{{#Wiki_filter:ES-301                         Control Room/In-Plant Systems Outline                       Form ES-301-2 Facility:       Davis Besse                                       Date of Examination:__6/15/15 thru 6/26/15 __
{{#Wiki_filter:NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __
Exam Level: RO SRO(I) SRO(U)                                   Operating Test No.: __DB NRC 2015__
Exam Level: RO SRO(I) SRO(U)
Operating Test No.: __DB NRC 2015__
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
System / JPM Title                                       Type Code*             Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)                                   (JPM New)               N, A, S             1 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open)                           (JPM New)           N, A, S, L           4P S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)                               (JPM New)           N, A, S, EN             5 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
System / JPM Title Type Code*
P1 - (004) / Perform Att. 5 of Control Room Evacuation                                       D, E, R 2
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
DB-OP-02508, CTRM Evacuation                             (JPM 048)
(JPM New)
P2 - (064) / Restore EDG to supply 4160 Essential Bus D, E                6 DB-OP-02538, Loss of D2P and DBP                         (JPM 079)
N, A, S 1
@        All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open)
                        *Type Codes                                       Criteria for RO / SRO-I / SRO-U (A)lternate Path                                                                     4-6 /4-6 /2-3 (C)ontrol room (D)irect from bank                                                                   9/8/4 (E)mergency or abnormal in-plant                                                     1/1/1 (EN)gineered safety feature                                                           1 /  1 / > 1 (control room system)
(JPM New)
(L)ow-power / Shutdown                                                               1/1/1 (N)ew or (M)odified from bank including 1(A)                                         2/2/1 (P)revious 2 exams                                                                      3/ 3 / 2 (randomly selected)
N, A, S, L 4P S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)
(R)CA                                                                                1/1/1 (S)imulator NUREG-1021, R9 Supplement 1                                                                            FENOC Facsimile Rev. 1}}
(JPM New)
N, A, S, EN 5
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 - (004) / Perform Att. 5 of Control Room Evacuation DB-OP-02508, CTRM Evacuation (JPM 048)
D, E, R 2
P2 - (064) / Restore EDG to supply 4160 Essential Bus DB-OP-02538, Loss of D2P and DBP (JPM 079)
D, E 6
All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.  
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1}}

Latest revision as of 09:23, 10 January 2025

2015 Davis-Besse Nuclear Power Station Initial License Examination ES-301-2 Srou Systems Outline
ML15231A840
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/06/2015
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
Reeser D
Shared Package
ML15217A099 List:
References
Download: ML15231A840 (1)


Text

NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __

Exam Level: RO SRO(I) SRO(U)

Operating Test No.: __DB NRC 2015__

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)

System / JPM Title Type Code*

Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)

(JPM New)

N, A, S 1

S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open)

(JPM New)

N, A, S, L 4P S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)

(JPM New)

N, A, S, EN 5

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1 - (004) / Perform Att. 5 of Control Room Evacuation DB-OP-02508, CTRM Evacuation (JPM 048)

D, E, R 2

P2 - (064) / Restore EDG to supply 4160 Essential Bus DB-OP-02538, Loss of D2P and DBP (JPM 079)

D, E 6

All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1