ML15345A263: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15345A263
| number = ML15345A263
| issue date = 12/10/2015
| issue date = 12/10/2015
| title = Ltr 12/10/15 LaSalle County Station, Units 1 and 2 - Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000373/2016007; 05000374/2016007 (Nja)
| title = Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000373/2016007; 05000374/2016007 (Nja)
| author name = Lipa C
| author name = Lipa C
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                              NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                REGION III
REGION III  
                                      2443 WARRENVILLE RD. SUITE 210
2443 WARRENVILLE RD. SUITE 210  
                                            LISLE, IL 60532-4352
LISLE, IL 60532-4352  
                                          December 10, 2015
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
December 10, 2015  
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
Mr. Bryan C. Hanson  
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2 - REQUEST FOR INFORMATION
Senior VP, Exelon Generation Company, LLC  
              FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES
President and CNO, Exelon Nuclear  
              INSPECTION; INSPECTION REPORT 05000373/2016007; 05000374/2016007
4300 Winfield Road  
Dear Mr. Hanson:
Warrenville, IL 60555  
On April 11, 2016, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2 - REQUEST FOR INFORMATION  
baseline Component Design Bases Inspection (CDBI) at the LaSalle County Station, Units 1
FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES  
and 2. This inspection will be performed in accordance with NRC Baseline Inspection
INSPECTION; INSPECTION REPORT 05000373/2016007; 05000374/2016007  
Procedure 71111.21.
Dear Mr. Hanson:  
The CDBI focuses on the design, maintenance, and operation of risk-significant components
On April 11, 2016, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial  
associated with one or more accident scenario or systems. The components to be reviewed
baseline Component Design Bases Inspection (CDBI) at the LaSalle County Station, Units 1  
during this baseline inspection will be identified during the in-office preparation week that occurs
and 2. This inspection will be performed in accordance with NRC Baseline Inspection  
prior to the first onsite inspection week. In addition, operating experience issues, associated
Procedure 71111.21.  
with the component samples, will also be selected for review. The inspection team may request
The CDBI focuses on the design, maintenance, and operation of risk-significant components  
scenarios to be performed on the simulator. This request would require support from your
associated with one or more accident scenario or systems. The components to be reviewed  
simulator staff to validate scenarios, simulator time, and a crew to perform the actions which
during this baseline inspection will be identified during the in-office preparation week that occurs  
would most likely occur during the second onsite week. The team will work closely with your
prior to the first onsite inspection week. In addition, operating experience issues, associated  
staff early on during the inspection process to ensure this activity can be accomplished with
with the component samples, will also be selected for review. The inspection team may request  
minimal impact.
scenarios to be performed on the simulator. This request would require support from your  
The inspection will include three weeks onsite. The inspection team will consist of six NRC
simulator staff to validate scenarios, simulator time, and a crew to perform the actions which  
inspectors, of which five will focus on engineering/maintenance and one on operations. The
would most likely occur during the second onsite week. The team will work closely with your  
current inspection schedule is as follows:
staff early on during the inspection process to ensure this activity can be accomplished with  
Onsite weeks:             April 11 - 15, 2016;
minimal impact.  
                          April 25 - 29, 2016; and
The inspection will include three weeks onsite. The inspection team will consist of six NRC  
                          May 9 - 13, 2016.
inspectors, of which five will focus on engineering/maintenance and one on operations. The  
current inspection schedule is as follows:  
Onsite weeks:  
April 11 - 15, 2016;  
April 25 - 29, 2016; and
May 9 - 13, 2016.  


B. Hanson                                       -2-
B. Hanson  
The team will be preparing for the inspection, mainly during the week of April 4 - 8, 2016,
-2-  
as discussed in the enclosure.
The team will be preparing for the inspection, mainly during the week of April 4 - 8, 2016,  
Experience with previous baseline design inspections of similar depth and length has shown
as discussed in the enclosure.  
that this type of inspection is extremely resource intensive, both for the NRC inspectors and the
Experience with previous baseline design inspections of similar depth and length has shown  
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive
that this type of inspection is extremely resource intensive, both for the NRC inspectors and the  
inspection for both parties, we have enclosed a request for information needed for the
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive  
inspection.
inspection for both parties, we have enclosed a request for information needed for the  
It is important that all of these documents are up-to-date and complete in order to minimize the
inspection.  
number of additional documents requested during the preparation and/or the onsite portions of
It is important that all of these documents are up-to-date and complete in order to minimize the  
the inspection. Insofar as possible, this information should be provided electronically to the lead
number of additional documents requested during the preparation and/or the onsite portions of  
inspector. The information request has been divided into three groups:
the inspection. Insofar as possible, this information should be provided electronically to the lead  
    *   The first group lists information necessary for our initial inspection scoping activities.
inspector. The information request has been divided into three groups:  
        This information should be provided to the lead inspector no later than February 29,
*  
        2016. By March 11, 2016, the lead inspector will communicate the initial selected set of
The first group lists information necessary for our initial inspection scoping activities.
        approximately 20 components.
This information should be provided to the lead inspector no later than February 29,  
    *   The second group of documents requested is those items needed to support our in-
2016. By March 11, 2016, the lead inspector will communicate the initial selected set of  
        office preparation activities. This set of documents, including the calculations associated
approximately 20 components.  
        with the initial selected components, should be provided to the lead inspector at the
*  
        Regional Office no later than March 30, 2016. During the inoffice preparation activities,
The second group of documents requested is those items needed to support our in-
        the team may identify additional information needed to support the inspection.
office preparation activities. This set of documents, including the calculations associated  
    *   The last group includes the additional information above, as well as plant specific
with the initial selected components, should be provided to the lead inspector at the  
        reference material. This information should be available to the team onsite on April 11,
Regional Office no later than March 30, 2016. During the inoffice preparation activities,  
        2016. It is also requested that corrective action documents and/or questions developed
the team may identify additional information needed to support the inspection.  
        during the inspection be provided to the lead inspector as the documents are generated.
*  
The lead inspector for this inspection is Néstor J. Féliz-Adorno. We understand that our
The last group includes the additional information above, as well as plant specific  
licensing contact for this inspection is Dwi Murray of your organization. If there are any
reference material. This information should be available to the team onsite on April 11,  
questions about the inspection or the material requested in the enclosure, please contact
2016. It is also requested that corrective action documents and/or questions developed  
the lead inspector at (630) 829-9739, or via e-mail at Nestor.Feliz-Adorno@nrc.gov.
during the inspection be provided to the lead inspector as the documents are generated.  
This letter does not contain new or amended information collection requirements subject to
The lead inspector for this inspection is Néstor J. Féliz-Adorno. We understand that our  
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
licensing contact for this inspection is Dwi Murray of your organization. If there are any  
collection requirements were approved by the Office of Management and Budget, Control
questions about the inspection or the material requested in the enclosure, please contact  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
the lead inspector at (630) 829-9739, or via e-mail at Nestor.Feliz-Adorno@nrc.gov.  
respond to, a request for information or an information collection requirement unless the
This letter does not contain new or amended information collection requirements subject to  
requesting document displays a currently valid Office of Management and Budget Control
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
Number.
collection requirements were approved by the Office of Management and Budget, Control  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget Control  
Number.  


B. Hanson                                     -3-
B. Hanson  
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
-3-  
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public  
of this letter, its enclosure, and your response (if any) will be available electronically for public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy  
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
of this letter, its enclosure, and your response (if any) will be available electronically for public  
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)  
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
(the Public Electronic Reading Room).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html  
                                              Sincerely,
(the Public Electronic Reading Room).  
                                              /RA/
Sincerely,  
                                              Christine A. Lipa, Chief
                                              Engineering Branch 2
/RA/  
                                              Division of Reactor Safety
Docket Nos. 50-373; 50-374
License Nos. NPF-11; NPF-18
Christine A. Lipa, Chief  
Enclosure:
Engineering Branch 2  
Information Request for CDBI
Division of Reactor Safety
cc: Distribution via LISTSERV
Docket Nos. 50-373; 50-374  
License Nos. NPF-11; NPF-18  
Enclosure:  
Information Request for CDBI
cc: Distribution via LISTSERV  


        COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION  
Inspection Report:             05000373/2016007; 05000374/2016007
Enclosure
Inspection Dates:               April 11 - 15, 2016;
Inspection Report:  
                                April 25 - 29, 2016; and
05000373/2016007; 05000374/2016007  
                                May 9 - 13, 2016.
Inspection Dates:  
Inspection Procedure:           IP 71111.21 Component Design Bases Inspection
April 11 - 15, 2016;  
Lead Inspector:                 Néstor J. Féliz-Adorno, Senior Reactor Engineer, DRS
April 25 - 29, 2016; and
                                (630) 829-9739
May 9 - 13, 2016.  
                                Nestor.Feliz-Adorno@nrc.gov
Inspection Procedure:  
I.     Information Requested Prior to the Onsite Information Gathering/Inspection Week
IP 71111.21 Component Design Bases Inspection  
      The following information is requested by February 29, 2016, or sooner, to facilitate
Lead Inspector:  
      inspection preparation. If you have any questions regarding this information, please
Néstor J. Féliz-Adorno, Senior Reactor Engineer, DRS
      call the team leader as soon as possible. Unless stated otherwise, please provide the
(630) 829-9739  
      information electronically in pdf files, Excel, or other searchable formats, preferably
Nestor.Feliz-Adorno@nrc.gov  
      on some portable electronic media (e.g., CD-ROM, DVD, etc.). The portable electronic
I.  
      media should contain descriptive names, and be indexed and hyperlinked to facilitate
Information Requested Prior to the Onsite Information Gathering/Inspection Week  
      ease of use. Information in lists should contain enough information to be easily
The following information is requested by February 29, 2016, or sooner, to facilitate  
      understood by someone who has knowledge of light water reactor technology.
inspection preparation. If you have any questions regarding this information, please  
      1.     Risk-ranking of top 250 components from your site specific probabilistic
call the team leader as soon as possible. Unless stated otherwise, please provide the  
              safety analysis (PSA) sorted by Risk-Achievement Worth (RAW). Include
information electronically in pdf files, Excel, or other searchable formats, preferably  
              values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley
on some portable electronic media (e.g., CD-ROM, DVD, etc.). The portable electronic  
              (as applicable).
media should contain descriptive names, and be indexed and hyperlinked to facilitate  
      2.     Risk-ranking of top 100 containment-related components (i.e. ,Large Early
ease of use. Information in lists should contain enough information to be easily  
              Release Frequency) from your site specific PSA sorted by RAW.
understood by someone who has knowledge of light water reactor technology.  
      3.     Provide a list of the top 200 cut-sets from your PSA.
1.  
      4.     Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that
Risk-ranking of top 250 components from your site specific probabilistic  
              contributes more than 5 percent to the baseline plant core damage frequency.
safety analysis (PSA) sorted by Risk-Achievement Worth (RAW). Include  
      5.     Copies of PSA system notebooks and latest PSA summary document.
values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley  
      6.     List of time critical operator actions. Identify those actions that do not have job
(as applicable).  
              performance measures.
2.  
      7.     Provide copies of the emergency operating procedures.
Risk-ranking of top 100 containment-related components (i.e. ,Large Early  
      8.     If you have an External Events or Fire PSA Model, provide the information
Release Frequency) from your site specific PSA sorted by RAW.  
              requested in Items 1 and 2 for external events and fire. Provide narrative
3.  
              description of each coded event (including fire, flood zone description).
Provide a list of the top 200 cut-sets from your PSA.  
      9.     Electronic copy of the site Individual Plant Examination of External Events,
4.  
              if available.
Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that  
                                                                                          Enclosure
contributes more than 5 percent to the baseline plant core damage frequency.  
5.  
Copies of PSA system notebooks and latest PSA summary document.  
6.  
List of time critical operator actions. Identify those actions that do not have job  
performance measures.  
7.  
Provide copies of the emergency operating procedures.  
8.  
If you have an External Events or Fire PSA Model, provide the information  
requested in Items 1 and 2 for external events and fire. Provide narrative  
description of each coded event (including fire, flood zone description).  
9.  
Electronic copy of the site Individual Plant Examination of External Events,  
if available.  


    COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION  
    10.     Any pre-existing evaluation or list of components and associated calculations
2
            with low design margins, (i.e., pumps closest to the design limit for flow or
10.  
            pressure, diesel generator close to design required output, heat exchangers
Any pre-existing evaluation or list of components and associated calculations  
            close to rated design heat removal etc.).
with low design margins, (i.e., pumps closest to the design limit for flow or  
    11.     List of available design (setup) margins in both the open and closed direction
pressure, diesel generator close to design required output, heat exchangers  
            (identify safety-related direction) for valves in the Motor-Operated Valve and
close to rated design heat removal etc.).  
            Air-Operated Valve Programs. Identify the basis for how the margin was
11.  
            determined.
List of available design (setup) margins in both the open and closed direction  
    12.     List of high-risk Maintenance Rule systems/components based on engineering
(identify safety-related direction) for valves in the Motor-Operated Valve and  
            or expert panel judgment (i.e., those systems/components not identified in the
Air-Operated Valve Programs. Identify the basis for how the margin was  
            PSA).
determined.  
    13.     Structures, systems, and components in the Maintenance Rule (a)(1) category
12.  
            for the last 3 years.
List of high-risk Maintenance Rule systems/components based on engineering  
    14.     Site top ten issues list (if applicable).
or expert panel judgment (i.e., those systems/components not identified in the  
    15.     A list of operating experience evaluations for the last 3 years.
PSA).  
    16.     Information of any common cause failure of components experienced in the last
13.  
            5 years at your facility.
Structures, systems, and components in the Maintenance Rule (a)(1) category  
    17.     List of Root Cause Evaluations associated with component failures or design
for the last 3 years.  
            issues initiated/completed in the last 5 years.
14.  
    18.     List of open operability evaluations.
Site top ten issues list (if applicable).  
    19.     List of components/systems considered operable but degraded/nonconforming.
15.  
    20.     Current management and engineering organizational chart.
A list of operating experience evaluations for the last 3 years.  
    21.     Electronic copies of Updated Final Safety Analysis Report, Technical
16.  
            Specifications, Technical Specifications Bases, and Technical Requirements
Information of any common cause failure of components experienced in the last  
            Manual.
5 years at your facility.  
    22.     Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
17.  
    23.     Electronic copy of Piping and Instrumentation Drawings (P&IDs), including the
List of Root Cause Evaluations associated with component failures or design  
            table of content (if available).
issues initiated/completed in the last 5 years.  
II. Information Requested (for the approximate 20 selected components) to be
18.  
    Available by March 30, 2016, (will be reviewed by the team in the Regional
List of open operability evaluations.  
    office during the week of April 4 - 8, 2016).
19.  
    This information should be separated for each selected component, especially if
List of components/systems considered operable but degraded/nonconforming.  
    provided electronically (e.g., folder with component name that includes calculations,
20.  
    condition reports, maintenance history, etc.).
Current management and engineering organizational chart.  
    1.     List of condition reports (corrective action documents) associated with each of
21.  
            the selected components for the last 6 years.
Electronic copies of Updated Final Safety Analysis Report, Technical  
                                                2
Specifications, Technical Specifications Bases, and Technical Requirements  
Manual.  
22.  
Major one line electrical drawings (ac and dc) and key diagrams (paper copies).  
23.  
Electronic copy of Piping and Instrumentation Drawings (P&IDs), including the  
table of content (if available).  
II.  
Information Requested (for the approximate 20 selected components) to be  
Available by March 30, 2016, (will be reviewed by the team in the Regional  
office during the week of April 4 - 8, 2016).  
This information should be separated for each selected component, especially if  
provided electronically (e.g., folder with component name that includes calculations,  
condition reports, maintenance history, etc.).  
1.  
List of condition reports (corrective action documents) associated with each of  
the selected components for the last 6 years.  


COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION  
2. The maintenance history (corrective, preventive, and elective) associated with
3
    each of the selected components for the last 10 years. Identify frequency of
2.  
    preventive maintenance activities.
The maintenance history (corrective, preventive, and elective) associated with  
3. Copies of calculations associated with each of the selected components (if not
each of the selected components for the last 10 years. Identify frequency of  
    previously provided), excluding data files. Please review the calculations and
preventive maintenance activities.  
    also provide copies of important referenced material (such as drawings,
3.  
    engineering requests, and vendor letters). Pipe stress calculations are excluded
Copies of calculations associated with each of the selected components (if not  
    from this request.
previously provided), excluding data files. Please review the calculations and  
4. System Health Reports, System Descriptions, Design Basis Documents, and/or
also provide copies of important referenced material (such as drawings,  
    Training Lesson Plans associated with each of the selected components.
engineering requests, and vendor letters). Pipe stress calculations are excluded  
5. A list of modifications, including equivalency evaluations and setpoint changes,
from this request.  
    associated with each of the selected components. This list should include a
4.  
    descriptive paragraph on the purpose of the modification. Please ensure this list
System Health Reports, System Descriptions, Design Basis Documents, and/or  
    only includes design completed (not canceled) modifications.
Training Lesson Plans associated with each of the selected components.  
6. Copies of operability evaluations (open/closed for last 3 years) associated with
5.  
    each of the selected components and plans for restoring operability, if applicable.
A list of modifications, including equivalency evaluations and setpoint changes,  
7. Copies of selected operator work-around evaluations associated with each of the
associated with each of the selected components. This list should include a  
    selected components and plans for resolution, if applicable.
descriptive paragraph on the purpose of the modification. Please ensure this list  
8. Copies of any open temporary modifications associated with each of the selected
only includes design completed (not canceled) modifications.  
    components, if applicable.
6.  
9. Trend data on the selected electrical/mechanical components performance for
Copies of operability evaluations (open/closed for last 3 years) associated with  
    last 3 years (For example, pumps performance including in-service testing, other
each of the selected components and plans for restoring operability, if applicable.  
    vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate
7.  
    results, etc.).
Copies of selected operator work-around evaluations associated with each of the  
10. Provide copies of the normal and abnormal operating procedures associated with
selected components and plans for resolution, if applicable.  
    the selected components and selected scenarios.
8.  
11. A copy of any internal/external self-assessments and associated corrective
Copies of any open temporary modifications associated with each of the selected  
    action documents generated in preparation for the inspection.
components, if applicable.  
12. Copy of latest completed tests and surveillances for each component, for
9.  
    example:
Trend data on the selected electrical/mechanical components performance for  
    *   Pumps: comprehensive test, quarterly test, flow balance, etc.
last 3 years (For example, pumps performance including in-service testing, other  
    *   Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc.
vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate  
    *   Heat Exchangers/room coolers: thermal performance, clean/inspect, fan
results, etc.).  
        flows, etc.
10.  
    Acceptance criteria basis calculations should also be included.
Provide copies of the normal and abnormal operating procedures associated with  
13. A copy of engineering/operations related audits completed in the last 2 years.
the selected components and selected scenarios.  
                                      3
11.  
A copy of any internal/external self-assessments and associated corrective  
action documents generated in preparation for the inspection.  
12.  
Copy of latest completed tests and surveillances for each component, for  
example:  
*  
Pumps: comprehensive test, quarterly test, flow balance, etc.
*  
Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc.  
*  
Heat Exchangers/room coolers: thermal performance, clean/inspect, fan  
flows, etc.  
Acceptance criteria basis calculations should also be included.  
13.  
A copy of engineering/operations related audits completed in the last 2 years.  


        COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION
COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION  
III.   Additional Information to be Provided on April 11, 2016, Onsite (for final selected
4
        components)
III.  
        1.     During the in-office preparation activities, the team will be making final selections
Additional Information to be Provided on April 11, 2016, Onsite (for final selected  
              and may identify additional information needed to support the inspection. The
components)
              lead inspector will provide a list of the additional information needed during the
1.  
              week of April 4 - 8, 2016.
During the in-office preparation activities, the team will be making final selections  
        2.     Schedule of any testing/maintenance activities to be conducted on the selected
and may identify additional information needed to support the inspection. The  
              components during the three onsite inspection weeks.
lead inspector will provide a list of the additional information needed during the  
        3.     One complete set of P&IDs (paper copies).
week of April 4 - 8, 2016.  
IV.     Information Requested to be Provided Throughout the Inspection
2.  
        1.     Copies of any corrective action documents generated as a result of the teams
Schedule of any testing/maintenance activities to be conducted on the selected  
              questions or queries during this inspection.
components during the three onsite inspection weeks.  
        2.     Copies of the list of questions submitted by the team members and the
3.  
              status/resolution of the information requested (provide daily during the inspection
One complete set of P&IDs (paper copies).  
              to each team member).
IV.  
        3.     Reference materials. (make available if needed during all on-site weeks):
Information Requested to be Provided Throughout the Inspection  
              *   Individual Plant Examination/Probabilistic Risk Assessment Report;
1.  
              *   Procurement documents for components selected (verify retrievable);
Copies of any corrective action documents generated as a result of the teams  
              *   Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
questions or queries during this inspection.  
              *   Vendor manuals.
2.  
If you have questions regarding the information requested, please contact the lead inspector.
Copies of the list of questions submitted by the team members and the  
                                                  4
status/resolution of the information requested (provide daily during the inspection  
to each team member).  
3.  
Reference materials. (make available if needed during all on-site weeks):  
*  
Individual Plant Examination/Probabilistic Risk Assessment Report;  
*  
Procurement documents for components selected (verify retrievable);  
*  
Plant procedures (normal, abnormal, emergency, surveillance, etc.); and  
*  
Vendor manuals.  
If you have questions regarding the information requested, please contact the lead inspector.  


B. Hanson                                                                 -3-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
B. Hanson  
of this letter, its enclosure, and your response (if any) will be available electronically for public
-3-  
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public  
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy  
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
of this letter, its enclosure, and your response (if any) will be available electronically for public  
(the Public Electronic Reading Room).
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)  
                                                                          Sincerely,
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
                                                                          /RA/
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html  
                                                                          Christine A. Lipa, Chief
(the Public Electronic Reading Room).  
                                                                          Engineering Branch 2
Sincerely,  
                                                                          Division of Reactor Safety
Docket Nos. 50-373; 50-374
/RA/  
License Nos. NPF-11; NPF-18
Enclosure:
Information Request for CDBI
Christine A. Lipa, Chief  
cc: Distribution via LISTSERV
Engineering Branch 2  
DISTRIBUTION:
Division of Reactor Safety
Janelle Jessie
Docket Nos. 50-373; 50-374  
RidsNrrDorlLpl3-2 Resource
License Nos. NPF-11; NPF-18  
RidsNrrPMLaSalle
Enclosure:  
RidsNrrDirsIrib Resource
Information Request for CDBI
Cynthia Pederson
cc: Distribution via LISTSERV  
Darrell Roberts
DISTRIBUTION:  
Richard Skokowski
Janelle Jessie  
Allan Barker
RidsNrrDorlLpl3-2 Resource
Carole Ariano
RidsNrrPMLaSalle  
Linda Linn
RidsNrrDirsIrib Resource  
DRPIII
Cynthia Pederson  
DRSIII
Darrell Roberts  
Jim Clay
Richard Skokowski  
Carmen Olteanu
Allan Barker  
ADAMS Accession Number ML15345A263
Carole Ariano  
    Publicly Available                           Non-Publicly Available                   Sensitive               Non-Sensitive
Linda Linn  
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
DRPIII  
  OFFICE             RIII                               RIII                           RIII                               RIII
DRSIII  
  NAME               NFeliz-Adorno:cl                   CLipa
Jim Clay  
  DATE               12/10/15                           12/10/15
Carmen Olteanu  
                                                            OFFICIAL RECORD COPY
ADAMS Accession Number ML15345A263  
Publicly Available  
Non-Publicly Available  
Sensitive  
Non-Sensitive  
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy  
OFFICE  
RIII  
RIII  
RIII  
RIII  
NAME  
NFeliz-Adorno:cl  
CLipa  
DATE  
12/10/15  
12/10/15  
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 06:07, 10 January 2025

Request for Information for an NRC Triennial Baseline Component Design Bases Inspection; Inspection Report 05000373/2016007; 05000374/2016007 (Nja)
ML15345A263
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 12/10/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2016007
Download: ML15345A263 (8)


See also: IR 05000373/2016007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

December 10, 2015

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2 - REQUEST FOR INFORMATION

FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES

INSPECTION; INSPECTION REPORT 05000373/2016007; 05000374/2016007

Dear Mr. Hanson:

On April 11, 2016, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial

baseline Component Design Bases Inspection (CDBI) at the LaSalle County Station, Units 1

and 2. This inspection will be performed in accordance with NRC Baseline Inspection

Procedure 71111.21.

The CDBI focuses on the design, maintenance, and operation of risk-significant components

associated with one or more accident scenario or systems. The components to be reviewed

during this baseline inspection will be identified during the in-office preparation week that occurs

prior to the first onsite inspection week. In addition, operating experience issues, associated

with the component samples, will also be selected for review. The inspection team may request

scenarios to be performed on the simulator. This request would require support from your

simulator staff to validate scenarios, simulator time, and a crew to perform the actions which

would most likely occur during the second onsite week. The team will work closely with your

staff early on during the inspection process to ensure this activity can be accomplished with

minimal impact.

The inspection will include three weeks onsite. The inspection team will consist of six NRC

inspectors, of which five will focus on engineering/maintenance and one on operations. The

current inspection schedule is as follows:

Onsite weeks:

April 11 - 15, 2016;

April 25 - 29, 2016; and

May 9 - 13, 2016.

B. Hanson

-2-

The team will be preparing for the inspection, mainly during the week of April 4 - 8, 2016,

as discussed in the enclosure.

Experience with previous baseline design inspections of similar depth and length has shown

that this type of inspection is extremely resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than February 29,

2016. By March 11, 2016, the lead inspector will communicate the initial selected set of

approximately 20 components.

The second group of documents requested is those items needed to support our in-

office preparation activities. This set of documents, including the calculations associated

with the initial selected components, should be provided to the lead inspector at the

Regional Office no later than March 30, 2016. During the inoffice preparation activities,

the team may identify additional information needed to support the inspection.

The last group includes the additional information above, as well as plant specific

reference material. This information should be available to the team onsite on April 11,

2016. It is also requested that corrective action documents and/or questions developed

during the inspection be provided to the lead inspector as the documents are generated.

The lead inspector for this inspection is Néstor J. Féliz-Adorno. We understand that our

licensing contact for this inspection is Dwi Murray of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact

the lead inspector at (630) 829-9739, or via e-mail at Nestor.Feliz-Adorno@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

B. Hanson

-3-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

Enclosure:

Information Request for CDBI

cc: Distribution via LISTSERV

COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION

Enclosure

Inspection Report: 05000373/2016007; 05000374/2016007

Inspection Dates:

April 11 - 15, 2016;

April 25 - 29, 2016; and

May 9 - 13, 2016.

Inspection Procedure:

IP 71111.21 Component Design Bases Inspection

Lead Inspector:

Néstor J. Féliz-Adorno, Senior Reactor Engineer, DRS

(630) 829-9739

Nestor.Feliz-Adorno@nrc.gov

I.

Information Requested Prior to the Onsite Information Gathering/Inspection Week

The following information is requested by February 29, 2016, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please

call the team leader as soon as possible. Unless stated otherwise, please provide the

information electronically in pdf files, Excel, or other searchable formats, preferably

on some portable electronic media (e.g., CD-ROM, DVD, etc.). The portable electronic

media should contain descriptive names, and be indexed and hyperlinked to facilitate

ease of use. Information in lists should contain enough information to be easily

understood by someone who has knowledge of light water reactor technology.

1.

Risk-ranking of top 250 components from your site specific probabilistic

safety analysis (PSA) sorted by Risk-Achievement Worth (RAW). Include

values for Birnbaum Importance, Risk-Reduction Worth, and Fussell-Veseley

(as applicable).

2.

Risk-ranking of top 100 containment-related components (i.e. ,Large Early

Release Frequency) from your site specific PSA sorted by RAW.

3.

Provide a list of the top 200 cut-sets from your PSA.

4.

Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that

contributes more than 5 percent to the baseline plant core damage frequency.

5.

Copies of PSA system notebooks and latest PSA summary document.

6.

List of time critical operator actions. Identify those actions that do not have job

performance measures.

7.

Provide copies of the emergency operating procedures.

8.

If you have an External Events or Fire PSA Model, provide the information

requested in Items 1 and 2 for external events and fire. Provide narrative

description of each coded event (including fire, flood zone description).

9.

Electronic copy of the site Individual Plant Examination of External Events,

if available.

COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION

2

10.

Any pre-existing evaluation or list of components and associated calculations

with low design margins, (i.e., pumps closest to the design limit for flow or

pressure, diesel generator close to design required output, heat exchangers

close to rated design heat removal etc.).

11.

List of available design (setup) margins in both the open and closed direction

(identify safety-related direction) for valves in the Motor-Operated Valve and

Air-Operated Valve Programs. Identify the basis for how the margin was

determined.

12.

List of high-risk Maintenance Rule systems/components based on engineering

or expert panel judgment (i.e., those systems/components not identified in the

PSA).

13.

Structures, systems, and components in the Maintenance Rule (a)(1) category

for the last 3 years.

14.

Site top ten issues list (if applicable).

15.

A list of operating experience evaluations for the last 3 years.

16.

Information of any common cause failure of components experienced in the last

5 years at your facility.

17.

List of Root Cause Evaluations associated with component failures or design

issues initiated/completed in the last 5 years.

18.

List of open operability evaluations.

19.

List of components/systems considered operable but degraded/nonconforming.

20.

Current management and engineering organizational chart.

21.

Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

22.

Major one line electrical drawings (ac and dc) and key diagrams (paper copies).

23.

Electronic copy of Piping and Instrumentation Drawings (P&IDs), including the

table of content (if available).

II.

Information Requested (for the approximate 20 selected components) to be

Available by March 30, 2016, (will be reviewed by the team in the Regional

office during the week of April 4 - 8, 2016).

This information should be separated for each selected component, especially if

provided electronically (e.g., folder with component name that includes calculations,

condition reports, maintenance history, etc.).

1.

List of condition reports (corrective action documents) associated with each of

the selected components for the last 6 years.

COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION

3

2.

The maintenance history (corrective, preventive, and elective) associated with

each of the selected components for the last 10 years. Identify frequency of

preventive maintenance activities.

3.

Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and

also provide copies of important referenced material (such as drawings,

engineering requests, and vendor letters). Pipe stress calculations are excluded

from this request.

4.

System Health Reports, System Descriptions, Design Basis Documents, and/or

Training Lesson Plans associated with each of the selected components.

5.

A list of modifications, including equivalency evaluations and setpoint changes,

associated with each of the selected components. This list should include a

descriptive paragraph on the purpose of the modification. Please ensure this list

only includes design completed (not canceled) modifications.

6.

Copies of operability evaluations (open/closed for last 3 years) associated with

each of the selected components and plans for restoring operability, if applicable.

7.

Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

8.

Copies of any open temporary modifications associated with each of the selected

components, if applicable.

9.

Trend data on the selected electrical/mechanical components performance for

last 3 years (For example, pumps performance including in-service testing, other

vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate

results, etc.).

10.

Provide copies of the normal and abnormal operating procedures associated with

the selected components and selected scenarios.

11.

A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

12.

Copy of latest completed tests and surveillances for each component, for

example:

Pumps: comprehensive test, quarterly test, flow balance, etc.

Valves: stroke time testing, diagnostic testing, leak testing, interlocks, etc.

Heat Exchangers/room coolers: thermal performance, clean/inspect, fan

flows, etc.

Acceptance criteria basis calculations should also be included.

13.

A copy of engineering/operations related audits completed in the last 2 years.

COMPONENT DESIGN BASES INSPECTION REQUEST FOR INFORMATION

4

III.

Additional Information to be Provided on April 11, 2016, Onsite (for final selected

components)

1.

During the in-office preparation activities, the team will be making final selections

and may identify additional information needed to support the inspection. The

lead inspector will provide a list of the additional information needed during the

week of April 4 - 8, 2016.

2.

Schedule of any testing/maintenance activities to be conducted on the selected

components during the three onsite inspection weeks.

3.

One complete set of P&IDs (paper copies).

IV.

Information Requested to be Provided Throughout the Inspection

1.

Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

3.

Reference materials. (make available if needed during all on-site weeks):

Individual Plant Examination/Probabilistic Risk Assessment Report;

Procurement documents for components selected (verify retrievable);

Plant procedures (normal, abnormal, emergency, surveillance, etc.); and

Vendor manuals.

If you have questions regarding the information requested, please contact the lead inspector.

B. Hanson

-3-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

Enclosure:

Information Request for CDBI

cc: Distribution via LISTSERV

DISTRIBUTION:

Janelle Jessie

RidsNrrDorlLpl3-2 Resource

RidsNrrPMLaSalle

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Jim Clay

Carmen Olteanu

ADAMS Accession Number ML15345A263

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE

RIII

RIII

RIII

RIII

NAME

NFeliz-Adorno:cl

CLipa

DATE

12/10/15

12/10/15

OFFICIAL RECORD COPY