{{#Wiki_filter:Oconee, Units 1, 2, & 3 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism                 Stillwater       Waves/           Design Basis         Reference Elevation        Runup                Hazard Elevation Local Intense Precipitation Not included   Not included         Not included Staff Assessment in DB           in DB               in DB Streams and Rivers Flooding in Reservoirs - Keowee   808.0 ft MSL         Not             808.0 ft MSL Staff Assessment Reservoir (not calculated at                        applicable Power Block)
{{#Wiki_filter:Oconee, Units 1, 2, & 3 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Elevation Waves/
Failure of Dams and Onsite Water Control/Storage Structures Not included   Not included         Not included Staff Assessment in DB          in DB                in DB Storm Surge Not included    Not included        Not included Staff Assessment in DB          in DB                in DB Seiche Not included   Not included         Not included Staff Assessment in DB          in DB                in DB Tsunami Not included   Not included         Not included Staff Assessment in DB          in DB                in DB Ice-Induced Flooding Not included   Not included         Not included Staff Assessment in DB          in DB                in DB Channel Migrations/Diversions Not included   Not included         Not included Staff Assessment in DB          in DB                in DB Note 1: Reported values are rounded to the nearest one-tenth of a foot.
Runup Reference Design Basis Hazard Elevation Note 1: Reported values are rounded to the nearest one-tenth of a foot.
Local Intense Precipitation Not included in DB Not included in DB Not included in DB Staff Assessment Failure of Dams and Onsite Water Control/Storage Structures Not included in DB Not included in DB Not included in DB Staff Assessment Streams and Rivers Flooding in Reservoirs - Keowee Reservoir (not calculated at Power Block) 808.0 ft MSL Not applicable 808.0 ft MSL Staff Assessment Storm Surge Not included in DB Not included in DB Not included in DB Staff Assessment Seiche Not included in DB Not included in DB Not included in DB Staff Assessment Tsunami Not included in DB Not included in DB Not included in DB Staff Assessment Ice-Induced Flooding Not included in DB Not included in DB Not included in DB Staff Assessment Channel Migrations/Diversions Not included in DB Not included in DB Not included in DB Staff Assessment


Oconee, Units 1, 2, & 3 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism                 Stillwater       Waves/           Reevaluated             Reference Elevation        Runup                Hazard Elevation Local Intense Precipitation 800.4 ft MSL     Minimal           800.4 ft MSL     FHRR Section 3.1 Streams and Rivers Streams and Rivers (Flooding in      808.9 ft MSL       3.3 ft           812.2 ft MSL     FHRR Section 3.2 Reservoirs, Keowee)
Oconee, Units 1, 2, & 3 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Elevation Waves/
Runup Reevaluated Hazard Elevation Reference Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table.
Note 3: Reported values are rounded to the nearest one-tenth of a foot.
Local Intense Precipitation 800.4 ft MSL Minimal 800.4 ft MSL FHRR Section 3.1 Streams and Rivers 808.9 ft MSL 3.3 ft 812.2 ft MSL FHRR Section 3.2 Streams and Rivers (Flooding in Reservoirs, Keowee)
Failure of Dams and Onsite Water Control/Storage Structures
Failure of Dams and Onsite Water Control/Storage Structures
[Redacted]                         [Redacted]       [Redacted]           [Redacted]           [Redacted]
[Redacted]
[Redacted]
[Redacted]
[Redacted]
[Redacted]
Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA consistent with the guidance. The NRC staff has reviewed information related to flood event duration parameters (including warning time and period of inundation).
Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA consistent with the guidance. The NRC staff has reviewed information related to flood event duration parameters (including warning time and period of inundation).
Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table.
Note 3: Reported values are rounded to the nearest one-tenth of a foot.
TION}}
TION}}

Latest revision as of 09:11, 10 January 2025

Interim Letter Public Tables (Tables 1 and 2)
ML15238B723
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/26/2015
From: Nebiyu Tiruneh, Willingham M
NRC/NRO/DSEA/RHMB
To:
Willingham M
References
Download: ML15238B723 (2)


Text

Oconee, Units 1, 2, & 3 Table 1. Current Design Basis Flood Hazards for Use in the MSA Mechanism Stillwater Elevation Waves/

Runup Reference Design Basis Hazard Elevation Note 1: Reported values are rounded to the nearest one-tenth of a foot.

Local Intense Precipitation Not included in DB Not included in DB Not included in DB Staff Assessment Failure of Dams and Onsite Water Control/Storage Structures Not included in DB Not included in DB Not included in DB Staff Assessment Streams and Rivers Flooding in Reservoirs - Keowee Reservoir (not calculated at Power Block) 808.0 ft MSL Not applicable 808.0 ft MSL Staff Assessment Storm Surge Not included in DB Not included in DB Not included in DB Staff Assessment Seiche Not included in DB Not included in DB Not included in DB Staff Assessment Tsunami Not included in DB Not included in DB Not included in DB Staff Assessment Ice-Induced Flooding Not included in DB Not included in DB Not included in DB Staff Assessment Channel Migrations/Diversions Not included in DB Not included in DB Not included in DB Staff Assessment

Oconee, Units 1, 2, & 3 Table 2. Reevaluated Flood Hazards for Flood-Causing Mechanisms for Use in the MSA Mechanism Stillwater Elevation Waves/

Runup Reevaluated Hazard Elevation Reference Note 2: Reevaluated hazard mechanisms bounded by the current design basis (see Table 1) are not included in this table.

Note 3: Reported values are rounded to the nearest one-tenth of a foot.

Local Intense Precipitation 800.4 ft MSL Minimal 800.4 ft MSL FHRR Section 3.1 Streams and Rivers 808.9 ft MSL 3.3 ft 812.2 ft MSL FHRR Section 3.2 Streams and Rivers (Flooding in Reservoirs, Keowee)

Failure of Dams and Onsite Water Control/Storage Structures

[Redacted]

[Redacted]

[Redacted]

[Redacted]

[Redacted]

Note 1: The licensee is expected to develop flood event duration parameters and applicable flood associated effects to conduct the MSA consistent with the guidance. The NRC staff has reviewed information related to flood event duration parameters (including warning time and period of inundation).