ML18045A071: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
#4. The word reactoC Is misspelled In the stem oldie question.
#4. The word reactoC Is misspelled In the stem oldie question.
: 4. Given the following:
: 4. Given the following:
              -Unftl lslnModelat3O%power
-Unftl lslnModelat3O%power
              - All 4 RCPs are In seMce Subsequently, the following reator trip SI status bistable lights Illuminate:
- All 4 RCPs are In seMce Subsequently, the following reator trip - SI status bistable lights Illuminate:
                                                      -
a
a


NRC response to Sequoyah 2017-301 Post Exam Comment:
NRC response to Sequoyah 2017-301 Post Exam Comment:
Because this comment related to a minor editorial (spelling) error, no changes were requested nor made to the final administered exam.}}
Because this comment related to a minor editorial (spelling) error, no changes were requested nor made to the final administered exam.}}

Latest revision as of 10:31, 6 January 2025

301 Post Exam Comments
ML18045A071
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/14/2018
From:
Tennessee Valley Authority
To:
NRC/RGN-II
References
Download: ML18045A071 (2)


Text

Post Exam Review Comments 1712 SON NRC Exam

  1. 4. The word reactoC Is misspelled In the stem oldie question.
4. Given the following:

-Unftl lslnModelat3O%power

- All 4 RCPs are In seMce Subsequently, the following reator trip - SI status bistable lights Illuminate:

a

NRC response to Sequoyah 2017-301 Post Exam Comment:

Because this comment related to a minor editorial (spelling) error, no changes were requested nor made to the final administered exam.