Engineering Inspection Review Objective Discuss recommendations of Engineering Inspection Working Group with stakeholders and seek feedback 2
Engineering Inspection Review Objective Discuss recommendations of Engineering Inspection Working Group with stakeholders and seek feedback 2


Engineering Inspection Review Principal Considerations
Engineering Inspection Review 3
Principal Considerations
- Consider stakeholder input
- Consider stakeholder input
- Increase or maintain effectiveness
- Increase or maintain effectiveness
  - Independent oversight
- Independent oversight
  - Identification of latent conditions
- Identification of latent conditions
  - Increase relevance to current challenges 3
- Increase relevance to current challenges


Engineering Inspection Review Principal Considerations (Contd.)
Engineering Inspection Review Principal Considerations (Contd.)
- Increase efficiency
- Increase efficiency
  - Eliminate overlap
- Eliminate overlap
  - Capture advantages of holistic inspection of engineering design changes
- Capture advantages of holistic inspection of engineering design changes
- Knowledge gained from inspection experience
- Knowledge gained from inspection experience
  - 18+ years
- 18+ years
  - Value of independent inspection
- Value of independent inspection
  - Credible assessment of plant design 4
- Credible assessment of plant design 4


Engineering Inspection Review Overall Results
Engineering Inspection Review 5
  - Conduct independent NRC engineering inspections annually
Overall Results
  - New suite of engineering inspection procedures
- Conduct independent NRC engineering inspections annually
  - Holistic, agile, flexible, relevant
- New suite of engineering inspection procedures
  - Reduced overlaps and addressed gaps
- Holistic, agile, flexible, relevant
  - Maintain reasonable assurance of safety 5
- Reduced overlaps and addressed gaps
- Maintain reasonable assurance of safety


Engineering Inspection Review Current Engineering Inspections (Triennial Period)
6 Engineering Inspection Review Current Engineering Inspections (Triennial Period)
Year 1                                  Year 2                      Year 3 DBAI - Programs Triennial Fire Protection                BI: 192 Hours DBAI - Team Inspection                           BI: 240 Hours          Resources: 3 Inspectors BI: 312 Hours                   Resources: 3-4 Inspectors   Onsite Presence: 2 Weeks Resources: 4 Inspectors / 2 Contractors    Onsite Presence: 2-3 Weeks Onsite Presence: 2 Weeks Heat Sink Inspection          50.59 Inspection BI: 40 Hours BI: 92 Hours Resources: 1-2 Inspectors    Resources: 3 Inspectors Onsite Presence: 1 Week     Onsite Presence: 1 Week Inservice Inspection                                              Inservice Inspection BI: 30 - 100 Hours                                               BI: 30 - 100 Hours Resources: 1-2 Inspectors                                        Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)                                       Onsite Presence: 1-2 Week(s) 6
DBAI - Team Inspection BI: 312 Hours Resources: 4 Inspectors / 2 Contractors Onsite Presence: 2 Weeks Triennial Fire Protection BI: 240 Hours Resources: 3-4 Inspectors Onsite Presence: 2-3 Weeks DBAI - Programs BI: 192 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks 50.59 Inspection BI: 92 Hours Resources: 3 Inspectors Onsite Presence: 1 Week Heat Sink Inspection BI: 40 Hours Resources: 1-2 Inspectors Onsite Presence: 1 Week Year 1 Year 2 Year 3 Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)
Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)


Engineering Inspection Review Proposed Engineering Inspections (Quadrennial Period)
7 Engineering Inspection Review Proposed Engineering Inspections (Quadrennial Period)
Year 1                               Year 2                       Year 3                     Year 4 Comprehensive                    Focused Engineering            Focused Engineering       Focused Engineering Engineering Team                        Inspection #1                 Inspection #2              Inspection #3 BI: 210 Hours               BI: 210 Hours              BI: 210 Hours Inspection                      Resources: 3 Inspectors      Resources: 3 Inspectors    Resources: 3 Inspectors BI: 350 Hours                  Onsite Presence: 2 Weeks     Onsite Presence: 2 Weeks  Onsite Presence: 2 Weeks Resources: 5 Inspectors / 2 Contractors Onsite Presence: 2 Weeks Inservice Inspection                                     Inservice Inspection BI: 30 - 100 Hours BI: 30 - 100 Hours Resources: 1-2 Inspectors Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)
Comprehensive Engineering Team Inspection BI: 350 Hours Resources: 5 Inspectors / 2 Contractors Onsite Presence: 2 Weeks Year 1 Year 2 Year 3 Focused Engineering Inspection #1 BI: 210 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks Focused Engineering Inspection #2 BI: 210 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks Focused Engineering Inspection #3 BI: 210 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks Year 4 Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)
Onsite Presence: 1-2 Week(s) 7
Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)


Engineering Inspection Review Future Engineering Inspections
Engineering Inspection Review Future Engineering Inspections
- Identify if latent design issues are introduced through design changes
- Identify if latent design issues are introduced through design changes
- Verify SSCs continue to be capable of performing as designed through a emphasis on more relevant areas (aging, obsolescence, etc.)
- Verify SSCs continue to be capable of performing as designed through a emphasis on more relevant areas (aging, obsolescence, etc.)  
- Verify changes do not introduce new or increased frequency of initiating events 8
- Verify changes do not introduce new or increased frequency of initiating events 8


Line 67: Line 70:
- Nominally three inspectors for two onsite weeks depending on inspection (focus area dependent)
- Nominally three inspectors for two onsite weeks depending on inspection (focus area dependent)
In-Service Inspection
In-Service Inspection
    - Added periodic oversight of 10-year program implementation
-Added periodic oversight of 10-year program implementation
    - Continue inspections during outages 11
-Continue inspections during outages 11


Engineering Inspection Review Resource Implications Current 3 Year Cycle Proposed 4 Year Cycle Total Number of 7 Inspections         6 Inspections Inspections Annual Onsite Weeks     3.66 weeks/yr         2.75 weeks/yr (11 onsite weeks)    (11 onsite weeks)
Engineering Inspection Review Resource Implications Overall reduction in annualized baseline inspection and associated prep/doc 12 Current 3 Year Cycle Proposed 4 Year Cycle Total Number of Inspections 7 Inspections 6 Inspections Annual Onsite Weeks 3.66 weeks/yr (11 onsite weeks) 2.75 weeks/yr (11 onsite weeks)
Average Inspection 293 Hours             245 Hours Hours per Year Overall reduction in annualized baseline inspection and associated prep/doc 12
Average Inspection Hours per Year 293 Hours 245 Hours


Engineering Inspection Review Improved safety inspections
Engineering Inspection Review Improved safety inspections
  - Annual independent NRC engineering inspections
- Annual independent NRC engineering inspections  
  - New suite of engineering inspection procedures
- New suite of engineering inspection procedures
* Holistic, agile, flexible, relevant
* Holistic, agile, flexible, relevant
* Reduced overlaps and addressed gaps
* Reduced overlaps and addressed gaps
  - Maintain reasonable assurance of safety 13
- Maintain reasonable assurance of safety 13


Engineering Inspection Review Recap of EIWG Recommendations Implement changes to engineering inspections Increased effectiveness Increased efficiency Increased agility Increased relevance 14
Engineering Inspection Review Recap of EIWG Recommendations Implement changes to engineering inspections Increased effectiveness Increased efficiency Increased agility Increased relevance 14
Line 98: Line 101:


Engineering Inspection Review Self Assessment Standard
Engineering Inspection Review Self Assessment Standard
  - Proposed by industry and reviewed/approved or endorsed by NRC
- Proposed by industry and reviewed/approved or endorsed by NRC
  - Must address
- Must address
* Independence
* Independence
* Clarity and Reliability (self-critical)
* Clarity and Reliability (self-critical)
Line 106: Line 109:


Engineering Inspection Review Project Demonstration
Engineering Inspection Review Project Demonstration
  - Using the industry-developed standard
- Using the industry-developed standard
  - NRC to provide oversight
- NRC to provide oversight
  - Select same area as FEI
- Select same area as FEI  
  - Compare self-assessment results with NRC independent inspection 19
- Compare self-assessment results with NRC independent inspection 19


Engineering Inspection Review Challenges
Engineering Inspection Review Challenges
Line 116: Line 119:
- Findings, transparency, and other issues 20
- Findings, transparency, and other issues 20


Engineering Inspection Review Self Assessment Considerations Year 1                             Year 2                     Year 3                         Year 4 Comprehensive Focused Engineering        Focused Engineering Engineering Team Inspection #1             Inspection #2 Inspection                          BI: 210 Hours               BI: 210 Hours        Licensee Self-Assessment BI: 350 Hours                  Resources: 3 Inspectors    Resources: 3 Inspectors Resources: 5 Inspectors / 2 Contractors  Onsite Presence: 2 Weeks   Onsite Presence: 2 Weeks Onsite Presence: 2 Weeks Inservice Inspection                                            Inservice Inspection          NRC Inspector Oversight BI: 30 - 100 Hours                                            BI: 30 - 100 Hours                   BI: TBD Resources: 1-2 Inspectors                                      Resources: 1-2 Inspectors           Resources: TBD Onsite Presence: 1-2 Week(s)                                   Onsite Presence: 1-2 Week(s)       Onsite Presence: TBD 21
Engineering Inspection Review Self Assessment Considerations 21 Comprehensive Engineering Team Inspection BI: 350 Hours Resources: 5 Inspectors / 2 Contractors Onsite Presence: 2 Weeks Year 1 Year 2 Year 3 Focused Engineering Inspection #1 BI: 210 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks Focused Engineering Inspection #2 BI: 210 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks Licensee Self-Assessment Year 4 NRC Inspector Oversight BI: TBD Resources: TBD Onsite Presence: TBD Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)
Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)


Engineering Inspection Review Next Steps/Milestones
Next Steps/Milestones
  - March 14 RIC Session on Engineering Inspection Working Group
- March 14 RIC Session on Engineering Inspection Working Group
  - Finalize Engineering Inspection Working Group recommendations (EIWG)
- Finalize Engineering Inspection Working Group recommendations (EIWG)
  - Develop SECY (DIRS)
- Develop SECY (DIRS)
  - Industry self-assessment standard engagement (DIRS)
- Industry self-assessment standard engagement (DIRS)
  - Project demonstration 22
- Project demonstration 22 Engineering Inspection Review


Recap Additional Feedback Questions?}}
Recap Additional Feedback Questions?}}

Latest revision as of 09:03, 6 January 2025

Engineering Inspection Review Public Presentation (2-21-18)
ML18057A215
Person / Time
Issue date: 02/26/2018
From: Isom J
Division of Inspection and Regional Support
To:
Isom J, NRR/DIRS,415-1109
References
Download: ML18057A215 (23)


Text

USNRC Engineering Inspection Review

Engineering Inspection Review Objective Discuss recommendations of Engineering Inspection Working Group with stakeholders and seek feedback 2

Engineering Inspection Review 3

Principal Considerations

- Consider stakeholder input

- Increase or maintain effectiveness

- Independent oversight

- Identification of latent conditions

- Increase relevance to current challenges

Engineering Inspection Review Principal Considerations (Contd.)

- Increase efficiency

- Eliminate overlap

- Capture advantages of holistic inspection of engineering design changes

- Knowledge gained from inspection experience

- 18+ years

- Value of independent inspection

- Credible assessment of plant design 4

Engineering Inspection Review 5

Overall Results

- Conduct independent NRC engineering inspections annually

- New suite of engineering inspection procedures

- Holistic, agile, flexible, relevant

- Reduced overlaps and addressed gaps

- Maintain reasonable assurance of safety

6 Engineering Inspection Review Current Engineering Inspections (Triennial Period)

DBAI - Team Inspection BI: 312 Hours Resources: 4 Inspectors / 2 Contractors Onsite Presence: 2 Weeks Triennial Fire Protection BI: 240 Hours Resources: 3-4 Inspectors Onsite Presence: 2-3 Weeks DBAI - Programs BI: 192 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks 50.59 Inspection BI: 92 Hours Resources: 3 Inspectors Onsite Presence: 1 Week Heat Sink Inspection BI: 40 Hours Resources: 1-2 Inspectors Onsite Presence: 1 Week Year 1 Year 2 Year 3 Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)

Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)

7 Engineering Inspection Review Proposed Engineering Inspections (Quadrennial Period)

Comprehensive Engineering Team Inspection BI: 350 Hours Resources: 5 Inspectors / 2 Contractors Onsite Presence: 2 Weeks Year 1 Year 2 Year 3 Focused Engineering Inspection #1 BI: 210 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks Focused Engineering Inspection #2 BI: 210 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks Focused Engineering Inspection #3 BI: 210 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks Year 4 Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)

Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)

Engineering Inspection Review Future Engineering Inspections

- Identify if latent design issues are introduced through design changes

- Verify SSCs continue to be capable of performing as designed through a emphasis on more relevant areas (aging, obsolescence, etc.)

- Verify changes do not introduce new or increased frequency of initiating events 8

Engineering Inspection Review Comprehensive Engineering Team Inspection (CETI)

- Emphasize inspection on changes, operating experience, and aging

- Incorporates elements of modifications, 10CFR50.59, and DBAI inspections

- Team makeup of five inspectors with one or two contractors for two onsite weeks 9

Engineering Inspection Review Focused Engineering Inspection (FEI)

- Independent inspection of specific engineering activities

- Areas may be identified with stakeholder input, selected by NRC

- Risk insights and operating experience considered 10

Engineering Inspection Review FEI (Contd)

- Nominally three inspectors for two onsite weeks depending on inspection (focus area dependent)

In-Service Inspection

-Added periodic oversight of 10-year program implementation

-Continue inspections during outages 11

Engineering Inspection Review Resource Implications Overall reduction in annualized baseline inspection and associated prep/doc 12 Current 3 Year Cycle Proposed 4 Year Cycle Total Number of Inspections 7 Inspections 6 Inspections Annual Onsite Weeks 3.66 weeks/yr (11 onsite weeks) 2.75 weeks/yr (11 onsite weeks)

Average Inspection Hours per Year 293 Hours 245 Hours

Engineering Inspection Review Improved safety inspections

- Annual independent NRC engineering inspections

- New suite of engineering inspection procedures

  • Holistic, agile, flexible, relevant
  • Reduced overlaps and addressed gaps

- Maintain reasonable assurance of safety 13

Engineering Inspection Review Recap of EIWG Recommendations Implement changes to engineering inspections Increased effectiveness Increased efficiency Increased agility Increased relevance 14

Engineering Inspection Review Recap of EIWG Recommendations (Continued)

Reduce types of inspections from 6 to 3 Increase inspection cycle from 3 years to 4 years Implementation Timeline Considerations Immediate?

2019?

2020?

15

Future Considerations Licensee Self Assessments

Engineering Inspection Review EIWG Recommendations

  • Continue dialog on self-assessments
  • Industry develop self-assessment standard
  • Consider implementation of a project demonstration with independent NRC oversight
  • Establish criteria for use (e.g., licensee in Column 1 for three consecutive years?)
  • Establish limitations on use 17

Engineering Inspection Review Self Assessment Standard

- Proposed by industry and reviewed/approved or endorsed by NRC

- Must address

  • Independence
  • Clarity and Reliability (self-critical)
  • Openness
  • Efficiency 18

Engineering Inspection Review Project Demonstration

- Using the industry-developed standard

- NRC to provide oversight

- Select same area as FEI

- Compare self-assessment results with NRC independent inspection 19

Engineering Inspection Review Challenges

- Industry development of a self-assessment standard

- NRC guidance for review of self-assessment

- Findings, transparency, and other issues 20

Engineering Inspection Review Self Assessment Considerations 21 Comprehensive Engineering Team Inspection BI: 350 Hours Resources: 5 Inspectors / 2 Contractors Onsite Presence: 2 Weeks Year 1 Year 2 Year 3 Focused Engineering Inspection #1 BI: 210 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks Focused Engineering Inspection #2 BI: 210 Hours Resources: 3 Inspectors Onsite Presence: 2 Weeks Licensee Self-Assessment Year 4 NRC Inspector Oversight BI: TBD Resources: TBD Onsite Presence: TBD Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)

Inservice Inspection BI: 30 - 100 Hours Resources: 1-2 Inspectors Onsite Presence: 1-2 Week(s)

Next Steps/Milestones

- March 14 RIC Session on Engineering Inspection Working Group

- Finalize Engineering Inspection Working Group recommendations (EIWG)

- Develop SECY (DIRS)

- Industry self-assessment standard engagement (DIRS)

- Project demonstration 22 Engineering Inspection Review

Recap Additional Feedback Questions?