ML18103A130: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18103A130
| number = ML18103A130
| issue date = 04/13/2018
| issue date = 04/13/2018
| title = 2018/04/13 Nuscale SMR DC RAI - Request for Additional Information No. 420 Erai No. 9459 (03.08.02)
| title = SMR DC RAI - Request for Additional Information No. 420 Erai No. 9459 (03.08.02)
| author name =  
| author name =  
| author affiliation = NRC
| author affiliation = NRC
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NuScaleDCRaisPEm Resource From:                             Chowdhury, Prosanta Sent:                             Friday, April 13, 2018 8:29 AM To:                               Request for Additional Information Cc:                               Lee, Samuel; Cranston, Gregory; Tabatabai, Omid; Lupold, Timothy; Huang, Jason; NuScaleDCRaisPEm Resource
{{#Wiki_filter:1 NuScaleDCRaisPEm Resource From:
Chowdhury, Prosanta Sent:
Friday, April 13, 2018 8:29 AM To:
Request for Additional Information Cc:
Lee, Samuel; Cranston, Gregory; Tabatabai, Omid; Lupold, Timothy; Huang, Jason; NuScaleDCRaisPEm Resource


==Subject:==
==Subject:==
Request for Additional Information No. 420 eRAI No. 9459 (03.08.02)
Request for Additional Information No. 420 eRAI No. 9459 (03.08.02)
Attachments:                       Request for Additional Information No. 420 (eRAI No. 9459).pdf Resending with corrected RAI No. (420 instead of 417) on the subject line..
Attachments:
Request for Additional Information No. 420 (eRAI No. 9459).pdf Resending with corrected RAI No. (420 instead of 417) on the subject line..
From: Chowdhury, Prosanta Sent: Wednesday, April 11, 2018 8:15 PM To: 'Request for Additional Information' <RAI@nuscalepower.com>
From: Chowdhury, Prosanta Sent: Wednesday, April 11, 2018 8:15 PM To: 'Request for Additional Information' <RAI@nuscalepower.com>
Cc: Lee, Samuel <Samuel.Lee@nrc.gov>; Cranston, Gregory <Gregory.Cranston@nrc.gov>; Tabatabai, Omid
Cc: Lee, Samuel <Samuel.Lee@nrc.gov>; Cranston, Gregory <Gregory.Cranston@nrc.gov>; Tabatabai, Omid  
<Omid.Tabatabai-Yazdi@nrc.gov>; Lupold, Timothy <Timothy.Lupold@nrc.gov>; Huang, Jason <Jason.Huang@nrc.gov>;
<Omid.Tabatabai-Yazdi@nrc.gov>; Lupold, Timothy <Timothy.Lupold@nrc.gov>; Huang, Jason <Jason.Huang@nrc.gov>;
NuScaleDCRaisPEm Resource <NuScaleDCRaisPEm.Resource@nrc.gov>
NuScaleDCRaisPEm Resource <NuScaleDCRaisPEm.Resource@nrc.gov>  


==Subject:==
==Subject:==
Line 34: Line 39:
Thank you.
Thank you.
Prosanta Chowdhury, Project Manager Licensing Branch 1 (NuScale)
Prosanta Chowdhury, Project Manager Licensing Branch 1 (NuScale)
Division of New Reactor Licensing Office of New Reactors U.S. Nuclear Regulatory Commission 301-415-1647 1
Division of New Reactor Licensing Office of New Reactors U.S. Nuclear Regulatory Commission 301-415-1647  


Hearing Identifier:     NuScale_SMR_DC_RAI_Public Email Number:           454 Mail Envelope Properties     (BN7PR09MB26097E10489C6CCDAB63B8E89EB30)
Hearing Identifier:
NuScale_SMR_DC_RAI_Public Email Number:
454 Mail Envelope Properties (BN7PR09MB26097E10489C6CCDAB63B8E89EB30)  


==Subject:==
==Subject:==
Request for Additional Information No. 420 eRAI No. 9459 (03.08.02)
Request for Additional Information No. 420 eRAI No. 9459 (03.08.02)
Sent Date:               4/13/2018 8:28:47 AM Received Date:           4/13/2018 8:28:56 AM From:                   Chowdhury, Prosanta Created By:             Prosanta.Chowdhury@nrc.gov Recipients:
Sent Date:
4/13/2018 8:28:47 AM Received Date:
4/13/2018 8:28:56 AM From:
Chowdhury, Prosanta Created By:
Prosanta.Chowdhury@nrc.gov Recipients:  
"Lee, Samuel" <Samuel.Lee@nrc.gov>
"Lee, Samuel" <Samuel.Lee@nrc.gov>
Tracking Status: None "Cranston, Gregory" <Gregory.Cranston@nrc.gov>
Tracking Status: None "Cranston, Gregory" <Gregory.Cranston@nrc.gov>
Line 48: Line 59:
Tracking Status: None "NuScaleDCRaisPEm Resource" <NuScaleDCRaisPEm.Resource@nrc.gov>
Tracking Status: None "NuScaleDCRaisPEm Resource" <NuScaleDCRaisPEm.Resource@nrc.gov>
Tracking Status: None "Request for Additional Information" <RAI@nuscalepower.com>
Tracking Status: None "Request for Additional Information" <RAI@nuscalepower.com>
Tracking Status: None Post Office:             BN7PR09MB2609.namprd09.prod.outlook.com Files                           Size                       Date & Time MESSAGE                         1132                       4/13/2018 8:28:56 AM Request for Additional Information No. 420 (eRAI No. 9459).pdf                   11966 Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Tracking Status: None Post Office:
Recipients Received:
BN7PR09MB2609.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1132 4/13/2018 8:28:56 AM Request for Additional Information No. 420 (eRAI No. 9459).pdf 11966 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:  


Request for Additional Information No. 420 (eRAI No. 9459)
Request for Additional Information No. 420 (eRAI No. 9459)
Issue Date: 04/12/2018 Application Title: NuScale Standard Design Certification 048 Operating Company: NuScale Power, LLC Docket No. 52-048 Review Section: 03.08.02 - Steel Containment Application Section:
Issue Date: 04/12/2018 Application
 
==Title:==
NuScale Standard Design Certification 048 Operating Company: NuScale Power, LLC Docket No. 52-048 Review Section: 03.08.02 - Steel Containment Application Section:
QUESTIONS 03.08.02-18 10 CFR 52.47 requires the design certification applicant to include a description and analysis of the structures, systems, and components with sufficient detail to permit understanding of the system designs. Regulatory Guide 1.216 C.1.k states the details of the analysis and results that should be submitted in report form.
QUESTIONS 03.08.02-18 10 CFR 52.47 requires the design certification applicant to include a description and analysis of the structures, systems, and components with sufficient detail to permit understanding of the system designs. Regulatory Guide 1.216 C.1.k states the details of the analysis and results that should be submitted in report form.
For the CNV Middle Section Model, in Section 3.4 of TR-0917-56119-P, "CNV Ultimate Pressure Integrity," it states that the design was modified to add 7.5 inches of reinforcement around the pressurizer access port opening on the inside surface of the CNV. The report stated that the added reinforcement served to stiffen the CNV shell around the opening and produce less distortion of the access flange, however the addition of the 7.5 inches of reinforcement is not clearly indicated in the drawings of the technical report, nor are there any further details on the reinforcement and its effect on the analysis. Please clearly show the reinforcement on the drawings of the technical report.
For the CNV Middle Section Model, in Section 3.4 of TR-0917-56119-P, "CNV Ultimate Pressure Integrity," it states that the design was modified to add 7.5 inches of reinforcement around the pressurizer access port opening on the inside surface of the CNV. The report stated that the added reinforcement served to stiffen the CNV shell around the opening and produce less distortion of the access flange, however the addition of the 7.5 inches of reinforcement is not clearly indicated in the drawings of the technical report, nor are there any further details on the reinforcement and its effect on the analysis. Please clearly show the reinforcement on the drawings of the technical report.
It does not appear that the analysis of the CNV Middle Section was re-evaluated to include this 7.5 inches of reinforcement. Please explain why this analysis was not re-evaluated as the reinforcement could produce a different bounding ultimate pressure than is currently indicated in the FSAR.
It does not appear that the analysis of the CNV Middle Section was re-evaluated to include this 7.5 inches of reinforcement. Please explain why this analysis was not re-evaluated as the reinforcement could produce a different bounding ultimate pressure than is currently indicated in the FSAR.
The RPV support design and RPV lateral support design, which impart stress to the shell of the containment vessel, were both modified since the completion of the containment ultimate pressure analysis. Please include drawings within the technical report that clearly show the differences in design from the one used for the ultimate pressure analysis (for example Figure 3-3) and the current design, to support the statements made that these design changes do not affect the ultimate pressure capacity or buckling results.}}
The RPV support design and RPV lateral support design, which impart stress to the shell of the containment vessel, were both modified since the completion of the containment ultimate pressure analysis. Please include drawings within the technical report that clearly show the differences in design from the one used for the ultimate pressure analysis (for example Figure 3-3) and the current design, to support the statements made that these design changes do not affect the ultimate pressure capacity or buckling results.}}

Latest revision as of 00:29, 6 January 2025

SMR DC RAI - Request for Additional Information No. 420 Erai No. 9459 (03.08.02)
ML18103A130
Person / Time
Site: NuScale
Issue date: 04/13/2018
From:
NRC
To:
NRC/NRO/DNRL/LB1
References
Download: ML18103A130 (3)


Text

1 NuScaleDCRaisPEm Resource From:

Chowdhury, Prosanta Sent:

Friday, April 13, 2018 8:29 AM To:

Request for Additional Information Cc:

Lee, Samuel; Cranston, Gregory; Tabatabai, Omid; Lupold, Timothy; Huang, Jason; NuScaleDCRaisPEm Resource

Subject:

Request for Additional Information No. 420 eRAI No. 9459 (03.08.02)

Attachments:

Request for Additional Information No. 420 (eRAI No. 9459).pdf Resending with corrected RAI No. (420 instead of 417) on the subject line..

From: Chowdhury, Prosanta Sent: Wednesday, April 11, 2018 8:15 PM To: 'Request for Additional Information' <RAI@nuscalepower.com>

Cc: Lee, Samuel <Samuel.Lee@nrc.gov>; Cranston, Gregory <Gregory.Cranston@nrc.gov>; Tabatabai, Omid

<Omid.Tabatabai-Yazdi@nrc.gov>; Lupold, Timothy <Timothy.Lupold@nrc.gov>; Huang, Jason <Jason.Huang@nrc.gov>;

NuScaleDCRaisPEm Resource <NuScaleDCRaisPEm.Resource@nrc.gov>

Subject:

Request for Additional Information No. 417 eRAI No. 9459 (03.08.02)

Attached please find NRC staffs request for additional information (RAI) concerning review of the NuScale Design Certification Application.

Please submit your technically correct and complete response within 60 days of the date of this RAI to the NRC Document Control Desk.

If you have any questions, please contact me.

Thank you.

Prosanta Chowdhury, Project Manager Licensing Branch 1 (NuScale)

Division of New Reactor Licensing Office of New Reactors U.S. Nuclear Regulatory Commission 301-415-1647

Hearing Identifier:

NuScale_SMR_DC_RAI_Public Email Number:

454 Mail Envelope Properties (BN7PR09MB26097E10489C6CCDAB63B8E89EB30)

Subject:

Request for Additional Information No. 420 eRAI No. 9459 (03.08.02)

Sent Date:

4/13/2018 8:28:47 AM Received Date:

4/13/2018 8:28:56 AM From:

Chowdhury, Prosanta Created By:

Prosanta.Chowdhury@nrc.gov Recipients:

"Lee, Samuel" <Samuel.Lee@nrc.gov>

Tracking Status: None "Cranston, Gregory" <Gregory.Cranston@nrc.gov>

Tracking Status: None "Tabatabai, Omid" <Omid.Tabatabai-Yazdi@nrc.gov>

Tracking Status: None "Lupold, Timothy" <Timothy.Lupold@nrc.gov>

Tracking Status: None "Huang, Jason" <Jason.Huang@nrc.gov>

Tracking Status: None "NuScaleDCRaisPEm Resource" <NuScaleDCRaisPEm.Resource@nrc.gov>

Tracking Status: None "Request for Additional Information" <RAI@nuscalepower.com>

Tracking Status: None Post Office:

BN7PR09MB2609.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1132 4/13/2018 8:28:56 AM Request for Additional Information No. 420 (eRAI No. 9459).pdf 11966 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Request for Additional Information No. 420 (eRAI No. 9459)

Issue Date: 04/12/2018 Application

Title:

NuScale Standard Design Certification 048 Operating Company: NuScale Power, LLC Docket No.52-048 Review Section: 03.08.02 - Steel Containment Application Section:

QUESTIONS 03.08.02-18 10 CFR 52.47 requires the design certification applicant to include a description and analysis of the structures, systems, and components with sufficient detail to permit understanding of the system designs. Regulatory Guide 1.216 C.1.k states the details of the analysis and results that should be submitted in report form.

For the CNV Middle Section Model, in Section 3.4 of TR-0917-56119-P, "CNV Ultimate Pressure Integrity," it states that the design was modified to add 7.5 inches of reinforcement around the pressurizer access port opening on the inside surface of the CNV. The report stated that the added reinforcement served to stiffen the CNV shell around the opening and produce less distortion of the access flange, however the addition of the 7.5 inches of reinforcement is not clearly indicated in the drawings of the technical report, nor are there any further details on the reinforcement and its effect on the analysis. Please clearly show the reinforcement on the drawings of the technical report.

It does not appear that the analysis of the CNV Middle Section was re-evaluated to include this 7.5 inches of reinforcement. Please explain why this analysis was not re-evaluated as the reinforcement could produce a different bounding ultimate pressure than is currently indicated in the FSAR.

The RPV support design and RPV lateral support design, which impart stress to the shell of the containment vessel, were both modified since the completion of the containment ultimate pressure analysis. Please include drawings within the technical report that clearly show the differences in design from the one used for the ultimate pressure analysis (for example Figure 3-3) and the current design, to support the statements made that these design changes do not affect the ultimate pressure capacity or buckling results.