| number = ML17059B666
| number = ML17059B666
| issue date = 07/08/1997
| issue date = 07/08/1997
| title = Rev 0 to S20.6-YD-TANK01, EDG Fuel Oil Tank Replacement.
| title = Rev 0 to S20.6-YD-TANK01, EDG Fuel Oil Tank Replacement
| author name = Agosta C, Alvi M
| author name = Agosta C, Alvi M
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:~
{{#Wiki_filter:N % NIAGARA LiMOHAWK NUCLEARENGINEERING DISPOSITION COVER SHEET ATTAI.'HMENT L Page 1 (Next~a.
ATTAI.'HMENT L
Total~
        % NIAGARA                                                                                Page 1 (Next~a.
Last ~A NINE MILEPOINT NUCLEARSTATION TiUe EDG FUEL OILTANKREPLACEMENT Unit (1, 2 or 0=Both):
N Li      MOHAWK DISPOSITION COVER SHEET                                                    Total NUCLEAR ENGINEERING                                                                            Last ~A NINE MILE POINT NUCLEAR STATION                  Unit (1, 2 or 0=Both):                       Discipline: STRUCTURAL TiUe                                                          Caiouhtion No.                         Rev        Disp EDG FUEL OIL TANKREPLACEMENT                                  S20.6-YD-TANK01                         00          00B Originator CARMEN R. AGOSTA         A                     Date 7/8/97 (Sub) System(s)                                     Index No.
Caiouhtion No.
82                                                  S20.6 Design Change No.                                                Approver                                     Date NA NMPC Acceptance/Date:       /I/A Superceded Document(s):      NONE DescripUon of Change TANK-82<3 WAS EVALUATEDUSING THE GENERIC IMPLEMENTATIONPROCEDURE (GIP) SCREENING EVALUATION WORK SHEETS (SEWS). THE EVALUATIONREFERENCED THIS CALCULATION.
S20.6-YD-TANK01 Originator CARMEN R. AGOSTA A Discipline: STRUCTURAL Rev Disp 00 00B Date 7/8/97 (Sub) System(s) 82 Design Change No.
ResoluUon ADD THE 82-43 SEWS TO THIS CALCULATION.
NA Index No.
S20.6 Approver Date Superceded Document(s):
NONE NMPC Acceptance/Date:
/I/A DescripUon of Change TANK-82<3WAS EVALUATEDUSING THE GENERIC IMPLEMENTATIONPROCEDURE (GIP) SCREENING EVALUATION WORK SHEETS (SEWS). THE EVALUATIONREFERENCED THIS CALCULATION.
ResoluUon ADDTHE 82-43 SEWS TO THIS CALCULATION.
Cross Reference change(s):
Cross Reference change(s):
NONE Confirmation Required (Yes / No ): Yes     Final Issue Status             File Location         Operations Acceptance See Page(s):                               ( APP / FIO / VOI): APP       (Gale / Hold):Gale   Req'd. ( Yes / No ): Yes Evaluation Number(s) / Revision: NR                             Component ID(s) / EPN(s) / Line Number(s):
NONE Confirmation Required (Yes / No ): Yes Final Issue Status File Location Operations Acceptance See Page(s):
Copy of Applicability Review Attached (Yes / N/R)? N/R         TANK42M TANK42M Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION P,
( APP / FIO / VOI): APP (Gale / Hold):Gale Req'd. ( Yes / No ): Yes Evaluation Number(s) / Revision: NR Copy of ApplicabilityReview Attached (Yes / N/R)? N/R Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION Component ID(s) / EPN(s) / Line Number(s):
9708070i42 PDR 9707$
TANK42M TANK42M 9708070i42 9707$i PDR ADOC(t('5000220 P,
ADOC(t('5000220 s
s PDR J
i PDR                   J FORMAT If NET) ES48+0340
FORMATIfNET)ES48+0340


T NIAGARA N 4 MOHAWK NUCLEAR ENGINEERING Nine Mile Point Nuclear Station CALCULATIONCONTINUATIONSHEET Unit: 1 Page (Next Disposition: 00B
NT NIAGARA 4 MOHAWK NUCLEAR ENGINEERING CALCULATIONCONTINUATIONSHEET Page Z.
                                                                                                              ~Z.
(Next~
OriIIlnator te                  Checker/Date                         Caiculation No.                       Reviston f7                          @4            os        S20.6-YD-TANK01                       00 ef.
Nine Mile Point Nuclear Station OriIIlnator te f7 ef.
PURPOSE:       Document the Screening Evaluation Work Sheets (SEWS) for the DG FUEL OIL STORAGE TANK4103, EQUIPMENT NUMBER 82-43.
Unit:
This SEWS has been prepared as part of the commitment to use the SQUG (GIP) methodology to document the seismic adequacy of SSEL components.         ~
1 Checker/Date @4 os Caiculation No.
CONCLUSION: Calculation S20.6-YD-TANK01 analyzed this tank for the design basis       load combination of DL+ seismic+ variable tank fill. Therefore, the DG Fuel Oil Tank is seismically adequate.
S20.6-YD-TANK01 Disposition:
00B Reviston 00 PURPOSE:
Document the Screening Evaluation Work Sheets (SEWS) forthe DG FUEL OIL STORAGE TANK4103, EQUIPMENT NUMBER 82-43.
This SEWS has been prepared as part ofthe commitment to use the SQUG (GIP) methodology to document the seismic adequacy of SSEL components.
~
CONCLUSION: Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+ seismic+ variable tank fill.Therefore, the DG Fuel Oil Tank is seismically adequate.
ATTACHMENTS A. SEWS for Equipment ID Number 82-43.
ATTACHMENTS A. SEWS for Equipment ID Number 82-43.
FORMAT 4 NEP-DES-08, Rev. 01 (F02)
FORMAT4 NEP-DES-08, Rev. 01 (F02)


ATTACHMENT ZEZZHS                            Revision 2, Corrected, 6/28/91 Status       Y N U SC  ENING EVALUATION NORK SHE    (SEMS)              Sheet 1 of 2 Equip.~ ID No.~                             Equip. Class  21 - Tanks and Heat Exchan ers Equipment Description           OA  C'c      5/c          AC              Fc Location: Bldg.       ~<~       floor El. 2 4 /     Room, Row/Col       c'
ATTACHMENTZEZZHS SC ENING EVALUATION NORK SHE (SEMS)
) Nanufacturer, Nodel, Etc. (optional)
Revision 2, Corrected, 6/28/91 Status Y
S         CA AC TY VS DEHAND
N U
  ~
Sheet 1 of 2 Equip.
Buckling capacity of shell of large. flat-bottom, vertical tank is,equal to or greater than demand:
ID No.
      ~g ~n     IS           i
~
                      /go@. P.o~~ac. 4 gUAyaH ANCHO     B     AND     B Capacity of anchor bolts and their embedments is equal to or greater than demand:
~
    /Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~               4<<           g  N U  N/A.
Equipment Description Location: Bldg. ~<~ floor El. 2 4 /
OE'SIINC> l~ Ca<.C,. S 2u.d - YO -78'~>i CONNEC ION BETMEEN ANCHO         80 TS AND   E Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand:                 Y   N U   /A F     IBI     OF     AC Attached piping has adequate flexibilityto accaaaodate motion of large, flat-bottom, vertical tank:                           Y   N U(S TANK FOUNDA     0 Ring-type foundation is not used to support large, flat-bottom, vertical tank:                                             Y N U~/
: Room, Row/Col c'
IS   E UIPNENT   SEISNICALLY ADE OAT T 6.21-1
)
Nanufacturer, Nodel, Etc. (optional)
S CA AC TY VS DEHAND
~ Buckling capacity of shell of large. flat-bottom, vertical tank is,equal to or greater than demand:
~g ~n IS
/go@. iP.o~~ac.
4 gUAyaH Equip. Class 21 - Tanks and Heat Exchan ers OA C'c 5/c AC Fc ANCHO B
AND B
Capacity of anchor bolts and their embedments is equal to or greater than demand:
/Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~ 4<<
OE'SIINC> l~
Ca<.C,.
S 2u.d - YO -78'~>i g
N U
N/A.
CONNEC ION BETMEEN ANCHO 80 TS AND E
Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand:
Y N
U
/A F
IBI OF AC Attached piping has adequate flexibilityto accaaaodate motion of large, flat-bottom, vertical tank:
Y N U(S TANK FOUNDA 0
Ring-type foundation is not used to support large, flat-bottom, vertical tank:
Y N U~/
IS E UIPNENT SEISNICALLY ADE OAT T 6.21-1


ATTACHMENT CAlC NO REVISION Revision 2, Corrected, 6/28/g1 PAGE NO                      SCREEHIN6 EVANATIOH WORK SHEET (SEMS)     Sheet 2 pf   2 Equip.~ ID No.~    8 Z -43           Equip. Class   21 - Tanks and Heat Exchan ers
ATTACHMENT CAlC NO REVISION PAGE NO Revision 2, Corrected, 6/28/g1 SCREEHIN6 EVANATIOH WORK SHEET (SEMS)
                                ~
Sheet 2 pf 2
Equipment Description COW EHTS fVrIrIPc     cwLGuL~7.row         S ~4'4     Y~ - TarIr'w o/ A'ev.o         Aced/ /a+~
~
76'G     p~4/ oar~a:
~
7pnlr: a p~sic~ao To: <g > ~p-                         Cp<aaal~.
~
P.V - p,db)F
Equip.
                                                                            / O/'t  OMBrtr%7rMM]
ID No.
p'/+/r'~/     /J ~~gr~~~~ 7-~         ~g~~     g~g7'roars 222 7"brf rtrIAL g 5CIsmrc. L,p&oS       C p~<>>o)
8 Z -43 Equipment Description COWEHTS Equip. Class 21 - Tanks and Heat Exchan ers fVrIrIPc cwLGuL~7.row S ~4'4 Y~ - TarIr'w o/
                                                    ~C.Cdc >ac a      COW os
A'ev.o Aced/ /a+~
            ~pQ SL,C       L,O4 gZ  gag   8C.C.Ou Evaluated by:                                                       Data:   /08/pJ to 6.21-2}}
76'G p~4/ oar~a:
7pnlr: a p~sic~ao To: <g
> ~p-Cp<aaal~.
P.V
- p,db)F p'/+/r'~/
/J
~~gr~~~~
7-~ ~g~~
g~g7'roars 222
/ O/'t OMBrtr%7rMM]
7"brf rtrIAL g 5CIsmrc. L,p&oS C p~<>>o)
~pQ SL,C L,O4gZ gag 8C.C.Ou
~C.Cdc >ac a COWos Evaluated by:
Data:
/08/pJ to 6.21-2}}

Latest revision as of 11:45, 9 January 2025

Rev 0 to S20.6-YD-TANK01, EDG Fuel Oil Tank Replacement
ML17059B666
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/08/1997
From: Agosta C, Alvi M
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059B657 List:
References
S20.6-YD-TANK01, S20.6-YD-TANK01-R00, S20.6-YD-TANK1, S20.6-YD-TANK1-R, NUDOCS 9708070142
Download: ML17059B666 (8)


Text

N % NIAGARA LiMOHAWK NUCLEARENGINEERING DISPOSITION COVER SHEET ATTAI.'HMENT L Page 1 (Next~a.

Total~

Last ~A NINE MILEPOINT NUCLEARSTATION TiUe EDG FUEL OILTANKREPLACEMENT Unit (1, 2 or 0=Both):

Caiouhtion No.

S20.6-YD-TANK01 Originator CARMEN R. AGOSTA A Discipline: STRUCTURAL Rev Disp 00 00B Date 7/8/97 (Sub) System(s) 82 Design Change No.

NA Index No.

S20.6 Approver Date Superceded Document(s):

NONE NMPC Acceptance/Date:

/I/A DescripUon of Change TANK-82<3WAS EVALUATEDUSING THE GENERIC IMPLEMENTATIONPROCEDURE (GIP) SCREENING EVALUATION WORK SHEETS (SEWS). THE EVALUATIONREFERENCED THIS CALCULATION.

ResoluUon ADDTHE 82-43 SEWS TO THIS CALCULATION.

Cross Reference change(s):

NONE Confirmation Required (Yes / No ): Yes Final Issue Status File Location Operations Acceptance See Page(s):

( APP / FIO / VOI): APP (Gale / Hold):Gale Req'd. ( Yes / No ): Yes Evaluation Number(s) / Revision: NR Copy of ApplicabilityReview Attached (Yes / N/R)? N/R Key Words: NMP-1, STRUCTURAL, SQUG, SEWS, SEISMIC VERIFICATION Component ID(s) / EPN(s) / Line Number(s):

TANK42M TANK42M 9708070i42 9707$i PDR ADOC(t('5000220 P,

s PDR J

FORMATIfNET)ES48+0340

NT NIAGARA 4 MOHAWK NUCLEAR ENGINEERING CALCULATIONCONTINUATIONSHEET Page Z.

(Next~

Nine Mile Point Nuclear Station OriIIlnator te f7 ef.

Unit:

1 Checker/Date @4 os Caiculation No.

S20.6-YD-TANK01 Disposition:

00B Reviston 00 PURPOSE:

Document the Screening Evaluation Work Sheets (SEWS) forthe DG FUEL OIL STORAGE TANK4103, EQUIPMENT NUMBER 82-43.

This SEWS has been prepared as part ofthe commitment to use the SQUG (GIP) methodology to document the seismic adequacy of SSEL components.

~

CONCLUSION: Calculation S20.6-YD-TANK01 analyzed this tank for the design basis load combination of DL+ seismic+ variable tank fill.Therefore, the DG Fuel Oil Tank is seismically adequate.

ATTACHMENTS A. SEWS for Equipment ID Number 82-43.

FORMAT4 NEP-DES-08, Rev. 01 (F02)

ATTACHMENTZEZZHS SC ENING EVALUATION NORK SHE (SEMS)

Revision 2, Corrected, 6/28/91 Status Y

N U

Sheet 1 of 2 Equip.

ID No.

~

~

Equipment Description Location: Bldg. ~<~ floor El. 2 4 /

Room, Row/Col c'

)

Nanufacturer, Nodel, Etc. (optional)

S CA AC TY VS DEHAND

~ Buckling capacity of shell of large. flat-bottom, vertical tank is,equal to or greater than demand:

~g ~n IS

/go@. iP.o~~ac.

4 gUAyaH Equip. Class 21 - Tanks and Heat Exchan ers OA C'c 5/c AC Fc ANCHO B

AND B

Capacity of anchor bolts and their embedments is equal to or greater than demand:

/Poco Oou us~w+Ps 4 0 rc.gizA R4'crt A'~~~~~ 4<<

OE'SIINC> l~

Ca<.C,.

S 2u.d - YO -78'~>i g

N U

N/A.

CONNEC ION BETMEEN ANCHO 80 TS AND E

Capacity of connections between the anchor bolts and the tank shell is equal to or greater than the demand:

Y N

U

/A F

IBI OF AC Attached piping has adequate flexibilityto accaaaodate motion of large, flat-bottom, vertical tank:

Y N U(S TANK FOUNDA 0

Ring-type foundation is not used to support large, flat-bottom, vertical tank:

Y N U~/

IS E UIPNENT SEISNICALLY ADE OAT T 6.21-1

ATTACHMENT CAlC NO REVISION PAGE NO Revision 2, Corrected, 6/28/g1 SCREEHIN6 EVANATIOH WORK SHEET (SEMS)

Sheet 2 pf 2

~

~

~

Equip.

ID No.

8 Z -43 Equipment Description COWEHTS Equip. Class 21 - Tanks and Heat Exchan ers fVrIrIPc cwLGuL~7.row S ~4'4 Y~ - TarIr'w o/

A'ev.o Aced/ /a+~

76'G p~4/ oar~a:

7pnlr: a p~sic~ao To: <g

> ~p-Cp<aaal~.

P.V

- p,db)F p'/+/r'~/

/J

~~gr~~~~

7-~ ~g~~

g~g7'roars 222

/ O/'t OMBrtr%7rMM]

7"brf rtrIAL g 5CIsmrc. L,p&oS C p~<>>o)

~pQ SL,C L,O4gZ gag 8C.C.Ou

~C.Cdc >ac a COWos Evaluated by:

Data:

/08/pJ to 6.21-2