ML16111A130: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-301                                         Transient and Event Checklist                                   Form ES-301-5 Facility: PRAIRIE ISLAND                   Date of Exam: MAY 2016                       Operating Test No.: PI-ILT-NRC-16 A           E                                               Scenarios - Group 1 P          V            EVAL #1                 EVAL #2             EVAL #4                               T       M P          E                                                                                                O        I L          N             CREW                     CREW                 CREW               CREW             T        N I          T          POSITION                 POSITION            POSITION            POSITION          A I
{{#Wiki_filter:ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A
M C                     S      A      B       S      A    B      S      A      B      S     A    B    L        U A          T        R       T      O       R      T     O     R       T      O       R      T     O              M(*)
P P
N          Y        O      C       P        O     C    P     O       C     P      O     C    P R   I U T          P E
L I
RX                   4                                                                             1     1   1 0 NOR                                                 1                     2                         2     1   1 1 R1        I/C               1, 5                           5, 7                 3, 7                       6     4   4 2 MAJ                 6                             6                   5, 8                       4     2   2 1 TS                                                                                                 0     0   2 2 RX                                           2                                                     1     1   1 0 NOR                                                       1                                         1     1   1 1 I/C                         1, 3,           3, 4         3, 4,                                     9     4   4 2 I1                                    7                          6, 7 MAJ                         6               6           5, 8                                       4     2   2 1 TS                                                       3, 4                                       2     0   2 2 RX                                                               1                                 1     1   1 0 NOR         4                       2                                                             2     1   1 1 I/C       1, 3,                   3, 4,                       4, 6                               10     4   4 2 I2                    5, 7                    5, 7 MAJ         6                       6                         5, 8                               4     2   2 1 TS         1, 2                     3                                                             3     0   2 2 RX                                                                                                         1   1 0 NOR                                                                                                       1   1 1 I/C                                                                                                       4   4 2 MAJ                                                                                                       2   2 1 TS                                                                                                         0   2 2 Instructions:
C A
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
N T
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
E V
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
E N
: 4.       For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
T T
Y P
E Scenarios - Group 1 EVAL #1 EVAL #2 EVAL #4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
R1 RX 4
1 1
1 0 NOR 1
2 2
1 1 1 I/C 1, 5 5, 7 3, 7 6
4 4 2 MAJ 6
6 5, 8 4
2 2 1 TS 0
0 2 2 I1 RX 2
1 1
1 0 NOR 1
1 1
1 1 I/C 1, 3, 7
3, 4 3, 4, 6, 7 9
4 4 2 MAJ 6
6 5, 8 4
2 2 1 TS 3, 4 2
0 2 2 I2 RX 1
1 1
1 0 NOR 4
2 2
1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 4, 6 10 4
4 2 MAJ 6
6 5, 8 4
2 2 1 TS 1, 2 3
3 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
: 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.  


ES-301                                         Transient and Event Checklist                                   Form ES-301-5 Facility: PRAIRIE ISLAND                   Date of Exam: MAY 2016                       Operating Test No.: PI-ILT-NRC-16 A           E                                               Scenarios - Group 2 P          V            EVAL #1                 EVAL #2             EVAL #3                               T       M P          E                                                                                                O        I L          N             CREW                     CREW                 CREW               CREW             T        N I          T          POSITION                 POSITION            POSITION            POSITION          A I
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A
M C                     S      A      B       S      A    B      S      A      B      S     A    B    L        U A          T        R       T      O       R      T     O     R       T      O       R      T     O              M(*)
P P
N          Y        O      C       P        O     C    P     O       C     P      O     C    P R   I U T          P E
L I
RX                   4                                                                             1     1   1 0 NOR                                                 1                     1                         2     1   1 1 R2        I/C               1, 5                           5, 7                 4, 7                       6     4   4 2 MAJ                 6                             6                     6                         3     2   2 1 TS                                                                                                 0     0   2 2 RX                                           2                                                     1     1   1 0 NOR                                                       3                                         1     1   1 1 I/C                         1, 3,           3, 4         2, 4,                                     9     4   4 2 I3                                    7                          5, 7 MAJ                         6               6           6                                         3     2   2 1 TS                                                       2, 4                                       2     0   2 2 RX                                                               3                                 1     1   1 0 NOR         4                       2                                                             2     1   1 1 I/C       1, 3,                   3, 4,                       2, 5                               10     4   4 2 I4                    5, 7                    5, 7 MAJ         6                       6                           6                                 3     2   2 1 TS         1, 2                     3                                                             3     0   2 2 RX                                                                                                         1   1 0 NOR                                                                                                       1   1 1 I/C                                                                                                       4   4 2 MAJ                                                                                                       2   2 1 TS                                                                                                         0   2 2 Instructions:
C A
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
N T
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
E V
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
E N
: 4.       For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
T T
Y P
E Scenarios - Group 2 EVAL #1 EVAL #2 EVAL #3 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
R2 RX 4
1 1
1 0 NOR 1
1 2
1 1 1 I/C 1, 5 5, 7 4, 7 6
4 4 2 MAJ 6
6 6
3 2
2 1 TS 0
0 2 2 I3 RX 2
1 1
1 0 NOR 3
1 1
1 1 I/C 1, 3, 7
3, 4 2, 4, 5, 7 9
4 4 2 MAJ 6
6 6
3 2
2 1 TS 2, 4 2
0 2 2 I4 RX 3
1 1
1 0 NOR 4
2 2
1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4
4 2 MAJ 6
6 6
3 2
2 1 TS 1, 2 3
3 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
: 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.  


ES-301                                         Transient and Event Checklist                                   Form ES-301-5 Facility: PRAIRIE ISLAND                   Date of Exam: MAY 2016                       Operating Test No.: PI-ILT-NRC-16 A           E                                               Scenarios - Group 3 P          V            EVAL #1                 EVAL #2             EVAL #3                               T       M P          E                                                                                                O        I L          N             CREW                     CREW                 CREW               CREW             T        N I          T          POSITION                 POSITION            POSITION            POSITION          A I
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A
M C                     S      A      B       S      A    B      S      A      B      S     A    B    L        U A          T        R       T      O       R      T     O     R       T      O       R      T     O              M(*)
P P
N          Y        O      C       P        O     C    P     O       C     P      O     C    P R   I U T          P E
L I
RX                   4                                                                             1     1   1 0 NOR                                                 1                     1                         2     1   1 1 R3        I/C               1, 5                           5, 7                 4, 7                       6     4   4 2 MAJ                 6                             6                     6                         3     2   2 1 TS                                                                                                 0     0   2 2 RX                                           2                                                     1     1   1 0 NOR                                                       3                                         1     1   1 1 I/C                         1, 3,           3, 4         2, 4,                                     9     4   4 2 I5                                    7                          5, 7 MAJ                         6               6           6                                         3     2   2 1 TS                                                       2, 4                                       2     0   2 2 RX                                                               3                                 1     1   1 0 NOR         4                       2                                                             2     1   1 1 I/C       1, 3,                   3, 4,                       2, 5                               10     4   4 2 I6                    5, 7                    5, 7 MAJ         6                       6                           6                                 3     2   2 1 TS         1, 2                     3                                                             3     0   2 2 RX                                                                                                         1   1 0 NOR                                                                                                       1   1 1 I/C                                                                                                       4   4 2 MAJ                                                                                                       2   2 1 TS                                                                                                         0   2 2 Instructions:
C A
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
N T
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
E V
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
E N
: 4.       For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
T T
Y P
E Scenarios - Group 3 EVAL #1 EVAL #2 EVAL #3 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
R3 RX 4
1 1
1 0 NOR 1
1 2
1 1 1 I/C 1, 5 5, 7 4, 7 6
4 4 2 MAJ 6
6 6
3 2
2 1 TS 0
0 2 2 I5 RX 2
1 1
1 0 NOR 3
1 1
1 1 I/C 1, 3, 7
3, 4 2, 4, 5, 7 9
4 4 2 MAJ 6
6 6
3 2
2 1 TS 2, 4 2
0 2 2 I6 RX 3
1 1
1 0 NOR 4
2 2
1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4
4 2 MAJ 6
6 6
3 2
2 1 TS 1, 2 3
3 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
: 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.  


ES-301                                         Transient and Event Checklist                                   Form ES-301-5 Facility: PRAIRIE ISLAND                   Date of Exam: MAY 2016                       Operating Test No.: PI-ILT-NRC-16 A           E                                               Scenarios - Group 4 P          V            EVAL #1                 EVAL #2             EVAL #3                               T       M P          E                                                                                                O        I L          N             CREW                     CREW                 CREW               CREW             T        N I          T          POSITION                 POSITION            POSITION            POSITION          A I
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A
M C                     S      A      B       S      A    B      S      A      B      S     A    B    L        U A          T        R       T      O       R      T     O     R       T      O       R      T     O              M(*)
P P
N          Y        O      C       P        O     C    P     O       C     P      O     C    P R   I U T          P E
L I
RX                   4                                                                             1     1   1 0 NOR                                                 1                     1                         2     1   1 1 R4        I/C               1, 5                           5, 7                 4, 7                       6     4   4 2 MAJ                 6                             6                     6                         3     2   2 1 TS                                                                                                 0     0   2 2 RX                                           2                                                     1     1   1 0 NOR                                                       3                                         1     1   1 1 I/C                         1, 3,           3, 4         2, 4,                                     9     4   4 2 I7                                    7                          5, 7 MAJ                         6               6           6                                         3     2   2 1 TS                                                       2, 4                                       2     0   2 2 RX                                                               3                                 1     1   1 0 NOR         4                       2                                                             2     1   1 1 I/C       1, 3,                   3, 4,                       2, 5                               10     4   4 2 I8                    5, 7                    5, 7 MAJ         6                       6                           6                                 3     2   2 1 TS         1, 2                     3                                                             3     0   2 2 RX                                                                                                         1   1 0 NOR                                                                                                       1   1 1 I/C                                                                                                       4   4 2 MAJ                                                                                                       2   2 1 TS                                                                                                         0   2 2 Instructions:
C A
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
N T
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
E V
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
E N
: 4.       For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
T T
Y P
E Scenarios - Group 4 EVAL #1 EVAL #2 EVAL #3 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
R4 RX 4
1 1
1 0 NOR 1
1 2
1 1 1 I/C 1, 5 5, 7 4, 7 6
4 4 2 MAJ 6
6 6
3 2
2 1 TS 0
0 2 2 I7 RX 2
1 1
1 0 NOR 3
1 1
1 1 I/C 1, 3, 7
3, 4 2, 4, 5, 7 9
4 4 2 MAJ 6
6 6
3 2
2 1 TS 2, 4 2
0 2 2 I8 RX 3
1 1
1 0 NOR 4
2 2
1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4
4 2 MAJ 6
6 6
3 2
2 1 TS 1, 2 3
3 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
: 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.  


ES-301                                         Transient and Event Checklist                                   Form ES-301-5 Facility: PRAIRIE ISLAND                   Date of Exam: MAY 2016                       Operating Test No.: PI-ILT-NRC-16 A           E                                               Scenarios - Group 5 P          V            EVAL #3                 EVAL #4                                                   T       M P          E                                                                                                O        I L          N             CREW                     CREW               CREW                 CREW             T        N I          T          POSITION                 POSITION            POSITION            POSITION          A I
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A
M C                     S      A      B       S      A    B      S      A      B      S     A    B    L        U A          T        R       T      O       R      T     O     R       T      O       R      T     O              M(*)
P P
N          Y        O      C       P        O     C    P     O       C     P      O     C    P R   I U T          P E
L I
RX                   3                                                                             1     1   1 0 NOR                                                 2                                               1     1   1 1 R5        I/C               2, 5                           3, 7                                             4     4   4 2 MAJ                 6                           5, 8                                             3     2   2 1 TS                                                                                                 0     0   2 2 RX                                           1                                                     1     1   1 0 NOR                         1                                                                     1     1   1 1 R6        I/C                         4, 7           4, 6                                                   4     4   4 2 MAJ                         6             5, 8                                                   3     2   2 1 TS                                                                                                 0     0   2 2 RX                                                                                                 0     1   1 0 NOR         3                       1                                                             2     1   1 1 I/C       2, 4,                   3, 4,                                                           8     4   4 2 U1                    5, 7                    6, 7 MAJ         6                       5, 8                                                           3     2   2 1 TS         2, 4                     3, 4                                                           4     0   2 2 RX                                                                                                         1   1 0 NOR                                                                                                       1   1 1 I/C                                                                                                       4   4 2 MAJ                                                                                                       2   2 1 TS                                                                                                         0   2 2 Instructions:
C A
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
N T
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
E V
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
E N
: 4.       For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
T T
Y P
E Scenarios - Group 5 EVAL #3 EVAL #4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
R5 RX 3
1 1
1 0 NOR 2
1 1
1 1 I/C 2, 5 3, 7 4
4 4 2 MAJ 6
5, 8 3
2 2 1 TS 0
0 2 2 R6 RX 1
1 1
1 0 NOR 1
1 1
1 1 I/C 4, 7 4, 6 4
4 4 2 MAJ 6
5, 8 3
2 2 1 TS 0
0 2 2 U1 RX 0
1 1 0 NOR 3
1 2
1 1 1 I/C 2, 4, 5, 7 3, 4, 6, 7 8
4 4 2 MAJ 6
5, 8 3
2 2 1 TS 2, 4 3, 4 4
0 2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
: 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.  


ES-301                                         Transient and Event Checklist                                   Form ES-301-5 Facility: PRAIRIE ISLAND                   Date of Exam: MAY 2016                       Operating Test No.: PI-ILT-NRC-16 A           E                                               Scenarios - Group 1 P          V            EVAL #1                 EVAL #2             EVAL #4                               T       M P          E                                                                                                O        I L          N             CREW                     CREW                 CREW               CREW             T        N I          T          POSITION                 POSITION            POSITION            POSITION          A I
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A
M C                     S      A      B       S      A    B      S      A      B      S     A    B    L        U A          T        R       T      O       R      T     O     R       T      O       R      T     O              M(*)
P P
N          Y        O      C       P        O     C    P     O       C     P      O     C    P R   I U T          P E
L I
RX                   4                                                                             1     1   1 0 NOR                                                 1                     2                         2     1   1 1 R1        I/C               1, 5                           5, 7                 3, 7                       6     4   4 2 MAJ                 6                             6                   5, 8                       4     2   2 1 TS                                                                                                 0     0   2 2 RX                                           2                                                     1     1   1 0 NOR                                                       1                                         1     1   1 1 I/C                         1, 3,           3, 4         3, 4,                                     9     4   4 2 I1                                    7                          6, 7 MAJ                         6               6           5, 8                                       4     2   2 1 TS                                                       3, 4                                       2     0   2 2 RX                                                               1                                 1     1   1 0 NOR         4                       2                                                             2     1   1 1 I/C       1, 3,                   3, 4,                       4, 6                               10     4   4 2 I2                    5, 7                    5, 7 MAJ         6                       6                         5, 8                               4     2   2 1 TS         1, 2                     3                                                             3     0   2 2 RX                                                                                                         1   1 0 NOR                                                                                                       1   1 1 I/C                                                                                                       4   4 2 MAJ                                                                                                       2   2 1 TS                                                                                                         0   2 2 Instructions:
C A
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
N T
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
E V
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
E N
: 4.       For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
T T
Y P
E Scenarios - Group 1 EVAL #1 EVAL #2 EVAL #4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
R1 RX 4
1 1
1 0 NOR 1
2 2
1 1 1 I/C 1, 5 5, 7 3, 7 6
4 4 2 MAJ 6
6 5, 8 4
2 2 1 TS 0
0 2 2 I1 RX 2
1 1
1 0 NOR 1
1 1
1 1 I/C 1, 3, 7
3, 4 3, 4, 6, 7 9
4 4 2 MAJ 6
6 5, 8 4
2 2 1 TS 3, 4 2
0 2 2 I2 RX 1
1 1
1 0 NOR 4
2 2
1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 4, 6 10 4
4 2 MAJ 6
6 5, 8 4
2 2 1 TS 1, 2 3
3 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
: 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.  


ES-301                                         Transient and Event Checklist                                   Form ES-301-5 Facility: PRAIRIE ISLAND                   Date of Exam: MAY 2016                       Operating Test No.: PI-ILT-NRC-16 A           E                                               Scenarios - Group 2 P          V            EVAL #1                 EVAL #2             EVAL #3                               T       M P          E                                                                                                O        I L          N             CREW                     CREW                 CREW               CREW             T        N I          T          POSITION                 POSITION            POSITION            POSITION          A I
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A
M C                     S      A      B       S      A    B      S      A      B      S     A    B    L        U A          T        R       T      O       R      T     O     R       T      O       R      T     O              M(*)
P P
N          Y        O      C       P        O     C    P     O       C     P      O     C    P R   I U T          P E
L I
RX                   4                                                                             1     1   1 0 NOR                                                 1                     1                         2     1   1 1 R2        I/C               1, 5                           5, 7                 4, 7                       6     4   4 2 MAJ                 6                             6                     6                         3     2   2 1 TS                                                                                                 0     0   2 2 RX                                           2                                                     1     1   1 0 NOR                                                       3                                         1     1   1 1 I/C                         1, 3,           3, 4         2, 4,                                     9     4   4 2 I3                                    7                          5, 7 MAJ                         6               6           6                                         3     2   2 1 TS                                                       2, 4                                       2     0   2 2 RX                                                               3                                 1     1   1 0 NOR         4                       2                                                             2     1   1 1 I/C       1, 3,                   3, 4,                       2, 5                               10     4   4 2 I4                    5, 7                    5, 7 MAJ         6                       6                           6                                 3     2   2 1 TS         1, 2                     3                                                             3     0   2 2 RX                                                                                                         1   1 0 NOR                                                                                                       1   1 1 I/C                                                                                                       4   4 2 MAJ                                                                                                       2   2 1 TS                                                                                                         0   2 2 Instructions:
C A
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
N T
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
E V
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
E N
: 4.       For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
T T
Y P
E Scenarios - Group 2 EVAL #1 EVAL #2 EVAL #3 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
R2 RX 4
1 1
1 0 NOR 1
1 2
1 1 1 I/C 1, 5 5, 7 4, 7 6
4 4 2 MAJ 6
6 6
3 2
2 1 TS 0
0 2 2 I3 RX 2
1 1
1 0 NOR 3
1 1
1 1 I/C 1, 3, 7
3, 4 2, 4, 5, 7 9
4 4 2 MAJ 6
6 6
3 2
2 1 TS 2, 4 2
0 2 2 I4 RX 3
1 1
1 0 NOR 4
2 2
1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4
4 2 MAJ 6
6 6
3 2
2 1 TS 1, 2 3
3 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
: 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.  


ES-301                                         Transient and Event Checklist                                   Form ES-301-5 Facility: PRAIRIE ISLAND                   Date of Exam: MAY 2016                       Operating Test No.: PI-ILT-NRC-16 A           E                                               Scenarios - Group 3 P          V            EVAL #1                 EVAL #2             EVAL #3                               T       M P          E                                                                                                O        I L          N             CREW                     CREW                 CREW               CREW             T        N I          T          POSITION                 POSITION            POSITION            POSITION          A I
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A
M C                     S      A      B       S      A    B      S      A      B      S     A    B    L        U A          T        R       T      O       R      T     O     R       T      O       R      T     O              M(*)
P P
N          Y        O      C       P        O     C    P     O       C     P      O     C    P R   I U T          P E
L I
RX                   4                                                                             1     1   1 0 NOR                                                 1                     1                         2     1   1 1 R3        I/C               1, 5                           5, 7                 4, 7                       6     4   4 2 MAJ                 6                             6                     6                         3     2   2 1 TS                                                                                                 0     0   2 2 RX                                           2                                                     1     1   1 0 NOR                                                       3                                         1     1   1 1 I/C                         1, 3,           3, 4         2, 4,                                     9     4   4 2 I5                                    7                          5, 7 MAJ                         6               6           6                                         3     2   2 1 TS                                                       2, 4                                       2     0   2 2 RX                                                               3                                 1     1   1 0 NOR         4                       2                                                             2     1   1 1 I/C       1, 3,                   3, 4,                       2, 5                               10     4   4 2 I6                    5, 7                    5, 7 MAJ         6                       6                           6                                 3     2   2 1 TS         1, 2                     3                                                             3     0   2 2 RX                                                                                                         1   1 0 NOR                                                                                                       1   1 1 I/C                                                                                                       4   4 2 MAJ                                                                                                       2   2 1 TS                                                                                                         0   2 2 Instructions:
C A
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
N T
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
E V
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
E N
: 4.       For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
T T
Y P
E Scenarios - Group 3 EVAL #1 EVAL #2 EVAL #3 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
R3 RX 4
1 1
1 0 NOR 1
1 2
1 1 1 I/C 1, 5 5, 7 4, 7 6
4 4 2 MAJ 6
6 6
3 2
2 1 TS 0
0 2 2 I5 RX 2
1 1
1 0 NOR 3
1 1
1 1 I/C 1, 3, 7
3, 4 2, 4, 5, 7 9
4 4 2 MAJ 6
6 6
3 2
2 1 TS 2, 4 2
0 2 2 I6 RX 3
1 1
1 0 NOR 4
2 2
1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4
4 2 MAJ 6
6 6
3 2
2 1 TS 1, 2 3
3 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
: 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.  


ES-301                                         Transient and Event Checklist                                   Form ES-301-5 Facility: PRAIRIE ISLAND                   Date of Exam: MAY 2016                       Operating Test No.: PI-ILT-NRC-16 A           E                                               Scenarios - Group 4 P          V            EVAL #1                 EVAL #2             EVAL #3                               T       M P          E                                                                                                O        I L          N             CREW                     CREW                 CREW               CREW             T        N I          T          POSITION                 POSITION            POSITION            POSITION          A I
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A
M C                     S      A      B       S      A    B      S      A      B      S     A    B    L        U A          T        R       T      O       R      T     O     R       T      O       R      T     O              M(*)
P P
N          Y        O      C       P        O     C    P     O       C     P      O     C    P R   I U T          P E
L I
RX                   4                                                                             1     1   1 0 NOR                                                 1                     1                         2     1   1 1 R4        I/C               1, 5                           5, 7                 4, 7                       6     4   4 2 MAJ                 6                             6                     6                         3     2   2 1 TS                                                                                                 0     0   2 2 RX                                           2                                                     1     1   1 0 NOR                                                       3                                         1     1   1 1 I/C                         1, 3,           3, 4         2, 4,                                     9     4   4 2 I7                                    7                          5, 7 MAJ                         6               6           6                                         3     2   2 1 TS                                                       2, 4                                       2     0   2 2 RX                                                               3                                 1     1   1 0 NOR         4                       2                                                             2     1   1 1 I/C       1, 3,                   3, 4,                       2, 5                               10     4   4 2 I8                    5, 7                    5, 7 MAJ         6                       6                           6                                 3     2   2 1 TS         1, 2                     3                                                             3     0   2 2 RX                                                                                                         1   1 0 NOR                                                                                                       1   1 1 I/C                                                                                                       4   4 2 MAJ                                                                                                       2   2 1 TS                                                                                                         0   2 2 Instructions:
C A
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
N T
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
E V
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
E N
: 4.       For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
T T
Y P
E Scenarios - Group 4 EVAL #1 EVAL #2 EVAL #3 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
R4 RX 4
1 1
1 0 NOR 1
1 2
1 1 1 I/C 1, 5 5, 7 4, 7 6
4 4 2 MAJ 6
6 6
3 2
2 1 TS 0
0 2 2 I7 RX 2
1 1
1 0 NOR 3
1 1
1 1 I/C 1, 3, 7
3, 4 2, 4, 5, 7 9
4 4 2 MAJ 6
6 6
3 2
2 1 TS 2, 4 2
0 2 2 I8 RX 3
1 1
1 0 NOR 4
2 2
1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4
4 2 MAJ 6
6 6
3 2
2 1 TS 1, 2 3
3 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
: 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.  


ES-301                                         Transient and Event Checklist                                   Form ES-301-5 Facility: PRAIRIE ISLAND                   Date of Exam: MAY 2016                       Operating Test No.: PI-ILT-NRC-16 A           E                                               Scenarios - Group 5 P          V            EVAL #3                 EVAL #4                                                   T       M P          E                                                                                                O        I L          N             CREW                     CREW               CREW                 CREW             T        N I          T          POSITION                 POSITION            POSITION            POSITION          A I
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A
M C                     S      A      B       S      A    B      S      A      B      S     A    B    L        U A          T        R       T      O       R      T     O     R       T      O       R      T     O              M(*)
P P
N          Y        O      C       P        O     C    P     O       C     P      O     C    P R   I U T          P E
L I
RX                   3                                                                             1     1   1 0 NOR                                                 2                                               1     1   1 1 R5        I/C               2, 5                           3, 7                                             4     4   4 2 MAJ                 6                           5, 8                                             3     2   2 1 TS                                                                                                 0     0   2 2 RX                                           1                                                     1     1   1 0 NOR                         1                                                                     1     1   1 1 R6        I/C                         4, 7           4, 6                                                   4     4   4 2 MAJ                         6             5, 8                                                   3     2   2 1 TS                                                                                                 0     0   2 2 RX                                                                                                 0     1   1 0 NOR         3                       1                                                             2     1   1 1 I/C       2, 4,                   3, 4,                                                           8     4   4 2 U1                    5, 7                    6, 7 MAJ         6                       5, 8                                                           3     2   2 1 TS         2, 4                     3, 4                                                           4     0   2 2 RX                                                                                                         1   1 0 NOR                                                                                                       1   1 1 I/C                                                                                                       4   4 2 MAJ                                                                                                       2   2 1 TS                                                                                                         0   2 2 Instructions:
C A
: 1.         Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
N T
: 2.         Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
E V
: 3.         Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
E N
: 4.       For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.}}
T T
Y P
E Scenarios - Group 5 EVAL #3 EVAL #4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
R5 RX 3
1 1
1 0 NOR 2
1 1
1 1 I/C 2, 5 3, 7 4
4 4 2 MAJ 6
5, 8 3
2 2 1 TS 0
0 2 2 R6 RX 1
1 1
1 0 NOR 1
1 1
1 1 I/C 4, 7 4, 6 4
4 4 2 MAJ 6
5, 8 3
2 2 1 TS 0
0 2 2 U1 RX 0
1 1 0 NOR 3
1 2
1 1 1 I/C 2, 4, 5, 7 3, 4, 6, 7 8
4 4 2 MAJ 6
5, 8 3
2 2 1 TS 2, 4 3, 4 4
0 2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
: 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
: 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.}}

Latest revision as of 00:59, 10 January 2025

2016 Prairie Island Nuclear Generating Plant Initial License Examination Form ES-301-5
ML16111A130
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 06/10/2016
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Northern States Power Company, Minnesota
References
Download: ML16111A130 (5)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios - Group 1 EVAL #1 EVAL #2 EVAL #4 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

R1 RX 4

1 1

1 0 NOR 1

2 2

1 1 1 I/C 1, 5 5, 7 3, 7 6

4 4 2 MAJ 6

6 5, 8 4

2 2 1 TS 0

0 2 2 I1 RX 2

1 1

1 0 NOR 1

1 1

1 1 I/C 1, 3, 7

3, 4 3, 4, 6, 7 9

4 4 2 MAJ 6

6 5, 8 4

2 2 1 TS 3, 4 2

0 2 2 I2 RX 1

1 1

1 0 NOR 4

2 2

1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 4, 6 10 4

4 2 MAJ 6

6 5, 8 4

2 2 1 TS 1, 2 3

3 0

2 2 RX 1

1 0 NOR 1

1 1 I/C 4

4 2 MAJ 2

2 1 TS 0

2 2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios - Group 2 EVAL #1 EVAL #2 EVAL #3 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

R2 RX 4

1 1

1 0 NOR 1

1 2

1 1 1 I/C 1, 5 5, 7 4, 7 6

4 4 2 MAJ 6

6 6

3 2

2 1 TS 0

0 2 2 I3 RX 2

1 1

1 0 NOR 3

1 1

1 1 I/C 1, 3, 7

3, 4 2, 4, 5, 7 9

4 4 2 MAJ 6

6 6

3 2

2 1 TS 2, 4 2

0 2 2 I4 RX 3

1 1

1 0 NOR 4

2 2

1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4

4 2 MAJ 6

6 6

3 2

2 1 TS 1, 2 3

3 0

2 2 RX 1

1 0 NOR 1

1 1 I/C 4

4 2 MAJ 2

2 1 TS 0

2 2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios - Group 3 EVAL #1 EVAL #2 EVAL #3 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

R3 RX 4

1 1

1 0 NOR 1

1 2

1 1 1 I/C 1, 5 5, 7 4, 7 6

4 4 2 MAJ 6

6 6

3 2

2 1 TS 0

0 2 2 I5 RX 2

1 1

1 0 NOR 3

1 1

1 1 I/C 1, 3, 7

3, 4 2, 4, 5, 7 9

4 4 2 MAJ 6

6 6

3 2

2 1 TS 2, 4 2

0 2 2 I6 RX 3

1 1

1 0 NOR 4

2 2

1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4

4 2 MAJ 6

6 6

3 2

2 1 TS 1, 2 3

3 0

2 2 RX 1

1 0 NOR 1

1 1 I/C 4

4 2 MAJ 2

2 1 TS 0

2 2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios - Group 4 EVAL #1 EVAL #2 EVAL #3 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

R4 RX 4

1 1

1 0 NOR 1

1 2

1 1 1 I/C 1, 5 5, 7 4, 7 6

4 4 2 MAJ 6

6 6

3 2

2 1 TS 0

0 2 2 I7 RX 2

1 1

1 0 NOR 3

1 1

1 1 I/C 1, 3, 7

3, 4 2, 4, 5, 7 9

4 4 2 MAJ 6

6 6

3 2

2 1 TS 2, 4 2

0 2 2 I8 RX 3

1 1

1 0 NOR 4

2 2

1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4

4 2 MAJ 6

6 6

3 2

2 1 TS 1, 2 3

3 0

2 2 RX 1

1 0 NOR 1

1 1 I/C 4

4 2 MAJ 2

2 1 TS 0

2 2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios - Group 5 EVAL #3 EVAL #4 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

R5 RX 3

1 1

1 0 NOR 2

1 1

1 1 I/C 2, 5 3, 7 4

4 4 2 MAJ 6

5, 8 3

2 2 1 TS 0

0 2 2 R6 RX 1

1 1

1 0 NOR 1

1 1

1 1 I/C 4, 7 4, 6 4

4 4 2 MAJ 6

5, 8 3

2 2 1 TS 0

0 2 2 U1 RX 0

1 1 0 NOR 3

1 2

1 1 1 I/C 2, 4, 5, 7 3, 4, 6, 7 8

4 4 2 MAJ 6

5, 8 3

2 2 1 TS 2, 4 3, 4 4

0 2 2 RX 1

1 0 NOR 1

1 1 I/C 4

4 2 MAJ 2

2 1 TS 0

2 2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios - Group 1 EVAL #1 EVAL #2 EVAL #4 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

R1 RX 4

1 1

1 0 NOR 1

2 2

1 1 1 I/C 1, 5 5, 7 3, 7 6

4 4 2 MAJ 6

6 5, 8 4

2 2 1 TS 0

0 2 2 I1 RX 2

1 1

1 0 NOR 1

1 1

1 1 I/C 1, 3, 7

3, 4 3, 4, 6, 7 9

4 4 2 MAJ 6

6 5, 8 4

2 2 1 TS 3, 4 2

0 2 2 I2 RX 1

1 1

1 0 NOR 4

2 2

1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 4, 6 10 4

4 2 MAJ 6

6 5, 8 4

2 2 1 TS 1, 2 3

3 0

2 2 RX 1

1 0 NOR 1

1 1 I/C 4

4 2 MAJ 2

2 1 TS 0

2 2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios - Group 2 EVAL #1 EVAL #2 EVAL #3 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

R2 RX 4

1 1

1 0 NOR 1

1 2

1 1 1 I/C 1, 5 5, 7 4, 7 6

4 4 2 MAJ 6

6 6

3 2

2 1 TS 0

0 2 2 I3 RX 2

1 1

1 0 NOR 3

1 1

1 1 I/C 1, 3, 7

3, 4 2, 4, 5, 7 9

4 4 2 MAJ 6

6 6

3 2

2 1 TS 2, 4 2

0 2 2 I4 RX 3

1 1

1 0 NOR 4

2 2

1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4

4 2 MAJ 6

6 6

3 2

2 1 TS 1, 2 3

3 0

2 2 RX 1

1 0 NOR 1

1 1 I/C 4

4 2 MAJ 2

2 1 TS 0

2 2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios - Group 3 EVAL #1 EVAL #2 EVAL #3 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

R3 RX 4

1 1

1 0 NOR 1

1 2

1 1 1 I/C 1, 5 5, 7 4, 7 6

4 4 2 MAJ 6

6 6

3 2

2 1 TS 0

0 2 2 I5 RX 2

1 1

1 0 NOR 3

1 1

1 1 I/C 1, 3, 7

3, 4 2, 4, 5, 7 9

4 4 2 MAJ 6

6 6

3 2

2 1 TS 2, 4 2

0 2 2 I6 RX 3

1 1

1 0 NOR 4

2 2

1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4

4 2 MAJ 6

6 6

3 2

2 1 TS 1, 2 3

3 0

2 2 RX 1

1 0 NOR 1

1 1 I/C 4

4 2 MAJ 2

2 1 TS 0

2 2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios - Group 4 EVAL #1 EVAL #2 EVAL #3 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

R4 RX 4

1 1

1 0 NOR 1

1 2

1 1 1 I/C 1, 5 5, 7 4, 7 6

4 4 2 MAJ 6

6 6

3 2

2 1 TS 0

0 2 2 I7 RX 2

1 1

1 0 NOR 3

1 1

1 1 I/C 1, 3, 7

3, 4 2, 4, 5, 7 9

4 4 2 MAJ 6

6 6

3 2

2 1 TS 2, 4 2

0 2 2 I8 RX 3

1 1

1 0 NOR 4

2 2

1 1 1 I/C 1, 3, 5, 7 3, 4, 5, 7 2, 5 10 4

4 2 MAJ 6

6 6

3 2

2 1 TS 1, 2 3

3 0

2 2 RX 1

1 0 NOR 1

1 1 I/C 4

4 2 MAJ 2

2 1 TS 0

2 2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: PRAIRIE ISLAND Date of Exam: MAY 2016 Operating Test No.: PI-ILT-NRC-16 A

P P

L I

C A

N T

E V

E N

T T

Y P

E Scenarios - Group 5 EVAL #3 EVAL #4 T

O T

A L

M I

N I

M U

M(*)

CREW POSITION CREW POSITION CREW POSITION CREW POSITION S

R O

A T

C B

O P

S R

O A

T C

B O

P S

R O

A T

C B

O P

S R

O A

T C

B O

P R

I U

R5 RX 3

1 1

1 0 NOR 2

1 1

1 1 I/C 2, 5 3, 7 4

4 4 2 MAJ 6

5, 8 3

2 2 1 TS 0

0 2 2 R6 RX 1

1 1

1 0 NOR 1

1 1

1 1 I/C 4, 7 4, 6 4

4 4 2 MAJ 6

5, 8 3

2 2 1 TS 0

0 2 2 U1 RX 0

1 1 0 NOR 3

1 2

1 1 1 I/C 2, 4, 5, 7 3, 4, 6, 7 8

4 4 2 MAJ 6

5, 8 3

2 2 1 TS 2, 4 3, 4 4

0 2 2 RX 1

1 0 NOR 1

1 1 I/C 4

4 2 MAJ 2

2 1 TS 0

2 2 Instructions:

1.

Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2.

Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.

3.

Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

4.

For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.