ML17341A362: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-81-291, Provides Info Re EPRI Safety & Relief Valve Test Program. Copes-Vulcan D-100-160 Relief Valve & Crosby Model HB-BP-86 Safety Valve Are Being Tested as Part of Program.Evaluations & plant-specific Data Will Be Submitted]]
| number = ML17341A362
| issue date = 07/14/1981
| title = Provides Info Re EPRI Safety & Relief Valve Test Program. Copes-Vulcan D-100-160 Relief Valve & Crosby Model HB-BP-86 Safety Valve Are Being Tested as Part of Program.Evaluations & plant-specific Data Will Be Submitted
| author name = Uhrig R
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = Varga S
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000250, 05000251
| license number =
| contact person =
| document report number = L-81-291, NUDOCS 8107230225
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 4
}}
 
=Text=
{{#Wiki_filter:REGULA!TORY          ORMATION DISTRIBUTION SY                            9  (RIDS)
ACCESSION'BR+8107230225<<DOC DATE:: 81/07/14 NOTARIZED: NO
                                            ~
FACILi:50 250 Turkey Point Planti Unit 3r Flor ida Power and Light 50-251 Tur key Point Plant'i'Unit" 4p Florida Power and Light C'5000251 C'2 AUTHi,NAME            AUTHOR AFF      ILIATION UHRIGiR ~ E ~          Flor,ida Power        L  Light          Co  ~
RECIP ~ NAMEr          REC'IP IENT AF F IL'I
          ~ AD              Operating, Reactors Branch ATION'ARGAiS 1
 
==SUBJECT:==
"-  Provides- info re EPRI safety                      L  relief      valve test program+
Copes  Vu,lean~ D"10 0 160.      relief            valve    8  Crosby.,Model HB BP-86 safety  valve are. be.'ing,      tested as part of program, Evaluations 8  plant specific data -will be submitted, DISTRIBUTION'ODEi-'001S COPIES RECEiIVED:LiTR                                    ENCL Q" SI Eo: '              "
TITLEt: Gener al Distributio n for- af ter- Issuance of Operating. License NOTES:
RECIPIENT                                            RECIPIENT                  COPIES'TTR~
ID coDE/NAMEr            LTTR ENCL                    ID CODE'/NAME                            ENCLi ACT'ION:    ORB    01 BC BR'OPIES 04 INTERNAL    D/O'IRrHUM FAC08 I 8 Er            06'ELD 11 1
2' DIR i D I V NRC O
PDR
                                                                                '1 OF  L I C.
BR 02" 10 C'905'6 RAD 'ASMT                    1                          EG  F EXTERNAL: ACRS                                  1                LPDR                  Q3i NS'I                          1-                      NTIS
                                                                                            'JUL 28 198l 6
TOTAL NUMBER OF COPIES              REQUIRED'iTTR                41. ENCL>
 
Q r r I
W
 
o  N~
I  P.O. SOX 529100 MIAMI,F L 33152
                                    .-.'<t,'I..    ~      h                              ~n~i~
pate~ ~
JUL 2 2 198l
                                              <Oh'
                                                      ~TO~
tt lot4 n  FLORIDA POWER & LIGHT COMPANY July 14, L-81-291 1981 a
Office of Nuclear Reactor Regulation Attention: Mr. S. A. Varga, Chief Operating Reactors Branch        81 Division of Operating Reactors U. S. Nuclear .Regulatory Commission Washington, D. C. 20555
 
==Dear Mr. Varga:==
 
Re:  Turkey Point Units 3 & 4 Docket Nos. 50-250 & 50-251 Post-TMI Requirements Safet & Relief Valve Testin By  letter  dated July '1, 1981 R.C. Youngdahl (Consumers Power) transmitted the Interim Data Re ort for the EPRI PWR safety and Relief Valve Test Program.
This report summarizes the test data collected to date on relief valves (safety valve data is    still not available). Our Turkey Point Plants have a Copes-Vulcan  D-100-160  relief valve and a Crosby model HB-BP-86 safety valve. Relief and safety valves representative of the above valves are being tested in the EPRI program. Florida Power and Light will submit evaluations and other plant specific data on a schedule consistant with the R. C.
Youngdahl letter of December 15, 1980 and modified on July 1, 1981.
Very  truly yours, Robert E. Uhrig Vice President Advanced Systems  &  Technology REU/JEM/ras cc:  Mr. J. P. O'Reilly, Region  II Harold F. Reis, Esquire gaol (l.
,
  'P            05000250'EOPLE...
8i07230225 ai0714 PDR ADOCK PDR.
SERVING PEOPLE
 
il II IW}}

Latest revision as of 12:33, 7 January 2025