ML16089A070: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML16089A070
| number = ML16089A070
| issue date = 03/30/2016
| issue date = 03/30/2016
| title = 03/30/2016 Salem Unit Nos. 1 and 2 Public Meeting Slide Presentation
| title = Public Meeting Slide Presentation
| author name =  
| author name =  
| author affiliation = PSEG Nuclear, LLC
| author affiliation = PSEG Nuclear, LLC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:PSEG/NRC Pre-Submittal Meeting Containment Fan Coil Unit Allowed Outage Time March 30, 2015
{{#Wiki_filter:Containment Fan Coil Unit Allowed Outage Time March 30, 2015 PSEG/NRC Pre-Submittal Meeting


Agenda Overview of proposed change
Agenda Overview of proposed change  


===Background===
===Background===
Purpose of license amendment request Scope of license amendment request Schedule 2
Purpose of license amendment request Scope of license amendment request Schedule 2  


Overview of Proposed Change Extend allowed outage time for one or two inoperable containment fan coil units (CFCUs) to 14 days No change to design basis containment response No change to dose analyses
Overview of Proposed Change Extend allowed outage time for one or two inoperable containment fan coil units (CFCUs) to 14 days No change to design basis containment response No change to dose analyses
* No change to system design or response to postulated events 3
* No change to system design or response to postulated events 3  


===
===
Line 31: Line 31:
* Containment fan cooling system Five CFCUs installed
* Containment fan cooling system Five CFCUs installed
* Minimum 1,300 gpm service water to each CFCU Three CFCUs in operation with single containment spray train capable of maintaining post-accident containment temperature and pressure below design basis values Available design margin in CFCU heat removal capability
* Minimum 1,300 gpm service water to each CFCU Three CFCUs in operation with single containment spray train capable of maintaining post-accident containment temperature and pressure below design basis values Available design margin in CFCU heat removal capability
* Total CFCU heat removal in containment analysis of record based on heat removal capability of two CFCUs 4
* Total CFCU heat removal in containment analysis of record based on heat removal capability of two CFCUs 4  


===
===
Line 37: Line 37:
Current Technical Specification requirements Five containment cooling fans shall be OPERABLE With one or two containment cooling fans inoperable
Current Technical Specification requirements Five containment cooling fans shall be OPERABLE With one or two containment cooling fans inoperable
* Restore inoperable cooling fan(s) to OPERABLE status within 7 days With three or more containment cooling fans inoperable
* Restore inoperable cooling fan(s) to OPERABLE status within 7 days With three or more containment cooling fans inoperable
* Restore at least three cooling fans to OPERABLE status within 1 hour 5
* Restore at least three cooling fans to OPERABLE status within 1 hour 5  


Reason for Proposed Change Extend allowed outage time for one or two inoperable CFCUs to 14 days Reduce risk associated with shutting down to respond to emergent issues without significant change in at-power risk Reduce unnecessary burden
Reason for Proposed Change Extend allowed outage time for one or two inoperable CFCUs to 14 days Reduce risk associated with shutting down to respond to emergent issues without significant change in at-power risk Reduce unnecessary burden
* Operational flexibility to allocate resources to more safety-significant aspects 6
* Operational flexibility to allocate resources to more safety-significant aspects 6  


Engineering Evaluation and Monitoring Program Traditional Engineering Assessment Adequate defense-in-depth maintained
Engineering Evaluation and Monitoring Program Traditional Engineering Assessment Adequate defense-in-depth maintained
* At least three CFCUs verified operational
* At least three CFCUs verified operational
* Containment spray operational
* Containment spray operational
* 10 CFR 50.65 (a)(4) used to plan maintenance Safety margins not affected Continued monitoring under the M-rule program and PSEG performance and predictive monitoring programs 7
* 10 CFR 50.65 (a)(4) used to plan maintenance Safety margins not affected Continued monitoring under the M-rule program and PSEG performance and predictive monitoring programs 7  


Scope of License Amendment Request Risk Assessment Applicable guidance and criteria
Scope of License Amendment Request Risk Assessment Applicable guidance and criteria
Line 51: Line 51:
* RG 1.200, Rev. 2
* RG 1.200, Rev. 2
* RG 1.177, Rev. 1 Quantitative analyses for internal events and flood
* RG 1.177, Rev. 1 Quantitative analyses for internal events and flood
* CDF and LERF Qualitative analyses for fire and external events Uncertainty addressed using latest draft of NUREG-1855 and supporting EPRI documents 8
* CDF and LERF Qualitative analyses for fire and external events Uncertainty addressed using latest draft of NUREG-1855 and supporting EPRI documents 8  


Proposed Schedule Submit LAR by 3Q 2016 Request normal NRC review 9
Proposed Schedule Submit LAR by 3Q 2016 Request normal NRC review 9  


PSEG/NRC Pre-Submittal Meeting Containment Fan Coil Unit Allowed Outage Time March 30, 2015
Containment Fan Coil Unit Allowed Outage Time March 30, 2015 PSEG/NRC Pre-Submittal Meeting


Agenda Overview of proposed change
Agenda Overview of proposed change  


===Background===
===Background===
Purpose of license amendment request Scope of license amendment request Schedule 2
Purpose of license amendment request Scope of license amendment request Schedule 2  


Overview of Proposed Change Extend allowed outage time for one or two inoperable containment fan coil units (CFCUs) to 14 days No change to design basis containment response No change to dose analyses
Overview of Proposed Change Extend allowed outage time for one or two inoperable containment fan coil units (CFCUs) to 14 days No change to design basis containment response No change to dose analyses
* No change to system design or response to postulated events 3
* No change to system design or response to postulated events 3  


===
===
Line 71: Line 71:
* Containment fan cooling system Five CFCUs installed
* Containment fan cooling system Five CFCUs installed
* Minimum 1,300 gpm service water to each CFCU Three CFCUs in operation with single containment spray train capable of maintaining post-accident containment temperature and pressure below design basis values Available design margin in CFCU heat removal capability
* Minimum 1,300 gpm service water to each CFCU Three CFCUs in operation with single containment spray train capable of maintaining post-accident containment temperature and pressure below design basis values Available design margin in CFCU heat removal capability
* Total CFCU heat removal in containment analysis of record based on heat removal capability of two CFCUs 4
* Total CFCU heat removal in containment analysis of record based on heat removal capability of two CFCUs 4  


===
===
Line 77: Line 77:
Current Technical Specification requirements Five containment cooling fans shall be OPERABLE With one or two containment cooling fans inoperable
Current Technical Specification requirements Five containment cooling fans shall be OPERABLE With one or two containment cooling fans inoperable
* Restore inoperable cooling fan(s) to OPERABLE status within 7 days With three or more containment cooling fans inoperable
* Restore inoperable cooling fan(s) to OPERABLE status within 7 days With three or more containment cooling fans inoperable
* Restore at least three cooling fans to OPERABLE status within 1 hour 5
* Restore at least three cooling fans to OPERABLE status within 1 hour 5  


Reason for Proposed Change Extend allowed outage time for one or two inoperable CFCUs to 14 days Reduce risk associated with shutting down to respond to emergent issues without significant change in at-power risk Reduce unnecessary burden
Reason for Proposed Change Extend allowed outage time for one or two inoperable CFCUs to 14 days Reduce risk associated with shutting down to respond to emergent issues without significant change in at-power risk Reduce unnecessary burden
* Operational flexibility to allocate resources to more safety-significant aspects 6
* Operational flexibility to allocate resources to more safety-significant aspects 6  


Engineering Evaluation and Monitoring Program Traditional Engineering Assessment Adequate defense-in-depth maintained
Engineering Evaluation and Monitoring Program Traditional Engineering Assessment Adequate defense-in-depth maintained
* At least three CFCUs verified operational
* At least three CFCUs verified operational
* Containment spray operational
* Containment spray operational
* 10 CFR 50.65 (a)(4) used to plan maintenance Safety margins not affected Continued monitoring under the M-rule program and PSEG performance and predictive monitoring programs 7
* 10 CFR 50.65 (a)(4) used to plan maintenance Safety margins not affected Continued monitoring under the M-rule program and PSEG performance and predictive monitoring programs 7  


Scope of License Amendment Request Risk Assessment Applicable guidance and criteria
Scope of License Amendment Request Risk Assessment Applicable guidance and criteria
Line 91: Line 91:
* RG 1.200, Rev. 2
* RG 1.200, Rev. 2
* RG 1.177, Rev. 1 Quantitative analyses for internal events and flood
* RG 1.177, Rev. 1 Quantitative analyses for internal events and flood
* CDF and LERF Qualitative analyses for fire and external events Uncertainty addressed using latest draft of NUREG-1855 and supporting EPRI documents 8
* CDF and LERF Qualitative analyses for fire and external events Uncertainty addressed using latest draft of NUREG-1855 and supporting EPRI documents 8  


Proposed Schedule Submit LAR by 3Q 2016 Request normal NRC review 9}}
Proposed Schedule Submit LAR by 3Q 2016 Request normal NRC review 9}}

Latest revision as of 02:12, 10 January 2025

Public Meeting Slide Presentation
ML16089A070
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/30/2016
From:
Public Service Enterprise Group
To:
Plant Licensing Branch 1
Wengert T, NRR/DORL/LPLI-2
References
Download: ML16089A070 (9)


Text

Containment Fan Coil Unit Allowed Outage Time March 30, 2015 PSEG/NRC Pre-Submittal Meeting

Agenda Overview of proposed change

Background

Purpose of license amendment request Scope of license amendment request Schedule 2

Overview of Proposed Change Extend allowed outage time for one or two inoperable containment fan coil units (CFCUs) to 14 days No change to design basis containment response No change to dose analyses

  • No change to system design or response to postulated events 3

=

Background===

System design Post-accident containment heat removal capability provided by two separate systems

  • Containment fan cooling system Five CFCUs installed
  • Minimum 1,300 gpm service water to each CFCU Three CFCUs in operation with single containment spray train capable of maintaining post-accident containment temperature and pressure below design basis values Available design margin in CFCU heat removal capability
  • Total CFCU heat removal in containment analysis of record based on heat removal capability of two CFCUs 4

=

Background===

Current Technical Specification requirements Five containment cooling fans shall be OPERABLE With one or two containment cooling fans inoperable

  • Restore at least three cooling fans to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 5

Reason for Proposed Change Extend allowed outage time for one or two inoperable CFCUs to 14 days Reduce risk associated with shutting down to respond to emergent issues without significant change in at-power risk Reduce unnecessary burden

  • Operational flexibility to allocate resources to more safety-significant aspects 6

Engineering Evaluation and Monitoring Program Traditional Engineering Assessment Adequate defense-in-depth maintained

  • At least three CFCUs verified operational
  • 10 CFR 50.65 (a)(4) used to plan maintenance Safety margins not affected Continued monitoring under the M-rule program and PSEG performance and predictive monitoring programs 7

Scope of License Amendment Request Risk Assessment Applicable guidance and criteria

  • RG 1.177, Rev. 1 Quantitative analyses for internal events and flood
  • CDF and LERF Qualitative analyses for fire and external events Uncertainty addressed using latest draft of NUREG-1855 and supporting EPRI documents 8

Proposed Schedule Submit LAR by 3Q 2016 Request normal NRC review 9

Containment Fan Coil Unit Allowed Outage Time March 30, 2015 PSEG/NRC Pre-Submittal Meeting

Agenda Overview of proposed change

Background

Purpose of license amendment request Scope of license amendment request Schedule 2

Overview of Proposed Change Extend allowed outage time for one or two inoperable containment fan coil units (CFCUs) to 14 days No change to design basis containment response No change to dose analyses

  • No change to system design or response to postulated events 3

=

Background===

System design Post-accident containment heat removal capability provided by two separate systems

  • Containment fan cooling system Five CFCUs installed
  • Minimum 1,300 gpm service water to each CFCU Three CFCUs in operation with single containment spray train capable of maintaining post-accident containment temperature and pressure below design basis values Available design margin in CFCU heat removal capability
  • Total CFCU heat removal in containment analysis of record based on heat removal capability of two CFCUs 4

=

Background===

Current Technical Specification requirements Five containment cooling fans shall be OPERABLE With one or two containment cooling fans inoperable

  • Restore at least three cooling fans to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 5

Reason for Proposed Change Extend allowed outage time for one or two inoperable CFCUs to 14 days Reduce risk associated with shutting down to respond to emergent issues without significant change in at-power risk Reduce unnecessary burden

  • Operational flexibility to allocate resources to more safety-significant aspects 6

Engineering Evaluation and Monitoring Program Traditional Engineering Assessment Adequate defense-in-depth maintained

  • At least three CFCUs verified operational
  • 10 CFR 50.65 (a)(4) used to plan maintenance Safety margins not affected Continued monitoring under the M-rule program and PSEG performance and predictive monitoring programs 7

Scope of License Amendment Request Risk Assessment Applicable guidance and criteria

  • RG 1.177, Rev. 1 Quantitative analyses for internal events and flood
  • CDF and LERF Qualitative analyses for fire and external events Uncertainty addressed using latest draft of NUREG-1855 and supporting EPRI documents 8

Proposed Schedule Submit LAR by 3Q 2016 Request normal NRC review 9