| title = Ltr 02/01/17 Quad Cities Nuclear Power Station, Unit 1 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2017001; 05000265/2017001
| title = Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2017001; 05000265/2017001
| author name = Neurauter J
| author name = Neurauter J
| author affiliation = NRC/RGN-III/DRS/EB1
| author affiliation = NRC/RGN-III/DRS/EB1
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
See also: [[see also::IR 05000254/2017001]]
See also: [[followed by::IR 05000254/2017001]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                            NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                  REGION III
REGION III  
                                      2443 WARRENVILLE RD. SUITE 210
2443 WARRENVILLE RD. SUITE 210  
                                            LISLE, IL 60532-4352
LISLE, IL 60532-4352  
                                            February 1, 2017
February 1, 2017  
Mr. Bryan C. Hanson
Mr. Bryan C. Hanson  
Senior VP, Exelon Generation Company, LLC
Senior VP, Exelon Generation Company, LLC  
President and CNO, Exelon Nuclear
President and CNO, Exelon Nuclear  
4300 Winfield Road
4300 Winfield Road  
Warrenville, IL 60555
Warrenville, IL 60555  
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNIT 1 - NOTIFICATION OF NRC
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNIT 1 - NOTIFICATION OF NRC  
              BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION
BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION  
              REPORT 05000254/2017001; 05000265/2017001
REPORT 05000254/2017001; 05000265/2017001  
Dear Mr. Hanson:
Dear Mr. Hanson:  
On March 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline
On March 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline  
Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed
Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed  
March 27, 2017, through March 31, 2017.
March 27, 2017, through March 31, 2017.  
Experience has shown that this inspection is resource intensive both for the NRC inspector and
Experience has shown that this inspection is resource intensive both for the NRC inspector and  
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive  
inspection for both sides, we have enclosed a request for documents needed for this inspection.
inspection for both sides, we have enclosed a request for documents needed for this inspection.
These documents have been divided into two groups.
These documents have been divided into two groups.  
The first group identifies information necessary to ensure that the inspector is adequately
The first group identifies information necessary to ensure that the inspector is adequately  
prepared. The second group identifies the information the inspector will need upon arrival at
prepared. The second group identifies the information the inspector will need upon arrival at  
the site. It is important that all of these documents are up-to-date, and complete, in order to
the site. It is important that all of these documents are up-to-date, and complete, in order to  
minimize the number of additional documents requested during the preparation and/or the
minimize the number of additional documents requested during the preparation and/or the  
onsite portions of the inspection.
onsite portions of the inspection.  
We have discussed the schedule for inspection activities with your staff and understand that our
We have discussed the schedule for inspection activities with your staff and understand that our  
regulatory contact for this inspection will be Mr. Thomas Petersen, of your organization. If there
regulatory contact for this inspection will be Mr. Thomas Petersen, of your organization. If there  
are any questions about this inspection or the material requested, please contact the lead
are any questions about this inspection or the material requested, please contact the lead  
inspector Mr. James Neurauter at 630-829-9828, or via e-mail at James.Neurauter@nrc.gov.
inspector Mr. James Neurauter at 630-829-9828, or via e-mail at James.Neurauter@nrc.gov.  
This letter does not contain new or amended information collection requirements subject to
This letter does not contain new or amended information collection requirements subject to  
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, Control Number
requirements were approved by the Office of Management and Budget, Control Number  
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,  
a request for information or an information collection requirement unless the requesting
a request for information or an information collection requirement unless the requesting  
document displays a currently valid Office of Management and Budget Control Number.
document displays a currently valid Office of Management and Budget Control Number.  


B. Hanson                                   -2-
B. Hanson  
This letter and its enclosure will be made available for public inspection and copying at
-2-  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
This letter and its enclosure will be made available for public inspection and copying at  
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
                                            Sincerely,
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.  
                                            /RA/
Sincerely,  
                                            James E. Neurauter, Reactor Inspector
                                            Engineering Branch 1
/RA/  
                                            Division of Reactor Safety
Docket Nos. 50-254, 50-265
License Nos. DPR-29, DPR-30
James E. Neurauter, Reactor Inspector  
Enclosure:
Engineering Branch 1  
Baseline Inservice Inspection Document Request
Division of Reactor Safety
cc: Distribution via LISTSERV
Docket Nos. 50-254, 50-265  
License Nos. DPR-29, DPR-30  
Enclosure:  
Baseline Inservice Inspection Document Request  
cc: Distribution via LISTSERV  


                BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST  
Inspection Report               05000254/2017001; 05000265/2017001
Enclosure
Inspection Dates:               March 27, 2017 - March 31, 2017
Inspection Report  
Inspection Procedures:         Inspection Procedure 71111-08, Inservice Inspection
05000254/2017001; 05000265/2017001  
Lead Inspector:                 James Neurauter, DRS
Inspection Dates:  
                                630-829-9828
March 27, 2017 - March 31, 2017  
                                James.Neurauter@nrc.gov
Inspection Procedures:  
A.     Information for the In-Office Preparation Week
Inspection Procedure 71111-08, Inservice Inspection  
      The following information (electronic copy CD ROM if possible) is requested by
Lead Inspector:  
      March 13, 2017, to facilitate the selection of specific items that will be reviewed during
James Neurauter, DRS  
      the onsite inspection week. The inspector will select specific items from the information
630-829-9828  
      requested below and request a list of additional documents needed onsite to your staff.
James.Neurauter@nrc.gov  
      We request that the specific items selected from the lists be available and ready for
A.  
      review on the first day of inspection. If you have any questions regarding this
Information for the In-Office Preparation Week  
      information, please call the inspector as soon as possible.
The following information (electronic copy CD ROM if possible) is requested by  
      1. For the upcoming outage, a detailed schedule and description of:
March 13, 2017, to facilitate the selection of specific items that will be reviewed during  
          a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2 Systems
the onsite inspection week. The inspector will select specific items from the information  
              and containment, performed as part of your American Society of Mechanical
requested below and request a list of additional documents needed onsite to your staff.
              Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition
We request that the specific items selected from the lists be available and ready for  
              and addenda of Code committed to), and NDEs planned for other systems
review on the first day of inspection. If you have any questions regarding this  
              performed as part of a Risk-Informed ISI Program, or other augmented
information, please call the inspector as soon as possible.  
              inspection programs commitments, as part of an industry initiative. For each
1. For the upcoming outage, a detailed schedule and description of:  
              weld examination, include the weld identification number, description of weld
a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2 Systems  
              (component name), category, class, type of exam and procedure number, and
and containment, performed as part of your American Society of Mechanical  
              date of examination; and
Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition  
          b. Welding on Code Class 1, 2, or 3 components
and addenda of Code committed to), and NDEs planned for other systems  
      2. A copy of the NDE procedures and welding procedures used to perform the activities
performed as part of a Risk-Informed ISI Program, or other augmented  
          identified in A.1 (including NDE calibration and flaw characterization/sizing procedures
inspection programs commitments, as part of an industry initiative. For each  
          and Welding Procedure Qualification Records). For ultrasonic examination procedures
weld examination, include the weld identification number, description of weld  
          qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide
(component name), category, class, type of exam and procedure number, and  
          documentation supporting the procedure qualification (e.g., the Electric Power
date of examination; and  
          Research Institute performance demonstration qualification summary sheets).
b. Welding on Code Class 1, 2, or 3 components  
      3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations
2. A copy of the NDE procedures and welding procedures used to perform the activities  
          identified in A.1. A copy of the 10-year ISI Program showing those required exams
identified in A.1 (including NDE calibration and flaw characterization/sizing procedures  
          scheduled to be performed this outage, and those which have been completed.
and Welding Procedure Qualification Records). For ultrasonic examination procedures  
      4. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye
qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide  
          penetrant), which have identified relevant indications on Code Class 1 and 2
documentation supporting the procedure qualification (e.g., the Electric Power  
          Systems since the beginning of the last refueling outage.
Research Institute performance demonstration qualification summary sheets).  
                                                                                          Enclosure
3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations  
identified in A.1. A copy of the 10-year ISI Program showing those required exams  
scheduled to be performed this outage, and those which have been completed.  
4. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye  
penetrant), which have identified relevant indications on Code Class 1 and 2  
Systems since the beginning of the last refueling outage.  


              BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST  
  5. List with short description of the welds in Code Class 1 and 2 Systems, which have
4
      been fabricated due to component repair/replacement activities since the beginning
5. List with short description of the welds in Code Class 1 and 2 Systems, which have  
      of the last refueling outage and identify the system, weld number, and reference
been fabricated due to component repair/replacement activities since the beginning  
      applicable documentation (e.g., NIS-2 forms with definitions of system and
of the last refueling outage and identify the system, weld number, and reference  
      component acronyms).
applicable documentation (e.g., NIS-2 forms with definitions of system and  
  6. If reactor vessel weld examinations required by the ASME Code are scheduled to
component acronyms).  
      occur during the inspection period, provide a detailed description of the welds to be
6. If reactor vessel weld examinations required by the ASME Code are scheduled to  
      examined, and the extent of the planned examination.
occur during the inspection period, provide a detailed description of the welds to be  
  7. List with description of ISI related issues such as piping degradation or damage
examined, and the extent of the planned examination.  
      (e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors
7. List with description of ISI related issues such as piping degradation or damage  
      identified in piping examinations that have been entered into your corrective action
(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors  
      system since the beginning of the last refueling outage. Also, include a list of
identified in piping examinations that have been entered into your corrective action  
      corrective action records associated with foreign material introduced/identified in
system since the beginning of the last refueling outage. Also, include a list of  
      the reactor vessel or reactor coolant system since the beginning of the last refueling
corrective action records associated with foreign material introduced/identified in  
      outage.
the reactor vessel or reactor coolant system since the beginning of the last refueling  
  8. Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports applicable to
outage.  
      your structures, systems, or components within the scope of Section XI of the ASME
8. Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports applicable to  
      Code that have been identified since the beginning of the last refueling outage.
your structures, systems, or components within the scope of Section XI of the ASME  
  9. A copy of the 10-year ISI Program showing those required exams scheduled to be
Code that have been identified since the beginning of the last refueling outage.  
      performed this outage, and those which have been completed.
9. A copy of the 10-year ISI Program showing those required exams scheduled to be  
B. Onsite Information to be Provided to the Inspector on the First Day of the
performed this outage, and those which have been completed.  
  Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies
B.  
  (e.g., Paper Records) of the Following Documents.
Onsite Information to be Provided to the Inspector on the First Day of the  
  1. For welds selected by the inspector from A.1.b and A.5 above, provide copies of the
Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies  
      following documents:
(e.g., Paper Records) of the Following Documents.  
      a. Document of the weld number and location (e.g., system, train, branch);
1. For welds selected by the inspector from A.1.b and A.5 above, provide copies of the  
      b. Document with a detail of the weld construction (e.g., drawing);
following documents:  
      c. Applicable portions of the Design Specification and applicable Code of
a. Document of the weld number and location (e.g., system, train, branch);  
            construction for the weldment (e.g., B31.1 or ASME Section III);
b. Document with a detail of the weld construction (e.g., drawing);  
      d. Applicable Code Edition and Addenda for weld procedure qualification;
c. Applicable portions of the Design Specification and applicable Code of  
      e. Applicable weld procedures and completed weld data sheets used to fabricate
construction for the weldment (e.g., B31.1 or ASME Section III);  
            the welds;
d. Applicable Code Edition and Addenda for weld procedure qualification;  
      f.   Copies of procedure qualification records supporting the weld procedures;
e. Applicable weld procedures and completed weld data sheets used to fabricate  
      g. Copies of welders performance qualification records;
the welds;  
      h. Copies of mechanical test reports identified in the procedure qualification
f. Copies of procedure qualification records supporting the weld procedures;  
            records above;
g. Copies of welders performance qualification records;  
      i.   Copies of the non-conformance reports for the selected welds;
h. Copies of mechanical test reports identified in the procedure qualification  
                                              4
records above;  
i.  
Copies of the non-conformance reports for the selected welds;  


                BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST  
          j. Access to radiographs and equipment to view radiographs of the selected welds;
5
              and
j.  
          k. Copies of the pre-service examination records for the selected welds.
Access to radiographs and equipment to view radiographs of the selected welds;  
        2. For the ISI-related corrective action issues selected by the inspector from Item A.7
and  
          above, provide a copy of the corrective actions and supporting documentation.
k. Copies of the pre-service examination records for the selected welds.  
        3. For the NDE reports with relevant indications on Code Class 1 and 2 Systems
2. For the ISI-related corrective action issues selected by the inspector from Item A.7  
          selected by the inspector from Item A.4 above, provide a copy of the examination
above, provide a copy of the corrective actions and supporting documentation.  
          records and associated corrective action documents.
3. For the NDE reports with relevant indications on Code Class 1 and 2 Systems  
        4. Updated schedules for Item A.1 (including schedule showing contingency repair
selected by the inspector from Item A.4 above, provide a copy of the examination  
          plans if available).
records and associated corrective action documents.  
        5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be examined
4. Updated schedules for Item A.1 (including schedule showing contingency repair  
          during the outage. Also provide any drawings used by NDE vendors to locate these
plans if available).  
          welds.
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be examined  
        6. Provide copies of the following standards at the onsite U.S. Nuclear Regulatory
during the outage. Also provide any drawings used by NDE vendors to locate these  
          Commission inspection location for the duration of the inspection:
welds.
          a. Sections V, IX, and XI of the ASME Code with Editions applicable to the
6. Provide copies of the following standards at the onsite U.S. Nuclear Regulatory  
              ISI Program and the Repair/Replacement Program; and
Commission inspection location for the duration of the inspection:  
          b. Copy of the performance demonstration initiative (PDI) generic procedures with
a. Sections V, IX, and XI of the ASME Code with Editions applicable to the  
              the latest applicable Revisions that support site qualified ultrasonic examination
ISI Program and the Repair/Replacement Program; and  
              of piping welds and components (e.g., PDI-UT-1, PDI-UT-2, PDI-UT-3, PDI-UT-
b. Copy of the performance demonstration initiative (PDI) generic procedures with  
              10 etc.).
the latest applicable Revisions that support site qualified ultrasonic examination  
        7. Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if
of piping welds and components (e.g., PDI-UT-1, PDI-UT-2, PDI-UT-3, PDI-UT-
          required to access the NDEs selected by the inspector for observation.
10 etc.).
If you have questions regarding the information requested, please contact the lead inspector.
7. Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if  
                                                  5
required to access the NDEs selected by the inspector for observation.
If you have questions regarding the information requested, please contact the lead inspector.  


B. Hanson                                 -3-
Letter to Bryan C. Hansen from James E. Neurauter dated February 1, 2017
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNIT 1 - NOTIFICATION OF NRC
B. Hanson  
            BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION
-3-  
            REPORT 05000254/2017001; 05000265/2017001
Letter to Bryan C. Hansen from James E. Neurauter dated February 1, 2017  
DISTRIBUTION:
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNIT 1 - NOTIFICATION OF NRC  
Jeremy Bowen
BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION  
RidsNrrDorlLpl3-2 Resource
REPORT 05000254/2017001; 05000265/2017001  
RidsNrrPMQuadCities Resource
DISTRIBUTION:  
RidsNrrDirsIrib Resource
Jeremy Bowen  
Cynthia Pederson
RidsNrrDorlLpl3-2 Resource  
Darrell Roberts
RidsNrrPMQuadCities Resource  
Richard Skokowski
RidsNrrDirsIrib Resource  
Allan Barker
Cynthia Pederson  
Carole Ariano
Darrell Roberts  
Linda Linn
Richard Skokowski  
DRPIII
Allan Barker  
DRSIII
Carole Ariano  
ADAMS Accession Number ML17033A062
Linda Linn  
  OFFICE RIII                   RIII             RIII               RIII
DRPIII  
  NAME       JNeurauter:cl
DRSIII  
  DATE       02/01/17
                                OFFICIAL RECORD COPY
ADAMS Accession Number ML17033A062  
OFFICE  
RIII  
RIII  
RIII  
RIII  
NAME  
JNeurauter:cl  
DATE  
02/01/17  
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 15:15, 9 January 2025

Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2017001; 05000265/2017001
ML17033A062
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 02/01/2017
From: James Neurauter
NRC/RGN-III/DRS/EB1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2017001
Download: ML17033A062 (6)


See also: IR 05000254/2017001

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

February 1, 2017

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNIT 1 - NOTIFICATION OF NRC

BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION

REPORT 05000254/2017001; 05000265/2017001

Dear Mr. Hanson:

On March 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline

Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed

March 27, 2017, through March 31, 2017.

Experience has shown that this inspection is resource intensive both for the NRC inspector and

your staff. In order to minimize the impact to your onsite resources, and to ensure a productive

inspection for both sides, we have enclosed a request for documents needed for this inspection.

These documents have been divided into two groups.

The first group identifies information necessary to ensure that the inspector is adequately

prepared. The second group identifies the information the inspector will need upon arrival at

the site. It is important that all of these documents are up-to-date, and complete, in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for inspection activities with your staff and understand that our

regulatory contact for this inspection will be Mr. Thomas Petersen, of your organization. If there

are any questions about this inspection or the material requested, please contact the lead

inspector Mr. James Neurauter at 630-829-9828, or via e-mail at James.Neurauter@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

B. Hanson

-2-

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

James E. Neurauter, Reactor Inspector

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-254, 50-265

License Nos. DPR-29, DPR-30

Enclosure:

Baseline Inservice Inspection Document Request

cc: Distribution via LISTSERV

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report 05000254/2017001; 05000265/2017001

Inspection Dates:

March 27, 2017 - March 31, 2017

Inspection Procedures:

Inspection Procedure 71111-08, Inservice Inspection

Lead Inspector:

James Neurauter, DRS

630-829-9828

James.Neurauter@nrc.gov

A.

Information for the In-Office Preparation Week

The following information (electronic copy CD ROM if possible) is requested by

March 13, 2017, to facilitate the selection of specific items that will be reviewed during

the onsite inspection week. The inspector will select specific items from the information

requested below and request a list of additional documents needed onsite to your staff.

We request that the specific items selected from the lists be available and ready for

review on the first day of inspection. If you have any questions regarding this

information, please call the inspector as soon as possible.

1. For the upcoming outage, a detailed schedule and description of:

a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2 Systems

and containment, performed as part of your American Society of Mechanical

Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition

and addenda of Code committed to), and NDEs planned for other systems

performed as part of a Risk-Informed ISI Program, or other augmented

inspection programs commitments, as part of an industry initiative. For each

weld examination, include the weld identification number, description of weld

(component name), category, class, type of exam and procedure number, and

date of examination; and

b. Welding on Code Class 1, 2, or 3 components

2. A copy of the NDE procedures and welding procedures used to perform the activities

identified in A.1 (including NDE calibration and flaw characterization/sizing procedures

and Welding Procedure Qualification Records). For ultrasonic examination procedures

qualified in accordance with Appendix VIII, of Section XI of the ASME Code, provide

documentation supporting the procedure qualification (e.g., the Electric Power

Research Institute performance demonstration qualification summary sheets).

3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations

identified in A.1. A copy of the 10-year ISI Program showing those required exams

scheduled to be performed this outage, and those which have been completed.

4. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye

penetrant), which have identified relevant indications on Code Class 1 and 2

Systems since the beginning of the last refueling outage.

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

4

5. List with short description of the welds in Code Class 1 and 2 Systems, which have

been fabricated due to component repair/replacement activities since the beginning

of the last refueling outage and identify the system, weld number, and reference

applicable documentation (e.g., NIS-2 forms with definitions of system and

component acronyms).

6. If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the inspection period, provide a detailed description of the welds to be

examined, and the extent of the planned examination.

7. List with description of ISI related issues such as piping degradation or damage

(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors

identified in piping examinations that have been entered into your corrective action

system since the beginning of the last refueling outage. Also, include a list of

corrective action records associated with foreign material introduced/identified in

the reactor vessel or reactor coolant system since the beginning of the last refueling

outage.

8. Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports applicable to

your structures, systems, or components within the scope of Section XI of the ASME

Code that have been identified since the beginning of the last refueling outage.

9. A copy of the 10-year ISI Program showing those required exams scheduled to be

performed this outage, and those which have been completed.

B.

Onsite Information to be Provided to the Inspector on the First Day of the

Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies

(e.g., Paper Records) of the Following Documents.

1. For welds selected by the inspector from A.1.b and A.5 above, provide copies of the

following documents:

a. Document of the weld number and location (e.g., system, train, branch);

b. Document with a detail of the weld construction (e.g., drawing);

c. Applicable portions of the Design Specification and applicable Code of

construction for the weldment (e.g., B31.1 or ASME Section III);

d. Applicable Code Edition and Addenda for weld procedure qualification;

e. Applicable weld procedures and completed weld data sheets used to fabricate

the welds;

f. Copies of procedure qualification records supporting the weld procedures;

g. Copies of welders performance qualification records;

h. Copies of mechanical test reports identified in the procedure qualification

records above;

i.

Copies of the non-conformance reports for the selected welds;

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

5

j.

Access to radiographs and equipment to view radiographs of the selected welds;

and

k. Copies of the pre-service examination records for the selected welds.

2. For the ISI-related corrective action issues selected by the inspector from Item A.7

above, provide a copy of the corrective actions and supporting documentation.

3. For the NDE reports with relevant indications on Code Class 1 and 2 Systems

selected by the inspector from Item A.4 above, provide a copy of the examination

records and associated corrective action documents.

4. Updated schedules for Item A.1 (including schedule showing contingency repair

plans if available).

5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be examined

during the outage. Also provide any drawings used by NDE vendors to locate these

welds.

6. Provide copies of the following standards at the onsite U.S. Nuclear Regulatory

Commission inspection location for the duration of the inspection:

a. Sections V, IX, and XI of the ASME Code with Editions applicable to the

ISI Program and the Repair/Replacement Program; and

b. Copy of the performance demonstration initiative (PDI) generic procedures with

the latest applicable Revisions that support site qualified ultrasonic examination

of piping welds and components (e.g., PDI-UT-1, PDI-UT-2, PDI-UT-3, PDI-UT-

10 etc.).

7. Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if

required to access the NDEs selected by the inspector for observation.

If you have questions regarding the information requested, please contact the lead inspector.

B. Hanson

-3-

Letter to Bryan C. Hansen from James E. Neurauter dated February 1, 2017

SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNIT 1 - NOTIFICATION OF NRC

BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION

REPORT 05000254/2017001; 05000265/2017001

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3-2 Resource

RidsNrrPMQuadCities Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

ADAMS Accession Number ML17033A062

OFFICE

RIII

RIII

RIII

RIII

NAME

JNeurauter:cl

DATE

02/01/17

OFFICIAL RECORD COPY