |||
- Maintained Subs tantive Cros s Cutting Is s ue in evaluation quality open 14 | |||
Human Performance SCCI | |||
* H.2(c ) - | * H.2(c) - Documentation & Procedures | ||
- Opened at the end of 2011 | |||
- NRC clos ed this SCCI at the end of 2012 becaus e PPL demons trated s us tainable performance improvement regarding procedures 15 | |||
Problem Identification & | |||
Res olution SCCI | |||
* P .1 (c ) - | * P.1 (c) - Evaluation Quality | ||
- SCCI opened s ince mid 2011. | |||
- At the end of 2012 there were 4 findings with this as pect | |||
- SCCI in P.1(c) remains open at the end of 2012 becaus e exit criteria not met | |||
- 2012 NRC As s es s ment Letter reques ts PPL addres s plans, trends & res ults at this meeting 16 | |||
17 Licens ee Res pons e and Remarks Timothy S. Raus ch Sr. Vice Pres ident & Chief Nuclear Officer PPL Sus quehanna, LLC | |||
18 Unit 1 - Licens ee Res pons e column of the Action Matrix | |||
- Bas eline Ins pection Program Unit 2 - Regulatory Res pons e column of the Action Matrix | |||
- Bas eline ins pections and one Supplemental Ins pection (IP 95001) | |||
SCCI in H.2(c) clos ed at the end of 2012 SCCI in P.1(c) remains open for a fourth cons ecutive as s es s ment Sus quehanna 2012 Annual As s es s ment Summary | |||
19 Contacting the NRC | |||
* | * Report an emergency | ||
- (301) 816-5100 (call collect) | |||
* | * Report a s afety concern | ||
- (800) 695-7403 | |||
- Allegation@nrc.gov | |||
* | * General information or ques tions | ||
- www.nrc.gov | |||
- Select What We Do for Public Affairs | |||
20 Reference Sources | |||
* | * Reactor Overs ight Proces s | ||
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html | |||
* | * Public Electronic Reading Room | ||
- http://www.nrc.gov/reading-rm.html | |||
* | * Public Document Room 800-397-4209 (Toll Free) | ||
Sus quehanna | 21 Sus quehanna Annual As s es s ment Meeting | ||
* | * Short break | ||
* NRC to | * NRC to addres s public ques tions}} | ||
Latest revision as of 09:25, 11 January 2025
| ML13107B196 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/10/2013 |
| From: | Mel Gray Reactor Projects Region 1 Branch 4 |
| To: | |
| GRAY, MEL | |
| References | |
| Download: ML13107B196 (21) | |
Text
1 Sus quehanna Annual As s es s ment Meeting Nuclear Regulatory Commis s ion - Region I Berwick, PA April 10, 2013
2 Agenda
- Introduction
- Reactor Overs ight Proces s
- Dis cus s ion of Plant Performance Res ults
- PPL Res pons e and Remarks
- NRC Clos ing Remarks
- Break
- NRC available to addres s public ques tions
3 Region I Organization William M. Dean Regional Administrator David C. Lew Deputy Regional Administrator Darrell J. Roberts Director Division of Reactor Projects Michael C. Layton Deputy Director Chris Miller Director Division of Reactor Safety James W. Clifford Deputy Director Mel Gray Branch Chief Regional Specialists Susquehanna Resident Inspectors Patrick Finney Jonathan Greives Project Engineers Scott Barber Juan Ayala Andrey Turilin
4 NRC Performance Goals
- Safety: Ens ure adequate protection of public health and s afety and the environment
- Security: Ens ure adequate protection in the s ecure us e and management of radioactive materials
5 Regulatory Framework PUBLIC HEALTH AND SAFETY AS A RESULT OF CIVILIAN NUCLEAR REACTOR OPERATION NRCS Overall Safety Mission REACTOR SAFETY RADIATION SAFETY SAFEGAURDS INITIATING EVENTS Strategic Performance Area MITIGATING SYSTEMS BARRIER INTEGRITY EMERGENCY PREPAREDNESS PUBLIC RADIATION SAFETY OCCUPATIONAL RADIATION SAFETY SECURITY Cornerstones HUMAN PERFOMANCE SAFETY CONSCIOUS WORK ENVIRONMENT PROBLEM IDENTIFICATION AND RESOLUTION Cross-Cutting Areas
6 Reactor Overs ight Proces s Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
NRC Action Matrix Concept 7
Licens ee Res pons e Regulatory Res pons e Degraded Corners tone Multiple Repetitive Degraded Corners tone Unacceptable Performance All Inputs are Green; Corners tone Objectives Fully Met 1 or 2 White Inputs (in different corners tones );
Corners tone Objectives Fully Met 2 White or 1 Yellow Input; Corners tone Objectives Met w/
Moderate Degradation in Safety Performance Multiple Yellow Inputs or 1 Red Input; Corners tone Objectives Met w/
Significant Degradation in Safety Performance Overall Unacceptable Performance; Plants not permitted to Operate w/in this Column; Unacceptable Margin to Safety Increas ing s afety s ignificance Increas ing NRC ins pection efforts Increas ing NRC/Licens ee management involvement Increas ing regulatory actions
Subs tantive Cros s -Cutting Is s ues (SCCI) Proces s 8
Cross-Cutting Theme Does the NRC have a concern with the scope of the licensees efforts or progress in addressing the theme?
NRC Finding Cross-Cutting Aspect (CCA)
CCA CCA CCA CCA Open SCCI No SCCI Yes No
9 Sus quehanna 2012 Ins pection Activities
- Approximately 8500 hours0.0984 days <br />2.361 hours <br />0.0141 weeks <br />0.00323 months <br /> of ins pection &
related activities
- 2 res ident ins pectors on s ite
- Team ins pections
- 2 Supplemental (95002 Initial and Follow Up)
- Problem Identification & Res olution
- Permanent Plant Modifications
- Others (Security, EP, Operator Licens ing)
10 Sus quehanna Unit 1 2012 As s es s ment Res ults
- Licens ee Res pons e column effective J anuary 25, 2013
- Clos ed White PI (2nd quarter 2012)
- Unplanned Scrams per 7000 hours0.081 days <br />1.944 hours <br />0.0116 weeks <br />0.00266 months <br />
- Clos ed White finding (4th quarter of 2012)
- 2010 flooding is s ue
Unit 1 Action Matrix LICENSEE RESPONSE 11 Licens ee Res pons e Regulatory Res pons e Degraded Corners tone Multiple Repetitive Degraded Corners tone Unacceptable Performance All Inputs are Green; Corners tone Objectives Fully Met 1 or 2 White Inputs (in different corners tones );
Corners tone Objectives Fully Met 2 White or 1 Yellow Input; Corners tone Objectives Met w/
Moderate Degradation in Safety Performance Multiple Yellow Inputs or 1 Red Input; Corners tone Objectives Met w/
Significant Degradation in Safety Performance Overall Unacceptable Performance; Plants not permitted to Operate w/in this Column; Unacceptable Margin to Safety
- White PI - Unplanned Scrams / 7000 hours0.081 days <br />1.944 hours <br />0.0116 weeks <br />0.00266 months <br />
- White Finding is s ued in 3rd quarter 2010
- All Green Findings
- All Green PIs
- Licens ee Res pons e column effective 1/25/2012
12 Sus quehanna Unit 2 As s es s ment Res ults
- Regulatory Res pons e column
- All Green Findings
- After additional NRC ins pector ques tions PPL revis ed Unplanned Scrams with Complications PI on 3/20/13 to clas s ify the 12/16/12 s cram as complicated
- NRC will follow-up with s upplemental ins pection (IP 95001)
Unit 2 Action Matrix REGULATORY RESPONSE 13 Licens ee Res pons e Regulatory Res pons e Degraded Corners tone Multiple Repetitive Degraded Corners tone Unacceptable Performance All Inputs are Green; Corners tone Objectives Fully Met 1 or 2 White Inputs (in different corners tones );
Corners tone Objectives Fully Met 2 White or 1 Yellow Input; Corners tone Objectives Met w/
Moderate Degradation in Safety Performance Multiple Yellow Inputs or 1 Red Input; Corners tone Objectives Met w/
Significant Degradation in Safety Performance Overall Unacceptable Performance; Plants not permitted to Operate w/in this Column; Unacceptable Margin to Safety
- White PI
- Unplanned Scrams with Complications
- All Green Findings
- All Green PIs
2012 Sus quehanna Unit 1 & 2 Subs tantive Cros s -Cutting Is s ues
- Human Performance - Documentation
& Procedures )
- Clos ed at the end of 2012
- Problem Identification & Res olution -
Evaluation Quality
- Maintained Subs tantive Cros s Cutting Is s ue in evaluation quality open 14
Human Performance SCCI
- H.2(c) - Documentation & Procedures
- Opened at the end of 2011
- NRC clos ed this SCCI at the end of 2012 becaus e PPL demons trated s us tainable performance improvement regarding procedures 15
Problem Identification &
Res olution SCCI
- P.1 (c) - Evaluation Quality
- SCCI opened s ince mid 2011.
- At the end of 2012 there were 4 findings with this as pect
- SCCI in P.1(c) remains open at the end of 2012 becaus e exit criteria not met
- 2012 NRC As s es s ment Letter reques ts PPL addres s plans, trends & res ults at this meeting 16
17 Licens ee Res pons e and Remarks Timothy S. Raus ch Sr. Vice Pres ident & Chief Nuclear Officer PPL Sus quehanna, LLC
18 Unit 1 - Licens ee Res pons e column of the Action Matrix
- Bas eline Ins pection Program Unit 2 - Regulatory Res pons e column of the Action Matrix
- Bas eline ins pections and one Supplemental Ins pection (IP 95001)
SCCI in H.2(c) clos ed at the end of 2012 SCCI in P.1(c) remains open for a fourth cons ecutive as s es s ment Sus quehanna 2012 Annual As s es s ment Summary
19 Contacting the NRC
- Report an emergency
- (301) 816-5100 (call collect)
- Report a s afety concern
- (800) 695-7403
- Allegation@nrc.gov
- General information or ques tions
- www.nrc.gov
- Select What We Do for Public Affairs
20 Reference Sources
- Reactor Overs ight Proces s
- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html
- Public Electronic Reading Room
- http://www.nrc.gov/reading-rm.html
- Public Document Room 800-397-4209 (Toll Free)
21 Sus quehanna Annual As s es s ment Meeting
- Short break
- NRC to addres s public ques tions