ML14364A385: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:ES-401                           Generic Knowledge and Abilities Outline (Tier 3)                                                   Form ES-401-3 Facility Name:Braidwood               Date of Exam:11/10/2014 RO      SRO-Only Category      K/A #                                                  Topic IR     #    IR   #
{{#Wiki_filter:ES-401 Generic Knowledge and Abilities Outline (Tier 3)
2.1. 27 Knowledge of system purpose and/or function.                                                       3.9   1 2.1. 13 Knowledge of facility requirements for controlling vital/controlled access.                       2.5   1
Form ES-401-3 Facility Name:Braidwood Date of Exam:11/10/2014 IR IR 2.1. 27 Knowledge of system purpose and/or function.
: 1.          2.1. 36 Knowledge of procedures and limitations involved in core alterations.                                           4.1   1 Conduct of          Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor Operations  2.1. 43 coolant system temperature, secondary plant, fuel depletion, etc.                                               4.3   1 2.1.
3.9 1
2.1. 13 Knowledge of facility requirements for controlling vital/controlled access.
2.5 1
2.1. 36 Knowledge of procedures and limitations involved in core alterations.
4.1 1
2.1. 43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc.
4.3 1
2.1.
2.1.
Subtotal                                                                                                           2           2 Knowledge of the process for managing maintenance activities during shutdown operations, such as 2.2. 18 risk assessments, work prioritization, etc.                                                       2.6   1 2.2. 40 Ability to apply Technical Specifications for a system.                                           3.4   1 2.2. 12 Knowledge of surveillance procedures.                                                             3.7   1 2.
2.1.
Equipment 2.2. 05 Knowledge of the process for making design or operating changes to the facility.                               3.2   1 Control 2.2.
Subtotal 2
2 2.2. 18 Knowledge of the process for managing maintenance activities during shutdown operations, such as risk assessments, work prioritization, etc.
2.6 1
2.2. 40 Ability to apply Technical Specifications for a system.
3.4 1
2.2. 12 Knowledge of surveillance procedures.
3.7 1
2.2. 05 Knowledge of the process for making design or operating changes to the facility.
3.2 1
2.2.
2.2.
Subtotal                                                                                                           3           1 2.3. 07 Ability to comply with radiation work permit requirements during normal or abnormal conditions. 3.5   1 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or 2.3. 14 emergency conditions or activities.                                                               3.4   1 Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable 2.3. 05 survey instruments, personnel monitoring equipment, etc.                                                       2.9   1 3.
2.2.
Radiation 2.3. 11 Ability to control radiation releases.                                                                         4.3   1 Control 2.3.
Subtotal 3
1 2.3. 07 Ability to comply with radiation work permit requirements during normal or abnormal conditions.
3.5 1
2.3. 14 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.
3.4 1
2.3. 05 Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
2.9 1
2.3. 11 Ability to control radiation releases.
4.3 1
2.3.
2.3.
2.3.
Subtotal                                                                                                           2           2 2.4. 17 Knowledge of EOP terms and definitions.                                                           3.9   1 2.4. 29 Knowledge of the emergency plan.                                                                   3.1   1
Subtotal 2
: 4.          2.4. 13 Knowledge of crew roles and responsibilities during EOP usage.                                     4.0   1 Emergency Procedures / 2.4. 18 Knowledge of the specific bases for EOPs.                                                                       4.0   1 Plan                Knowledge of EOP implementation hierarchy and coordination with other support procedures or 2.4. 16 guidelines such as, operating procedures, abnormal operating procedures, and severe accident                   4.4   1 management guidelines 2.4.
2 2.4. 17 Knowledge of EOP terms and definitions.
Subtotal                                                                                                           3           2 Tier 3 Point Total                                                                                                              10           7 ES-401, Page 26 of 33}}
3.9 1
2.4. 29 Knowledge of the emergency plan.
3.1 1
2.4. 13 Knowledge of crew roles and responsibilities during EOP usage.
4.0 1
2.4. 18 Knowledge of the specific bases for EOPs.
4.0 1
2.4. 16 Knowledge of EOP implementation hierarchy and coordination with other support procedures or guidelines such as, operating procedures, abnormal operating procedures, and severe accident management guidelines 4.4 1
2.4.
Subtotal 3
2 10 7
ES-401, Page 26 of 33 RO SRO-Only Tier 3 Point Total
: 3.
Radiation Control
: 4.
Emergency Procedures /
Plan
: 2.
Equipment Control Category Topic
: 1.
Conduct of Operations K/A #}}

Latest revision as of 15:11, 10 January 2025

2014 Braidwood Station Initial License Examination Form ES-401-3
ML14364A385
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/24/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14344A990 List:
References
ES-401-3 50-456/OL-14, 50-457/OL-14
Download: ML14364A385 (1)


Text

ES-401 Generic Knowledge and Abilities Outline (Tier 3)

Form ES-401-3 Facility Name:Braidwood Date of Exam:11/10/2014 IR IR 2.1. 27 Knowledge of system purpose and/or function.

3.9 1

2.1. 13 Knowledge of facility requirements for controlling vital/controlled access.

2.5 1

2.1. 36 Knowledge of procedures and limitations involved in core alterations.

4.1 1

2.1. 43 Ability to use procedures to determine the effects on reactivity of plant changes, such as reactor coolant system temperature, secondary plant, fuel depletion, etc.

4.3 1

2.1.

2.1.

Subtotal 2

2 2.2. 18 Knowledge of the process for managing maintenance activities during shutdown operations, such as risk assessments, work prioritization, etc.

2.6 1

2.2. 40 Ability to apply Technical Specifications for a system.

3.4 1

2.2. 12 Knowledge of surveillance procedures.

3.7 1

2.2. 05 Knowledge of the process for making design or operating changes to the facility.

3.2 1

2.2.

2.2.

Subtotal 3

1 2.3. 07 Ability to comply with radiation work permit requirements during normal or abnormal conditions.

3.5 1

2.3. 14 Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.

3.4 1

2.3. 05 Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.

2.9 1

2.3. 11 Ability to control radiation releases.

4.3 1

2.3.

2.3.

Subtotal 2

2 2.4. 17 Knowledge of EOP terms and definitions.

3.9 1

2.4. 29 Knowledge of the emergency plan.

3.1 1

2.4. 13 Knowledge of crew roles and responsibilities during EOP usage.

4.0 1

2.4. 18 Knowledge of the specific bases for EOPs.

4.0 1

2.4. 16 Knowledge of EOP implementation hierarchy and coordination with other support procedures or guidelines such as, operating procedures, abnormal operating procedures, and severe accident management guidelines 4.4 1

2.4.

Subtotal 3

2 10 7

ES-401, Page 26 of 33 RO SRO-Only Tier 3 Point Total

3.

Radiation Control

4.

Emergency Procedures /

Plan

2.

Equipment Control Category Topic

1.

Conduct of Operations K/A #