ML18184A240: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML18184A240 | | number = ML18184A240 | ||
| issue date = 07/03/2018 | | issue date = 07/03/2018 | ||
| title = Acceptance for Review of Application to Revise Technical Specification Surveillance Requirement 3.3.5.2a for the Diesel Generator Undervoltage Start | | title = NRR E-mail Capture - Acceptance for Review of Application to Revise Technical Specification Surveillance Requirement 3.3.5.2a for the Diesel Generator Undervoltage Start | ||
| author name = Green K | | author name = Green K | ||
| author affiliation = NRC/NRR/DORL/LPLIII | | author affiliation = NRC/NRR/DORL/LPLIII | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:NRR-DMPSPEm Resource From: | {{#Wiki_filter:1 NRR-DMPSPEm Resource From: | ||
Green, Kimberly Sent: | |||
Tuesday, July 3, 2018 8:33 AM To: | |||
ERICKSON, JEFFREY S; MIKSA, JAMES P | |||
==Subject:== | ==Subject:== | ||
| Line 24: | Line 27: | ||
==Dear Mr. Erickson and Mr. Miksa:== | ==Dear Mr. Erickson and Mr. Miksa:== | ||
By {{letter dated|date=May 30, 2018|text=letter dated May 30, 2018}}, Entergy Nuclear Operations, Inc. submitted an amendment request for the Palisades Nuclear Plant. The proposed amendment would revise Technical Specification (TS) 3.3.5, Diesel Generator (DG) - Undervoltage Start (UV Start), Surveillance Requirement (SR) 3.3.5.2a by adding a channel calibration requirement for the combined time delay setpoints for the degraded voltage sensing relay and the degraded voltage time delay relay. | |||
By letter dated May 30, 2018, Entergy Nuclear Operations, Inc. submitted an amendment request for the Palisades Nuclear Plant. The proposed amendment would revise Technical Specification (TS) 3.3.5, Diesel Generator (DG) - Undervoltage Start (UV Start), Surveillance Requirement (SR) 3.3.5.2a by adding a channel calibration requirement for the combined time delay setpoints for the degraded voltage sensing relay and the degraded voltage time delay relay. | |||
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the proposed license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the proposed license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations, an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations, an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. | ||
| Line 32: | Line 34: | ||
These estimates are based on the staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. | These estimates are based on the staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. | ||
If you have any questions, please contact me at (301) 415-1627. | If you have any questions, please contact me at (301) 415-1627. | ||
Sincerely, Kimberly J. Green, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing | Sincerely, Kimberly J. Green, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing | ||
Office of Nuclear Reactor Regulation | 2 Office of Nuclear Reactor Regulation | ||
Hearing Identifier: | Hearing Identifier: | ||
NRR_DMPS Email Number: | |||
453 Mail Envelope Properties (Kimberly.Green@nrc.gov20180703083200) | |||
==Subject:== | ==Subject:== | ||
Acceptance for Review of Application to Revise Technical Specification Surveillance Requirement 3.3.5.2a for the Diesel Generator Undervoltage Start (EPID L-2018-LLA-0153) | Acceptance for Review of Application to Revise Technical Specification Surveillance Requirement 3.3.5.2a for the Diesel Generator Undervoltage Start (EPID L-2018-LLA-0153) | ||
Sent Date: | Sent Date: | ||
7/3/2018 8:32:58 AM Received Date: | |||
7/3/2018 8:32:00 AM From: | |||
Green, Kimberly Created By: | |||
Kimberly.Green@nrc.gov Recipients: | |||
"ERICKSON, JEFFREY S" <JERICKS@entergy.com> | "ERICKSON, JEFFREY S" <JERICKS@entergy.com> | ||
Tracking Status: None "MIKSA, JAMES P" <jmiksa@entergy.com> | Tracking Status: None "MIKSA, JAMES P" <jmiksa@entergy.com> | ||
Tracking Status: None Post Office: | Tracking Status: None Post Office: | ||
Files | Files Size Date & Time MESSAGE 3116 7/3/2018 8:32:00 AM Options Priority: | ||
Standard Return Notification: | |||
No Reply Requested: | |||
No Sensitivity: | |||
Normal Expiration Date: | |||
Recipients Received:}} | Recipients Received:}} | ||
Latest revision as of 17:57, 5 January 2025
| ML18184A240 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/03/2018 |
| From: | Kimberly Green Plant Licensing Branch III |
| To: | Erickson J, Miksa J Entergy Nuclear Operations |
| References | |
| L-2018-LLA-0153 | |
| Download: ML18184A240 (3) | |
Text
1 NRR-DMPSPEm Resource From:
Green, Kimberly Sent:
Tuesday, July 3, 2018 8:33 AM To:
ERICKSON, JEFFREY S; MIKSA, JAMES P
Subject:
Acceptance for Review of Application to Revise Technical Specification Surveillance Requirement 3.3.5.2a for the Diesel Generator Undervoltage Start (EPID L-2018-LLA-0153)
Dear Mr. Erickson and Mr. Miksa:
By letter dated May 30, 2018, Entergy Nuclear Operations, Inc. submitted an amendment request for the Palisades Nuclear Plant. The proposed amendment would revise Technical Specification (TS) 3.3.5, Diesel Generator (DG) - Undervoltage Start (UV Start), Surveillance Requirement (SR) 3.3.5.2a by adding a channel calibration requirement for the combined time delay setpoints for the degraded voltage sensing relay and the degraded voltage time delay relay.
The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the proposed license amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations, an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 525 hours0.00608 days <br />0.146 hours <br />8.680556e-4 weeks <br />1.997625e-4 months <br /> to complete. The NRC staff expects to complete this review in May 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates will be communicated, during the routine interactions.
These estimates are based on the staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions, please contact me at (301) 415-1627.
Sincerely, Kimberly J. Green, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing
2 Office of Nuclear Reactor Regulation
Hearing Identifier:
NRR_DMPS Email Number:
453 Mail Envelope Properties (Kimberly.Green@nrc.gov20180703083200)
Subject:
Acceptance for Review of Application to Revise Technical Specification Surveillance Requirement 3.3.5.2a for the Diesel Generator Undervoltage Start (EPID L-2018-LLA-0153)
Sent Date:
7/3/2018 8:32:58 AM Received Date:
7/3/2018 8:32:00 AM From:
Green, Kimberly Created By:
Kimberly.Green@nrc.gov Recipients:
"ERICKSON, JEFFREY S" <JERICKS@entergy.com>
Tracking Status: None "MIKSA, JAMES P" <jmiksa@entergy.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 3116 7/3/2018 8:32:00 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: