{{#Wiki_filter:April 22, 2014 MEMORANDUM TO:                 FILE FROM:                         Nadiyah S. Morgan, Project Manager /RA/
{{#Wiki_filter:April 22, 2014 MEMORANDUM TO:
Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulations
FILE FROM:
Nadiyah S. Morgan, Project Manager /RA/
Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulations  


==SUBJECT:==
==SUBJECT:==
Line 29: Line 31:
Nuclear Regulatory Commission (NRC) staff and Entergy Nuclear Operations, Inc., the licensee.
Nuclear Regulatory Commission (NRC) staff and Entergy Nuclear Operations, Inc., the licensee.
The discussion was in regard to the licensees request for relief PRR-25, Revision 1 for Pilgrim Nuclear Power Station (Pilgrim). Participants in the discussion included:
The discussion was in regard to the licensees request for relief PRR-25, Revision 1 for Pilgrim Nuclear Power Station (Pilgrim). Participants in the discussion included:
NRC                                           Licensee Dee Morgan             Ray McKinley           John Dent                     Frank Clifford Ben Beasley           Niklas Floyd           Steve Verrochi               Dave Mannai John Tsao             Max Schneider           Ted Bordelon                 Walter Lobo Dave Alley                                     Bruce Chenard                 Hamil Grimes Tim Lupold                                     Frank McGinnis               Murray Williams Steve Scott                   Ray Pace Joe Weicks                   Ron Williams By letter dated March 5, 2014 (Agencywide Document and Access Management System (ADAMS) Accession No. ML14073A059), as supplemented by letter dated March 25, 2014 (ADAMS Accession No. ML14091A407), the licensee requested relief from certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI for Pilgrim. The licensee proposed an alternate repair for leaking spool JF29-8-4 of the salt service water system piping, as documented in PRR-25, Revision 1.
NRC Licensee Dee Morgan Ray McKinley John Dent Frank Clifford Ben Beasley Niklas Floyd Steve Verrochi Dave Mannai John Tsao Max Schneider Ted Bordelon Walter Lobo Dave Alley Bruce Chenard Hamil Grimes Tim Lupold Frank McGinnis Murray Williams Steve Scott Ray Pace Joe Weicks Ron Williams By {{letter dated|date=March 5, 2014|text=letter dated March 5, 2014}} (Agencywide Document and Access Management System (ADAMS) Accession No. ML14073A059), as supplemented by {{letter dated|date=March 25, 2014|text=letter dated March 25, 2014}} (ADAMS Accession No. ML14091A407), the licensee requested relief from certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI for Pilgrim. The licensee proposed an alternate repair for leaking spool JF29-8-4 of the salt service water system piping, as documented in PRR-25, Revision 1.
The licensee developed its proposed alternative in response to leakage from the subject component which placed the plant in a Technical Specification Action Statement due to flooding concerns. The licensees proposed alternative consists of mitigating the observed leakage from the subject component using a non-ASME Code compliant weld repair in conjunction with a seismically qualified mechanical clamp. As reported in its submission, the licensee performed stress calculations which demonstrated that the piping, with or without the attempted welded repairs or mechanical clamp, was structurally sound. The licensee will perform daily walkdowns and ultrasonic examination of the wall thickness of the repaired area (outside the clamp area) every 30 days, which is a condition of approval of this request. The licensees proposed alternative is temporary and will be repaired/replaced in accordance with ASME Code requirements, not later than its next refueling outage, which is currently scheduled for April 2015.
The licensee developed its proposed alternative in response to leakage from the subject component which placed the plant in a Technical Specification Action Statement due to flooding concerns. The licensees proposed alternative consists of mitigating the observed leakage from the subject component using a non-ASME Code compliant weld repair in conjunction with a seismically qualified mechanical clamp. As reported in its submission, the licensee performed stress calculations which demonstrated that the piping, with or without the attempted welded repairs or mechanical clamp, was structurally sound. The licensee will perform daily walkdowns and ultrasonic examination of the wall thickness of the repaired area (outside the clamp area) every 30 days, which is a condition of approval of this request. The licensees proposed alternative is temporary and will be repaired/replaced in accordance with ASME Code requirements, not later than its next refueling outage, which is currently scheduled for April 2015.
Based on an evaluation of the information submitted, the NRC staff has determined that the proposed alternative provides reasonable assurance of the structural integrity of the subject degraded salt service water system piping. The NRC staff also determined that complying with the specified ASME Code requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff has concluded that the licensee has adequately addressed all of the regulatory requirements set forth in Title 10 of the Code of Federal Regulations Section 50.55a(a)(3)(ii). Therefore, on March 26, 2014, the NRC staff authorizes the use of PRR-25, Revision 1 at Pilgrim, not longer than the next scheduled refueling outage in April 2015.
Based on an evaluation of the information submitted, the NRC staff has determined that the proposed alternative provides reasonable assurance of the structural integrity of the subject degraded salt service water system piping. The NRC staff also determined that complying with the specified ASME Code requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff has concluded that the licensee has adequately addressed all of the regulatory requirements set forth in Title 10 of the Code of Federal Regulations Section 50.55a(a)(3)(ii). Therefore, on March 26, 2014, the NRC staff authorizes the use of PRR-25, Revision 1 at Pilgrim, not longer than the next scheduled refueling outage in April 2015.
All other requirements of ASME Code, Section XI for which relief was not specifically requested and authorized by the NRC staff remain applicable, including the third party review by the Authorized Nuclear In-service Inspector.
All other requirements of ASME Code, Section XI for which relief was not specifically requested and authorized by the NRC staff remain applicable, including the third party review by the Authorized Nuclear In-service Inspector.
This verbal authorization does not preclude the NRC staff from asking additional clarifying questions regarding Relief Request PRR-25, Revision 1 while preparing the subsequent written safety evaluation.
This verbal authorization does not preclude the NRC staff from asking additional clarifying questions regarding Relief Request PRR-25, Revision 1 while preparing the subsequent written safety evaluation.
The licensee did not have any comments or concerns.
The licensee did not have any comments or concerns.
Docket No. 50-293
Docket No. 50-293  


ML14086A291 OFFICE           LPLI-1/PM               LPLI-1/LA             LPLI-1/BC NAME             NMorgan                 KGoldstein             BBeasley DATE             4/2/2014               04/02/2014             4/22/2014}}
ML14086A291 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME NMorgan KGoldstein BBeasley DATE 4/2/2014 04/02/2014 4/22/2014}}

Latest revision as of 22:27, 10 January 2025

Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request PRR-25, Revision 1
ML14086A291
Person / Time
Site: Pilgrim
Issue date: 04/22/2014
From: Nadiyah Morgan
Plant Licensing Branch 1
To:
Office of Nuclear Reactor Regulation
Morgan N
References
TAC MF3558
Download: ML14086A291 (3)


Text

April 22, 2014 MEMORANDUM TO:

FILE FROM:

Nadiyah S. Morgan, Project Manager /RA/

Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulations

SUBJECT:

PILGRIM NUCELAR POWER STATION -

SUMMARY

OF TELEPHONE CONFERENCE REGARDING THE VERBAL AUTHORIZATION OF RELIEF REQUEST PRR-25, REVISION 1 (TAC NO. MF3558)

This memorandum summarizes the telephone discussion on March 26, 2014, between the U.S.

Nuclear Regulatory Commission (NRC) staff and Entergy Nuclear Operations, Inc., the licensee.

The discussion was in regard to the licensees request for relief PRR-25, Revision 1 for Pilgrim Nuclear Power Station (Pilgrim). Participants in the discussion included:

NRC Licensee Dee Morgan Ray McKinley John Dent Frank Clifford Ben Beasley Niklas Floyd Steve Verrochi Dave Mannai John Tsao Max Schneider Ted Bordelon Walter Lobo Dave Alley Bruce Chenard Hamil Grimes Tim Lupold Frank McGinnis Murray Williams Steve Scott Ray Pace Joe Weicks Ron Williams By letter dated March 5, 2014 (Agencywide Document and Access Management System (ADAMS) Accession No. ML14073A059), as supplemented by letter dated March 25, 2014 (ADAMS Accession No. ML14091A407), the licensee requested relief from certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI for Pilgrim. The licensee proposed an alternate repair for leaking spool JF29-8-4 of the salt service water system piping, as documented in PRR-25, Revision 1.

The licensee developed its proposed alternative in response to leakage from the subject component which placed the plant in a Technical Specification Action Statement due to flooding concerns. The licensees proposed alternative consists of mitigating the observed leakage from the subject component using a non-ASME Code compliant weld repair in conjunction with a seismically qualified mechanical clamp. As reported in its submission, the licensee performed stress calculations which demonstrated that the piping, with or without the attempted welded repairs or mechanical clamp, was structurally sound. The licensee will perform daily walkdowns and ultrasonic examination of the wall thickness of the repaired area (outside the clamp area) every 30 days, which is a condition of approval of this request. The licensees proposed alternative is temporary and will be repaired/replaced in accordance with ASME Code requirements, not later than its next refueling outage, which is currently scheduled for April 2015.

Based on an evaluation of the information submitted, the NRC staff has determined that the proposed alternative provides reasonable assurance of the structural integrity of the subject degraded salt service water system piping. The NRC staff also determined that complying with the specified ASME Code requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff has concluded that the licensee has adequately addressed all of the regulatory requirements set forth in Title 10 of the Code of Federal Regulations Section 50.55a(a)(3)(ii). Therefore, on March 26, 2014, the NRC staff authorizes the use of PRR-25, Revision 1 at Pilgrim, not longer than the next scheduled refueling outage in April 2015.

All other requirements of ASME Code,Section XI for which relief was not specifically requested and authorized by the NRC staff remain applicable, including the third party review by the Authorized Nuclear In-service Inspector.

This verbal authorization does not preclude the NRC staff from asking additional clarifying questions regarding Relief Request PRR-25, Revision 1 while preparing the subsequent written safety evaluation.

The licensee did not have any comments or concerns.

Docket No. 50-293

ML14086A291 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME NMorgan KGoldstein BBeasley DATE 4/2/2014 04/02/2014 4/22/2014