{{#Wiki_filter:Entergy Operations, Inc.
{{#Wiki_filter:1CAN081504 August 27, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555  
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One 1CAN081504 August 27, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555


==Subject:==
==Subject:==
ANO-1 Cycle 26 COLR Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51
ANO-1 Cycle 26 COLR Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Entergy Operations, Inc. (Entergy) Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specification 5.6.5 requires the submittal of the Core Operating Limits Report (COLR) for each reload cycle. Revision 0 of the ANO-1 Cycle 26 COLR was submitted on February 5, 2015 (1CAN021501, ML15036A249). It was recently identified that the axis and some (x,y) coordinates on Figure 11 did not properly convert from Microsoft Word to Adobe and were subsequently missing from the figure (Condition Report CR-ANO-1-2015-3186). Therefore, Revision 0 of the ANO-1 Cycle 26 COLR is resubmitted to include the missing coordinate references. Note that the graph itself did not change from that of the Cycle 25 ANO-1 COLR.
Entergy Operations, Inc. (Entergy) Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specification 5.6.5 requires the submittal of the Core Operating Limits Report (COLR) for each reload cycle. Revision 0 of the ANO-1 Cycle 26 COLR was submitted on February 5, 2015 (1CAN021501, ML15036A249). It was recently identified that the axis and some (x,y) coordinates on Figure 11 did not properly convert from Microsoft Word to Adobe and were subsequently missing from the figure (Condition Report CR-ANO-1-2015-3186). Therefore, Revision 0 of the ANO-1 Cycle 26 COLR is resubmitted to include the missing coordinate references. Note that the graph itself did not change from that of the Cycle 25 ANO-1 COLR.
Please note that the latest approved revision number of the Babcock and Wilcox Topical Report BAW-10179P-A is identified in the COLR as Revision 8, May 2010. In addition, the approved revision number of the Entergy Reactor Physics Methods Report is identified in the COLR as Revision 0, December 1993.
Please note that the latest approved revision number of the Babcock and Wilcox Topical Report BAW-10179P-A is identified in the COLR as Revision 8, May 2010. In addition, the approved revision number of the Entergy Reactor Physics Methods Report is identified in the COLR as Revision 0, December 1993.
This submittal contains no regulatory commitments. Should you have any questions, please contact me.
This submittal contains no regulatory commitments. Should you have any questions, please contact me.
Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/dbb
Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/dbb Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One


1CAN081504 Page 2 of 2
1CAN081504 Page 2 of 2  


==Attachment:==
==Attachment:==
ANO-1 Cycle 26 Core Operating Limits Report (COLR) cc:   Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Ms. Andrea E. George MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205
ANO-1 Cycle 26 Core Operating Limits Report (COLR) cc:
Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Ms. Andrea E. George MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205  


Attachment to 1CAN081504 ANO-1 Cycle 26 Core Operating Limits Report (COLR)
Attachment to 1CAN081504 ANO-1 Cycle 26 Core Operating Limits Report (COLR)  


CYCLE 26 COLR                         CALC-ANO1-NE-14-00003 ENTERGY OPERATIONS ARKANSAS NUCLEAR ONE UNIT ONE CYCLE 26 CORE OPERATING LIMITS REPORT ANO-1                      1                          Rev. 0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 1
Rev. 0 ENTERGY OPERATIONS ARKANSAS NUCLEAR ONE UNIT ONE CYCLE 26 CORE OPERATING LIMITS REPORT  


CYCLE 26 COLR                                                           CALC-ANO1-NE-14-00003 1.0     CORE OPERATING LIMITS This Core Operating Limits Report for ANO-1 Cycle 26 has been prepared in accordance with the requirements of Technical Specification 5.6.5 with applicable 10 CFR 50.46 reporting. The core operating limits have been developed using the methodology provided in the references.
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 2
Rev. 0 1.0 CORE OPERATING LIMITS This Core Operating Limits Report for ANO-1 Cycle 26 has been prepared in accordance with the requirements of Technical Specification 5.6.5 with applicable 10 CFR 50.46 reporting. The core operating limits have been developed using the methodology provided in the references.
The following cycle-specific core operating limits are included in this report:
The following cycle-specific core operating limits are included in this report:
: 1)   2.1.1.3   Variable Low RCS Pressure - Temperature Protective Limits
: 1) 2.1.1.3 Variable Low RCS Pressure - Temperature Protective Limits
: 2)   3.1.1     SHUTDOWN MARGIN (SDM)
: 2) 3.1.1 SHUTDOWN MARGIN (SDM)
: 3)   3.1.8     PHYSICS TESTS Exceptions - MODE 1
: 3) 3.1.8 PHYSICS TESTS Exceptions - MODE 1
: 4)   3.1.9     PHYSICS TEST Exceptions - MODE 2
: 4) 3.1.9 PHYSICS TEST Exceptions - MODE 2
: 5)   3.2.1     Regulating Rod Insertion Limits
: 5) 3.2.1 Regulating Rod Insertion Limits
: 6)   3.2.2     AXIAL POWER SHAPING RODS (APSR) Insertion Limits
: 6) 3.2.2 AXIAL POWER SHAPING RODS (APSR) Insertion Limits
: 7)   3.2.3     AXIAL POWER IMBALANCE Operating Limits
: 7) 3.2.3 AXIAL POWER IMBALANCE Operating Limits
: 8)   3.2.4     QUADRANT POWER TILT (QPT)
: 8) 3.2.4 QUADRANT POWER TILT (QPT)
: 9)   3.2.5     Power Peaking
: 9) 3.2.5 Power Peaking
: 10)   3.3.1     Reactor Protection System (RPS) Instrumentation
: 10) 3.3.1 Reactor Protection System (RPS) Instrumentation
: 11)   3.4.1     RCS Pressure, Temperature, and Flow DNB Limits
: 11) 3.4.1 RCS Pressure, Temperature, and Flow DNB Limits
: 12)   3.4.4     RCS Loops - MODES 1 and 2
: 12) 3.4.4 RCS Loops - MODES 1 and 2
: 13)   3.9.1     Boron Concentration
: 13) 3.9.1 Boron Concentration  


==2.0 REFERENCES==
==2.0 REFERENCES==
: 1.   "Safety Criteria and Methodology for Acceptable Cycle Reload Analyses," BAW-10179P-A, Rev. 8, Framatome ANP, Inc., Lynchburg, Virginia, May 2010.
: 1.  
: 2. Letter dated 4/9/02 from L.W. Barnett, USNRC, to J.M. Mallay, FRA-ANP, Safety Evaluation of Framatome Technologies Topical Report BAW-10164P Revision 4, RELAP5/MOD2- B&W, An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis (TAC Nos. MA8465 and MA8468), USNRC ADAMS Accession Number ML013390204.
"Safety Criteria and Methodology for Acceptable Cycle Reload Analyses," BAW-10179P-A, Rev. 8, Framatome ANP, Inc., Lynchburg, Virginia, May 2010.
: 3. RELAP5/MOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA Transient Analysis, BAW-10164PA, Rev. 6, Framatome Technologies, Inc., Lynchburg, Virginia, June 2007.
: 2.
: 4.   "Qualification of Reactor Physics Methods for the Pressurized Water Reactors of the Entergy System," ENEAD-01-P, Rev. 0, Entergy Operations, Inc., Jackson, Mississippi, December 1993.
Letter dated 4/9/02 from L.W. Barnett, USNRC, to J.M. Mallay, FRA-ANP, Safety Evaluation of Framatome Technologies Topical Report BAW-10164P Revision 4, RELAP5/MOD2-B&W, An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis (TAC Nos. MA8465 and MA8468), USNRC ADAMS Accession Number ML013390204.
: 5. ANO-1 Cycle 26 Limits and Setpoints, Areva Doc. No. FS1-0016730, January 2015.
: 3.
: 6. Arkansas Nuclear One, Unit 1, Cycle 26 Final Reload Report, ANP-3366, Rev. 0, January 2015. (CALC-ANO1-NE-14-00001).
RELAP5/MOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA Transient Analysis, BAW-10164PA, Rev. 6, Framatome Technologies, Inc., Lynchburg, Virginia, June 2007.
: 7. ANO 1-26 Core Loading Plan (AREVA document no. FS1-0017393-2.0), FAB14-689, December 19, 2014.
: 4.  
: 8. IC (Initial Condition) DNB RCS Protection Criteria, CALC-96-E-0023-02, Rev. 7.
"Qualification of Reactor Physics Methods for the Pressurized Water Reactors of the Entergy System," ENEAD-01-P, Rev. 0, Entergy Operations, Inc., Jackson, Mississippi, December 1993.
ANO-1                                            2                                      Rev. 0
: 5.
ANO-1 Cycle 26 Limits and Setpoints, Areva Doc. No. FS1-0016730, January 2015.
: 6.
Arkansas Nuclear One, Unit 1, Cycle 26 Final Reload Report, ANP-3366, Rev. 0, January 2015. (CALC-ANO1-NE-14-00001).
: 7.
ANO 1-26 Core Loading Plan (AREVA document no. FS1-0017393-2.0), FAB14-689, December 19, 2014.
: 8.
IC (Initial Condition) DNB RCS Protection Criteria, CALC-96-E-0023-02, Rev. 7.  


CYCLE 26 COLR                                                   CALC-ANO1-NE-14-00003
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 3
Rev. 0


==2.0 REFERENCES==
==2.0 REFERENCES==
(continued)
(continued)
: 9. Arkansas Nuclear One Unit 1, Cycle 26 Reload Technical Document (RTD), AREVA document no. FS1-00184680 Revision 1, January 12, 2015 (CALC-ANO1-NE-14-00002).
: 9.
: 10. Special Report, Licensee Event Report 50-313/2014-002-00, Arkansas Nuclear One Unit 1, Docket No. 50-313, License No. DPR-51, 1CAN121405, December 22, 2014.
Arkansas Nuclear One Unit 1, Cycle 26 Reload Technical Document (RTD), AREVA document no. FS1-00184680 Revision 1, January 12, 2015 (CALC-ANO1-NE-14-00002).
ANO-1                                        3                                      Rev. 0
: 10. Special Report, Licensee Event Report 50-313/2014-002-00, Arkansas Nuclear One Unit 1, Docket No. 50-313, License No. DPR-51, 1CAN121405, December 22, 2014.  


CYCLE 26 COLR                                                                     CALC-ANO1-NE-14-00003 Table Of Contents Page REACTOR CORE SAFETY LIMITS Fig. 1   Variable Low RCS Pressure-Temperature Protective Limits................................. 6 Fig. 2   AXIAL POWER IMBALANCE Protective Limits..................................................... 7 SHUTDOWN MARGIN (SDM) ...................................................................................................... 8 REGULATING ROD INSERTION LIMITS Fig. 3-A Regulating Rod Insertion Limits for Four-Pump Operation From 0 to 200 10 EFPD...................................................................................... 9 Fig. 3-B Regulating Rod Insertion Limits for Four-Pump Operation From 200 10 EFPD to EOC ............................................................................. 10 Fig. 4-A Regulating Rod Insertion Limits for Three-Pump Operation From 0 to 200 10 EFPD ................................................................................... 11 Fig. 4-B Regulating Rod Insertion Limits for Three-Pump Operation From 200 10 EFPD to EOC ............................................................................. 12 Fig. 5-A Regulating Rod Insertion Limits for Two-Pump Operation From 0 to 200 10 EFPD ................................................................................... 13 Fig. 5-B Regulating Rod Insertion Limits for Two-Pump Operation From 200 10 EFPD to EOC ............................................................................. 14 AXIAL POWER SHAPING RODS (APSR) INSERTION LIMITS ............................................... 15 AXIAL POWER IMBALANCE OPERATING LIMITS Fig. 6-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Four-Pump Operation from 0 to EOC .................................................................. 16 Fig. 6-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions for Four-Pump Operation from 0 to EOC............................................................. 17 Fig. 6-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Four-Pump Operation from 0 to EOC .................................................................. 18 Fig. 7-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Three-Pump Operation from 0 to EOC ................................................................ 19 Fig. 7-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions for Three-Pump Operation from 0 to EOC........................................................... 20 Fig. 7-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Three-Pump Operation from 0 to EOC ................................................................ 21 Fig. 8-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Two-Pump Operation from 0 to EOC .................................................................. 22 Fig. 8-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions for Two-Pump Operation from 0 to EOC ............................................................. 23 Fig. 8-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Two-Pump Operation from 0 to EOC .................................................................. 24 QUADRANT POWER TILT LIMITS AND SETPOINTS ............................................................. 25 ANO-1                                            4                                                                  Rev. 0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 4
Rev. 0 Table Of Contents Page REACTOR CORE SAFETY LIMITS Fig. 1 Variable Low RCS Pressure-Temperature Protective Limits................................. 6 Fig. 2 AXIAL POWER IMBALANCE Protective Limits..................................................... 7 SHUTDOWN MARGIN (SDM)...................................................................................................... 8 REGULATING ROD INSERTION LIMITS Fig. 3-A Regulating Rod Insertion Limits for Four-Pump Operation From 0 to 200 10 EFPD...................................................................................... 9 Fig. 3-B Regulating Rod Insertion Limits for Four-Pump Operation From 200 10 EFPD to EOC............................................................................. 10 Fig. 4-A Regulating Rod Insertion Limits for Three-Pump Operation From 0 to 200 10 EFPD................................................................................... 11 Fig. 4-B Regulating Rod Insertion Limits for Three-Pump Operation From 200 10 EFPD to EOC............................................................................. 12 Fig. 5-A Regulating Rod Insertion Limits for Two-Pump Operation From 0 to 200 10 EFPD................................................................................... 13 Fig. 5-B Regulating Rod Insertion Limits for Two-Pump Operation From 200 10 EFPD to EOC............................................................................. 14 AXIAL POWER SHAPING RODS (APSR) INSERTION LIMITS............................................... 15 AXIAL POWER IMBALANCE OPERATING LIMITS Fig. 6-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Four-Pump Operation from 0 to EOC.................................................................. 16 Fig. 6-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions for Four-Pump Operation from 0 to EOC............................................................. 17 Fig. 6-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Four-Pump Operation from 0 to EOC.................................................................. 18 Fig. 7-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Three-Pump Operation from 0 to EOC................................................................ 19 Fig. 7-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions for Three-Pump Operation from 0 to EOC........................................................... 20 Fig. 7-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Three-Pump Operation from 0 to EOC................................................................ 21 Fig. 8-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Two-Pump Operation from 0 to EOC.................................................................. 22 Fig. 8-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions for Two-Pump Operation from 0 to EOC............................................................. 23 Fig. 8-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Two-Pump Operation from 0 to EOC.................................................................. 24 QUADRANT POWER TILT LIMITS AND SETPOINTS............................................................. 25  


CYCLE 26 COLR                                                                       CALC-ANO1-NE-14-00003 POWER PEAKING FACTORS Fig. 9A LOCA Linear Heat Rate Limits for Mark-B-HTP Fuel .......................................... 26 DNB Power Peaking Factors ............................................................................................... 27 REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION Fig. 10 RPS Maximum Allowable Setpoints for Axial Power Imbalance ......................... 28 Fig. 11 RPS Variable Low Pressure Temperature Envelope Setpoints .......................... 29 RCS PRESSURE, TEMPERATURE, AND FLOW DNB SURVEILLANCE LIMITS .................. 30 RCS LOOPS MODE 1 AND 2 .................................................................................................... 31 REFUELING BORON CONCENTRATION ................................................................................ 31 ANO-1                                              5                                                                  Rev. 0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 5
Rev. 0 POWER PEAKING FACTORS Fig. 9A LOCA Linear Heat Rate Limits for Mark-B-HTP Fuel.......................................... 26 DNB Power Peaking Factors............................................................................................... 27 REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION Fig. 10 RPS Maximum Allowable Setpoints for Axial Power Imbalance......................... 28 Fig. 11 RPS Variable Low Pressure Temperature Envelope Setpoints.......................... 29 RCS PRESSURE, TEMPERATURE, AND FLOW DNB SURVEILLANCE LIMITS.................. 30 RCS LOOPS MODE 1 AND 2.................................................................................................... 31 REFUELING BORON CONCENTRATION................................................................................ 31  


CYCLE 26 COLR                                                                                       CALC-ANO1-NE-14-00003 FIGURE 1 Variable Low RCS Pressure - Temperature Protective Limits (Figure is referred to by Technical Specification 2.1.1.3) 2300 3-PUMP 2200 4-PUMP Core Outlet Pressure, psig 2100 2000 1900 1 PUMP EACH LOOP 1800 1700 590        600          610        620      630          640      650 Reactor Coolant Outlet Temperature, °F PUMPS OPERATING (TYPE OF LIMIT)                                                       GPM*                   POWER**
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 6
FOUR PUMPS (DNBR LIMIT)                                                           383,680 (100%)               110%
Rev. 0 FIGURE 1 Variable Low RCS Pressure - Temperature Protective Limits (Figure is referred to by Technical Specification 2.1.1.3)
THREE PUMPS (DNBR LIMIT)                                                         284,307 (74.1%)               89%
PUMPS OPERATING (TYPE OF LIMIT)
ONE PUMP IN EACH LOOP (DNBR LIMIT)                                                 188,003 (49%)               62.2%
GPM*
* 109% OF DESIGN FLOW (2.5% UNCERTAINTY INCLUDED IN STATISTICAL DESIGN LIMIT)
POWER**
        ** AN ADDITIONAL 2% POWER UNCERTAINTY IS INCLUDED IN STATISTICAL DESIGN LIMIT ANO-1                                                                       6                                          Rev. 0
FOUR PUMPS (DNBR LIMIT) 383,680 (100%)
110%
THREE PUMPS (DNBR LIMIT) 284,307 (74.1%)
89%
ONE PUMP IN EACH LOOP (DNBR LIMIT) 188,003 (49%)
62.2%
109% OF DESIGN FLOW (2.5% UNCERTAINTY INCLUDED IN STATISTICAL DESIGN LIMIT)  
** AN ADDITIONAL 2% POWER UNCERTAINTY IS INCLUDED IN STATISTICAL DESIGN LIMIT 4-PUMP 3-PUMP 590 600 610 620 630 640 650 2300 2200 2100 2000 1900 1800 1700 Reactor Coolant Outlet Temperature, °F Core Outlet Pressure, psig 1 PUMP EACH LOOP


CYCLE 26 COLR                                                                                                             CALC-ANO1-NE-14-00003 Figure 2 AXIAL POWER IMBALANCE Protective Limits (measurement system independent)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 7
(Figure is referred to by Technical Specification 2.1.1 Bases) 120
Rev. 0 Figure 2 AXIAL POWER IMBALANCE Protective Limits (measurement system independent)
(-47.3, 112.0)                                                         (44.6, 112.0)
(Figure is referred to by Technical Specification 2.1.1 Bases)
(-55.1, 101.4)                 ACCEPTABLE                                                                              (56.3, 101.4) 100 4 PUMP OPERATION
(44.6, 112.0)
(-47.3, 87.6)                                                           (44.6, 87.6) 80
(44.6, 87.6)
(-55.1, 77.0)                                                                                                         (56.3, 77.0)
(44.6, 61.0)
ACCEPTABLE 3 AND 4 PUMP OPERATION
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
(-47.3, 61.0)                                                           (44.6, 61.0) 60
(-55.1, 101.4)
(-55.1, 50.4)                                                                  The three- or two-pump               (56.3, 50.4) example setpoint Thermal Power Level %
(-55.1, 77.0)
curves show allowable 40      values for an ACCEPTABLE                                          approximate 26% and 2, 3 AND 4 PUMP                                        51% flow reduction for OPERATION                                          three- and two-pump operation respectively.
(-55.1, 50.4)
The actual setpoint curve will be calculated 20      by the Reactor Protection System and will be directly proportional to the indicated flow.
(-55.1, 0.0)
(-55.1, 0.0)                                                         0                                              (56.3, 0.0)
(-47.3, 112.0)
            -70    -60    -50   -40      -30    -20      -10                      0     10    20      30        40    50  60      70 Axial Power Imbalance, %
(-47.3, 87.6)
ANO-1                                                                              7                                                            Rev. 0
(-47.3, 61.0)
ACCEPTABLE 4 PUMP OPERATION ACCEPTABLE 3 AND 4 PUMP OPERATION ACCEPTABLE 2, 3 AND 4 PUMP OPERATION Thermal Power Level %
Axial Power Imbalance, %
The three-or two-pump example setpoint curves show allowable values for an approximate 26% and 51% flow reduction for three-and two-pump operation respectively.
The actual setpoint curve will be calculated by the Reactor Protection System and will be directly proportional to the indicated flow.
120 100 80 60 40 20 0
(56.3, 101.4)
(56.3, 77.0)
(56.3, 50.4)
(56.3, 0.0)


CYCLE 26 COLR                                                           CALC-ANO1-NE-14-00003 SHUTDOWN MARGIN (SDM)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 8
Rev. 0 SHUTDOWN MARGIN (SDM)
(Limits are referred to by Technical Specifications 3.1.1, 3.1.4, 3.1.5, 3.1.8, 3.1.9, and 3.3.9)
(Limits are referred to by Technical Specifications 3.1.1, 3.1.4, 3.1.5, 3.1.8, 3.1.9, and 3.3.9)
Verify SHUTDOWN MARGIN per the table below.
Verify SHUTDOWN MARGIN per the table below.
REQUIRED               TECHNICAL APPLICABILITY                        SHUTDOWN              SPECIFICATION MARGIN                REFERENCE MODE 1*                                                   1 %k/k               3.1.4, 3.1.5 MODE 2*                                                   1 %k/k           3.1.4, 3.1.5, 3.3.9 MODE 3                                                   1 %k/k               3.1.1, 3.3.9 MODE 4                                                   1 %k/k               3.1.1, 3.3.9 MODE 5                                                   1 %k/k               3.1.1, 3.3.9 MODE 1 PHYSICS TESTS Exceptions**                         1 %k/k                   3.1.8 MODE 2 PHYSICS TESTS Exceptions                           1 %k/k                   3.1.9
APPLICABILITY REQUIRED SHUTDOWN MARGIN TECHNICAL SPECIFICATION REFERENCE MODE 1*
* The required Shutdown Margin capability of 1 %k/k in MODE 1 and MODE 2 is preserved by the Regulating Rod Insertion Limits specified in Figures 3-A&B, 4-A&B, and 5-A&B, as required by Technical Specification 3.2.1.
1 %k/k 3.1.4, 3.1.5 MODE 2*
** Entry into Mode 1 Physics Tests Exceptions is not supported by existing analyses and as such requires actual shutdown margin to be 1 %k/k.
1 %k/k 3.1.4, 3.1.5, 3.3.9 MODE 3 1 %k/k 3.1.1, 3.3.9 MODE 4 1 %k/k 3.1.1, 3.3.9 MODE 5 1 %k/k 3.1.1, 3.3.9 MODE 1 PHYSICS TESTS Exceptions**
ANO-1                                            8                                            Rev. 0
1 %k/k 3.1.8 MODE 2 PHYSICS TESTS Exceptions 1 %k/k 3.1.9
* The required Shutdown Margin capability of 1 %k/k in MODE 1 and MODE 2 is preserved by the Regulating Rod Insertion Limits specified in Figures 3-A&B, 4-A&B, and 5-A&B, as required by Technical Specification 3.2.1.  
** Entry into Mode 1 Physics Tests Exceptions is not supported by existing analyses and as such requires actual shutdown margin to be 1 %k/k.  


CYCLE 26 COLR                                                                                                       CALC-ANO1-NE-14-00003 Figure 3-A Regulating Rod Insertion Limits for Four-Pump Operation From 0 to 200 10 EFPD (Figure is referred to by Technical Specification 3.2.1) 110.0 100.0                                                        (105.4, 102)                                    (264.1, 102)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 9
(300.0, 102) 90.0                    OPERATION IN THIS                                                              (248.5, 90)
Rev. 0 Figure 3-A Regulating Rod Insertion Limits for Four-Pump Operation From 0 to 200 10 EFPD (Figure is referred to by Technical Specification 3.2.1)
REGION IS NOT 80.0                      ALLOWED                                                                    (248.5, 78)
Power, % of 2568 MWt OPERATION 70.0                                                                          RESTRICTED SHUTDOWN MARGIN 60.0            LIMIT                    (64.5, 58)
(206.5, 58) 50.0 40.0 PERMISSIBLE 30.0                                                                                                                  OPERATING REGION 20.0 (33.5, 20) 10.0 (0.0, 7.3) 0.0 0                      50                    100                  150            200                      250                  300 Rod Index, % Withdrawn 0            20        40        60    80            100 GROUP 7*
0                20        40    60    80          100 GROUP 6*
0        20      40        60    80                100 GROUP 5*
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
ANO-1                                                                                       9                                                        Rev. 0
0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 7.3)
(33.5, 20)
(64.5, 58)
(105.4, 102)
(264.1, 102)
(300.0, 102)
(248.5, 90)
(248.5, 78)
(206.5, 58)
OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*
0 20 40 60 80 100 GROUP 5*
0 20 40 60 80 100 GROUP 7*


CYCLE 26 COLR                                                                                     CALC-ANO1-NE-14-00003 Figure 3-B Regulating Rod Insertion Limits for Four-Pump Operation From 200 10 EFPD to EOC (Figure is referred to by Technical Specification 3.2.1) 110.0 (207.3, 102)          (264.1, 102) 100.0 (300.0, 102) 90.0                              OPERATION IN THIS                                                (248.5, 90)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 10 Rev. 0 Figure 3-B Regulating Rod Insertion Limits for Four-Pump Operation From 200 10 EFPD to EOC (Figure is referred to by Technical Specification 3.2.1)
REGION IS NOT 80.0                                ALLOWED OPERATION Power, % of 2568 MWt (248.5, 78)
RESTRICTED 70.0 60.0                                                            (167.5, 58)
SHUTDOWN                                                      (206.5, 58) 50.0 MARGIN 40.0                                LIMIT PERMISSIBLE 30.0                                                                                                              OPERATING REGION 20.0 (98.5, 20) 10.0      (0.0, 0.4) 0.0 0                    50              100                    150                  200                  250                  300 Rod Index, % Withdrawn 0            20      40          60      80    100 GROUP 7*
0              20      40        60    80            100 GROUP 6*
0        20      40        60    80            100 GROUP 5*
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
ANO-1                                                             10                                                          Rev. 0
0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 0.4)
(98.5, 20)
(167.5, 58)
(207.3, 102)
(264.1, 102)
(300.0, 102)
(248.5, 90)
(248.5, 78)
(206.5, 58)
OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*
0 20 40 60 80 100 GROUP 5*
0 20 40 60 80 100 GROUP 7*


CYCLE 26 COLR                                                                                   CALC-ANO1-NE-14-00003 Figure 4-A Regulating Rod Insertion Limits for Three-Pump Operation From 0 to 200 10 EFPD (Figure is referred to by Technical Specification 3.2.1) 110.0 100.0 90.0 OPERATION IN THIS 80.0                    REGION IS NOT                                                                  (264.7, 77)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 11 Rev. 0 Figure 4-A Regulating Rod Insertion Limits for Three-Pump Operation From 0 to 200 10 EFPD (Figure is referred to by Technical Specification 3.2.1)
Power, % of 2568 MWt ALLOWED                      (106.0, 77) 70.0                                                                                                                      (300.0, 77)
OPERATION            (248.5, 67) 60.0                                                                        RESTRICTED          (248.5, 58)
SHUTDOWN 50.0          MARGIN LIMIT 40.0                                    (64.5, 43.5)
(206.5, 43) 30.0 PERMISSIBLE 20.0                                                                                                            OPERATING REGION 10.0                    (33.5, 15)
(0.0, 5.5) 0.0 0                    50                  100                  150                200                  250                  300 Rod Index, % Withdrawn 0            20      40          60    80      100 GROUP 7*
0            20      40          60    80          100 GROUP 6*
0      20      40        60    80            100 GROUP 5*
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
ANO-1                                                              11                                                        Rev. 0
0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 5.5)
(33.5, 15)
(64.5, 43.5)
(106.0, 77)
(264.7, 77)
(300.0, 77)
(248.5, 67)
(248.5, 58)
(206.5, 43)
OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*
0 20 40 60 80 100 GROUP 5*
0 20 40 60 80 100 GROUP 7*


CYCLE 26 COLR                                                                                                 CALC-ANO1-NE-14-00003 Figure 4-B Regulating Rod Insertion Limits for Three-Pump Operation From 200 10 EFPD to EOC (Figure is referred to by Technical Specification 3.2.1) 110.0 100.0 90.0 80.0 (207.9, 77)            (264.7, 77)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 12 Rev. 0 Figure 4-B Regulating Rod Insertion Limits for Three-Pump Operation From 200 10 EFPD to EOC (Figure is referred to by Technical Specification 3.2.1)
Power, % of 2568 MWt 70.0                        OPERATION IN THIS                                                                            (300.0, 77)
REGION IS NOT                                                      (248.5, 67) 60.0                            ALLOWED                                                  OPERATION RESTRICTED              (248.5, 58) 50.0 SHUTDOWN              (167.5, 43.5) 40.0                                    MARGIN                                              (206.5, 43)
LIMIT 30.0 PERMISSIBLE 20.0                                      (98.5, 15)                                                            OPERATING REGION 10.0      (0.0, 0.3) 0.0 0                      50                  100              150                200                    250                  300 Rod Index, % Withdrawn 0            20      40          60      80      100 GROUP 7*
0            20    40        60  80            100 GROUP 6*
0        20      40        60      80            100 GROUP 5*
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
ANO-1                                                                              12                                                        Rev. 0
0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 0.3)
(98.5, 15)
(167.5, 43.5)
(207.9, 77)
(264.7, 77)
(300.0, 77)
(248.5, 58)
(248.5, 67)
(206.5, 43)
OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*
0 20 40 60 80 100 GROUP 5*
0 20 40 60 80 100 GROUP 7*


CYCLE 26 COLR                                                                                       CALC-ANO1-NE-14-00003 Figure 5-A Regulating Rod Insertion Limits for Two-Pump Operation From 0 to 200 10 EFPD (Figure is referred to by Technical Specification 3.2.1) 110.0 100.0 90.0 80.0 Power, % of 2568 MWt OPERATION IN THIS 70.0                    REGION IS NOT ALLOWED 60.0 (265.8, 52) 50.0                                                  (107.2, 52)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 13 Rev. 0 Figure 5-A Regulating Rod Insertion Limits for Two-Pump Operation From 0 to 200 10 EFPD (Figure is referred to by Technical Specification 3.2.1)
SHUTDOWN                                                                      (248.5, 44)              (300.0, 52) 40.0            MARGIN                                                OPERATION            (248.5, 38)
LIMIT                                                RESTRICTED 30.0 (64.5, 29)                                                          PERMISSIBLE (206.5, 28)      OPERATING 20.0 REGION (0.0, 3.6) 10.0 (33.5, 10) 0.0 0                      50                100                  150            200                    250                  300 Rod Index, % Withdrawn 0          20      40            60    80      100 GROUP 7*
0            20      40        60  80        100 GROUP 6*
0      20        40        60    80            100 GROUP 5*
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
ANO-1                                                                      13                                                      Rev. 0
0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 3.6)
(33.5, 10)
(64.5, 29)
(107.2, 52)
(265.8, 52)
(300.0, 52)
(248.5, 44)
(248.5, 38)
(206.5, 28)
OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*
0 20 40 60 80 100 GROUP 5*
0 20 40 60 80 100 GROUP 7*


CYCLE 26 COLR                                                                                         CALC-ANO1-NE-14-00003 Figure 5-B Regulating Rod Insertion Limits for Two-Pump Operation From 200 10 EFPD to EOC (Figure is referred to by Technical Specification 3.2.1) 110.0 100.0 90.0 80.0 Power, % of 2568 MWt 70.0 OPERATION IN THIS 60.0                              REGION IS NOT (209.1, 52)                (265.8, 52)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 14 Rev. 0 Figure 5-B Regulating Rod Insertion Limits for Two-Pump Operation From 200 10 EFPD to EOC (Figure is referred to by Technical Specification 3.2.1)
ALLOWED 50.0 (300.0, 52)
(248.5, 44) 40.0                                                                                  OPERATION SHUTDOWN                                          RESTRICTED (248.5, 38)
(167.5, 29) 30.0                                MARGIN LIMIT (206.5, 28) 20.0 (98.5, 10)                                                                PERMISSIBLE 10.0                                                                                                                OPERATING (0.0, 0.2)
REGION 0.0 0                    50                100                150                  200                      250                  300 Rod Index, % Withdrawn 0              20          40        60    80    100 GROUP 7*
0            20    40          60    80            100 GROUP 6*
0        20      40        60    80            100 GROUP 5*
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
* Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.
ANO-1                                                                   14                                                              Rev. 0
0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 0.2)
(98.5, 10)
(167.5, 29)
(209.1, 52)
(265.8, 52)
(300.0, 52)
(248.5, 38)
(248.5, 44)
(206.5, 28)
OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*
0 20 40 60 80 100 GROUP 5*
0 20 40 60 80 100 GROUP 7*


CYCLE 26 COLR                                                         CALC-ANO1-NE-14-00003 AXIAL POWER SHAPING RODS (APSR) INSERTION LIMITS (Limits referred to by Technical Specification 3.2.2)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 15 Rev. 0 AXIAL POWER SHAPING RODS (APSR) INSERTION LIMITS (Limits referred to by Technical Specification 3.2.2)
Up to 530 +/- 10 EFPD, the APSRs may be positioned as necessary for transient imbalance control. However, the APSRs shall be fully withdrawn by 540 EFPD. After the APSR withdrawal at 530 +/- 10 EFPD, the APSRs shall not be reinserted, except during the end of cycle shutdown when the reactor power is equal to, or less than, 30% FP.
Up to 530 +/- 10 EFPD, the APSRs may be positioned as necessary for transient imbalance control. However, the APSRs shall be fully withdrawn by 540 EFPD. After the APSR withdrawal at 530 +/- 10 EFPD, the APSRs shall not be reinserted, except during the end of cycle shutdown when the reactor power is equal to, or less than, 30% FP.  
ANO-1                                          15                                      Rev. 0


CYCLE 26 COLR                                                                                                   CALC-ANO1-NE-14-00003 Figure 6-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Four-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3) 110.0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 16 Rev. 0 Figure 6-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Four-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)  
(-19.89, 102)                                                                     (20.76, 102) 100.0
-50.00
(-25.14, 92)                                                                                 (27.66, 92) 90.0
-40.00
(-32.45, 80)                                                   80.0                                        (34.48, 80) 70.0
-30.00
(-32.67, 60)                                                   60.0                                        (34.71, 60)
-20.00
PERMISSIBLE                                                PERMISSIBLE OPERATING                            50.0                 OPERATING REGION                                                    REGION RESTRICTED                                                                                                                              RESTRICTED REGION                                                                                                                                  REGION 40.0 Power, % of 2568 MWt 30.0 20.0 10.0 0.0
-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION
    -50.00    -40.00      -30.00    -20.00  -10.00                       0.00      10.00    20.00      30.00      40.00    50.00 Axial Power Imbalance, %FP ANO-1                                                                              16                                                        Rev. 0
(-32.67, 60)
(-32.45, 80)
(34.71, 60)
(-25.14, 92)
(-19.89, 102)
(34.48, 80)
(27.66, 92)
(20.76, 102) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0


CYCLE 26 COLR                                                                                                 CALC-ANO1-NE-14-00003 Figure 6-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions* for Four-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3) 110.0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 17 Rev. 0 Figure 6-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions* for Four-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)
(-11.96, 102)                                               (12.56, 102) 100.0
* Assumes that no individual long emitter detector affecting the minimum incore imbalance calculation exceeds 73% sensitivity depletion. The imbalance setpoints for the minimum incore system must be reduced to 2.8% FP at the earliest time-in-life this assumption is no longer valid.
(-16.61, 92)                                                             (18.79, 92) 90.0
-50.00
(-23.25, 80)                                           80.0                            (25.01, 80) 70.0
-40.00
(-24.10, 60)                                               60.0                            (25.86, 60)
-30.00
PERMISSIBLE                                      PERMISSIBLE OPERATING                            50.0       OPERATING REGION                                            REGION RESTRICTED                                                                                                                RESTRICTED REGION                                                                                                                    REGION 40.0 Power, % of 2568 MWt 30.0 20.0 10.0 0.0
-20.00
        -50.00  -40.00      -30.00      -20.00      -10.00                       0.00  10.00    20.00        30.00    40.00    50.00 Axial Power Imbalance, %FP
-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION
* Assumes that no individual long emitter detector affecting the minimum incore imbalance calculation exceeds 73% sensitivity depletion. The imbalance setpoints for the minimum incore system must be reduced to 2.8% FP at the earliest time-in-life this assumption is no longer valid.
(-24.10, 60)
ANO-1                                                                              17                                                        Rev. 0
(-23.25, 80)
(25.86, 60)
(-16.61, 92)
(-11.96, 102)
(25.01, 80)
(18.79, 92)
(12.56, 102) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0  


CYCLE 26 COLR                                                                                         CALC-ANO1-NE-14-00003 Figure 6-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Four-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3) 110.0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 18 Rev. 0 Figure 6-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Four-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)  
(-13.77, 102)                                                 (14.46, 102) 100.0
-50.00
(-19.02, 92)                                                             (21.30, 92) 90.0
-40.00
(-26.27, 80)                                           80.0                            (28.10, 80) 70.0
-30.00
(-26.95, 60)                                           60.0                            (28.80, 60)
-20.00
PERMISSIBLE                                    PERMISSIBLE OPERATING                          50.0       OPERATING REGION                                        REGION RESTRICTED                                                                                                    RESTRICTED REGION                                                                                                        REGION 40.0 Power, % of 2568 MWt 30.0 20.0 10.0 0.0
-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION
        -50.00  -40.00    -30.00    -20.00    -10.00                         0.00  10.00  20.00      30.00      40.00  50.00 Axial Power Imbalance, %FP ANO-1                                                                      18                                                      Rev. 0
(-26.95, 60)
(-26.27, 80)
(28.80, 60)
(-19.02, 92)
(-13.77, 102)
(28.10, 80)
(21.30, 92)
(14.46, 102) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0  


CYCLE 26 COLR                                                                                               CALC-ANO1-NE-14-00003 Figure 7-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Three-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3) 110.0 100.0 90.0 80.0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 19 Rev. 0 Figure 7-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Three-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)  
(-20.17, 77)                                                               (21.04, 77)
-50.00
(-25.40, 69)                                             70.0                            (27.92, 69)
-40.00
(-32.67, 60)                                                   60.0                                    (34.71, 60)
-30.00
PERMISSIBLE                                        PERMISSIBLE OPERATING                              50.0        OPERATING REGION                                              REGION
-20.00
(-32.84, 45)                                                                                           (34.87, 45) 40.0 Power, % of 2568 MWt RESTRICTED                                                                                                        RESTRICTED REGION                                                                                                            REGION 30.0 20.0 10.0 0.0
-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION
        -50.00      -40.00      -30.00    -20.00  -10.00                         0.00  10.00  20.00      30.00      40.00    50.00 Axial Power Imbalance, %FP ANO-1                                                                              19                                                      Rev. 0
(-32.84, 45)
(-32.67, 60)
(34.87, 45)
(-25.40, 69)
(-20.17, 77)
(34.71, 60)
(27.92, 69)
(21.04, 77) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0


CYCLE 26 COLR                                                                                                 CALC-ANO1-NE-14-00003 Figure 7-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions* for Three-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3) 110.0 100.0 90.0 80.0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 20 Rev. 0 Figure 7-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions* for Three-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)
(-12.68, 77)                                                 (13.44, 77)
* Assumes that no individual long emitter detector affecting the minimum incore imbalance calculation exceeds 73% sensitivity depletion. The imbalance setpoints for the minimum incore system must be reduced to 2.8% FP at the earliest time-in-life this assumption is no longer valid.
(-17.41, 69)                                       70.0                      (19.60, 69)
-50.00
(-23.95, 60)                                             60.0                            (25.71, 60)
-40.00
PERMISSIBLE                                      PERMISSIBLE OPERATING 50.0                                  OPERATING REGION                                          REGION
-30.00
(-24.62, 45)                                                                               (26.38, 45) 40.0 Power, % of 2568 MWt RESTRICTED                                                                                                    RESTRICTED REGION                                                                                                        REGION 30.0 20.0 10.0 0.0
-20.00
        -50.00  -40.00  -30.00      -20.00      -10.00                         0.00  10.00  20.00        30.00    40.00  50.00 Axial Power Imbalance, %FP
-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION
* Assumes that no individual long emitter detector affecting the minimum incore imbalance calculation exceeds 73% sensitivity depletion. The imbalance setpoints for the minimum incore system must be reduced to 2.8% FP at the earliest time-in-life this assumption is no longer valid.
(-24.62, 45)
ANO-1                                                                            20                                                      Rev. 0
(-23.95, 60)
(26.38, 45)
(-17.41, 69)
(-12.68, 77)
(25.71, 60)
(19.60, 69)
(13.44, 77) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0  


CYCLE 26 COLR                                                                                         CALC-ANO1-NE-14-00003 Figure 7-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Three-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3) 110.0 100.0 90.0 80.0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 21 Rev. 0 Figure 7-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Three-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)  
(-14.62, 77)                                                 (15.33, 77) 70.0                      (22.10, 69)
-50.00
-40.00
-30.00
-20.00
-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION
(-27.44, 45)
(-26.95, 60)
(29.31, 45)
(-19.80, 69)
(-19.80, 69)
(-26.95, 60)                                             60.0                            (28.80, 60)
(-14.62, 77)
PERMISSIBLE                                  PERMISSIBLE OPERATING 50.0                              OPERATING REGION                                      REGION
(28.80, 60)
(-27.44, 45)                                                                               (29.31, 45) 40.0 Power, % of 2568 MWt RESTRICTED                                                                                              RESTRICTED REGION                                                                                                  REGION 30.0 20.0 10.0 0.0
(22.10, 69)
        -50.00  -40.00    -30.00    -20.00    -10.00                         0.00  10.00  20.00    30.00      40.00  50.00 Axial Power Imbalance, %FP ANO-1                                                                        21                                                  Rev. 0
(15.33, 77) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0  


CYCLE 26 COLR                                                                                             CALC-ANO1-NE-14-00003 Figure 8-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Two-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3) 110.0 100.0 90.0 80.0 70.0 60.0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 22 Rev. 0 Figure 8-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Two-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)  
(-20.45, 52)                                                             (21.32, 52) 50.0
-50.00
(-25.65, 46)                                                                            (28.17, 46)
-40.00
(-32.90, 40)                                                 40.0                                    (34.93, 40)
-30.00
PERMISSIBLE                                        PERMISSIBLE OPERATING                                          OPERATING REGION                                            REGION Power, % of 2568 MWt
-20.00
(-33.01, 30)                                                 30.0                                   (35.04, 30)
-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION
RESTRICTED                                                            20.0                                           RESTRICTED REGION                                                                                                              REGION 10.0 0.0
(-33.01, 30)
        -50.00      -40.00      -30.00    -20.00  -10.00                         0.00  10.00  20.00      30.00      40.00      50.00 Axial Power Imbalance, %FP ANO-1                                                                            22                                                      Rev. 0
(-32.90, 40)
(35.04, 30)
(-25.65, 46)
(-20.45, 52)
(34.93, 40)
(28.17, 46)
(21.32, 52) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0


CYCLE 26 COLR                                                                                             CALC-ANO1-NE-14-00003 Figure 8-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions* for Two-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3) 110.0 100.0 90.0 80.0 70.0 60.0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 23 Rev. 0 Figure 8-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions* for Two-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)
(-13.56, 52)                                               (14.11, 52) 50.0
* Assumes that no individual long emitter detector affecting the minimum incore imbalance calculation exceeds 73% sensitivity depletion. The imbalance setpoints for the minimum incore system must be reduced to 2.8% FP at the earliest time-in-life this assumption is no longer valid.
(-18.02, 46)                                                                (20.20, 46)
-50.00
(-24.45, 40)                                           40.0                            (26.21, 40)
-40.00
PERMISSIBLE                                    PERMISSIBLE OPERATING                                      OPERATING REGION                                          REGION Power, % of 2568 MWt
-30.00
(-25.15, 30)                                             30.0                             (26.91, 30)
-20.00
RESTRICTED                                                        20.0                                     RESTRICTED REGION                                                                                                    REGION 10.0 0.0
-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION
        -50.00  -40.00  -30.00      -20.00      -10.00                        0.00  10.00  20.00        30.00    40.00  50.00 Axial Power Imbalance, %FP
(-25.15, 30)
* Assumes that no individual long emitter detector affecting the minimum incore imbalance calculation exceeds 73% sensitivity depletion. The imbalance setpoints for the minimum incore system must be reduced to 2.8% FP at the earliest time-in-life this assumption is no longer valid.
(-24.45, 40)
ANO-1                                                                          23                                                      Rev. 0
(26.91, 30)
(-18.02, 46)
(-13.56, 52)
(26.21, 40)
(20.20, 46)
(14.11, 52) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 Power, % of 2568 MWt


CYCLE 26 COLR                                                                                         CALC-ANO1-NE-14-00003 Figure 8-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Two-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3) 110.0 100.0 90.0 80.0 70.0 60.0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 24 Rev. 0 Figure 8-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Two-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)  
(-15.44, 52)                                                 (16.17, 52) 50.0
-50.00
(-20.55, 46)                                                              (22.87, 46)
-40.00
(-27.60, 40)                                             40.0                              (29.47, 40)
-30.00
PERMISSIBLE                                  PERMISSIBLE OPERATING                                    OPERATING REGION                                        REGION Power, % of 2568 MWt
-20.00
(-27.92, 30)                                             30.0                             (29.80, 30)
-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION
RESTRICTED                                                      20.0                                   RESTRICTED REGION                                                                                                  REGION 10.0 0.0
(-27.92, 30)
        -50.00  -40.00    -30.00    -20.00    -10.00                        0.00  10.00  20.00    30.00        40.00  50.00 Axial Power Imbalance, %FP ANO-1                                                                        24                                                    Rev. 0
(-27.60, 40)
(29.80, 30)
(-20.55, 46)
(-15.44, 52)
(29.47, 40)
(22.87, 46)
(16.17, 52) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 Power, % of 2568 MWt


CYCLE 26 COLR                                                           CALC-ANO1-NE-14-00003 Quadrant Power Tilt Limits And Setpoints (Limits are referred to by Technical Specification 3.2.4)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 25 Rev. 0 Quadrant Power Tilt Limits And Setpoints (Limits are referred to by Technical Specification 3.2.4)
From 0 EFPD to EOC Measurement System                                 Steady State Value (%)       Maximum Value (%)
From 0 EFPD to EOC Measurement System Steady State Value (%)
60 % FP     > 60 % FP Full In-core Detector System Setpoint               6.83           5.50               25.00 Minimum In-core Detector System Setpoint           2.78*         1.90*               25.00 Ex-core Power Range NI Channel Setpoint             4.05           1.96               25.00 Measurement System Independent Limit               7.50           4.92               25.00
Maximum Value (%)
* Assumes that no individual long emitter detector affecting the minimum in-core tilt calculation exceeds 73% sensitivity depletion. The setpoint must be reduced to 1.50% (power levels
60 % FP  
  > 60% FP) and to 2.19% (power levels 60% FP) at the earliest time-in-life that this assumption is no longer valid.
> 60 % FP Full In-core Detector System Setpoint 6.83 5.50 25.00 Minimum In-core Detector System Setpoint 2.78*
ANO-1                                            25                                        Rev. 0
1.90*
25.00 Ex-core Power Range NI Channel Setpoint 4.05 1.96 25.00 Measurement System Independent Limit 7.50 4.92 25.00
* Assumes that no individual long emitter detector affecting the minimum in-core tilt calculation exceeds 73% sensitivity depletion. The setpoint must be reduced to 1.50% (power levels  
> 60% FP) and to 2.19% (power levels 60% FP) at the earliest time-in-life that this assumption is no longer valid.  


CYCLE 26 COLR                                                         CALC-ANO1-NE-14-00003 Figure 9A LOCA Linear Heat Rate Limits for Mark-B-HTP Fuel (Figure is referred to by Technical Specification 3.1.8 and 3.2.5)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 26 Rev. 0 Figure 9A LOCA Linear Heat Rate Limits for Mark-B-HTP Fuel (Figure is referred to by Technical Specification 3.1.8 and 3.2.5)
Allowable LOCA LHR Limits LHR Limit for           LHR Limit for LHR Limit for Core Elevation, ft                                34,000 MWd/mtU,         62,000 MWd/mtU, 0 MWd/mtU, kW/ft kW/ft                  kW/ft 0.000                   15.83                     13.83                 11.80 2.506                   16.73                     14.73                 12.50 4.264                   17.20                     15.20                 12.50 6.021                   17.30                     15.30                 12.50 7.779                   17.40                     15.40                 12.50 9.536                   17.10                     15.10                 12.50 12.000                   16.20                     14.20                 11.80 Note: The LOCA LHR limits may be linearly interpolated as a function of burnup between 0 MWd/mtU and 34,000 MWd/mtU, between 34,000 MWd/mtU and 62,000 MWd/mtU, and as a function of core elevation.
Allowable LOCA LHR Limits Core Elevation, ft LHR Limit for 0 MWd/mtU, kW/ft LHR Limit for 34,000 MWd/mtU, kW/ft LHR Limit for 62,000 MWd/mtU, kW/ft 0.000 15.83 13.83 11.80 2.506 16.73 14.73 12.50 4.264 17.20 15.20 12.50 6.021 17.30 15.30 12.50 7.779 17.40 15.40 12.50 9.536 17.10 15.10 12.50 12.000 16.20 14.20 11.80 Note: The LOCA LHR limits may be linearly interpolated as a function of burnup between 0 MWd/mtU and 34,000 MWd/mtU, between 34,000 MWd/mtU and 62,000 MWd/mtU, and as a function of core elevation.  
ANO-1                                        26                                        Rev. 0


CYCLE 26 COLR                                                                                   CALC-ANO1-NE-14-00003 DNB Power Peaking Factors (Limits are referred to by Technical Specification 3.1.8 and 3.2.5)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 27 Rev. 0 DNB Power Peaking Factors (Limits are referred to by Technical Specification 3.1.8 and 3.2.5)
The following total power peaking factors define the Maximum Allowable Peaking (MAP) limits to protect the initial conditions assumed in the DNB Loss of Flow transient analysis. The total power peaking factors for IC-DNB 4-pump and 3-pump are identical; hence one set of IC-DNB values are provided for both 4-pump and 3-pump operation.
The following total power peaking factors define the Maximum Allowable Peaking (MAP) limits to protect the initial conditions assumed in the DNB Loss of Flow transient analysis. The total power peaking factors for IC-DNB 4-pump and 3-pump are identical; hence one set of IC-DNB values are provided for both 4-pump and 3-pump operation.
IC-DNB Total Power Peaking Factors Mark-B-HTP Axial                                         Axial                                        Axial x/L       IC MAP Limits                     x/L       IC MAP Limits                   x/L       IC MAP Limits Peak                                          Peak                                          Peak 0.01           2.04426                       0.01         2.94000                     0.01         3.20469 0.14           2.04515                       0.14         2.94000                     0.14         3.20469 0.20           2.04535                       0.20         2.93545                     0.20         3.15423 0.30           2.04551                       0.30         2.84715                     0.30         3.08083 0.40           2.04470                       0.40         2.76077                     0.40         2.98064 1.1      0.50           2.04437             1.4      0.50         2.66671               1.7  0.50         2.89369 0.60           2.04415                       0.60         2.55808                     0.60         2.78037 0.70           2.04400                       0.70         2.46508                     0.70         2.68552 0.80           2.04329                       0.80         2.34973                     0.80         2.56207 0.89           2.00109                       0.89         2.27714                     0.89         2.49021 0.99           1.90427                       0.99         2.18525                     0.99         2.39515 0.01           2.33088                       0.01         3.08066                     0.01         3.24949 0.14           2.33287                       0.14         3.08066                     0.14         3.24949 0.20           2.33339                       0.20         3.03513                     0.20         3.20303 0.30           2.33352                       0.30         2.93856                     0.30         3.13047 0.40           2.33338                       0.40         2.84115                     0.40         3.04037 1.2      0.50           2.33285             1.5      0.50         2.75216               1.8  0.50         2.95027 0.60           2.33232                       0.60         2.63946                     0.60         2.84225 0.70           2.26721                       0.70         2.54429                     0.70         2.74696 0.80           2.16931                       0.80         2.42655                     0.80         2.62489 0.89           2.10460                       0.89         2.35382                     0.89         2.55373 0.99           2.00767                       0.99         2.26040                     0.99         2.45882 0.01           2.64464                       0.01         3.14861                     0.01         3.28611 0.14           2.64863                       0.14         3.14861                     0.14         3.28611 0.20           2.64909                       0.20         3.09918                     0.20         3.24461 0.30           2.64997                       0.30         3.01573                     0.30         3.17163 0.40           2.64949                       0.40         2.91490                     0.40         3.08589 1.3      0.50           2.56272             1.6      0.50         2.82718               1.9  0.50         3.00025 0.60           2.46600                       0.60         2.71210                     0.60         2.89826 0.70           2.37484                       0.70         2.61653                     0.70         2.80288 0.80           2.26452                       0.80         2.49634                     0.80         2.68386 0.89           2.19471                       0.89         2.42370                     0.89         2.61261 0.99           2.09988                       0.99         2.32955                     0.99         2.51792 Notes
IC-DNB Total Power Peaking Factors Mark-B-HTP Axial Peak x/L IC MAP Limits Axial Peak x/L IC MAP Limits Axial Peak x/L IC MAP Limits 1.1 0.01 2.04426 1.4 0.01 2.94000 1.7 0.01 3.20469 0.14 2.04515 0.14 2.94000 0.14 3.20469 0.20 2.04535 0.20 2.93545 0.20 3.15423 0.30 2.04551 0.30 2.84715 0.30 3.08083 0.40 2.04470 0.40 2.76077 0.40 2.98064 0.50 2.04437 0.50 2.66671 0.50 2.89369 0.60 2.04415 0.60 2.55808 0.60 2.78037 0.70 2.04400 0.70 2.46508 0.70 2.68552 0.80 2.04329 0.80 2.34973 0.80 2.56207 0.89 2.00109 0.89 2.27714 0.89 2.49021 0.99 1.90427 0.99 2.18525 0.99 2.39515 1.2 0.01 2.33088 1.5 0.01 3.08066 1.8 0.01 3.24949 0.14 2.33287 0.14 3.08066 0.14 3.24949 0.20 2.33339 0.20 3.03513 0.20 3.20303 0.30 2.33352 0.30 2.93856 0.30 3.13047 0.40 2.33338 0.40 2.84115 0.40 3.04037 0.50 2.33285 0.50 2.75216 0.50 2.95027 0.60 2.33232 0.60 2.63946 0.60 2.84225 0.70 2.26721 0.70 2.54429 0.70 2.74696 0.80 2.16931 0.80 2.42655 0.80 2.62489 0.89 2.10460 0.89 2.35382 0.89 2.55373 0.99 2.00767 0.99 2.26040 0.99 2.45882 1.3 0.01 2.64464 1.6 0.01 3.14861 1.9 0.01 3.28611 0.14 2.64863 0.14 3.14861 0.14 3.28611 0.20 2.64909 0.20 3.09918 0.20 3.24461 0.30 2.64997 0.30 3.01573 0.30 3.17163 0.40 2.64949 0.40 2.91490 0.40 3.08589 0.50 2.56272 0.50 2.82718 0.50 3.00025 0.60 2.46600 0.60 2.71210 0.60 2.89826 0.70 2.37484 0.70 2.61653 0.70 2.80288 0.80 2.26452 0.80 2.49634 0.80 2.68386 0.89 2.19471 0.89 2.42370 0.89 2.61261 0.99 2.09988 0.99 2.32955 0.99 2.51792 Notes
: 1. The values above are not error corrected.
: 1. The values above are not error corrected.
: 2. The values above were generated using SCD methods which incorporate a 3.8% radial peak uncertainty in the DNBR design limit. Therefore, the above IC MAP limits can be compared to predicted peaks without the addition of up to 3.8% in radial peak calculation uncertainty. These limits, however, do not incorporate any grid bias uncertainty.
: 2. The values above were generated using SCD methods which incorporate a 3.8% radial peak uncertainty in the DNBR design limit. Therefore, the above IC MAP limits can be compared to predicted peaks without the addition of up to 3.8% in radial peak calculation uncertainty. These limits, however, do not incorporate any grid bias uncertainty.
: 3. The present T-H methodology allows for an increase in the design radial-local peak for power levels below 100% full power.
: 3. The present T-H methodology allows for an increase in the design radial-local peak for power levels below 100% full power.
The equations defining the multipliers are as follows:
The equations defining the multipliers are as follows:
P/Pm = 1.00               P/Pm < 1.00 MAP Multiplier                   1.0                 1 + 0.3(1 - P/Pm)
P/Pm = 1.00 P/Pm < 1.00 MAP Multiplier 1.0 1 + 0.3(1 - P/Pm)
Where       P   =   core power fraction, and Pm =   1.00 for 4-pump operation, or
Where P  
                =   0.75 for 3-pump operation ANO-1                                                          27                                                      Rev. 0
=
core power fraction, and Pm =
1.00 for 4-pump operation, or  
=
0.75 for 3-pump operation  


CYCLE 26 COLR                                                                                                     CALC-ANO1-NE-14-00003 Figure 10 Reactor Protection System Maximum Allowable Setpoints for Axial Power Imbalance (Figure is referred to by Technical Specification 2.1.1.1, 2.1.1.2, and 3.3.1) 120
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 28 Rev. 0 Figure 10 Reactor Protection System Maximum Allowable Setpoints for Axial Power Imbalance (Figure is referred to by Technical Specification 2.1.1.1, 2.1.1.2, and 3.3.1)
(-34.0, 107.0)                                                (30.0, 107.0) 100 ACCEPTABLE
(-44.0, 92.5)                4 PUMP                                                                              (45.0, 92.5)
OPERATION
(-34.0, 79.3)                                                    (30.0, 79.3) 80 ACCEPTABLE 3 AND 4 PUMP
(-44.0, 64.8)              OPERATION                                                                              (45.0, 64.8) 60
(-34.0, 52.4)                                                    (30.0, 52.4)
The three- or two-ACCEPTABLE                                            pump example 2, 3 AND 4 PUMP                                      setpoint curves show OPERATION                              40          allowable values for
(-44.0, 37.9)                                                                  an approximate 26%                  (45.0, 37.9)
Thermal Power Level %
and 51% flow reduction for three-and two-pump operation respectively. The actual setpoint curve 20          will be calculated by the Reactor Protection System and will be directly proportional to the indicated flow.
(-44.0, 0.0)                                                        0                                            (45.0, 0.0)
    -60        -50      -40      -30      -20                -10                0        10        20          30  40    50      60 Axial Power Imbalance, %
Flux / Flow Setpoint
Flux / Flow Setpoint
(% Power / % Flow)
(% Power / % Flow)
Four Pump Operation                                               1.07 Three Pump Operation                                             1.07 Two Pump Operation                                               1.07 ANO-1                                                                            28                                                      Rev. 0
Four Pump Operation 1.07 Three Pump Operation 1.07 Two Pump Operation 1.07  
-60
-50
-40
-30
-20
-10 0
10 20 30 40 50 60
(-44.0, 92.5)
(-44.0, 64.8)
(-44.0, 37.9)
(-44.0, 0.0)
(-34.0, 107.0)
(-34.0, 79.3)
(-34.0, 52.4)
ACCEPTABLE 4 PUMP OPERATION ACCEPTABLE 3 AND 4 PUMP OPERATION ACCEPTABLE 2, 3 AND 4 PUMP OPERATION Thermal Power Level %
Axial Power Imbalance, %
The three-or two-pump example setpoint curves show allowable values for an approximate 26%
and 51% flow reduction for three-and two-pump operation respectively. The actual setpoint curve will be calculated by the Reactor Protection System and will be directly proportional to the indicated flow.
(45.0, 92.5)
(45.0, 64.8)
(45.0, 37.9)
(45.0, 0.0)
(30.0, 107.0)
(30.0, 79.3)
(30.0, 52.4) 120 100 80 60 40 20 0


CYCLE 26 COLR                                                                                           CALC-ANO1-NE-14-00003 Figure 11 Reactor Protection System Variable Low Pressure Temperature Envelope Setpoints (Figure is referred to by Technical Specification 3.3.1) 2400 618, 2355 560, 2355 2200 Reactor Coolant Pressure, psig ACCEPTABLE OPERATION 2000 618, 1980 P = 16.25 Tout - 8063, psig     UNACCEPTABLE OPERATION 1800 560, 1800                      606.9, 1800 1600 560           580            600              620          640        660 Reactor Outlet Temperature, &deg;F ANO-1                                                                          29                                        Rev. 0
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 29 Rev. 0 Figure 11 Reactor Protection System Variable Low Pressure Temperature Envelope Setpoints (Figure is referred to by Technical Specification 3.3.1) 2400 2200 2000 1800 1600 560 580 600 620 640 660 Reactor Outlet Temperature, &deg;F Reactor Coolant Pressure, psig 606.9, 1800 618, 2355 P = 16.25 Tout - 8063, psig ACCEPTABLE OPERATION UNACCEPTABLE OPERATION 560, 2355 618, 1980 560, 1800


CYCLE 26 COLR                                                           CALC-ANO1-NE-14-00003 RCS Pressure, Temperature, and Flow DNB Surveillance Limits (Limit is referred to by Technical Specification 3.4.1)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 30 Rev. 0 RCS Pressure, Temperature, and Flow DNB Surveillance Limits (Limit is referred to by Technical Specification 3.4.1)
Four-Pump         Three-Pump     Two-Pump Operation         Operation    Operation 2081.2Note 4 Minimum RCS Hot Leg Pressure (psig) Note 1             2082.2                         2118.1 2120.4Note 5 Maximum RCS Hot Leg Temperature (&deg;F) Note 2             602.6             602.9       603.15 Note 6            Note 7 143.36            106.46        70.64 Note 8 Minimum RCS Total Flow (Mlbm/hr) Note 3 138.01 Note 9     102.45 Note 9 67.96 Note 9 Note 1 -- Using individual indications P1021, P1023, P1038 and P1039 (or equivalent) from the plant computer.
Four-Pump Operation Three-Pump Operation Two-Pump Operation Minimum RCS Hot Leg Pressure (psig) Note 1 2082.2 2081.2Note 4 2120.4Note 5 2118.1 Maximum RCS Hot Leg Temperature (&deg;F) Note 2 602.6 602.9 603.15 Minimum RCS Total Flow (Mlbm/hr) Note 3 143.36 Note 6 138.01 Note 9 106.46 Note 7 102.45 Note 9 70.64 Note 8 67.96 Note 9 Note 1 -- Using individual indications P1021, P1023, P1038 and P1039 (or equivalent) from the plant computer.
Note 2 -- Using individual indications T1011NR, T1014NR, T1039NR, T1042NR, T1012, T1013, T1040 and T1041 or averages TOUTA, XTOUTA, TOUTB, XTOUTB, TOUT, XTOUT from the plant computer.
Note 2 -- Using individual indications T1011NR, T1014NR, T1039NR, T1042NR, T1012, T1013, T1040 and T1041 or averages TOUTA, XTOUTA, TOUTB, XTOUTB, TOUT, XTOUT from the plant computer.
Note 3 -- Using indication WRCFT (or equivalent) from the plant computer, and can be linearly interpolated between these values provided the Tave versus Power level curve is followed.
Note 3 -- Using indication WRCFT (or equivalent) from the plant computer, and can be linearly interpolated between these values provided the Tave versus Power level curve is followed.
Line 299: Line 439:
Note 7 -- For Tcold = 556.3 &deg;F.
Note 7 -- For Tcold = 556.3 &deg;F.
Note 8 -- For Tcold = 556.1 &deg;F.
Note 8 -- For Tcold = 556.1 &deg;F.
Note 9 -- For Tcold = 580 &deg;F.
Note 9 -- For Tcold = 580 &deg;F.  
ANO-1                                            30                                      Rev. 0


CYCLE 26 COLR                                                           CALC-ANO1-NE-14-00003 RCS Loops - Mode 1 and Mode 2 (Limit is referred to by Technical Specification 3.4.4)
CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 31 Rev. 0 RCS Loops - Mode 1 and Mode 2 (Limit is referred to by Technical Specification 3.4.4)
Nominal Operating Power Level
Nominal Operating Power Level
(% Power)
(% Power)
Four Pump Operation                       100 Three Pump Operation                       75 Two Pump Operation*                         49
Four Pump Operation 100 Three Pump Operation 75 Two Pump Operation*
49
* Technical Specification 3.4.4 does not allow indefinite operation in Modes 1 and 2 with only two pumps operating.
* Technical Specification 3.4.4 does not allow indefinite operation in Modes 1 and 2 with only two pumps operating.
Refueling Boron Concentration (Limit is referred to by Technical Specification 3.9.1)
Refueling Boron Concentration (Limit is referred to by Technical Specification 3.9.1)
The minimum required boron concentration (which includes uncertainties) for use during refueling is 2404 ppm.
The minimum required boron concentration (which includes uncertainties) for use during refueling is 2404 ppm.}}
ANO-1                                            31                                    Rev. 0}}

Latest revision as of 09:04, 10 January 2025

Cycle 26 Core Operating Limits Report (COLR)
ML15239A540
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/27/2015
From: Pyle S
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
1CAN081504
Download: ML15239A540 (34)


Text

1CAN081504 August 27, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

ANO-1 Cycle 26 COLR Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51

Dear Sir or Madam:

Entergy Operations, Inc. (Entergy) Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specification 5.6.5 requires the submittal of the Core Operating Limits Report (COLR) for each reload cycle. Revision 0 of the ANO-1 Cycle 26 COLR was submitted on February 5, 2015 (1CAN021501, ML15036A249). It was recently identified that the axis and some (x,y) coordinates on Figure 11 did not properly convert from Microsoft Word to Adobe and were subsequently missing from the figure (Condition Report CR-ANO-1-2015-3186). Therefore, Revision 0 of the ANO-1 Cycle 26 COLR is resubmitted to include the missing coordinate references. Note that the graph itself did not change from that of the Cycle 25 ANO-1 COLR.

Please note that the latest approved revision number of the Babcock and Wilcox Topical Report BAW-10179P-A is identified in the COLR as Revision 8, May 2010. In addition, the approved revision number of the Entergy Reactor Physics Methods Report is identified in the COLR as Revision 0, December 1993.

This submittal contains no regulatory commitments. Should you have any questions, please contact me.

Sincerely, ORIGINAL SIGNED BY STEPHENIE L. PYLE SLP/dbb Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4704 Stephenie L. Pyle Manager, Regulatory Assurance Arkansas Nuclear One

1CAN081504 Page 2 of 2

Attachment:

ANO-1 Cycle 26 Core Operating Limits Report (COLR) cc:

Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Ms. Andrea E. George MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205

Attachment to 1CAN081504 ANO-1 Cycle 26 Core Operating Limits Report (COLR)

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 1

Rev. 0 ENTERGY OPERATIONS ARKANSAS NUCLEAR ONE UNIT ONE CYCLE 26 CORE OPERATING LIMITS REPORT

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 2

Rev. 0 1.0 CORE OPERATING LIMITS This Core Operating Limits Report for ANO-1 Cycle 26 has been prepared in accordance with the requirements of Technical Specification 5.6.5 with applicable 10 CFR 50.46 reporting. The core operating limits have been developed using the methodology provided in the references.

The following cycle-specific core operating limits are included in this report:

1) 2.1.1.3 Variable Low RCS Pressure - Temperature Protective Limits
2) 3.1.1 SHUTDOWN MARGIN (SDM)
3) 3.1.8 PHYSICS TESTS Exceptions - MODE 1
4) 3.1.9 PHYSICS TEST Exceptions - MODE 2
5) 3.2.1 Regulating Rod Insertion Limits
6) 3.2.2 AXIAL POWER SHAPING RODS (APSR) Insertion Limits
7) 3.2.3 AXIAL POWER IMBALANCE Operating Limits
8) 3.2.4 QUADRANT POWER TILT (QPT)
9) 3.2.5 Power Peaking
10) 3.3.1 Reactor Protection System (RPS) Instrumentation
11) 3.4.1 RCS Pressure, Temperature, and Flow DNB Limits
12) 3.4.4 RCS Loops - MODES 1 and 2
13) 3.9.1 Boron Concentration

2.0 REFERENCES

1.

"Safety Criteria and Methodology for Acceptable Cycle Reload Analyses," BAW-10179P-A, Rev. 8, Framatome ANP, Inc., Lynchburg, Virginia, May 2010.

2.

Letter dated 4/9/02 from L.W. Barnett, USNRC, to J.M. Mallay, FRA-ANP, Safety Evaluation of Framatome Technologies Topical Report BAW-10164P Revision 4, RELAP5/MOD2-B&W, An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis (TAC Nos. MA8465 and MA8468), USNRC ADAMS Accession Number ML013390204.

3.

RELAP5/MOD2-B&W - An Advanced Computer Program for Light Water Reactor LOCA Transient Analysis, BAW-10164PA, Rev. 6, Framatome Technologies, Inc., Lynchburg, Virginia, June 2007.

4.

"Qualification of Reactor Physics Methods for the Pressurized Water Reactors of the Entergy System," ENEAD-01-P, Rev. 0, Entergy Operations, Inc., Jackson, Mississippi, December 1993.

5.

ANO-1 Cycle 26 Limits and Setpoints, Areva Doc. No. FS1-0016730, January 2015.

6.

Arkansas Nuclear One, Unit 1, Cycle 26 Final Reload Report, ANP-3366, Rev. 0, January 2015. (CALC-ANO1-NE-14-00001).

7.

ANO 1-26 Core Loading Plan (AREVA document no. FS1-0017393-2.0), FAB14-689, December 19, 2014.

8.

IC (Initial Condition) DNB RCS Protection Criteria, CALC-96-E-0023-02, Rev. 7.

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 3

Rev. 0

2.0 REFERENCES

(continued)

9.

Arkansas Nuclear One Unit 1, Cycle 26 Reload Technical Document (RTD), AREVA document no. FS1-00184680 Revision 1, January 12, 2015 (CALC-ANO1-NE-14-00002).

10. Special Report, Licensee Event Report 50-313/2014-002-00, Arkansas Nuclear One Unit 1, Docket No. 50-313, License No. DPR-51, 1CAN121405, December 22, 2014.

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 4

Rev. 0 Table Of Contents Page REACTOR CORE SAFETY LIMITS Fig. 1 Variable Low RCS Pressure-Temperature Protective Limits................................. 6 Fig. 2 AXIAL POWER IMBALANCE Protective Limits..................................................... 7 SHUTDOWN MARGIN (SDM)...................................................................................................... 8 REGULATING ROD INSERTION LIMITS Fig. 3-A Regulating Rod Insertion Limits for Four-Pump Operation From 0 to 200 10 EFPD...................................................................................... 9 Fig. 3-B Regulating Rod Insertion Limits for Four-Pump Operation From 200 10 EFPD to EOC............................................................................. 10 Fig. 4-A Regulating Rod Insertion Limits for Three-Pump Operation From 0 to 200 10 EFPD................................................................................... 11 Fig. 4-B Regulating Rod Insertion Limits for Three-Pump Operation From 200 10 EFPD to EOC............................................................................. 12 Fig. 5-A Regulating Rod Insertion Limits for Two-Pump Operation From 0 to 200 10 EFPD................................................................................... 13 Fig. 5-B Regulating Rod Insertion Limits for Two-Pump Operation From 200 10 EFPD to EOC............................................................................. 14 AXIAL POWER SHAPING RODS (APSR) INSERTION LIMITS............................................... 15 AXIAL POWER IMBALANCE OPERATING LIMITS Fig. 6-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Four-Pump Operation from 0 to EOC.................................................................. 16 Fig. 6-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions for Four-Pump Operation from 0 to EOC............................................................. 17 Fig. 6-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Four-Pump Operation from 0 to EOC.................................................................. 18 Fig. 7-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Three-Pump Operation from 0 to EOC................................................................ 19 Fig. 7-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions for Three-Pump Operation from 0 to EOC........................................................... 20 Fig. 7-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Three-Pump Operation from 0 to EOC................................................................ 21 Fig. 8-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Two-Pump Operation from 0 to EOC.................................................................. 22 Fig. 8-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions for Two-Pump Operation from 0 to EOC............................................................. 23 Fig. 8-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Two-Pump Operation from 0 to EOC.................................................................. 24 QUADRANT POWER TILT LIMITS AND SETPOINTS............................................................. 25

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 5

Rev. 0 POWER PEAKING FACTORS Fig. 9A LOCA Linear Heat Rate Limits for Mark-B-HTP Fuel.......................................... 26 DNB Power Peaking Factors............................................................................................... 27 REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION Fig. 10 RPS Maximum Allowable Setpoints for Axial Power Imbalance......................... 28 Fig. 11 RPS Variable Low Pressure Temperature Envelope Setpoints.......................... 29 RCS PRESSURE, TEMPERATURE, AND FLOW DNB SURVEILLANCE LIMITS.................. 30 RCS LOOPS MODE 1 AND 2.................................................................................................... 31 REFUELING BORON CONCENTRATION................................................................................ 31

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 6

Rev. 0 FIGURE 1 Variable Low RCS Pressure - Temperature Protective Limits (Figure is referred to by Technical Specification 2.1.1.3)

PUMPS OPERATING (TYPE OF LIMIT)

GPM*

POWER**

FOUR PUMPS (DNBR LIMIT) 383,680 (100%)

110%

THREE PUMPS (DNBR LIMIT) 284,307 (74.1%)

89%

ONE PUMP IN EACH LOOP (DNBR LIMIT) 188,003 (49%)

62.2%

109% OF DESIGN FLOW (2.5% UNCERTAINTY INCLUDED IN STATISTICAL DESIGN LIMIT)

    • AN ADDITIONAL 2% POWER UNCERTAINTY IS INCLUDED IN STATISTICAL DESIGN LIMIT 4-PUMP 3-PUMP 590 600 610 620 630 640 650 2300 2200 2100 2000 1900 1800 1700 Reactor Coolant Outlet Temperature, °F Core Outlet Pressure, psig 1 PUMP EACH LOOP

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 7

Rev. 0 Figure 2 AXIAL POWER IMBALANCE Protective Limits (measurement system independent)

(Figure is referred to by Technical Specification 2.1.1 Bases)

(44.6, 112.0)

(44.6, 87.6)

(44.6, 61.0)

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

(-55.1, 101.4)

(-55.1, 77.0)

(-55.1, 50.4)

(-55.1, 0.0)

(-47.3, 112.0)

(-47.3, 87.6)

(-47.3, 61.0)

ACCEPTABLE 4 PUMP OPERATION ACCEPTABLE 3 AND 4 PUMP OPERATION ACCEPTABLE 2, 3 AND 4 PUMP OPERATION Thermal Power Level %

Axial Power Imbalance, %

The three-or two-pump example setpoint curves show allowable values for an approximate 26% and 51% flow reduction for three-and two-pump operation respectively.

The actual setpoint curve will be calculated by the Reactor Protection System and will be directly proportional to the indicated flow.

120 100 80 60 40 20 0

(56.3, 101.4)

(56.3, 77.0)

(56.3, 50.4)

(56.3, 0.0)

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 8

Rev. 0 SHUTDOWN MARGIN (SDM)

(Limits are referred to by Technical Specifications 3.1.1, 3.1.4, 3.1.5, 3.1.8, 3.1.9, and 3.3.9)

Verify SHUTDOWN MARGIN per the table below.

APPLICABILITY REQUIRED SHUTDOWN MARGIN TECHNICAL SPECIFICATION REFERENCE MODE 1*

1 %k/k 3.1.4, 3.1.5 MODE 2*

1 %k/k 3.1.4, 3.1.5, 3.3.9 MODE 3 1 %k/k 3.1.1, 3.3.9 MODE 4 1 %k/k 3.1.1, 3.3.9 MODE 5 1 %k/k 3.1.1, 3.3.9 MODE 1 PHYSICS TESTS Exceptions**

1 %k/k 3.1.8 MODE 2 PHYSICS TESTS Exceptions 1 %k/k 3.1.9

    • Entry into Mode 1 Physics Tests Exceptions is not supported by existing analyses and as such requires actual shutdown margin to be 1 %k/k.

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 9

Rev. 0 Figure 3-A Regulating Rod Insertion Limits for Four-Pump Operation From 0 to 200 10 EFPD (Figure is referred to by Technical Specification 3.2.1)

  • Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.

0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 7.3)

(33.5, 20)

(64.5, 58)

(105.4, 102)

(264.1, 102)

(300.0, 102)

(248.5, 90)

(248.5, 78)

(206.5, 58)

OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*

0 20 40 60 80 100 GROUP 5*

0 20 40 60 80 100 GROUP 7*

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 10 Rev. 0 Figure 3-B Regulating Rod Insertion Limits for Four-Pump Operation From 200 10 EFPD to EOC (Figure is referred to by Technical Specification 3.2.1)

  • Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.

0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 0.4)

(98.5, 20)

(167.5, 58)

(207.3, 102)

(264.1, 102)

(300.0, 102)

(248.5, 90)

(248.5, 78)

(206.5, 58)

OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*

0 20 40 60 80 100 GROUP 5*

0 20 40 60 80 100 GROUP 7*

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 11 Rev. 0 Figure 4-A Regulating Rod Insertion Limits for Three-Pump Operation From 0 to 200 10 EFPD (Figure is referred to by Technical Specification 3.2.1)

  • Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.

0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 5.5)

(33.5, 15)

(64.5, 43.5)

(106.0, 77)

(264.7, 77)

(300.0, 77)

(248.5, 67)

(248.5, 58)

(206.5, 43)

OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*

0 20 40 60 80 100 GROUP 5*

0 20 40 60 80 100 GROUP 7*

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 12 Rev. 0 Figure 4-B Regulating Rod Insertion Limits for Three-Pump Operation From 200 10 EFPD to EOC (Figure is referred to by Technical Specification 3.2.1)

  • Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.

0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 0.3)

(98.5, 15)

(167.5, 43.5)

(207.9, 77)

(264.7, 77)

(300.0, 77)

(248.5, 58)

(248.5, 67)

(206.5, 43)

OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*

0 20 40 60 80 100 GROUP 5*

0 20 40 60 80 100 GROUP 7*

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 13 Rev. 0 Figure 5-A Regulating Rod Insertion Limits for Two-Pump Operation From 0 to 200 10 EFPD (Figure is referred to by Technical Specification 3.2.1)

  • Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.

0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 3.6)

(33.5, 10)

(64.5, 29)

(107.2, 52)

(265.8, 52)

(300.0, 52)

(248.5, 44)

(248.5, 38)

(206.5, 28)

OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*

0 20 40 60 80 100 GROUP 5*

0 20 40 60 80 100 GROUP 7*

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 14 Rev. 0 Figure 5-B Regulating Rod Insertion Limits for Two-Pump Operation From 200 10 EFPD to EOC (Figure is referred to by Technical Specification 3.2.1)

  • Operating rod group overlap is 20% +/- 5% between two sequential groups, except for physics tests.

0 50 100 150 200 250 300 Rod Index, % Withdrawn Power, % of 2568 MWt 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 (0.0, 0.2)

(98.5, 10)

(167.5, 29)

(209.1, 52)

(265.8, 52)

(300.0, 52)

(248.5, 38)

(248.5, 44)

(206.5, 28)

OPERATION IN THIS REGION IS NOT ALLOWED SHUTDOWN MARGIN LIMIT OPERATION RESTRICTED PERMISSIBLE OPERATING REGION 0 20 40 60 80 100 GROUP 6*

0 20 40 60 80 100 GROUP 5*

0 20 40 60 80 100 GROUP 7*

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 15 Rev. 0 AXIAL POWER SHAPING RODS (APSR) INSERTION LIMITS (Limits referred to by Technical Specification 3.2.2)

Up to 530 +/- 10 EFPD, the APSRs may be positioned as necessary for transient imbalance control. However, the APSRs shall be fully withdrawn by 540 EFPD. After the APSR withdrawal at 530 +/- 10 EFPD, the APSRs shall not be reinserted, except during the end of cycle shutdown when the reactor power is equal to, or less than, 30% FP.

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 16 Rev. 0 Figure 6-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Four-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)

-50.00

-40.00

-30.00

-20.00

-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION

(-32.67, 60)

(-32.45, 80)

(34.71, 60)

(-25.14, 92)

(-19.89, 102)

(34.48, 80)

(27.66, 92)

(20.76, 102) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 17 Rev. 0 Figure 6-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions* for Four-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)

  • Assumes that no individual long emitter detector affecting the minimum incore imbalance calculation exceeds 73% sensitivity depletion. The imbalance setpoints for the minimum incore system must be reduced to 2.8% FP at the earliest time-in-life this assumption is no longer valid.

-50.00

-40.00

-30.00

-20.00

-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION

(-24.10, 60)

(-23.25, 80)

(25.86, 60)

(-16.61, 92)

(-11.96, 102)

(25.01, 80)

(18.79, 92)

(12.56, 102) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 18 Rev. 0 Figure 6-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Four-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)

-50.00

-40.00

-30.00

-20.00

-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION

(-26.95, 60)

(-26.27, 80)

(28.80, 60)

(-19.02, 92)

(-13.77, 102)

(28.10, 80)

(21.30, 92)

(14.46, 102) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 19 Rev. 0 Figure 7-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Three-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)

-50.00

-40.00

-30.00

-20.00

-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION

(-32.84, 45)

(-32.67, 60)

(34.87, 45)

(-25.40, 69)

(-20.17, 77)

(34.71, 60)

(27.92, 69)

(21.04, 77) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 20 Rev. 0 Figure 7-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions* for Three-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)

  • Assumes that no individual long emitter detector affecting the minimum incore imbalance calculation exceeds 73% sensitivity depletion. The imbalance setpoints for the minimum incore system must be reduced to 2.8% FP at the earliest time-in-life this assumption is no longer valid.

-50.00

-40.00

-30.00

-20.00

-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION

(-24.62, 45)

(-23.95, 60)

(26.38, 45)

(-17.41, 69)

(-12.68, 77)

(25.71, 60)

(19.60, 69)

(13.44, 77) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 21 Rev. 0 Figure 7-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Three-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)

-50.00

-40.00

-30.00

-20.00

-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION

(-27.44, 45)

(-26.95, 60)

(29.31, 45)

(-19.80, 69)

(-14.62, 77)

(28.80, 60)

(22.10, 69)

(15.33, 77) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 22 Rev. 0 Figure 8-A AXIAL POWER IMBALANCE Setpoints for Full In-Core Conditions for Two-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)

-50.00

-40.00

-30.00

-20.00

-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Power, % of 2568 MWt Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION

(-33.01, 30)

(-32.90, 40)

(35.04, 30)

(-25.65, 46)

(-20.45, 52)

(34.93, 40)

(28.17, 46)

(21.32, 52) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 23 Rev. 0 Figure 8-B AXIAL POWER IMBALANCE Setpoints for Minimum In-Core Conditions* for Two-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)

  • Assumes that no individual long emitter detector affecting the minimum incore imbalance calculation exceeds 73% sensitivity depletion. The imbalance setpoints for the minimum incore system must be reduced to 2.8% FP at the earliest time-in-life this assumption is no longer valid.

-50.00

-40.00

-30.00

-20.00

-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION

(-25.15, 30)

(-24.45, 40)

(26.91, 30)

(-18.02, 46)

(-13.56, 52)

(26.21, 40)

(20.20, 46)

(14.11, 52) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 Power, % of 2568 MWt

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 24 Rev. 0 Figure 8-C AXIAL POWER IMBALANCE Setpoints for Ex-Core Conditions for Two-Pump Operation from 0 to EOC (Figure is referred to by Technical Specification 3.2.3)

-50.00

-40.00

-30.00

-20.00

-10.00 0.00 10.00 20.00 30.00 40.00 50.00 PERMISSIBLE OPERATING REGION RESTRICTED REGION Axial Power Imbalance, %FP RESTRICTED REGION PERMISSIBLE OPERATING REGION

(-27.92, 30)

(-27.60, 40)

(29.80, 30)

(-20.55, 46)

(-15.44, 52)

(29.47, 40)

(22.87, 46)

(16.17, 52) 110.0 100.0 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 Power, % of 2568 MWt

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 25 Rev. 0 Quadrant Power Tilt Limits And Setpoints (Limits are referred to by Technical Specification 3.2.4)

From 0 EFPD to EOC Measurement System Steady State Value (%)

Maximum Value (%)

60 % FP

> 60 % FP Full In-core Detector System Setpoint 6.83 5.50 25.00 Minimum In-core Detector System Setpoint 2.78*

1.90*

25.00 Ex-core Power Range NI Channel Setpoint 4.05 1.96 25.00 Measurement System Independent Limit 7.50 4.92 25.00

  • Assumes that no individual long emitter detector affecting the minimum in-core tilt calculation exceeds 73% sensitivity depletion. The setpoint must be reduced to 1.50% (power levels

> 60% FP) and to 2.19% (power levels 60% FP) at the earliest time-in-life that this assumption is no longer valid.

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 26 Rev. 0 Figure 9A LOCA Linear Heat Rate Limits for Mark-B-HTP Fuel (Figure is referred to by Technical Specification 3.1.8 and 3.2.5)

Allowable LOCA LHR Limits Core Elevation, ft LHR Limit for 0 MWd/mtU, kW/ft LHR Limit for 34,000 MWd/mtU, kW/ft LHR Limit for 62,000 MWd/mtU, kW/ft 0.000 15.83 13.83 11.80 2.506 16.73 14.73 12.50 4.264 17.20 15.20 12.50 6.021 17.30 15.30 12.50 7.779 17.40 15.40 12.50 9.536 17.10 15.10 12.50 12.000 16.20 14.20 11.80 Note: The LOCA LHR limits may be linearly interpolated as a function of burnup between 0 MWd/mtU and 34,000 MWd/mtU, between 34,000 MWd/mtU and 62,000 MWd/mtU, and as a function of core elevation.

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 27 Rev. 0 DNB Power Peaking Factors (Limits are referred to by Technical Specification 3.1.8 and 3.2.5)

The following total power peaking factors define the Maximum Allowable Peaking (MAP) limits to protect the initial conditions assumed in the DNB Loss of Flow transient analysis. The total power peaking factors for IC-DNB 4-pump and 3-pump are identical; hence one set of IC-DNB values are provided for both 4-pump and 3-pump operation.

IC-DNB Total Power Peaking Factors Mark-B-HTP Axial Peak x/L IC MAP Limits Axial Peak x/L IC MAP Limits Axial Peak x/L IC MAP Limits 1.1 0.01 2.04426 1.4 0.01 2.94000 1.7 0.01 3.20469 0.14 2.04515 0.14 2.94000 0.14 3.20469 0.20 2.04535 0.20 2.93545 0.20 3.15423 0.30 2.04551 0.30 2.84715 0.30 3.08083 0.40 2.04470 0.40 2.76077 0.40 2.98064 0.50 2.04437 0.50 2.66671 0.50 2.89369 0.60 2.04415 0.60 2.55808 0.60 2.78037 0.70 2.04400 0.70 2.46508 0.70 2.68552 0.80 2.04329 0.80 2.34973 0.80 2.56207 0.89 2.00109 0.89 2.27714 0.89 2.49021 0.99 1.90427 0.99 2.18525 0.99 2.39515 1.2 0.01 2.33088 1.5 0.01 3.08066 1.8 0.01 3.24949 0.14 2.33287 0.14 3.08066 0.14 3.24949 0.20 2.33339 0.20 3.03513 0.20 3.20303 0.30 2.33352 0.30 2.93856 0.30 3.13047 0.40 2.33338 0.40 2.84115 0.40 3.04037 0.50 2.33285 0.50 2.75216 0.50 2.95027 0.60 2.33232 0.60 2.63946 0.60 2.84225 0.70 2.26721 0.70 2.54429 0.70 2.74696 0.80 2.16931 0.80 2.42655 0.80 2.62489 0.89 2.10460 0.89 2.35382 0.89 2.55373 0.99 2.00767 0.99 2.26040 0.99 2.45882 1.3 0.01 2.64464 1.6 0.01 3.14861 1.9 0.01 3.28611 0.14 2.64863 0.14 3.14861 0.14 3.28611 0.20 2.64909 0.20 3.09918 0.20 3.24461 0.30 2.64997 0.30 3.01573 0.30 3.17163 0.40 2.64949 0.40 2.91490 0.40 3.08589 0.50 2.56272 0.50 2.82718 0.50 3.00025 0.60 2.46600 0.60 2.71210 0.60 2.89826 0.70 2.37484 0.70 2.61653 0.70 2.80288 0.80 2.26452 0.80 2.49634 0.80 2.68386 0.89 2.19471 0.89 2.42370 0.89 2.61261 0.99 2.09988 0.99 2.32955 0.99 2.51792 Notes

1. The values above are not error corrected.
2. The values above were generated using SCD methods which incorporate a 3.8% radial peak uncertainty in the DNBR design limit. Therefore, the above IC MAP limits can be compared to predicted peaks without the addition of up to 3.8% in radial peak calculation uncertainty. These limits, however, do not incorporate any grid bias uncertainty.
3. The present T-H methodology allows for an increase in the design radial-local peak for power levels below 100% full power.

The equations defining the multipliers are as follows:

P/Pm = 1.00 P/Pm < 1.00 MAP Multiplier 1.0 1 + 0.3(1 - P/Pm)

Where P

=

core power fraction, and Pm =

1.00 for 4-pump operation, or

=

0.75 for 3-pump operation

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 28 Rev. 0 Figure 10 Reactor Protection System Maximum Allowable Setpoints for Axial Power Imbalance (Figure is referred to by Technical Specification 2.1.1.1, 2.1.1.2, and 3.3.1)

Flux / Flow Setpoint

(% Power / % Flow)

Four Pump Operation 1.07 Three Pump Operation 1.07 Two Pump Operation 1.07

-60

-50

-40

-30

-20

-10 0

10 20 30 40 50 60

(-44.0, 92.5)

(-44.0, 64.8)

(-44.0, 37.9)

(-44.0, 0.0)

(-34.0, 107.0)

(-34.0, 79.3)

(-34.0, 52.4)

ACCEPTABLE 4 PUMP OPERATION ACCEPTABLE 3 AND 4 PUMP OPERATION ACCEPTABLE 2, 3 AND 4 PUMP OPERATION Thermal Power Level %

Axial Power Imbalance, %

The three-or two-pump example setpoint curves show allowable values for an approximate 26%

and 51% flow reduction for three-and two-pump operation respectively. The actual setpoint curve will be calculated by the Reactor Protection System and will be directly proportional to the indicated flow.

(45.0, 92.5)

(45.0, 64.8)

(45.0, 37.9)

(45.0, 0.0)

(30.0, 107.0)

(30.0, 79.3)

(30.0, 52.4) 120 100 80 60 40 20 0

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 29 Rev. 0 Figure 11 Reactor Protection System Variable Low Pressure Temperature Envelope Setpoints (Figure is referred to by Technical Specification 3.3.1) 2400 2200 2000 1800 1600 560 580 600 620 640 660 Reactor Outlet Temperature, °F Reactor Coolant Pressure, psig 606.9, 1800 618, 2355 P = 16.25 Tout - 8063, psig ACCEPTABLE OPERATION UNACCEPTABLE OPERATION 560, 2355 618, 1980 560, 1800

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 30 Rev. 0 RCS Pressure, Temperature, and Flow DNB Surveillance Limits (Limit is referred to by Technical Specification 3.4.1)

Four-Pump Operation Three-Pump Operation Two-Pump Operation Minimum RCS Hot Leg Pressure (psig) Note 1 2082.2 2081.2Note 4 2120.4Note 5 2118.1 Maximum RCS Hot Leg Temperature (°F) Note 2 602.6 602.9 603.15 Minimum RCS Total Flow (Mlbm/hr) Note 3 143.36 Note 6 138.01 Note 9 106.46 Note 7 102.45 Note 9 70.64 Note 8 67.96 Note 9 Note 1 -- Using individual indications P1021, P1023, P1038 and P1039 (or equivalent) from the plant computer.

Note 2 -- Using individual indications T1011NR, T1014NR, T1039NR, T1042NR, T1012, T1013, T1040 and T1041 or averages TOUTA, XTOUTA, TOUTB, XTOUTB, TOUT, XTOUT from the plant computer.

Note 3 -- Using indication WRCFT (or equivalent) from the plant computer, and can be linearly interpolated between these values provided the Tave versus Power level curve is followed.

Note 4 -- Applies to the RCS loop with two RCPs operating.

Note 5 -- Applies to the RCS loop with one RCP operating.

Note 6 -- For Tcold = 556.57 °F.

Note 7 -- For Tcold = 556.3 °F.

Note 8 -- For Tcold = 556.1 °F.

Note 9 -- For Tcold = 580 °F.

CYCLE 26 COLR CALC-ANO1-NE-14-00003 ANO-1 31 Rev. 0 RCS Loops - Mode 1 and Mode 2 (Limit is referred to by Technical Specification 3.4.4)

Nominal Operating Power Level

(% Power)

Four Pump Operation 100 Three Pump Operation 75 Two Pump Operation*

49

Refueling Boron Concentration (Limit is referred to by Technical Specification 3.9.1)