ML17075A340: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000382/2017301]]
| number = ML17075A340
| issue date = 03/14/2017
| title = NRC Initial Operator Licensing Examination Approval 05000382/2017301
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Chisum M
| addressee affiliation = Entergy Operations, Inc
| docket = 05000382
| license number = NPF-038
| contact person = Gaddy V
| case reference number = 50-382/17-01
| document report number = 50-382/OL-17
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 3
}}
See also: [[see also::IR 05000382/2017301]]
 
=Text=
{{#Wiki_filter:UNITED STATES
                            NUCLEAR REGULATORY COMMISSION
                                              REGION IV
                                          1600 E. LAMAR BLVD
                                      ARLINGTON, TX 76011-4511
                                          March 14, 2017
Mr. Michael R. Chisum
Site Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
SUBJECT:        WATERFORD STEAM ELECTRIC STATION, UNIT 3: NRC INITIAL
                OPERATOR LICENSING EXAMINATION APPROVAL 05000382/2017301
Dear Mr. Chisum:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at the Waterford Steam Electric Station, Unit 3.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Mr. Robert
Simpson, Manager, Training and Development. Note that any examination waivers and
application denials have been addressed in separate correspondence.
The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations and
you may administer the written examinations in accordance with Revision 10, of NUREG-1021,
Operator Licensing Examination Standards for Power Reactors, on April 5, 2017. The NRC
staff will administer the operating tests during the week of March 27, 2017. This examination
has undergone extensive review by my staff and representatives responsible for licensed
operator training at your facility. Based on this review I have concluded that the examination
meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By
administering this examination, you also agree that it meets NUREG-1021 guidelines, and is
appropriate for measuring the qualifications of licensed operator applicants at your facility. If
you determine that this examination is not appropriate for licensing operators at your facility, do
not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Chris Cowdrey, at (817) 200-1545, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of
 
M. Chisum                                    2
examination (partial or complete written examination and/or operating test) specified for each
applicant.
                                              Sincerely,
                                              /RA/
                                              Vincent G. Gaddy, Chief
                                              Operations Branch
                                              Division of Reactor Safety
Docket No. 50-382
License No. NPF-38
Enclosure:
ES-201-4
cc w/enclosure:
Robert Simpson
Manager, Training and Development
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
cc w/o enclosure:
Electronic Distribution for Waterford
Steam Electric Station, Unit 3
 
 
ML17075A340
SUNSI Review:          ADAMS:            Non-Publicly Available  Non-Sensitive Keyword:
  By: CBC                Yes  No        Publicly Available      Sensitive    NRR-077
OFFICE          RIV:OB:LA      SOE:OB        C:OB
NAME            JBridges      CCowdrey      VGaddy
SIGNATURE      /RA/          /RA/          /RA/
DATE            3/14/17          3/14/17    3/14/17
}}

Latest revision as of 11:18, 9 January 2025