ML18351A130: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.01 Revision History Date of Revision      Description of Revision 11/30/2017            IP 71111.01, Adverse Weather Protection, has been revised to add additional ultimate heat sink considerations to summer readiness sample, and improved plain writing. Relocated optional requirements to the guidance section to better align with IMC 2515, Section 08.04.
{{#Wiki_filter:}}
09/04/2015            IP 71111.01, "Adverse Weather Protection," has been revised to incorporate Fukushima Lessons Learned and Fukushima flooding inspection insights.
Incorporated the following feedback form: 71111.01-2130.
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                    1                2                1                  4 NCV Green                                    6                2                4                12 NCVIV Green                                  0                1                0                  1 NCVIV N/A                                    1                0                0                  1 Total                                        8                5                5                18 9/11/2018 2:22:01 PM                                                                                                                                              Page 1 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.01 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  6        0    2    3    0          6          1            4          1          0              0          0          0 Region 2                  5        0    2    3    0          5          2            3          0          0              0          0          0 Region 3                  2        0    0    1    0          2          1            1          0          0              0          0          0 Region 4                  8        0    2    6    0          8          5            2          1          0              0          0          0 1 Unit Sites              9        0    1    8    0          9          3            5          1          0              0          0          0 2 Unit Sites              11        0    4    5    0          11          6            4          1          0              0          0          0 3 Unit Sites              1        0    1    0    0          1          0            1          0          0              0          0          0 BWR                        7        0    2    4    0          7          2            5          0          0              0          0          0 PWR                      14        0    4    9    0          14          7            5          2          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        21        0    6  13    0          21          9          10          2          0              0          0          0 Percentage of All    100%        0% 29%  62%    0%      100%          43%        48%        10%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                      Page 2 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.01 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  6.1        4.5        2.2          4.3        Region 1                  6.1        4.5        2.2          4.3 Region 2                  0.0        3.1        3.9          2.5        Region 2                  0.0        3.1        3.9          2.5 Region 3                  2.1        2.3        0.0          1.6        Region 3                  2.1        2.3        0.0          1.6 Region 4                  11.5        0.0        2.1          4.1        Region 4                  11.5        0.0        2.1          4.1 1 Unit Sites              4.2        4.1        2.6          3.6        1 Unit Sites              4.2        4.1        2.6          3.6 2 Unit Sites              4.4        1.8        1.8          2.7        2 Unit Sites              4.4        1.8        1.8          2.7 3 Unit Sites              0.0        0.0        5.7          3.2        3 Unit Sites              0.0        0.0        5.7          3.2 BWR                        4.4        2.6        1.3          2.7        BWR                        4.4        2.6        1.3          2.7 PWR                        4.0        2.7        3.0          3.2        PWR                        4.0        2.7        3.0          3.2 Total All Regions          4.2        2.6        2.4          3.0        Total All Regions          4.2        2.6        2.4          3.0 71111.01 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 3 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            490      91          5.4        5.4    441          91          5.4        4.8      461        91        5.4          5.1 Region 2            615      92          5.1        6.7    648        101          5.6        6.4      775        94        5.2          8.2 Region 3            472      76          4.8        6.2    437          78          4.9        5.6      367        68        4.3          5.4 Region 4            347      60          4.6        5.8    375          56          4.3        6.7      487        54        4.2          9.0 1 Unit Sites        420      78          4.9        5.4    455          80          5.0        5.7      482        78        4.9          6.2 2 Unit Sites      1287      206          5.3        6.2    1233        208          5.3        5.9    1314      191        4.9          6.9 3 Unit Sites        216      35          4.4        6.2    213          38          4.8        5.6      296        38        4.8          7.8 BWR                680      120          5.0        5.7    775        126          5.3        6.1      746      114        4.8          6.5 PWR                1243      199          5.2        6.2    1126        200          5.3        5.6    1345      193        5.1          7.0 Total All          1923      319          5.2        6.0    1900        326          5.3        5.8    2091      307        5.0          6.8 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 4 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1392    273        5.6        5.1 Region 2          2038    287        5.5        7.1 Region 3          1276    222        4.8        5.7 Region 4          1209    170        4.6        7.1 1 Unit Sites      1356    236        5.1        5.7 2 Unit Sites      3834    605        5.3        6.3 3 Unit Sites        725    111        5.0        6.5 BWR                2200    360        5.1        6.1 PWR                3714    592        5.2        6.3 Total All          5914    952        5.2        6.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 5 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04 Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total AV Green                                  0    1          0              1 FIN Green                                  2    0          0              2 NCV Green                                  7    6          7            20 NOV N/A                                    1    0          0              1 Total                                    10    7          7            24 9/11/2018 2:22:01 PM                                                                  Page 6 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  4        0    1    3    0          3          1            3          0          0              0          0          0 Region 2                  3        0    1    1    0          2          0            3          0          0              0          0          0 Region 3                  3        0    2    1    0          2          0            2          1          0              0          0          0 Region 4                  14        0    2    6    0          13          0          11          2          0              0          0          0 1 Unit Sites              14        0    5    5    0          12          1          11          1          0              0          0          0 2 Unit Sites              9        0    1    6    0          7          0            7          2          0              0          0          0 3 Unit Sites              1        0    0    0    0          1          0            1          0          0              0          0          0 BWR                      13        0    5    4    0          11          1          10          1          0              0          0          0 PWR                      11        0    1    7    0          9          0            9          2          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        24        0    6  11    0          20          1          19          3          0              0          0          0 Percentage of All    100%        0% 25%  46%    0%        83%          4%        79%        13%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                      Page 7 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  3.6        0.0        1.2          1.6        Region 1                  2.4        0.0        1.2          1.2 Region 2                  1.1        2.1        1.0          1.4        Region 2                  1.1        1.1        1.0          1.1 Region 3                  1.3        2.8        0.0          1.4        Region 3                  1.3        1.4        0.0          0.9 Region 4                  8.2        3.8        6.8          6.2        Region 4                  6.3        2.5        6.8          5.1 1 Unit Sites              6.0        3.0        1.5          3.5        1 Unit Sites              4.0        2.3        1.5          2.6 2 Unit Sites              1.2        1.1        2.8          1.7        2 Unit Sites              1.2        0.0        2.8          1.3 3 Unit Sites              5.9        5.1        0.0          3.4        3 Unit Sites              5.9        5.1        0.0          3.4 BWR                        5.9        3.1        1.5          3.6        BWR                        4.0        2.4        1.5          2.6 PWR                        1.6        1.5        2.5          1.9        PWR                        1.6        0.5        2.5          1.5 Total All Regions          3.4        2.1        2.1          2.5        Total All Regions          2.6        1.2        2.1          2.0 71111.04 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 8 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            830      233        13.7        3.6    817        232        13.6        3.5      842      231        13.6          3.6 Region 2            896      234        13.0        3.8    952        227        12.6        4.2    1001      246        13.7          4.1 Region 3            757      195        12.2        3.9    723        199        12.4        3.6      740      188        11.8          3.9 Region 4            636      149        11.5        4.3    785        161        12.4        4.9      733      157        12.1          4.7 1 Unit Sites        732      199        12.4        3.7    829        207        12.9        4.0      849      197        12.3          4.3 2 Unit Sites      2020      510        13.1        4.0    2044        506        13.0        4.0    2030      519        13.3          3.9 3 Unit Sites        367      102        12.8        3.6    403        106        13.3        3.8      437      106        13.3          4.1 BWR                1263      313        13.0        4.0    1272        321        13.4        4.0    1294      308        12.8          4.2 PWR                1857      498        13.1        3.7    2004        498        13.1        4.0    2022      514        13.5          3.9 Total All          3119      811        13.3        3.8    3276        819        13.4        4.0    3316      822        13.5          4.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 9 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          2488    696        14.2        3.6 Region 2          2849    707        13.6        4.0 Region 3          2220    582        12.7        3.8 Region 4          2154    467        12.6        4.6 1 Unit Sites      2410    603        13.1        4.0 2 Unit Sites      6094    1535        13.3        4.0 3 Unit Sites      1207    314        14.3        3.8 BWR                3828    942        13.3        4.1 PWR                5883    1510        13.4        3.9 Total All          9711    2452        13.4        4.0 Regions 9/11/2018 2:22:01 PM                                                                      Page 10 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04S Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2017  3 Year Total FIN Green                                  0    1            1 NCV Green                                  2    5            7 Total                                      2    6            8 9/11/2018 2:22:01 PM                                                                    Page 11 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04S PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  3        0    1    2    0          2          0            2          1          0              0          0          0 Region 2                  2        0    1    1    0          2          0            2          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  3        0    0    2    0          2          0            3          0          0              0          0          0 1 Unit Sites              2        0    0    2    0          1          0            2          0          0              0          0          0 2 Unit Sites              5        0    2    2    0          4          0            4          1          0              0          0          0 3 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 BWR                      5        0    0    5    0          3          0            5          0          0              0          0          0 PWR                      3        0    2    0    0          3          0            2          1          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        8        0    2    5    0          6          0            7          1          0              0          0          0 Percentage of All    100%        0% 25%  63%    0%        75%          0%        88%        13%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 12 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.04S Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        7.8          2.7        Region 1                  0.0        0.0        5.2          1.8 Region 2                  3.0        0.0        2.8          2.1        Region 2                  3.0        0.0        2.8          2.1 Region 3                  2.5        0.0        0.0          0.9        Region 3                  2.5        0.0        0.0          0.9 Region 4                  3.1        0.0        5.3          3.1        Region 4                  0.0        0.0        5.3          2.1 1 Unit Sites              1.8        0.0        1.6          1.2        1 Unit Sites              0.0        0.0        1.6          0.6 2 Unit Sites              1.3        0.0        6.1          2.6        2 Unit Sites              1.3        0.0        4.9          2.2 3 Unit Sites              15.4        0.0        0.0          6.3        3 Unit Sites              15.4        0.0        0.0          6.3 BWR                        3.6        0.0        5.6          3.1        BWR                        1.8        0.0        3.7          1.9 PWR                        1.2        0.0        3.1          1.6        PWR                        1.2        0.0        3.1          1.6 Total All Regions          2.1        0.0        4.0          2.2        Total All Regions          1.4        0.0        3.3          1.7 71111.04S Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 13 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            383      36          2.1        10.6    356          34          2.0        10.5    386        36        2.1        10.7 Region 2            329      35          1.9        9.4    257          36          2.1        7.1    363        34        1.9        10.7 Region 3            394      30          1.9        13.1    334          30          1.9        11.1    376        31        1.9        12.1 Region 4            318      25          1.9        12.7    272          24          1.8        11.3    378        24        1.8        15.8 1 Unit Sites        353      30          1.9        11.8    308          30          1.9        10.3    419        30        1.9        14.0 2 Unit Sites        852      79          2.0        10.8    777          78          2.0        10.0    913        78        2.0        11.7 3 Unit Sites        219      17          2.1        12.9    133          16          2.3        8.3    173        17        2.1        10.1 BWR                556      47          2.0        11.8    501          48          2.0        10.4    534        48        2.0        11.1 PWR                868      79          2.1        11.0    717          76          2.1        9.4    970        77        2.0        12.6 Total All          1424      126          2.1        11.3    1218        124          2.1        9.8    1504      125        2.0        12.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 14 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1125    106        2.2        10.6 Region 2            949    105        2.1        9.0 Region 3          1104      91        2.0        12.1 Region 4            968      73        2.0        13.3 1 Unit Sites      1079      90        2.0        12.0 2 Unit Sites      2542    235        2.0        10.8 3 Unit Sites        525      50        2.4        10.5 BWR                1591    143        2.0        11.1 PWR                2555    232        2.1        11.0 Total All          4146    375        2.1        11.1 Regions 9/11/2018 2:22:01 PM                                                                      Page 15 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05A Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total NCV Green                                  2    1          3              6 Total                                      2    1          3              6 9/11/2018 2:22:01 PM                                                                  Page 16 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05A PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  2        0    2    0    0          2          0            2          0          0              0          0          0 Region 2                  2        0    0    2    0          2          0            2          0          0              0          0          0 Region 3                  2        0    0    2    0          2          1            1          0          0              0          0          0 Region 4                  0        0    0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 2 Unit Sites              5        0    2    3    0          5          1            4          0          0              0          0          0 3 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 BWR                      2        0    1    1    0          2          0            2          0          0              0          0          0 PWR                      4        0    1    3    0          4          1            3          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        6        0    2    4    0          6          1            5          0          0              0          0          0 Percentage of All    100%        0% 33%  67%    0%      100%          17%        83%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 17 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05A Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  0.0        0.0      21.2          7.2        Region 1                  0.0        0.0        21.2          7.2 Region 2                  11.2        0.0      10.1          6.9        Region 2                  11.2        0.0        10.1          6.9 Region 3                  14.1      11.0      13.5          12.7        Region 3                  14.1        11.0        0.0          8.5 Region 4                  0.0        0.0        0.0          0.0        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              0.0        0.0        7.8          2.7        1 Unit Sites              0.0        0.0        0.0          0.0 2 Unit Sites              9.4        5.3      10.2          8.4        2 Unit Sites              9.4        5.3        10.2          8.4 3 Unit Sites              0.0        0.0      80.0          31.3        3 Unit Sites              0.0        0.0        80.0        31.3 BWR                        0.0        0.0      21.9          6.3        BWR                        0.0        0.0        21.9          6.3 PWR                        9.3        4.6        8.2          7.3        PWR                        9.3        4.6        4.1          5.9 Total All Regions          6.2        3.0      11.9          7.0        Total All Regions          6.2        3.0        8.9          6.0 71111.05A Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 18 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            103      18          1.1        5.7      81        17          1.1        4.8        95      19          1.2          5.0 Region 2            89      21          1.2        4.2    103          23          1.4        4.5        99      19          1.1          5.2 Region 3            71      16          1.1        4.4      91        16          1.0        5.7        74      16          1.0          4.6 Region 4            61      14          1.1        4.3      62        13          1.0        4.8        69      12          0.9          5.7 1 Unit Sites        67      17          1.1        3.9      72        15          1.0        4.8        78      16          1.0          4.9 2 Unit Sites        222      43          1.1        5.2    236          46          1.2        5.1      214        42          1.1          5.1 3 Unit Sites        35        9          1.3        3.9      29          8          1.1        3.6        44        8          1.0          5.5 BWR                108      26          1.2        4.1    117          24          1.1        4.9        91      25          1.1          3.7 PWR                216      43          1.1        5.0    220          45          1.2        4.9      245        41          1.1          6.0 Total All          323      69          1.2        4.7    337          69          1.2        4.9      337        66          1.1          5.1 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 19 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            278      54        1.2        5.2 Region 2            291      63        1.3        4.6 Region 3            236      48        1.1        4.9 Region 4            192      39        1.1        4.9 1 Unit Sites        216      48        1.1        4.5 2 Unit Sites        672    131        1.2        5.1 3 Unit Sites        108      25        1.3        4.3 BWR                316      75        1.1        4.2 PWR                681    129        1.2        5.3 Total All          996    204        1.2        4.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 20 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05Q Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total AV Pending                                0    2          0              2 FIN Green                                  0    0          1              1 NCV Green                                17    14        10            41 NCVIV Green                                0    2          0              2 VIO N/A                                    2    0          0              2 Total                                    19    18        11            48 9/11/2018 2:22:01 PM                                                                  Page 21 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05Q PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  5        0    1    4    0          5          2          3          0          0              0          0          0 Region 2                  22        2    4  12    0          19          6          14          0          0              0          0          0 Region 3                  16        0    3  11    0          13          5          11          0          0              0          0          0 Region 4                  5        0    1    4    0          5          1          4          0          0              0          0          0 1 Unit Sites              12        0    3    8    0          11          2          10          0          0              0          0          0 2 Unit Sites              35        2    6  22    0          30          11          22          0          0              0          0          0 3 Unit Sites              1        0    0    1    0          1          1          0          0          0              0          0          0 BWR                      14        0    3    9    0          13          4          10          0          0              0          0          0 PWR                      34        2    6  22    0          29          10          22          0          0              0          0          0 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        48        2    9  31    0          42          14          32          0          0              0          0          0 Percentage of All    100%        4% 19%  65%    0%        88%          29%        67%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 22 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05Q Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  5.4        3.5        0.0          3.0        Region 1                  5.4        3.5        0.0          3.0 Region 2                  8.1      16.7      13.0          12.8        Region 2                  6.5        13.9        9.9        10.3 Region 3                  13.7        9.7        7.1          10.1        Region 3                  11.8        7.8        5.3          8.2 Region 4                  5.7        3.5        2.1          3.8        Region 4                  5.7        3.5        2.1          3.8 1 Unit Sites              8.0        6.7        2.2          5.6        1 Unit Sites              6.9        6.7        2.2          5.2 2 Unit Sites              9.2      11.2        9.4          10.0        2 Unit Sites              8.3        8.8        6.9          8.0 3 Unit Sites              0.0        4.2        0.0          1.9        3 Unit Sites              0.0        4.2        0.0          1.9 BWR                        8.7        4.6        3.4          5.5        BWR                        7.5        4.6        2.3          4.7 PWR                        7.8      11.2        7.4          8.9        PWR                        7.1        9.3        5.9          7.5 Total All Regions          8.1        8.8        5.8          7.6        Total All Regions          7.2        7.6        4.5          6.5 71111.05Q Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 23 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            560      339        19.9        1.7    571        325        19.1        1.8      557      334        19.6          1.7 Region 2            620      365        20.3        1.7    719        358        19.9        2.0      607      324        18.0          1.9 Region 3            510      284        17.8        1.8    515        296        18.5        1.7      567      292        18.3          1.9 Region 4            524      218        16.8        2.4    570        220        16.9        2.6      484      223        17.2          2.2 1 Unit Sites        541      292        18.3        1.9    511        296        18.5        1.7      575      296        18.5          1.9 2 Unit Sites      1368      770        19.7        1.8    1462        755        19.4        1.9    1359      733        18.8          1.9 3 Unit Sites        305      144        18.0        2.1    401        148        18.5        2.7      280      144        18.0          1.9 BWR                801      446        18.6        1.8    862        453        18.9        1.9      865      450        18.8          1.9 PWR                1413      760        20.0        1.9    1512        746        19.6        2.0    1349      723        19.0          1.9 Total All          2214    1206        19.8        1.8    2374        1199        19.7        2.0    2214    1173        19.2          1.9 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 24 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1688    998        20.4        1.7 Region 2          1945    1047        20.1        1.9 Region 3          1591    872        19.0        1.8 Region 4          1577    661        17.9        2.4 1 Unit Sites      1627    884        19.2        1.8 2 Unit Sites      4189    2258        19.6        1.9 3 Unit Sites        986    436        19.8        2.3 BWR                2528    1349        19.0        1.9 PWR                4274    2229        19.7        1.9 Total All          6802    3578        19.6        1.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 25 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05T Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total FIN Green                                  0    1          0              1 NCV Green                                24    12        18            54 NCVIV Green                                1    0          0              1 NCVIV N/A                                  1    0          1              2 Total                                    26    13        19            58 9/11/2018 2:22:01 PM                                                                  Page 26 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05T PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  10        0    1    4    0          10          0          10          0          0              0          0          0 Region 2                  15        0    1    3    0          15          1          12          0          0              0          0          0 Region 3                  15        0    0    6    0          15          1          13          0          0              0          0          1 Region 4                  18        0    2    3    0          18          1          17          0          0              0          0          0 1 Unit Sites              29        0    3  10    0          29          1          27          0          0              0          0          1 2 Unit Sites              26        0    1    6    0          26          1          23          0          0              0          0          0 3 Unit Sites              3        0    0    0    0          3          1            2          0          0              0          0          0 BWR                      26        0    2    6    0          26          1          25          0          0              0          0          0 PWR                      32        0    2  10    0          32          2          27          0          0              0          0          1 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        58        0    4  16    0          58          3          52          0          0              0          0          1 Percentage of All    100%        0%  7%  28%    0%      100%            5%        90%          0%          0%            0%        0%          2%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 27 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05T Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  1.9        1.9        2.3          2.1        Region 1                  1.9        1.6        1.2          1.5 Region 2                  3.9        4.2        1.7          3.7        Region 2                  4.4        3.0        1.7          3.6 Region 3                  4.4        3.8        3.8          4.0        Region 3                  3.4        3.8        3.8          3.7 Region 4                  5.0      10.7        5.0          5.5        Region 4                  5.2        7.1        4.7          5.2 1 Unit Sites              4.7        6.7        3.8          4.7        1 Unit Sites              4.2        6.8        3.0          4.0 2 Unit Sites              3.3        1.4        3.1          2.8        2 Unit Sites              3.3        1.4        2.6          2.5 3 Unit Sites              3.9      16.5        0.0          7.9        3 Unit Sites              3.9        16.5        0.0          6.3 BWR                        4.0        5.1        3.2          3.9        BWR                        2.7        4.2        3.0          3.2 PWR                        3.7        2.2        3.8          3.5        PWR                        4.0        2.2        2.5          3.1 Total All Regions          3.8        3.6        3.5          3.6        Total All Regions          3.6        3.0        2.8          3.2 71111.05T Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 28 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1559      60          8.6        26.0    1258          60        12.0        21.0    1709        98        14.0        17.4 Region 2          1811      51          7.3        35.5    658          0          0.0        0.0    596        23        4.6        25.9 Region 3            885      16          3.2        55.3    783          18          3.0        43.5    1302        28        4.7        46.5 Region 4            765      28          7.0        27.3    280          8          4.0        35.0    1073        48        9.6        22.4 1 Unit Sites        971      30          6.0        32.4    144          6          3.0        23.9    1334        54        7.7        24.7 2 Unit Sites      3535      111          7.9        31.8    2050          42          3.8        48.8    2632      113        9.4        23.3 3 Unit Sites        515      14          4.7        36.8    786          38          9.5        20.7    714        30        10.0        23.8 BWR                1486      55          7.9        27.0    1184          30          5.0        39.5    2311        84        8.4        27.5 PWR                3534      100          7.1        35.3    1795          56          5.6        32.1    2369      113        10.3        21.0 Total All          5020      155          7.8        32.4    2979          86          5.7        34.6    4680      197        9.9        23.8 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 29 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          4526    218        12.8        20.8 Region 2          3065      74        4.9        41.4 Region 3          2971      62        4.1        47.9 Region 4          2118      84        9.3        25.2 1 Unit Sites      2449      90        7.5        27.2 2 Unit Sites      8216    266        7.6        30.9 3 Unit Sites      2014      82      10.3        24.6 BWR                4981    169        7.7        29.5 PWR                7699    269        7.9        28.6 Total All        12679    438        8.0        28.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 30 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05XT Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total NCV Green                                  5    6          1            12 NOV N/A                                    0    3          0              3 Total                                      5    9          1            15 9/11/2018 2:22:01 PM                                                                  Page 31 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05XT PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  5        0    1    2    0          5          1            2          0          0              0          0          0 Region 3                  3        0    0    1    0          3          0            3          0          0              0          0          0 Region 4                  4        0    0    1    0          4          0            3          0          0              0          0          0 1 Unit Sites              2        0    0    1    0          2          0            2          0          0              0          0          0 2 Unit Sites              9        0    1    2    0          9          1            5          0          0              0          0          0 3 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 BWR                        2        0    1    0    0          2          0            2          0          0              0          0          0 PWR                      10        0    0    4    0          10          1            6          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        12        0    1    4    0          12          1            8          0          0              0          0          0 Percentage of All    100%        0%  8%  33%    0%      100%            8%        67%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 32 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.05XT Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        4.1        1.3          3.0        Region 2                  0.0        3.8        1.3          2.7 Region 3                  5.7        3.4        0.0          4.7        Region 3                  5.7        3.4        0.0          4.7 Region 4                  0.0        4.4        0.0          3.7        Region 4                  0.0        2.8        0.0          2.3 1 Unit Sites              3.2        3.1        0.0          2.6        1 Unit Sites              3.2        1.6        0.0          2.0 2 Unit Sites              0.0        4.0        1.9          3.4        2 Unit Sites              0.0        3.3        1.9          2.8 3 Unit Sites              0.0        4.2        0.0          4.2        3 Unit Sites              0.0        4.2        0.0          4.2 BWR                        2.8        3.9        3.6          3.5        BWR                        2.8        1.9        3.6          2.6 PWR                        2.7        3.9        0.0          3.2        PWR                        2.7        3.3        0.0          2.7 Total All Regions          2.7        3.9        1.3          3.3        Total All Regions          2.7        3.0        1.3          2.7 71111.05XT Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 33 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            110        5          2.5        22.0    229          12          6.0        19.0        0        0          0.0          0.0 Region 2              0        0          0.0        0.0    1050          30          5.0        35.0    780        16          4.0        48.7 Region 3            348      15          5.0        23.2    296          9          3.0        32.9        0        0          0.0          0.0 Region 4            274      10          5.0        27.4    1060          36          9.0        29.4        0        0          0.0          0.0 1 Unit Sites        622      25          6.3        24.9    643          20          6.7        32.1    257        4          2.0        64.2 2 Unit Sites        110        6          3.0        18.3    1520          53          6.6        28.7    523        12          4.0        43.6 3 Unit Sites          0        0          0.0        0.0    472          14          4.7        33.7        0        0          0.0          0.0 BWR                362      13          4.3        27.8    514          16          5.3        32.1    279        8          4.0        34.9 PWR                370      18          6.0        20.5    2121          71          7.1        29.9    501        8          2.7        62.6 Total All          731      31          6.2        23.6    2634          87          7.3        30.3    780        16          4.0        48.7 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 34 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            338      17        5.7        19.9 Region 2          1830      47        5.2        38.9 Region 3            644      24        4.8        26.8 Region 4          1333      46        9.2        29.0 1 Unit Sites      1521      49        7.0        31.0 2 Unit Sites      2153      71        6.5        30.3 3 Unit Sites        472      14        4.7        33.7 BWR                1155      37        5.3        31.2 PWR                2991      97        6.5        30.8 Total All          4145    134        6.4        30.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 35 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.06 Revision History Date of Revision      Description of Revision 11/25/2015            IP 71111.06, "Flood Protection Measures," has been revised to address feedback forms 71111.06-1768 and 71111.06-1863, and expand on guidance related to inspection of cable routing areas susceptible to flooding or where cables may be exposed to moisture form condensation or wetting.
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                    5                1                  0                6 NCV Green                                    4                6                  3              13 Total                                        9                7                  3              19 9/11/2018 2:22:01 PM                                                                                                                                        Page 36 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.06 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  4        0    1    1    0          4          0            4          0          0              0          0          0 Region 2                  6        0    0    4    0          5          0            6          0          0              0          0          0 Region 3                  5        0    1    4    0          4          0            5          0          0              0          0          0 Region 4                  4        0    1    2    0          4          0            3          1          0              0          0          0 1 Unit Sites              10        0    2    7    0          9          0            9          1          0              0          0          0 2 Unit Sites              8        0    1    4    0          7          0            8          0          0              0          0          0 3 Unit Sites              1        0    0    0    0          1          0            1          0          0              0          0          0 BWR                        7        0    1    5    0          7          0            7          0          0              0          0          0 PWR                      12        0    2    6    0          10          0          11          1          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        19        0    3  11    0          17          0          18          1          0              0          0          0 Percentage of All    100%        0% 16%  58%    0%        89%          0%        95%          5%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 37 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.06 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  10.1        3.5        0.0          4.8        Region 1                  10.1        3.5        0.0          4.8 Region 2                  9.1        3.6        6.3          6.5        Region 2                  6.1        3.6        6.3          5.4 Region 3                  3.9      11.3        0.0          5.7        Region 3                  3.9        6.3        0.0          3.5 Region 4                  7.2        4.1        3.5          4.9        Region 4                  7.2        4.1        3.5          4.9 1 Unit Sites              13.4        5.5        2.1          6.8        1 Unit Sites              11.1        3.9        2.1          5.6 2 Unit Sites              4.6        7.0        1.7          4.5        2 Unit Sites              4.6        5.2        1.7          3.9 3 Unit Sites              0.0        0.0      14.2          5.8        3 Unit Sites              0.0        0.0        14.2          5.8 BWR                        6.9        6.3        2.3          5.2        BWR                        6.9        4.5        2.3          4.6 PWR                        8.3        5.9        2.9          5.7        PWR                        6.9        4.4        2.9          4.8 Total All Regions          7.8        6.1        2.7          5.5        Total All Regions          6.9        4.5        2.7          4.7 71111.06 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 38 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            298      52          3.1        5.7    283          45          2.6        6.3      249        45        2.6          5.5 Region 2            328      52          2.9        6.3    276          54          3.0        5.1      320        53        2.9          6.0 Region 3            257      46          2.9        5.6    318          39          2.4        8.2      270        41        2.6          6.6 Region 4            278      42          3.2        6.6    243          32          2.5        7.6      289        37        2.8          7.8 1 Unit Sites        227      47          2.9        4.8    353          41          2.6        8.6      326        43        2.7          7.6 2 Unit Sites        773      121          3.1        6.4    660        108          2.8        6.1      647      109        2.8          5.9 3 Unit Sites        161      24          3.0        6.7    108          21          2.6        5.2      155        24        3.0          6.5 BWR                436      71          3.0        6.1    440          64          2.7        6.9      442        65        2.7          6.8 PWR                725      121          3.2        6.0    680        106          2.8        6.4      685      111        2.9          6.2 Total All          1161      192          3.1        6.0    1120        170          2.8        6.6    1128      176        2.9          6.4 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 39 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            831    142        2.9        5.8 Region 2            924    159        3.1        5.8 Region 3            845    126        2.7        6.7 Region 4            809    111        3.0        7.3 1 Unit Sites        905    131        2.8        6.9 2 Unit Sites      2079    338        2.9        6.2 3 Unit Sites        425      69        3.1        6.2 BWR                1318    200        2.8        6.6 PWR                2090    338        3.0        6.2 Total All          3408    538        2.9        6.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 40 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07A Revision History Date of Revision      Description of Revision 12/08/2016            IP 71111.07, "Heat Sink Performance," has been revised to incorporate aging management programs per ROP Feedback Form 71111.07-2059 (ADAMS ML16160A006). ROP Feedback Form 71111.07-2185 (ADAMS ML16160A008) was considered but rejected. Revised text to clarify inspection requirements versus guidance (should and shall), to address recommendations from OIG 16-A-12 audit.
Summary of PIM Findings 2015              2016            2017    3 Year Total NCV Green                                  2                  1              1                4 Total                                      2                  1              1                4 9/11/2018 2:22:01 PM                                                                                                                                    Page 41 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07A PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  2        0    0    1    0          2          0            1          1          0              0          0          0 Region 4                  2        0    0    1    0          2          0            2          0          0              0          0          0 1 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 2 Unit Sites              3        0    0    1    0          3          0            2          1          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      4        0    0    2    0          4          0            3          1          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        4        0    0    2    0          4          0            3          1          0              0          0          0 Percentage of All    100%        0%  0%  50%    0%      100%            0%        75%        25%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 42 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07A Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  16.0        0.0        0.0          6.4        Region 3                  8.0        0.0        0.0          3.2 Region 4                  0.0      10.0        6.7          6.2        Region 4                  0.0        10.0        6.7          6.2 1 Unit Sites              0.0        4.6        0.0          1.7        1 Unit Sites              0.0        4.6        0.0          1.7 2 Unit Sites              7.3        0.0        4.0          4.0        2 Unit Sites              3.7        0.0        4.0          2.7 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                        6.9        3.6        3.2          4.5        PWR                        3.4        3.6        3.2          3.4 Total All Regions          4.1        2.2        2.0          2.8        Total All Regions          2.1        2.2        2.0          2.1 71111.07A Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 43 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            161      34          2.0        4.7    136          30          1.8        4.5      132        32          1.9          4.1 Region 2            123      23          1.3        5.4    119          24          1.3        5.0      121        23          1.3          5.3 Region 3            125      18          1.1        6.9      97        16          1.1        6.1        91      17          1.1          5.4 Region 4            76      14          1.1        5.4    100          17          1.3        5.9      149        17          1.3          8.7 1 Unit Sites        123      22          1.4        5.6    127          22          1.4        5.8      117        21          1.3          5.6 2 Unit Sites        300      56          1.4        5.4    278          55          1.5        5.1      293        56          1.4          5.2 3 Unit Sites        63      11          1.4        5.7      47        10          1.3        4.7        82      12          1.5          6.8 BWR                195      34          1.4        5.7    175          32          1.3        5.5      175        36          1.5          4.9 PWR                291      55          1.4        5.3    277          55          1.5        5.0      317        53          1.4          6.0 Total All          485      89          1.5        5.5    452          87          1.5        5.2      492        89          1.5          5.5 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 44 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            428      96        2.0        4.5 Region 2            364      70        1.3        5.2 Region 3            313      51        1.2        6.1 Region 4            324      48        1.3        6.8 1 Unit Sites        366      65        1.4        5.6 2 Unit Sites        871    167        1.5        5.2 3 Unit Sites        192      33        1.5        5.8 BWR                545    102        1.4        5.3 PWR                884    163        1.5        5.4 Total All          1429    265        1.5        5.4 Regions 9/11/2018 2:22:01 PM                                                                      Page 45 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07T Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total NCV Green                                  2    2          2              6 NOV Green                                  0    0          1              1 Total                                      2    2          3              7 9/11/2018 2:22:01 PM                                                                  Page 46 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07T PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  5        0    1    2    0          5          0            5          0          0              0          0          0 Region 4                  2        0    0    2    0          2          0            2          0          0              0          0          0 1 Unit Sites              4        0    1    2    0          4          0            4          0          0              0          0          0 2 Unit Sites              3        0    0    2    0          3          0            3          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      5        0    0    3    0          5          0            5          0          0              0          0          0 PWR                      2        0    1    1    0          2          0            2          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        7        0    1    4    0          7          0            7          0          0              0          0          0 Percentage of All    100%        0% 14%  57%    0%      100%            0%        100%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 47 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.07T Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  4.0        0.0        0.0          1.6        Region 2                  4.0        0.0        0.0          1.6 Region 3                  3.2        3.0        4.9          3.7        Region 3                  2.0        3.0        4.9          3.3 Region 4                  0.0        5.7      11.4          6.7        Region 4                  0.0        5.7        5.7          4.4 1 Unit Sites              0.0        4.7        5.3          3.6        1 Unit Sites              0.0        4.7        5.3          3.6 2 Unit Sites              4.1        0.0        3.9          2.8        2 Unit Sites              3.4        0.0        1.9          1.8 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        3.2        5.8        3.0          3.9        BWR                        2.1        5.8        3.0          3.4 PWR                        2.0        0.0        5.4          2.4        PWR                        2.0        0.0        3.6          1.8 Total All Regions          2.7        2.1        4.5          3.0        Total All Regions          2.0        2.1        3.4          2.5 71111.07T Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 48 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            154      17          3.4        9.1    229          26          3.3        8.8    158        13          2.2        12.1 Region 2            249      32          4.6        7.8    227          25          3.6        9.1    146        20          4.0          7.3 Region 3            491      20          2.5        24.6    329          17          2.4        19.4    411        13          2.2        31.6 Region 4            99      14          2.8        7.0    176          19          3.2        9.3    176        14          2.8        12.5 1 Unit Sites        284      22          3.1        12.9    211          20          3.3        10.5    310        14          2.3        22.2 2 Unit Sites        463      46          3.8        10.1    680          61          3.4        11.1    501        40          3.1        12.5 3 Unit Sites        246      15          3.0        16.4      70          6          2.0        11.7      78        6          3.0        13.0 BWR                484      31          3.1        15.6    342          33          3.3        10.4    334        21          3.0        15.9 PWR                509      52          4.0        9.8    618          54          3.4        11.4    555        39          3.0        14.2 Total All          993      83          3.8        12.0    960          87          3.5        11.0    890        60          3.2        14.8 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 49 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            540      56        3.3        9.6 Region 2            622      77        4.5        8.1 Region 3          1231      50        2.6        24.6 Region 4            450      47        3.4        9.6 1 Unit Sites        805      56        3.3        14.4 2 Unit Sites      1644    147        3.6        11.2 3 Unit Sites        394      27        3.4        14.6 BWR                1160      85        3.3        13.6 PWR                1683    145        3.5        11.6 Total All          2843    230        3.5        12.4 Regions 9/11/2018 2:22:01 PM                                                                      Page 50 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08G Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total NCV Green                                  4    4          1              9 VIO N/A                                    0    1          0              1 Total                                      4    5          1            10 9/11/2018 2:22:01 PM                                                                  Page 51 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08G PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          0          0            0          1          0              0          0          0 Region 2                  2        1    0    1    0          2          1            0          0          0              0          0          0 Region 3                  7        0    2    5    0          7          3            3          1          0              0          0          0 Region 4                  0        0    0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              5        0    1    4    0          4          1            2          2          0              0          0          0 2 Unit Sites              5        1    1    3    0          5          3            1          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      10        1    2    7    0          9          4            3          2          0              0          0          0 PWR                        0        0    0    0    0          0          0            0          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        10        1    2    7    0          9          4            3          2          0              0          0          0 Percentage of All    100%      10%  20%  70%    0%        90%          40%        30%        20%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 52 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08G Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  3.2        0.0        3.8          2.4        Region 1                  0.0        0.0        3.8          1.2 Region 2                  0.0      26.9        0.0          11.5        Region 2                  0.0        26.9        0.0        11.5 Region 3                  12.3        7.2        3.4          7.3        Region 3                  12.3        4.2        3.4          6.4 Region 4                  0.0        0.0        0.0          0.0        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              5.9        6.2        3.5          5.4        1 Unit Sites              3.0        3.3        3.5          3.2 2 Unit Sites              5.7      12.3        2.4          6.4        2 Unit Sites              5.7        12.3        2.4          6.4 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        5.5        8.0        2.7          5.6        BWR                        4.1        7.2        2.7          4.6 Total All Regions          5.5        8.0        2.7          5.6        Total All Regions          4.1        7.2        2.7          4.6 71111.08G Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 53 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            316        6          0.9        52.6    239          5          0.7        47.8    266        9          1.3        29.5 Region 2            102        3          0.8        34.0    149          3          0.8        49.5      96        3          0.8        32.0 Region 3            244        7          1.0        34.8    236          5          0.8        47.1    298        7          0.9        42.5 Region 4            62        2          0.7        31.0      75          2          0.7        37.3      75        2          0.7        37.5 1 Unit Sites        101        3          1.0        33.6    174          3          0.6        57.8    145        5          1.0        29.1 2 Unit Sites        507      12          0.9        42.3    380          9          0.9        42.2    451        11          0.9        41.0 3 Unit Sites        116        3          0.8        38.5    144          3          0.8        48.0    138        5          1.3        27.6 BWR                723      18          1.0        40.2    697          15          0.9        46.5    734        21          1.1        35.0 PWR                  0        0          0.0        0.0        0          0          0.0        0.0        0        0          0.0          0.0 Total All          723      18          1.0        40.2    697          15          0.9        46.5    734        21          1.1        35.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 54 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            820      20        1.1        41.0 Region 2            347        9        0.9        38.5 Region 3            777      19        1.0        40.9 Region 4            212        6        0.9        35.3 1 Unit Sites        420      11        1.0        38.1 2 Unit Sites      1338      32        1.0        41.8 3 Unit Sites        397      11        1.1        36.1 BWR                2155      54        1.0        39.9 PWR                  0        0        0.0        0.0 Total All          2155      54        1.0        39.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 55 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08P Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total FIN Green                                  3    0          0              3 NCV Green                                15    3          6            24 NCVIV Green                                1    0          0              1 Total                                    19    3          6            28 9/11/2018 2:22:01 PM                                                                  Page 56 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08P PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    1    0    0          1          0            0          1          0              0          0          0 Region 2                  5        0    2    0    0          5          0            0          5          0              0          0          0 Region 3                  7        0    0    6    0          7          3            3          1          0              0          0          0 Region 4                  9        0    2    5    0          7          4            5          0          0              0          0          0 1 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 2 Unit Sites              20        0    5  10    0          18          7            7          6          0              0          0          0 3 Unit Sites              1        0    0    0    0          1          0            0          1          0              0          0          0 BWR                        0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      22        0    5  11    0          20          7            8          7          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        22        0    5  11    0          20          7            8          7          0              0          0          0 Percentage of All    100%        0% 23%  50%    0%        91%          32%        36%        32%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 57 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.08P Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        6.7        1.6          2.4        Region 1                  0.0        4.5        1.6          1.8 Region 2                  1.9        2.0        1.1          1.7        Region 2                  1.9        2.0        1.1          1.7 Region 3                  9.9        3.2        0.0          4.0        Region 3                  9.4        3.2        0.0          3.6 Region 4                  6.3        0.0        5.7          4.2        Region 4                  3.8        0.0        5.7          3.3 1 Unit Sites              2.8        0.0        0.0          1.2        1 Unit Sites              2.8        0.0        0.0          1.2 2 Unit Sites              5.1        3.1        2.7          3.7        2 Unit Sites              3.9        2.6        2.7          3.1 3 Unit Sites              0.0        2.9        0.0          1.3        3 Unit Sites              0.0        2.9        0.0          1.3 PWR                        4.3        2.6        2.0          3.0        PWR                        3.4        2.2        2.0          2.5 Total All Regions          4.3        2.6        2.0          3.0        Total All Regions          3.4        2.2        2.0          2.5 71111.08P Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 58 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            589      10          1.1        58.9    445          6          1.0        74.1    625        11          1.2        56.8 Region 2          1063      17          1.1        62.5    983          12          1.0        81.9    881        18          1.3        48.9 Region 3            534        7          1.0        76.2    624          7          1.0        89.2    771        9          1.3        85.7 Region 4            794      11          1.4        72.1    656          9          1.3        72.8    700        10          1.3        70.0 1 Unit Sites        442        6          0.9        73.7    304          4          1.0        75.9    456        7          1.0        65.1 2 Unit Sites      2219      33          1.3        67.2    1812          24          1.1        75.5    2098        34          1.4        61.7 3 Unit Sites        318        6          1.2        52.9    592          6          1.2        98.7    422        7          1.4        60.2 BWR                  0        0          0.0        0.0        0          0          0.0        0.0        0        0          0.0          0.0 PWR                2979      45          1.3        66.2    2708          34          1.2        79.6    2976        48          1.4        62.0 Total All          2979      45          1.3        66.2    2708          34          1.2        79.6    2976        48          1.4        62.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 59 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1658      27        1.2        61.4 Region 2          2926      47        1.2        62.3 Region 3          1929      23        1.2        83.9 Region 4          2149      30        1.4        71.6 1 Unit Sites      1202      17        1.1        70.7 2 Unit Sites      6129      91        1.3        67.3 3 Unit Sites      1331      19        1.5        70.1 BWR                  0        0        0.0        0.0 PWR                8662    127        1.3        68.2 Total All          8662    127        1.3        68.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 60 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11A Revision History Date of Revision      Description of Revision Summary of PIM Findings 2016  3 Year Total FIN Green                                  1            1 NCV Green                                  1            1 Total                                      2            2 9/11/2018 2:22:01 PM                                                                          Page 61 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11A PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          0          0            1          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  1        0    0    0    0          1          0            1          0          0              0          0          0 1 Unit Sites              1        0    0    0    0          1          0            1          0          0              0          0          0 2 Unit Sites              1        0    0    1    0          0          0            1          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      1        0    0    1    0          0          0            1          0          0              0          0          0 PWR                      1        0    0    0    0          1          0            1          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        2        0    0    1    0          1          0            2          0          0              0          0          0 Percentage of All    100%        0%  0%  50%    0%        50%          0%        100%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 62 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11A Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0      71.4        0.0          19.2        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0    111.1        0.0          43.5        Region 4                  0.0      111.1        0.0        43.5 1 Unit Sites              0.0      62.5        0.0          13.3        1 Unit Sites              0.0        62.5        0.0        13.3 2 Unit Sites              0.0      40.8        0.0          14.4        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0      43.5        0.0          18.8        BWR                        0.0        0.0        0.0          0.0 PWR                        0.0      55.6        0.0          9.6        PWR                        0.0        55.6        0.0          9.6 Total All Regions          0.0      48.8        0.0          12.7        Total All Regions          0.0        24.4        0.0          6.3 71111.11A Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 63 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1              1        9          4.5        0.1      14        14          1.3        1.0        37      20          4.0          1.9 Region 2            17      17          1.2        1.0        9        18          1.6        0.5        24      16          0.9          1.5 Region 3            17      15          1.7        1.1        9        15          1.9        0.6        6      15          1.9          0.4 Region 4              9        6          1.5        1.5        9          8          1.1        1.1        5        6          1.2          0.8 1 Unit Sites          8      11          2.2        0.7        6        12          1.7        0.5        8      13          1.6          0.6 2 Unit Sites        26      30          1.7        0.9      34        37          1.4        0.9        63      35          1.5          1.8 3 Unit Sites        11        6          1.2        1.9        2          6          2.0        0.3        2        9          3.0          0.3 BWR                  18      16          1.6        1.1      23        20          1.3        1.2        13      22          1.8          0.6 PWR                  27      31          1.8        0.9      18        35          1.8        0.5        60      35          1.6          1.7 Total All            44      47          1.8        0.9      41        55          1.6        0.7        72      57          1.7          1.3 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 64 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            52      43        2.7        1.2 Region 2            51      51        1.2        1.0 Region 3            32      45        2.0        0.7 Region 4            23      20        1.4        1.2 1 Unit Sites        21      36        2.0        0.6 2 Unit Sites        122    102        1.5        1.2 3 Unit Sites        15      21        2.3        0.7 BWR                  53      58        1.6        0.9 PWR                104    101        1.8        1.0 Total All          158    159        1.7        1.0 Regions 9/11/2018 2:22:01 PM                                                                      Page 65 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11B Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total FIN Green                                  7    0          0              7 NCV Green                                  0    2          3              5 NCVIV Green                                1    1          0              2 NCVIV N/A                                  0    0          1              1 NCVIV No Performance                      0    0          2              2 Deficiency Total                                      8    3          6            17 9/11/2018 2:22:01 PM                                                                  Page 66 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11B PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  3        0    0    3    0          2          0            3          0          0              0          0          0 Region 2                  7        0    0    4    0          7          0            6          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  6        0    0    3    0          5          0            6          0          0              0          0          0 1 Unit Sites              5        0    0    3    0          4          0            4          0          0              0          0          0 2 Unit Sites              10        0    0    6    0          9          0          10          0          0              0          0          0 3 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 BWR                        2        0    0    2    0          1          0            2          0          0              0          0          0 PWR                      14        0    0    8    0          13          0          13          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        16        0    0  10    0          14          0          15          0          0              0          0          0 Percentage of All    100%        0%  0%  63%    0%        88%          0%        94%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 67 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11B Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.9        1.7        1.0          1.1        Region 1                  0.0        1.7        1.0          0.8 Region 2                  3.6        1.0        4.2          2.8        Region 2                  3.1        1.0        4.2          2.6 Region 3                  0.0        0.0        1.2          0.5        Region 3                  0.0        0.0        0.0          0.0 Region 4                  4.3        1.9        2.4          2.9        Region 4                  2.9        1.9        1.4          2.0 1 Unit Sites              2.3        1.2        1.6          1.8        1 Unit Sites              1.5        1.2        1.6          1.5 2 Unit Sites              2.3        1.1        2.1          1.9        2 Unit Sites              1.5        1.1        1.1          1.2 3 Unit Sites              0.0        0.0        5.8          2.8        3 Unit Sites              0.0        0.0        5.8          2.8 BWR                        0.8        1.0        0.9          0.9        BWR                        0.0        1.0        0.0          0.3 PWR                        3.0        1.2        2.7          2.4        PWR                        2.2        1.2        2.4          2.0 Total All Regions          2.2        1.1        2.1          1.9        Total All Regions          1.4        1.1        1.5          1.4 71111.11B Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 68 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1086      14          0.9        77.6    591          7          0.9        84.4    958        15        1.1        63.9 Region 2            980      10          1.1        98.0    990          10          0.9        99.0    719        9        1.0        79.9 Region 3            693        8          0.6        86.7    563          6          0.9        93.8    852        21        2.1        40.6 Region 4            700        8          1.0        87.5    537          7          1.2        76.6    733        10        1.1        73.3 1 Unit Sites        877      10          0.8        87.7    459          6          1.0        76.5    875        19        1.7        46.1 2 Unit Sites      2268      25          1.0        90.7    1873          19          1.0        98.6    1976        32        1.3        61.8 3 Unit Sites        315        5          0.8        63.0    348          5          1.0        69.7    410        4        0.7      102.6 BWR                1236      14          0.9        88.3    1045          10          0.9      104.5    1156        27        1.8        42.8 PWR                2223      26          0.9        85.5    1636          20          1.1        81.8    2106        28        1.1        75.2 Total All          3459      40          1.0        86.5    2680          30          1.0        89.3    3262        55        1.4        59.3 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 69 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          2635      36        1.0        73.2 Region 2          2689      29        1.1        92.7 Region 3          2108      35        1.3        60.2 Region 4          1969      25        1.2        78.8 1 Unit Sites      2211      35        1.3        63.2 2 Unit Sites      6117      76        1.1        80.5 3 Unit Sites      1074      14        0.9        76.7 BWR                3437      51        1.3        67.4 PWR                5964      74        1.0        80.6 Total All          9401    125        1.1        75.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 70 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11Q Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016  3 Year Total NCV Green                                  2    3            5 Total                                      2    3            5 9/11/2018 2:22:01 PM                                                                    Page 71 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11Q PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          1          0            1          0          0              0          0          0 Region 2                  2        0    0    1    0          1          0            2          0          0              0          0          0 Region 3                  1        0    0    0    0          0          1            0          0          0              0          0          0 Region 4                  1        0    0    1    0          1          0            1          0          0              0          0          0 1 Unit Sites              3        0    0    2    0          2          1            2          0          0              0          0          0 2 Unit Sites              1        0    0    1    0          1          0            1          0          0              0          0          0 3 Unit Sites              1        0    0    0    0          0          0            1          0          0              0          0          0 BWR                      3        0    0    1    0          1          1            2          0          0              0          0          0 PWR                      2        0    0    2    0          2          0            2          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        5        0    0    3    0          3          1            4          0          0              0          0          0 Percentage of All    100%        0%  0%  60%    0%        60%          20%        80%          0%          0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 72 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.11Q Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        1.6        0.0          0.5        Region 1                  0.0        1.6        0.0          0.5 Region 2                  1.7        1.6        0.0          1.0        Region 2                  0.0        1.6        0.0          0.5 Region 3                  2.0        3.8        1.7          2.5        Region 3                  2.0        0.0        0.0          0.6 Region 4                  2.0        0.0        0.0          0.6        Region 4                  2.0        0.0        0.0          0.6 1 Unit Sites              2.5        3.5        1.1          2.3        1 Unit Sites              2.5        1.2        0.0          1.1 2 Unit Sites              0.0        0.8        0.0          0.2        2 Unit Sites              0.0        0.8        0.0          0.2 3 Unit Sites              10.1        0.0        0.0          3.1        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        3.6        1.1        1.1          1.8        BWR                        2.4        0.0        0.0          0.7 PWR                        0.0        2.1        0.0          0.7        PWR                        0.0        1.4        0.0          0.5 Total All Regions          1.4        1.7        0.4          1.1        Total All Regions          0.9        0.9        0.0          0.6 71111.11Q Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 73 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            636      156          9.2        4.1    637        155          9.1        4.1      638      154        9.1          4.1 Region 2            588      167          9.3        3.5    631        163          9.1        3.9      727      168        9.3          4.3 Region 3            494      124          7.8        4.0    532        123          7.7        4.3      601      128        8.0          4.7 Region 4            497      108          8.3        4.6    517        108          8.3        4.8      542      110        8.5          4.9 1 Unit Sites        508      129          8.1        3.9    540        132          8.3        4.1      574      132        8.3          4.3 2 Unit Sites      1398      349          8.9        4.0    1442        344          8.8        4.2    1604      356        9.1          4.5 3 Unit Sites        309      77          9.6        4.0    336          73          9.1        4.6      329        72        9.0          4.6 BWR                845      197          8.2        4.3    914        199          8.3        4.6      950      200        8.3          4.7 PWR                1371      358          9.4        3.8    1404        350          9.2        4.0    1557      360        9.5          4.3 Total All          2215      555          9.1        4.0    2318        549          9.0        4.2    2507      560        9.2          4.5 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 74 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1911    465        9.5        4.1 Region 2          1945    498        9.6        3.9 Region 3          1627    375        8.2        4.3 Region 4          1556    326        8.8        4.8 1 Unit Sites      1621    393        8.5        4.1 2 Unit Sites      4445    1049        9.1        4.2 3 Unit Sites        974    222        10.1        4.4 BWR                2708    596        8.4        4.5 PWR                4332    1068        9.5        4.1 Total All          7039    1664        9.1        4.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 75 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.12 Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total FIN Green                                  3    7          4            14 NCV Green                                38    32        18            88 NCVIV N/A                                  0    1          0              1 Total                                    41    40        22            103 9/11/2018 2:22:01 PM                                                                  Page 76 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.12 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  27        0  11  12    0          16          2          17          5          0              0          3          0 Region 2                  23        0    5  13    0          10          7          15          1          0              0          0          0 Region 3                  25        0    8  11    0          12          4          18          2          0              0          0          0 Region 4                  29        0    7  16    0          20          5          21          3          0              0          0          0 1 Unit Sites              47        0  14  21    0          26          7          31          5          0              0          3          0 2 Unit Sites              54        0  16  29    0          31          10          38          6          0              0          0          0 3 Unit Sites              3        0    1    2    0          1          1          2          0          0              0          0          0 BWR                      38        0  12  19    0          25          5          23          6          0              0          3          0 PWR                      66        0  19  33    0          33          13          48          5          0              0          0          0 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        104        0  31  52    0          58          18          71        11            0              0          3          0 Percentage of All    100%        0% 30%  50%    0%        56%          17%        68%        11%            0%            0%        3%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 77 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.12 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  8.1        9.6        5.3          7.7        Region 1                  4.1        5.4        3.1          4.2 Region 2                  9.3        6.9        1.5          5.9        Region 2                  3.1        3.9        0.8          2.6 Region 3                  9.8        7.5        5.7          7.7        Region 3                  4.9        3.6        1.6          3.4 Region 4                  8.9        8.0        7.2          8.0        Region 4                  6.3        6.2        4.5          5.7 1 Unit Sites              9.9        8.2        7.2          8.4        1 Unit Sites              4.8        4.3        3.1          4.1 2 Unit Sites              9.3        8.5        3.2          6.9        2 Unit Sites              4.6        5.3        2.1          4.0 3 Unit Sites              0.0        0.0        6.3          1.6        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        5.7        8.6        7.0          7.2        BWR                        3.4        5.1        3.8          4.1 PWR                      11.1        7.6        3.6          7.4        PWR                        5.1        4.4        1.6          3.7 Total All Regions          9.1        8.0        4.8          7.3        Total All Regions          4.5        4.7        2.4          3.9 71111.12 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 78 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1232      144          8.5        8.6    1299        146          8.6        8.9    1295      145        8.5          8.9 Region 2          1287      151          8.4        8.5    1298        153          8.5        8.5    1302      150        8.3          8.7 Region 3          1221      124          7.8        9.8    1393        133          8.3        10.5    1224      129        8.1          9.5 Region 4            952      98          7.5        9.7    1122        102          7.8        11.0    1106      100        7.7        11.1 1 Unit Sites      1161      127          7.9        9.1    1371        132          8.3        10.4    1247      127        7.9          9.8 2 Unit Sites      2950      328          8.4        9.0    3155        339          8.7        9.3    3216      335        8.6          9.6 3 Unit Sites        581      62          7.8        9.4    587          63          7.9        9.3    463        62        7.8          7.5 BWR                1761      195          8.1        9.0    1959        210          8.8        9.3    1833      200        8.3          9.2 PWR                2931      322          8.5        9.1    3153        324          8.5        9.7    3093      324        8.5          9.5 Total All          4692      517          8.5        9.1    5112        534          8.8        9.6    4926      524        8.6          9.4 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 79 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          3826    435        8.9        8.8 Region 2          3887    454        8.7        8.6 Region 3          3838    386        8.4        9.9 Region 4          3180    300        8.1        10.6 1 Unit Sites      3779    386        8.4        9.8 2 Unit Sites      9321    1002        8.7        9.3 3 Unit Sites      1631    187        8.5        8.7 BWR                5553    605        8.5        9.2 PWR                9177    970        8.6        9.5 Total All        14730    1575        8.6        9.4 Regions 9/11/2018 2:22:01 PM                                                                      Page 80 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.13 Revision History Date of Revision      Description of Revision 12/20/2017            IP 71111.13, Maintenance Risk Assessments and Emergent Work Control, has been revised to add inspection of RICT times and risk management actions.
These are a subset of maintenance activities and are included in the samples. This change includes information to facilitate inspection of RICT and PRA functionality. In addition, this revision streamlines IP formatting.
02/03/2016            IP 71111.13, "Maintenance Risk Assessments and Emergent Work Control," has been revised o update references to Revision 3 to RG 1.160 and Revision 4A to NUMARC 93-01, which were recently issued. IP 71111.13 has been revised to update references to the new revision numbers. Changes made in accordance with ROP Enhancement Project (see ML14017A381)
Summary of PIM Findings 2015                2016              2017      3 Year Total FIN Green                                      1                  0                2              3 NCV Green                                    18                  24              11              53 Total                                        19                  24              13              56 9/11/2018 2:22:01 PM                                                                                                                                                  Page 81 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.13 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  14        0    1  13    0          11          3          9          2          0              0          0          0 Region 2                  10        0    0  10    0          8          2          8          0          0              0          0          0 Region 3                  12        0    1    9    0          6          2          7          3          0              0          0          0 Region 4                  20        0    2  17    0          17          3          13          3          0              1          0          0 1 Unit Sites              25        0    2  22    0          19          5          15          4          0              1          0          0 2 Unit Sites              29        0    2  25    0          21          5          20          4          0              0          0          0 3 Unit Sites              2        0    0    2    0          2          0          2          0          0              0          0          0 BWR                      25        0    1  24    0          19          2          17          5          0              1          0          0 PWR                      31        0    3  25    0          23          8          20          3          0              0          0          0 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        56        0    4  49    0          42          10          37          8          0              1          0          0 Percentage of All    100%        0%  7%  88%    0%        75%          18%        66%        14%            0%            2%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 82 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.13 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.7        5.9        3.8          3.5        Region 1                  0.7        4.6        2.4          2.5 Region 2                  2.1        3.9        1.5          2.5        Region 2                  1.4        3.1        1.5          2.0 Region 3                  5.5        4.7        0.0          3.5        Region 3                  3.3        1.6        0.0          1.6 Region 4                  8.9        4.5        4.6          5.7        Region 4                  7.7        3.6        3.8          4.8 1 Unit Sites              4.8        4.3        2.3          3.8        1 Unit Sites              3.9        2.4        1.9          2.7 2 Unit Sites              3.1        5.6        2.5          3.7        2 Unit Sites              1.9        4.2        1.8          2.6 3 Unit Sites              4.0        0.0        4.1          2.8        3 Unit Sites              4.0        0.0        4.1          2.8 BWR                        5.5        5.1        2.1          4.2        BWR                        3.3        3.6        1.6          2.9 PWR                        2.9        4.6        2.7          3.4        PWR                        2.6        3.0        2.2          2.6 Total All Regions          3.9        4.8        2.5          3.7        Total All Regions          2.9        3.2        2.0          2.7 71111.13 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 83 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1344      322        18.9        4.2    1317        322        18.9        4.1    1268      320        18.8          4.0 Region 2          1416      320        17.8        4.4    1270        292        16.2        4.3    1364      314        17.4          4.3 Region 3          1228      260        16.3        4.7    1251        260        16.3        4.8    1181      243        15.2          4.9 Region 4            904      204        15.7        4.4    1102        208        16.0        5.3    1305      213        16.4          6.1 1 Unit Sites      1212      275        17.2        4.4    1297        284        17.8        4.6    1343      267        16.7          5.0 2 Unit Sites      3066      690        17.7        4.4    3057        657        16.8        4.7    3235      690        17.7          4.7 3 Unit Sites        614      141        17.6        4.4    586        141        17.6        4.2      540      133        16.6          4.1 BWR                1797      415        17.3        4.3    1922        423        17.6        4.5    1878      413        17.2          4.5 PWR                3096      691        18.2        4.5    3018        659        17.3        4.6    3239      677        17.8          4.8 Total All          4892    1106        18.1        4.4    4941        1082        17.7        4.6    5118    1090        17.9          4.7 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 84 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          3930    964        19.7        4.1 Region 2          4050    926        17.8        4.4 Region 3          3660    763        16.6        4.8 Region 4          3311    625        16.9        5.3 1 Unit Sites      3852    826        18.0        4.7 2 Unit Sites      9359    2037        17.7        4.6 3 Unit Sites      1740    415        18.9        4.2 BWR                5597    1251        17.6        4.5 PWR                9353    2027        17.9        4.6 Total All        14950    3278        17.9        4.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 85 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.15 Revision History Date of Revision      Description of Revision 12/22/2016            IP 71111.15, "Operability Determinations and Functionality Assessments," has been revised to address use of mandatory and discretionary language concerns and recommendations found in OIG Audit OIG-16-A-12. The requirement to inspect at least one sample associated with OWA has been deleted.
Summary of PIM Findings 2015              2016            2017      3 Year Total FIN Green                                  4                1                  1              6 NCV Green                                65                47                49              161 NCV N/A                                    0                1                  0              1 NCVIV Green                                0                0                  1              1 NCVIV Minor Performance                    0                0                  1              1 Deficiency NCVIV N/A                                  4                5                  2              11 NCVIV No Performance                        0                0                  1              1 Deficiency NOV N/A                                    1                1                  0              2 NOV White                                  0                1                  2              3 VIO Green                                  0                1                  0              1 VIO N/A                                    1                0                  0              1 VIO White                                  0                1                  0              1 Total                                    75                58                57              190 9/11/2018 2:22:01 PM                                                                                                                                            Page 86 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.15 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  50        1  12  30    0          40          2          34        14            0              0          0          0 Region 2                  42        1  10  24    0          37          1          29          6          1              0          1          0 Region 3                  64        3    9  37    0          50          4          48          7          0              0          0          0 Region 4                  34        0    4  23    0          26          0          26          5          2              1          0          0 1 Unit Sites              82        4  16  47    0          68          5          57        12            2              0          0          0 2 Unit Sites              95        1  16  61    0          75          1          70        18            1              1          1          0 3 Unit Sites              13        0    3    6    0          10          1          10          2          0              0          0          0 BWR                      95        3  20  56    0          74          5          67        18            1              0          0          0 PWR                      95        2  15  58    0          79          2          70        14            2              1          1          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        190        5  35  114    0        153          7          137        32            3              1          1          0 Percentage of All    100%        3% 18%  60%    0%        81%          4%        72%        17%            2%            1%        1%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 87 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.15 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  13.4        7.3        5.5          8.6        Region 1                  11.0        5.5        3.6          6.6 Region 2                  6.3        6.7        6.9          6.6        Region 2                  5.5        4.4        5.2          5.0 Region 3                  9.9      11.4      11.5          11.0        Region 3                  7.5        7.3        7.0          7.3 Region 4                  8.9        4.8        8.2          7.3        Region 4                  7.1        3.4        5.4          5.3 1 Unit Sites              12.4      10.0        7.5          10.0        1 Unit Sites              9.9        7.1        5.1          7.4 2 Unit Sites              7.8        6.6        8.4          7.6        2 Unit Sites              6.6        4.4        5.4          5.4 3 Unit Sites              6.1        6.5        8.0          6.8        3 Unit Sites              5.0        3.6        4.4          4.3 BWR                      12.2      10.3        9.9          10.8        BWR                        9.7        7.6        5.6          7.6 PWR                        7.8        6.2        6.9          7.0        PWR                        6.5        3.8        5.1          5.1 Total All Regions          9.4        7.8        8.0          8.4        Total All Regions          7.7        5.3        5.3          6.1 71111.15 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 88 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1905      350        20.6        5.4    2187        332        19.5        6.6    1956      340        20.0          5.8 Region 2          2376      367        20.4        6.5    2257        364        20.2        6.2    2124      356        19.8          6.0 Region 3          1856      294        18.4        6.3    2056        292        18.3        7.0    1870      293        18.3          6.4 Region 4          1403      232        17.8        6.0    1465        233        17.9        6.3    1652      233        17.9          7.1 1 Unit Sites      1660      271        16.9        6.1    1726        273        17.1        6.3    1712      269        16.8          6.4 2 Unit Sites      4674      801        20.5        5.8    5069        776        19.9        6.5    4909      780        20.0          6.3 3 Unit Sites      1206      171        21.4        7.0    1169        172        21.5        6.8      980      173        21.6          5.7 BWR                2797      461        19.2        6.1    3017        457        19.0        6.6    2862      457        19.0          6.3 PWR                4743      782        20.6        6.1    4948        764        20.1        6.5    4739      765        20.1          6.2 Total All          7539    1243        20.4        6.1    7964        1221        20.0        6.5    7601    1222        20.0          6.2 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 89 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          6047    1022        20.9        5.9 Region 2          6756    1087        20.9        6.2 Region 3          5781    879        19.1        6.6 Region 4          4520    698        18.9        6.5 1 Unit Sites      5098    813        17.7        6.3 2 Unit Sites      14652    2357        20.5        6.2 3 Unit Sites      3354    516        23.5        6.5 BWR                8675    1375        19.4        6.3 PWR              14429    2311        20.5        6.2 Total All        23104    3686        20.1        6.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 90 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.17T Revision History Date of Revision      Description of Revision 12/08/2016            IP 71111.17T, "Evaluations of Changes, Tests, and Experiments," has been revised to: 1) address use of mandatory and discretionary language concerns and recommendations found in OIG-16-A-12 (ML16097A515), and 2) relocate inspection of permanent plant modifications to IP 71111.21M, "Component Design Bases Inspection (Teams).
11/13/2015            IP 71111.17T, "Evaluations of Changes, Tests and Experiments and Permanent Plant Modifications," has been revised to ensure security related issues identified as a result of changes are raised to be considered under the security inspection program, ensure that changes to the aging management program associated with 10 CFR 54.21(d) are within scope of this IP, and ensure that there is awareness that NEI 96-07, Revision 1, Appendix E has not been reviewed or endorsed by the NRC. Incorporated feedback forms 71111.17T-2145.
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                      3                1                0                4 NCV Green                                    17                13                4              34 NCVIV Green                                    5              10                1              16 NCVIV N/A                                      2                1                0                3 NCVIV No Performance                            0                0                1                1 Deficiency Total                                        27                25                6              58 9/11/2018 2:22:01 PM                                                                                                                                              Page 91 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.17T PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  5        0    1    2    0          5          1            2          2          0              0          0          0 Region 2                  22        0    4  12    0          22          0          19          1          0              0          0          0 Region 3                  19        0    3    7    0          18          3          13          3          0              0          0          0 Region 4                  11        0    3    2    0          11          1            8          1          0              0          0          0 1 Unit Sites              25        0    4    9    0          25          4          15          6          0              0          0          0 2 Unit Sites              27        0    7  10    0          26          1          22          1          0              0          0          0 3 Unit Sites              5        0    0    4    0          5          0            5          0          0              0          0          0 BWR                      30        0    6  11    0          29          3          22          5          0              0          0          0 PWR                      27        0    5  12    0          27          2          20          2          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        57        0  11  23    0          56          5          42          7          0              0          0          0 Percentage of All    100%        0% 19%  40%    0%        98%          9%        74%        12%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 92 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.17T Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  3.9        1.3        0.0          1.8        Region 1                  3.9        1.3        0.0          1.8 Region 2                  5.9        6.0        7.1          6.1        Region 2                  5.6        5.2        5.4          5.4 Region 3                  9.7        9.2        3.3          8.0        Region 3                  8.7        7.2        1.6          6.5 Region 4                  4.1        9.6        2.5          5.9        Region 4                  4.1        5.5        2.5          4.3 1 Unit Sites              6.1        7.2        0.0          6.0        1 Unit Sites              6.1        5.1        0.0          5.1 2 Unit Sites              5.8        4.7        4.4          5.1        2 Unit Sites              5.5        3.8        2.8          4.1 3 Unit Sites              9.0        3.3        5.5          6.1        3 Unit Sites              6.0        3.3        5.5          4.9 BWR                        8.4        9.2        0.0          7.8        BWR                        7.8        6.3        0.0          6.2 PWR                        5.0        2.8        4.8          4.2        PWR                        4.4        2.8        3.3          3.5 Total All Regions          6.1        5.7        3.7          5.5        Total All Regions          5.8        4.4        2.5          4.6 71111.17T Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 93 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            768      146        24.3        5.3    1537        273        34.1        5.6      454      132        22.0          3.4 Region 2          1605      190        23.8        8.4    1344        169        24.1        8.0      556        95        15.8          5.9 Region 3          1033      165        27.5        6.3    978        175        29.2        5.6      607      125        20.8          4.9 Region 4            739      155        31.0        4.8    731        163        32.6        4.5      406      109        21.8          3.7 1 Unit Sites      1172      209        29.9        5.6    1310        254        31.8        5.2      190        57        19.0          3.3 2 Unit Sites      2440      407        31.3        6.0    2503        441        33.9        5.7    1584      352        23.5          4.5 3 Unit Sites        533      40        10.0        13.3    777          85        21.3        9.1      249        52        13.0          4.8 BWR                1657      286        28.6        5.8    2065        364        33.1        5.7      501      113        18.8          4.4 PWR                2488      370        28.5        6.7    2525        416        32.0        6.1    1522      348        23.2          4.4 Total All          4145      656        29.8        6.3    4590        780        33.9        5.9    2023      461        23.1          4.4 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 94 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          2759    551        30.6        5.0 Region 2          3505    454        23.9        7.7 Region 3          2617    465        29.1        5.6 Region 4          1876    427        32.8        4.4 1 Unit Sites      2672    520        32.5        5.1 2 Unit Sites      6527    1200        30.8        5.4 3 Unit Sites      1558    177        17.7        8.8 BWR                4223    763        29.3        5.5 PWR                6535    1134        28.4        5.8 Total All        10757    1897        29.2        5.7 Regions 9/11/2018 2:22:01 PM                                                                      Page 95 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.18 Revision History Date of Revision      Description of Revision 11/17/2016            IP 71111.18, "Plant Modifications," has been revised to: 1) Provide oversight of licensee commitments to consider Severe Accident Management Guidelines (SAMGs) within plant configuration management processes in order to ensure that the SAMGs reflect changes to the facility over time. Additional background information can be found in SRM SECY-15-0065 (ML15239A767) and a February 23, 2016, letter from the NRC to NEI (ML16032A029). The February 23, 2016, letter, which also references the SRM, is added to the References section. (2) Address use of mandatory and discretionary language concerns and recommendations found in OIG-16-A-12 (ML16097A515). (3) Closed feedback form 71111.18-2212.
11/13/2015            IP 71111.18, "Plant Modifications," has been revised to ensure security related issues identified as a result of changes are raised to be considered under the security inspection program, ensure that changes to the aging management program associated with 10 CFR 54.21(d) are within scope of this IP, and ensure that there is awareness that NEI 96-07, Revision 1, Appendix E has not been reviewed or endorsed by the NRC. Incorporated feedback forms 71111.17T-2145.
Summary of PIM Findings 2015              2016            2017    3 Year Total FIN Green                                    4                1                1                  6 NCV Green                                    9                3                4                16 NCVIV Green                                  6                4                0                10 NCVIV N/A                                    2                0                1                  3 NOV N/A                                      0                0                1                  1 VIO Green                                    0                0                1                  1 Total                                        21                8                8                37 9/11/2018 2:22:01 PM                                                                                                                                                    Page 96 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.18 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  6        0    1    4    0          6          0            5          1          0              0          0          0 Region 2                  7        0    0    5    0          5          1            3          2          0              0          0          0 Region 3                  16        0    2    8    0          15          3            5          6          0              0          0          0 Region 4                  8        0    0    6    0          7          2            5          0          0              0          0          0 1 Unit Sites              17        0    3    8    0          15          4            7          4          0              0          0          0 2 Unit Sites              18        0    0  14    0          16          1          11          5          0              0          0          0 3 Unit Sites              2        0    0    1    0          2          1            0          0          0              0          0          0 BWR                      18        0    2  10    0          17          3            7          6          0              0          0          0 PWR                      19        0    1  13    0          16          3          11          3          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        37        0    3  23    0          33          6          18          9          0              0          0          0 Percentage of All    100%        0%  8%  62%    0%        89%          16%        49%        24%            0%            0%        0%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 97 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.18 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  4.8        6.1        1.6          4.2        Region 1                  4.8        6.1        0.0          3.7 Region 2                  6.7        0.0        5.7          4.7        Region 2                  5.3        0.0        3.8          3.5 Region 3                  16.2        7.5        5.6          10.1        Region 3                  13.0        7.5        3.7          8.4 Region 4                  12.0        1.8        3.9          5.4        Region 4                  9.6        1.8        3.9          4.7 1 Unit Sites              12.8        3.9        2.1          6.3        1 Unit Sites              10.1        3.9        2.1          5.3 2 Unit Sites              7.9        4.8        6.2          6.4        2 Unit Sites              6.6        4.8        3.6          5.1 3 Unit Sites              7.3        7.1        0.0          5.4        3 Unit Sites              7.3        7.1        0.0          5.4 BWR                      12.6        6.1        3.4          7.4        BWR                      10.5        6.1        3.4          6.8 PWR                        8.2        3.5        4.6          5.5        PWR                        6.5        3.5        2.3          4.2 Total All Regions          9.9        4.5        4.1          6.3        Total All Regions          8.0        4.5        2.7          5.2 71111.18 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 98 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            630      86          5.1        7.3    654          90          5.3        7.3    606        89        5.2          6.8 Region 2            752      80          4.4        9.4    416          65          3.6        6.4    526        67        3.7          7.9 Region 3            694      65          4.1        10.7    796          59          3.7        13.5    540        60        3.8          9.0 Region 4            417      54          4.2        7.7    560          51          3.9        11.0    515        49        3.8        10.5 1 Unit Sites        662      68          4.3        9.7    726          72          4.5        10.1    677        67        4.2        10.1 2 Unit Sites      1539      185          4.7        8.3    1380        158          4.1        8.7    1239      162        4.2          7.6 3 Unit Sites        292      32          4.0        9.1    320          35          4.4        9.1    272        36        4.5          7.5 BWR                949      110          4.6        8.6    983        105          4.4        9.4    883      107        4.5          8.3 PWR                1543      175          4.6        8.8    1443        160          4.2        9.0    1304      158        4.2          8.3 Total All          2492      285          4.7        8.7    2426        265          4.3        9.2    2187      265        4.3          8.3 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 99 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1890    265        5.4        7.1 Region 2          1694    212        4.1        8.0 Region 3          2030    184        4.0        11.0 Region 4          1491    154        4.2        9.7 1 Unit Sites      2064    207        4.5        10.0 2 Unit Sites      4158    505        4.4        8.2 3 Unit Sites        883    103        4.7        8.6 BWR                2815    322        4.5        8.7 PWR                4290    493        4.4        8.7 Total All          7105    815        4.5        8.7 Regions 9/11/2018 2:22:01 PM                                                                      Page 100 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.19 Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016      2017    3 Year Total FIN Green                                  1    1          0              2 NCV Green                                14    6          8            28 Total                                    15    7          8            30 9/11/2018 2:22:01 PM                                                                  Page 101 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.19 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  7        0    2    4    0          6          0            4          3          0              0          0          0 Region 2                  7        0    2    5    0          6          1            4          2          0              0          0          0 Region 3                  5        0    1    4    0          3          1            4          0          0              0          0          0 Region 4                  11        0    0    8    0          6          1          10          0          0              0          0          0 1 Unit Sites              12        0    0  11    0          7          2            8          2          0              0          0          0 2 Unit Sites              15        0    5    8    0          12          0          12          3          0              0          0          0 3 Unit Sites              3        0    0    2    0          2          1            2          0          0              0          0          0 BWR                      15        0    3  10    0          10          3            9          3          0              0          0          0 PWR                      15        0    2  11    0          11          0          13          2          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        30        0    5  21    0          21          3          22          5          0              0          0          0 Percentage of All    100%        0% 17%  70%    0%        70%          10%        73%        17%            0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 102 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.19 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  2.5        1.3        0.7          1.5        Region 1                  1.9        1.3        0.7          1.3 Region 2                  2.5        2.3        0.7          1.8        Region 2                  1.3        2.3        0.7          1.4 Region 3                  3.1        0.0        2.3          1.8        Region 3                  1.6        0.0        0.8          0.8 Region 4                  4.3        2.3        3.0          3.1        Region 4                  3.2        0.8        1.5          1.7 1 Unit Sites              3.3        1.3        2.2          2.3        1 Unit Sites              1.9        0.9        0.9          1.2 2 Unit Sites              2.7        1.4        1.0          1.7        2 Unit Sites              1.7        1.0        1.0          1.2 3 Unit Sites              3.6        3.7        3.5          3.6        3 Unit Sites              3.6        3.7        0.0          2.4 BWR                        5.1        2.3        0.5          2.6        BWR                        2.6        1.8        0.5          1.6 PWR                        1.8        0.9        2.3          1.7        PWR                        1.5        0.6        1.2          1.1 Total All Regions          3.0        1.5        1.6          2.0        Total All Regions          1.9        1.1        0.9          1.3 71111.19 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 103 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1570      401        23.6        3.9    1541        397        23.4        3.9    1532      395        23.2          3.9 Region 2          1567      388        21.6        4.0    1323        366        20.3        3.6    1418      372        20.7          3.8 Region 3          1287      318        19.9        4.0    1247        329        20.6        3.8    1290      331        20.7          3.9 Region 4            928      245        18.8        3.8    1293        251        19.3        5.1    1328      256        19.7          5.2 1 Unit Sites      1199      333        20.8        3.6    1288        348        21.8        3.7    1418      337        21.1          4.2 2 Unit Sites      3465      854        21.9        4.1    3461        831        21.3        4.2    3468      850        21.8          4.1 3 Unit Sites        688      165        20.6        4.2    654        164        20.5        4.0      682      167        20.9          4.1 BWR                1935      523        21.8        3.7    2198        532        22.2        4.1    2102      525        21.9          4.0 PWR                3417      829        21.8        4.1    3205        811        21.3        4.0    3466      829        21.8          4.2 Total All          5352    1352        22.2        4.0    5403        1343        22.0        4.0    5568    1354        22.2          4.1 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 104 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          4642    1193        24.3        3.9 Region 2          4307    1126        21.7        3.8 Region 3          3824    978        21.3        3.9 Region 4          3549    752        20.3        4.7 1 Unit Sites      3906    1018        22.1        3.8 2 Unit Sites      10393    2535        22.0        4.1 3 Unit Sites      2024    496        22.5        4.1 BWR                6234    1580        22.3        3.9 PWR              10089    2469        21.8        4.1 Total All        16322    4049        22.1        4.0 Regions 9/11/2018 2:22:01 PM                                                                      Page 105 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.20 Revision History Date of Revision      Description of Revision 11/30/2017            IP 71111.20, Refueling and Other Outage Activities, has been revised to add guidance to review calculations for reactor pressure vessel water inventory control. Improved plain writing. Relocated optional requirements to the guidance section to better align with IMC 2515, Section 08.04.
01/27/2015            IP 71111.20, "Refueling and Other Outage Activities," has been revised to group existing fatigue assessment guidance into a new, separate section, and to add IP 71111.11 as acceptable guidance to observe start-up activities in the control room, based on the 2014 ROP Enhancement Project feedback.
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                    0                1                1                  2 NCV Green                                  11                15                10                36 NCVIV N/A                                    0                0                1                  1 Total                                      11                16                12                39 9/11/2018 2:22:01 PM                                                                                                                                              Page 106 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.20 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  8        0    2    4    0          6          1          5          2          0              0          0          0 Region 2                  7        0    1    5    0          6          0          2          4          0              0          0          0 Region 3                  17        0    0  15    0          7          8          4          5          0              0          0          0 Region 4                  7        0    0    5    0          5          3          1          3          0              0          0          0 1 Unit Sites              11        0    1    8    0          5          6          2          2          0              0          0          0 2 Unit Sites              28        0    2  21    0          19          6          10        12            0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0          0          0          0              0          0          0 BWR                      11        0    0  10    0          5          5          5          1          0              0          0          0 PWR                      28        0    3  19    0          19          7          7        13            0              0          0          0 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        39        0    3  29    0          24          12          12        14            0              0          0          0 Percentage of All    100%        0%  8%  74%    0%        62%          31%        31%        36%            0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 107 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.20 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  1.6        1.1        2.2          1.6        Region 1                  1.1        1.1        1.1          1.1 Region 2                  1.3        1.2        2.0          1.5        Region 2                  0.9        1.2        1.6          1.2 Region 3                  2.9        5.4        1.8          3.4        Region 3                  0.5        2.1        0.6          1.0 Region 4                  1.7        1.6        2.5          2.0        Region 4                  0.9        1.6        1.7          1.4 1 Unit Sites              2.0        1.5        1.8          1.7        1 Unit Sites              1.0        0.0        1.0          0.7 2 Unit Sites              2.0        3.3        2.4          2.5        2 Unit Sites              0.8        2.5        1.4          1.5 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        2.2        1.4        1.4          1.7        BWR                        0.9        0.4        0.9          0.7 PWR                        1.8        3.2        2.4          2.4        PWR                        0.8        2.3        1.3          1.4 Total All Regions          1.9        2.5        2.1          2.1        Total All Regions          0.8        1.5        1.2          1.2 71111.20 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 108 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1896      33          2.1        57.4    1772          30          1.9        59.1    1846        29        1.9        63.6 Region 2          2233      45          2.5        49.6    1663          27          1.7        61.6    1916        38        2.2        50.4 Region 3          1909      33          2.2        57.8    1443          21          1.5        68.7    1679        23        1.5        73.0 Region 4          1159      21          1.8        55.2    1224          25          1.9        49.0    1189        25        2.3        47.5 1 Unit Sites      1222      22          1.6        55.5    1193          20          1.7        59.6    1228        18        1.5        68.2 2 Unit Sites      5142      93          2.4        55.3    3977          66          1.7        60.3    4439        81        2.2        54.8 3 Unit Sites        833      17          2.1        49.0    933          17          2.1        54.9    963        16        2.0        60.2 BWR                2222      44          2.1        50.5    2659          47          2.0        56.6    2133        42        2.0        50.8 PWR                4975      88          2.3        56.5    3444          56          1.6        61.5    4496        73        2.1        61.6 Total All          7197      132          2.3        54.5    6102        103          1.8        59.2    6629      115        2.1        57.6 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 109 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          5513      92        2.0        59.9 Region 2          5812    110        2.2        52.8 Region 3          5031      77        1.8        65.3 Region 4          3572      71        2.1        50.3 1 Unit Sites      3642      60        1.7        60.7 2 Unit Sites      13557    240        2.2        56.5 3 Unit Sites      2729      50        2.3        54.6 BWR                7014    133        2.1        52.7 PWR              12915    217        2.0        59.5 Total All        19928    350        2.1        56.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 110 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21M Revision History Date of Revision      Description of Revision 12/08/2016            IP 71111.21M, "Design Bases Assurance Inspection (Teams)," has been revised to inspection procedure to address internal and external comments from conducting the eight CDBI pilot inspections and also to address FFs -1989; -2072; and -2172.
11/24/2015            IP 71111.21M, "Component Design Bases Inspection (Teams)," has been revised after the regional comment period and reissued after incorporating regional comments.
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                  0                  2                0                2 NCV Green                                  11                14                41              66 NCVIV N/A                                  0                  1                3                4 NOV Green                                  0                  0                1                1 Total                                      11                17                45              73 9/11/2018 2:22:01 PM                                                                                                                                          Page 111 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21M PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  8        0    1    1    0          8          0            8          0          0              0          0          0 Region 2                  24        0    3    3    0          24          2          17          4          0              0          0          0 Region 3                  16        0    1    2    0          16          1          14          1          0              0          0          0 Region 4                  25        0    2  11    0          24          1          21          1          0              0          0          0 1 Unit Sites              27        0    1  10    0          26          0          23          2          0              0          0          0 2 Unit Sites              43        0    5    6    0          43          4          35          3          0              0          0          0 3 Unit Sites              3        0    1    1    0          3          0            2          1          0              0          0          0 BWR                      18        0    2    8    0          17          0          15          2          0              0          0          0 PWR                      55        0    5    9    0          55          4          45          4          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        73        0    7  17    0          72          4          60          6          0              0          0          0 Percentage of All    100%        0% 10%  23%    0%        99%          5%        82%          8%          0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 112 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21M Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                800.0        0.0        3.3          4.0        Region 1                800.0        0.0        3.4          4.2 Region 2                  44.4      76.9        4.2          6.1        Region 2                  44.4        51.3        4.6          7.0 Region 3                  0.0        0.0        4.8          7.1        Region 3                  0.0        0.0        4.7          5.4 Region 4                  0.0      12.2        4.4          6.0        Region 4                  0.0        7.8        6.0          6.6 1 Unit Sites              0.0        3.1        4.4          4.3        1 Unit Sites              0.0        3.1        5.3          5.1 2 Unit Sites          3600.0        13.7        4.0          7.4        2 Unit Sites            2000.0        9.0        3.9          6.4 3 Unit Sites              44.4        0.0        3.3          10.8        3 Unit Sites              44.4        0.0        3.3          6.1 BWR                      44.4        1.6        4.1          4.3        BWR                      44.4        1.6        4.5          4.2 PWR                    3600.0        18.8        4.3          6.7        PWR                    2000.0        15.1        4.7          7.1 Total All Regions      171.4        11.4        4.2          5.9        Total All Regions        240.0        7.2        4.6          5.8 71111.21M Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 113 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1              3      14          7.0        0.2    197          15          7.5        13.1    1476      142        23.7        10.4 Region 2            23      16          8.0        1.4      78        34        17.0          2.3    1744      249        35.6          7.0 Region 3              0        0          0.0        0.0    317          13          6.5        24.4    1713        75        9.4        22.8 Region 4              0        0          0.0        0.0    515          31        10.3        16.6    1164      103        20.6        11.3 1 Unit Sites          0        0          0.0        0.0    197          15          7.5        13.1    1855      170        21.3        10.9 2 Unit Sites          3      27        13.5        0.1    593          65        16.3          9.1    3701      336        24.0        11.0 3 Unit Sites        23      16          8.0        1.4    317          13          6.5        24.4    541        63        21.0          8.6 BWR                  23      16          8.0        1.4    642          43        10.8        14.9    2468      167        16.7        14.8 PWR                  3      27        13.5        0.1    465          50        16.7          9.3    3630      402        28.7          9.0 Total All            25      43        14.3        0.6    1107          93        15.5        11.9    6098      569        24.7        10.7 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 114 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1676    171        21.4        9.8 Region 2          1844    299        33.2        6.2 Region 3          2030    101        11.2        20.1 Region 4          1679    134        19.1        12.5 1 Unit Sites      2052    185        20.6        11.1 2 Unit Sites      4297    428        23.8        10.0 3 Unit Sites        881      92      18.4        9.6 BWR                3132    226        15.1        13.9 PWR                4097    479        26.6        8.6 Total All          7229    705        22.0        10.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 115 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21N Revision History Date of Revision      Description of Revision 12/08/2016            IP 71111.21N, "Design Bases Assurance Inspection (Programs)," has been revised to include lessons learned from the pilot EQ inspections and FF 71111.21-1965 and 71111.21-2120 02/17/2016            IP 71111.21N, "Component Design Bases Inspection (Programs)," has been issued as a pilot inspection procedure. Researched commitments for the last four years and found none.
Summary of PIM Findings 2016            2017    3 Year Total FIN Green                                  1              0                1 NCV Green                                  4            17                21 Total                                      5            17                22 9/11/2018 2:22:01 PM                                                                                                                                          Page 116 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21N PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  2        0    0    1    0          2          0            1          1          0              0          0          0 Region 2                  12        0    0    3    0          12          0          11          0          1              0          0          0 Region 3                  6        0    0    1    0          6          0            6          0          0              0          0          0 Region 4                  2        0    0    2    0          2          0            1          0          1              0          0          0 1 Unit Sites              7        0    0    2    0          7          0            6          0          1              0          0          0 2 Unit Sites              14        0    0    5    0          14          0          12          1          1              0          0          0 3 Unit Sites              1        0    0    0    0          1          0            1          0          0              0          0          0 BWR                        8        0    0    2    0          8          0            7          1          0              0          0          0 PWR                      14        0    0    5    0          14          0          12          0          2              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        22        0    0    7    0          22          0          19          1          2              0          0          0 Percentage of All    100%        0%  0%  32%    0%      100%            0%        86%          5%          9%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 117 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.21N Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        2.3          2.2        Region 1                  0.0        0.0        2.3          2.2 Region 2                  0.0      19.3        4.4          5.0        Region 2                  0.0        14.5        3.6          4.4 Region 3                  0.0        4.6        4.3          4.4        Region 3                  0.0        4.6        3.0          3.4 Region 4                  0.0        0.0        2.9          2.3        Region 4                  0.0        0.0        2.9          2.3 1 Unit Sites              0.0        0.0        2.5          2.4        1 Unit Sites              0.0        0.0        1.9          1.8 2 Unit Sites              0.0        9.5        6.2          6.5        2 Unit Sites              0.0        5.7        3.9          4.1 3 Unit Sites              0.0        9.8        0.0          9.8        3 Unit Sites              0.0        9.8        0.0          9.8 BWR                        0.0        6.6        3.5          3.8        BWR                        0.0        6.6        1.9          2.7 PWR                        0.0        9.6        4.3          4.6        PWR                        0.0        4.1        3.8          3.9 Total All Regions          0.0        8.1        4.1          4.3        Total All Regions          0.0        5.5        3.1          3.4 71111.21N Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 118 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours  Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            0        0          0.0        0.0      34          8          4.0        4.3    869        72        14.4        12.1 Region 2            0        0          0.0        0.0    138          14          4.7        9.8    1688      136        19.4        12.4 Region 3            0        0          0.0        0.0    219          15          5.0        14.6    674        25        6.3        27.0 Region 4            0        0          0.0        0.0    157          16          5.3        9.8    698        39        7.8        17.9 1 Unit Sites        0        0          0.0        0.0      34          8          4.0        4.3    1146        68        11.3        16.8 2 Unit Sites        0        0          0.0        0.0    300          29          5.8        10.3    2554      186        15.5        13.7 3 Unit Sites        0        0          0.0        0.0    213          16          5.3        13.3    229        18        9.0        12.7 BWR                  0        0          0.0        0.0    305          33          6.6        9.2    1579        99        12.4        15.9 PWR                  0        0          0.0        0.0    242          20          5.0        12.1    2350      173        15.7        13.6 Total All            0        0          0.0        0.0    547          53          6.6        10.3    3929      272        15.1        14.4 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 119 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            903      89      14.8        10.1 Region 2          1826    150        16.7        12.2 Region 3            893      40        6.7        22.3 Region 4            855      55        7.9        15.5 1 Unit Sites      1180      76      10.9        15.5 2 Unit Sites      2854    224        14.0        12.7 3 Unit Sites        442      34        8.5        13.0 BWR                1884    132        10.2        14.3 PWR                2592    202        13.5        12.8 Total All          4476    334        12.4        13.4 Regions 9/11/2018 2:22:01 PM                                                                      Page 120 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.22 Revision History Date of Revision      Description of Revision 06/15/2015            IP 71111.22, "Surveillance Testing," has been revised to incorporate feedback associated with the 2014 ROP Enhancement Project.
Summary of PIM Findings 2015              2016              2017    3 Year Total FIN Green                                    1                1                0                2 NCV Green                                  13              12                13              38 NCVIV N/A                                    0                1                0                1 Total                                      14              14                13              41 9/11/2018 2:22:01 PM                                                                                                                                  Page 121 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.22 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  9        0    2    5    0          7          0            7          2          0              0          0          0 Region 2                  10        0    0    9    0          6          1            8          0          0              0          0          0 Region 3                  10        0    1    7    0          5          0            4          6          0              0          0          0 Region 4                  11        0    2    7    0          9          0            9          2          0              0          0          0 1 Unit Sites              16        0    2  10    0          10          0            9          7          0              0          0          0 2 Unit Sites              22        0    3  16    0          15          1          17          3          0              0          0          0 3 Unit Sites              2        0    0    2    0          2          0            2          0          0              0          0          0 BWR                      21        0    2  15    0          14          0          13          8          0              0          0          0 PWR                      19        0    3  13    0          13          1          15          2          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        40        0    5  28    0          27          1          28        10            0              0          0          0 Percentage of All    100%        0% 13%  70%    0%        68%          3%        70%        25%            0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 122 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71111.22 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  2.6        2.1        1.3          2.0        Region 1                  2.0        2.1        0.7          1.6 Region 2                  2.1        2.9        3.3          2.8        Region 2                  1.4        2.2        2.0          1.9 Region 3                  2.3        3.4        2.5          2.8        Region 3                  0.8        2.8        0.8          1.5 Region 4                  4.0        2.6        3.0          3.2        Region 4                  4.0        2.6        1.5          2.6 1 Unit Sites              1.5        2.8        3.1          2.5        1 Unit Sites              1.0        2.3        1.3          1.5 2 Unit Sites              3.8        2.7        2.0          2.8        2 Unit Sites              2.7        2.3        1.0          2.0 3 Unit Sites              0.0        4.1        3.3          2.6        3 Unit Sites              0.0        4.1        3.3          2.6 BWR                        3.0        4.2        2.9          3.4        BWR                        2.0        3.3        1.5          2.3 PWR                        2.5        1.8        2.3          2.2        PWR                        1.9        1.8        1.1          1.6 Total All Regions          2.7        2.8        2.5          2.7        Total All Regions          1.9        2.4        1.3          1.9 71111.22 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 123 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1526      349        20.5        4.4    1412        326        19.2        4.3    1532      325        19.1          4.7 Region 2          1414      354        19.7        4.0    1358        341        18.9        4.0    1497      334        18.6          4.5 Region 3          1278      290        18.1        4.4    1454        286        17.9        5.1    1207      268        16.8          4.5 Region 4            998      236        18.2        4.2    1157        211        16.2        5.5    1332      220        16.9          6.1 1 Unit Sites      1257      302        18.9        4.2    1323        300        18.8        4.4    1489      278        17.4          5.4 2 Unit Sites      3278      773        19.8        4.2    3433        706        18.1        4.9    3438      720        18.5          4.8 3 Unit Sites        681      154        19.3        4.4    625        158        19.8        4.0      641      149        18.6          4.3 BWR                1981      462        19.3        4.3    2133        460        19.2        4.6    2036      427        17.8          4.8 PWR                3235      767        20.2        4.2    3248        704        18.5        4.6    3532      720        18.9          4.9 Total All          5216    1229        20.1        4.2    5381        1164        19.1        4.6    5568    1147        18.8          4.9 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 124 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          4470    1000        20.4        4.5 Region 2          4269    1029        19.8        4.1 Region 3          3939    844        18.3        4.7 Region 4          3487    667        18.0        5.2 1 Unit Sites      4069    880        19.1        4.6 2 Unit Sites      10149    2199        19.1        4.6 3 Unit Sites      1946    461        21.0        4.2 BWR                6150    1349        19.0        4.6 PWR              10015    2191        19.4        4.6 Total All        16165    3540        19.3        4.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 125 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.01 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.01, "Exercise Evaluation," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925 Summary of PIM Findings 2017    3 Year Total NCV Green                                  1                  1 Total                                      1                  1 9/11/2018 2:22:01 PM                                                                                                                                  Page 126 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.01 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                  Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  1        0    1    0    0          1          0            0          0          1              0          0          0 1 Unit Sites              1        0    1    0    0          1          0            0          0          1              0          0          0 2 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      1        0    1    0    0          1          0            0          0          1              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        1        0    1    0    0          1          0            0          0          1              0          0          0 Percentage of All    100%        0% 100%  0%    0%      100%            0%          0%          0%        100%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 127 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.01 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0        0.0        4.0          4.0        Region 4                  0.0        0.0        4.0          4.0 1 Unit Sites              0.0        0.0        1.1          0.6        1 Unit Sites              0.0        0.0        1.1          0.6 2 Unit Sites              0.0        0.0        0.0          0.0        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                        0.0        0.0        0.7          0.3        PWR                        0.0        0.0        0.7          0.3 Total All Regions          0.0        0.0        0.5          0.2        Total All Regions          0.0        0.0        0.5          0.2 71114.01 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 128 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            227        2          0.5      113.5    526          9          0.9        58.4    326        7        0.9        46.5 Region 2            196        3          0.8        65.3    691          8          0.9        86.3    856        9        0.9        95.1 Region 3            201        2          0.7      100.4    631          8          0.9        78.8    626        7        0.9        89.5 Region 4              0        0          0.0        0.0        0          0          0.0        0.0    251        6        1.5        41.8 1 Unit Sites        222        3          0.8        73.9    234          4          1.0        58.4    732        11        1.1        66.6 2 Unit Sites        299        3          0.6        99.6    1353          23          1.2        58.8    1149        15        1.0        76.6 3 Unit Sites        103        1          0.5      103.3    261          4          0.8        65.3    178        3        0.8        59.3 BWR                221        3          0.8        73.5    756          13          1.2        58.1    603        10        1.0        60.3 PWR                403        4          0.7      100.8    1092          18          1.1        60.6    1456        19        1.1        76.6 Total All          624        7          0.8        89.1    1847          31          1.2        59.6    2059        29        1.1        71.0 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 129 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1079      18        0.9        59.9 Region 2          1742      20        1.0        87.1 Region 3          1458      17        0.9        85.8 Region 4            251      12        3.0        20.9 1 Unit Sites      1188      18        1.1        66.0 2 Unit Sites      2800      41        1.1        68.3 3 Unit Sites        542        8        0.9        67.8 BWR                1579      26        1.1        60.7 PWR                2951      41        1.1        72.0 Total All          4530      67        1.1        67.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 130 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.02 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.02, "Alert and Notification System Testing," has been revised to address technical, guidance and editorial changes. Closed feedback form71114-1925.
Summary of PIM Findings 9/11/2018 2:22:01 PM                                                                                                                                            Page 131 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.02 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  0        0    0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 2 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        0        0    0    0    0          0          0            0          0          0              0          0          0 Percentage of All    100%        0%  0%  0%    0%          0%          0%          0%          0%          0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 132 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.02 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0        0.0        0.0          0.0        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              0.0        0.0        0.0          0.0        1 Unit Sites              0.0        0.0        0.0          0.0 2 Unit Sites              0.0        0.0        0.0          0.0        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                        0.0        0.0        0.0          0.0        PWR                        0.0        0.0        0.0          0.0 Total All Regions          0.0        0.0        0.0          0.0        Total All Regions          0.0        0.0        0.0          0.0 71114.02 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 133 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            12        9          4.5        1.3        0          0          0.0        0.0        20        9          1.8          2.2 Region 2            70        8          1.1        8.7      61          9          1.0        6.7        71        8          0.9          8.8 Region 3              8        8          4.0        1.0      44        11          1.4        4.0        37        8          1.1          4.6 Region 4              0        0          0.0        0.0        0          0          0.0        0.0        18        7          1.2          2.5 1 Unit Sites          0        0          0.0        0.0      27        12          2.0        2.3        13        4          1.0          3.3 2 Unit Sites        82      23          2.9        3.6      60        16          1.8        3.7      112        24          1.3          4.7 3 Unit Sites          8        4          2.0        2.0      18          4          1.3        4.4        20        4          1.0          5.0 BWR                  8      13          6.5        0.6      26        10          2.0        2.6        52      14          1.3          3.7 PWR                  82      18          2.3        4.5      78        22          1.8        3.6        93      18          1.3          5.2 Total All            90      31          3.4        2.9    105          32          2.0        3.3      145        32          1.3          4.5 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 134 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            32      25        4.2        1.3 Region 2            201      25        1.1        8.0 Region 3            89      27        1.8        3.3 Region 4            18      18        3.0        1.0 1 Unit Sites        40      20        2.2        2.0 2 Unit Sites        254      63        1.9        4.0 3 Unit Sites        46      12        1.7        3.8 BWR                  86      37        2.2        2.3 PWR                253      58        1.8        4.4 Total All          339      95        1.9        3.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 135 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.03 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.03, "Emergency Preparedness Organization Staffing and Augmentation System," has been revised to address editorial changes. Closed feedback form 71114-1925 Summary of PIM Findings 2015            2016    3 Year Total NCV Green                                  1              2                3 Total                                      1              2                3 9/11/2018 2:22:01 PM                                                                                                                                        Page 136 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.03 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          1          0            0          0          1              0          0          0 Region 2                  1        0    1    0    0          1          0            0          0          1              0          0          0 Region 3                  1        0    0    1    0          0          0            0          0          1              0          0          0 Region 4                  0        0    0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              1        0    0    1    0          1          0            0          0          1              0          0          0 2 Unit Sites              2        0    1    1    0          1          0            0          0          2              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      3        0    1    2    0          2          0            0          0          3              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        3        0    1    2    0          2          0            0          0          3              0          0          0 Percentage of All    100%        0% 33%  67%    0%        67%          0%          0%          0%        100%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 137 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.03 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          25.0        Region 1                  0.0        0.0        0.0        25.0 Region 2                  0.0      10.7        0.0          3.9        Region 2                  0.0        10.7        0.0          3.9 Region 3                100.0        0.0        0.0          7.9        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0        0.0        0.0          0.0        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              0.0      17.2        0.0          8.9        1 Unit Sites              0.0        17.2        0.0          8.9 2 Unit Sites              11.6      10.9        0.0          6.6        2 Unit Sites              0.0        10.9        0.0          3.3 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                      10.6      16.5        0.0          9.0        PWR                        0.0        16.5        0.0          6.0 Total All Regions          9.6      12.6        0.0          6.8        Total All Regions          0.0        12.6        0.0          4.5 71114.03 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 138 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            12        9          4.5        1.3        0          0          0.0        0.0      28        9          1.8          3.1 Region 2            82        8          1.0        10.3      94          8          0.9        11.7      83        8          0.9        10.4 Region 3            10        8          4.0        1.3      65        11          1.4        5.9      51        8          1.1          6.4 Region 4              0        0          0.0        0.0        0          0          0.0        0.0      19        7          1.2          2.7 1 Unit Sites          0        0          0.0        0.0      43        12          2.0        3.6      17        4          1.0          4.3 2 Unit Sites        96      23          2.6        4.2      92        15          1.7        6.1    132        24          1.3          5.5 3 Unit Sites          8        4          2.0        2.0      24          4          1.3        6.0      32        4          1.0          8.0 BWR                  10      13          6.5        0.8      38        10          2.0        3.8      65      14          1.3          4.6 PWR                  94      18          2.0        5.2    121          21          1.8        5.8    116        18          1.3          6.5 Total All          104      31          3.1        3.4    159          31          1.9        5.1    181        32          1.3          5.6 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 139 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            40      25        4.2        1.6 Region 2            259      24        1.0        10.8 Region 3            126      27        1.8        4.7 Region 4            19      18        3.0        1.0 1 Unit Sites        61      20        2.2        3.0 2 Unit Sites        319      62        1.8        5.1 3 Unit Sites        64      12        1.7        5.3 BWR                112      37        2.2        3.0 PWR                332      57        1.7        5.8 Total All          444      94        1.9        4.7 Regions 9/11/2018 2:22:01 PM                                                                      Page 140 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.04 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.04, "Emergency Action Level and Emergency Plan Changes," has been revised to address editorial changes. Closed feedback form 71114-1925.
Summary of PIM Findings 2015            2016    3 Year Total NCV Green                                  2                2              4 NCVIV Green                                1                0              1 NCVIV N/A                                  1                0              1 VIO White                                  0                1              1 Total                                      4                3              7 9/11/2018 2:22:01 PM                                                                                                                                      Page 141 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.04 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  2        1    0    2    0          1          0            0          0          2              0          0          0 Region 2                  2        0    0    1    0          2          0            0          0          2              0          0          0 Region 3                  1        0    0    0    0          1          0            0          0          1              0          0          0 Region 4                  1        0    0    1    0          1          0            0          0          1              0          0          0 1 Unit Sites              3        1    0    3    0          2          0            0          0          3              0          0          0 2 Unit Sites              3        0    0    1    0          3          0            0          0          3              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      1        0    0    1    0          1          0            0          0          1              0          0          0 PWR                      5        1    0    3    0          4          0            0          0          5              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        6        1    0    4    0          5          0            0          0          6              0          0          0 Percentage of All    100%      17%  0%  67%    0%        83%          0%          0%          0%        100%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 142 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.04 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  10.1        5.2        0.0          5.3        Region 1                  0.0        5.2        0.0          2.7 Region 2                  3.8        4.2        0.0          2.7        Region 2                  3.8        4.2        0.0          2.7 Region 3                  9.0        0.0        0.0          3.4        Region 3                  4.5        0.0        0.0          1.7 Region 4                  0.0        0.0        0.0          32.5        Region 4                  0.0        0.0        0.0        32.5 1 Unit Sites              4.6        9.9        0.0          5.1        1 Unit Sites              0.0        9.9        0.0          3.4 2 Unit Sites              8.8        2.6        0.0          3.8        2 Unit Sites              5.9        2.6        0.0          2.8 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        5.2        4.3        0.0          3.2        BWR                        0.0        4.3        0.0          1.6 PWR                        7.7        5.1        0.0          4.5        PWR                        5.1        5.1        0.0          3.6 Total All Regions          6.9        4.8        0.0          4.0        Total All Regions          3.4        4.8        0.0          2.9 71114.04 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 143 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            100      22          1.3        4.5    194          17          1.0        11.4      81      15          1.3          5.4 Region 2            260      17          1.0        15.3    236          17          1.0        13.9    243        17          0.9        14.3 Region 3            223      15          1.0        14.8    194          20          1.3        9.7    173        14          0.9        12.3 Region 4              0        0          0.0        0.0        0          0          0.0        0.0      31      25          3.6          1.2 1 Unit Sites        183      34          2.8        5.4    140          20          1.8        7.0    124        26          2.0          4.8 2 Unit Sites        357      74          2.5        4.8    372          57          1.8        6.5    339        34          1.1        10.0 3 Unit Sites        42      12          1.7        3.5    112          9          1.3        12.4      64      11          1.6          5.8 BWR                191      40          2.2        4.8    231          27          1.4        8.5    202        25          1.3          8.1 PWR                391      80          2.7        4.9    393          59          2.0        6.7    325        46          1.4          7.1 Total All          582      120          2.6        4.8    624          86          1.8        7.3    527        71          1.4          7.4 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 144 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            374      54        1.2        6.9 Region 2            739      51        1.0        14.5 Region 3            589      49        1.1        12.0 Region 4            31    123        17.6        0.3 1 Unit Sites        447      80        2.4        5.6 2 Unit Sites      1068    165        1.8        6.5 3 Unit Sites        218      32        1.7        6.8 BWR                624      92        1.7        6.8 PWR                1109    185        2.1        6.0 Total All          1733    277        1.9        6.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 145 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.05 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.05, "Maintenance of Emergency Preparedness," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.
Summary of PIM Findings 2015            2016            2017    3 Year Total NCV Green                                  3              4                3              10 Total                                      3              4                3              10 9/11/2018 2:22:01 PM                                                                                                                                        Page 146 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.05 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency    Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                  Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0            0              0          0          0 Region 2                  3        0    0    3    0          3          0            0          0            3              0          0          0 Region 3                  2        0    0    2    0          1          0            0          0            2              0          0          0 Region 4                  5        0    2    3    0          5          0            0          0            5              0          0          0 1 Unit Sites              5        0    2    3    0          5          0            0          0            5              0          0          0 2 Unit Sites              3        0    0    3    0          2          0            0          0            3              0          0          0 3 Unit Sites              2        0    0    2    0          2          0            0          0            2              0          0          0 BWR                        5        0    2    3    0          5          0            0          0            5              0          0          0 PWR                        5        0    0    5    0          4          0            0          0            5              0          0          0 Findings                  0        0    0    0    0          0          0            0          0            0              0          0          0 Associated SIT/AIT Total All Regions        10        0    2    8    0          9          0            0          0          10              0          0          0 Percentage of All    100%        0% 20%  80%    0%        90%          0%          0%          0%        100%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 147 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.05 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  10.3        6.7      10.5          8.8        Region 2                  10.3        6.7        10.5          8.8 Region 3                  71.4        0.0      10.6          10.2        Region 3                  71.4        0.0        0.0          5.1 Region 4                  0.0        0.0      15.0          59.9        Region 4                  0.0        0.0        15.0        59.9 1 Unit Sites            142.9        10.6      11.2          20.2        1 Unit Sites            142.9        10.6        11.2        20.2 2 Unit Sites              0.0        7.7      10.3          7.0        2 Unit Sites              0.0        7.7        5.1          4.7 3 Unit Sites              95.2      76.9        0.0          53.3        3 Unit Sites              95.2        76.9        0.0        53.3 BWR                    142.9        20.2        7.7          20.6        BWR                      142.9        20.2        7.7        20.6 PWR                        8.7      10.6      11.9          10.6        PWR                        8.7        10.6        6.0          8.5 Total All Regions        23.2      12.6      10.1          13.5        Total All Regions        23.2        12.6        6.7        12.0 71114.05 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 148 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            18      10          5.0        1.8        0          0          0.0        0.0      42        9          1.8          4.7 Region 2            98        8          1.0        12.2    150          9          1.0        16.6      95        8          0.9        11.9 Region 3            14        8          4.0        1.8      88        11          1.4        8.0      94        8          1.1        11.8 Region 4              0        0          0.0        0.0        0          0          0.0        0.0      67        6          1.0        11.1 1 Unit Sites          0        0          0.0        0.0      77        12          2.0        6.4      41        4          1.0        10.3 2 Unit Sites        119      23          2.6        5.2    129          17          1.9        7.6    216        23          1.3          9.4 3 Unit Sites        11        4          2.0        2.6      32          4          1.3        8.0      41        4          1.0        10.3 BWR                  14      13          6.5        1.1      50        10          2.0        5.0    130        14          1.3          9.3 PWR                116      19          2.1        6.1    188          23          1.9        8.2    168        17          1.2          9.9 Total All          130      32          3.2        4.0    238          33          2.1        7.2    298        31          1.3          9.6 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 149 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            60      26        4.3        2.3 Region 2            342      25        1.0        13.7 Region 3            196      27        1.8        7.3 Region 4            67      18        3.0        3.7 1 Unit Sites        118      21        2.3        5.6 2 Unit Sites        464      63        1.9        7.4 3 Unit Sites        84      12        1.7        7.0 BWR                194      37        2.2        5.2 PWR                471      59        1.7        8.0 Total All          665      96        1.9        6.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 150 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.06 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.06, "Drill Evaluation," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.
Summary of PIM Findings 2015              2016              2017    3 Year Total NCV Green                                    1                3                1                5 NCVIV N/A                                    0                0                1                1 Total                                        1                3                2                6 9/11/2018 2:22:01 PM                                                                                                                                Page 151 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.06 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  4        0    3    1    0          4          0            0          0          4              0          0          0 Region 2                  1        0    1    0    0          1          0            0          0          1              0          0          0 Region 3                  1        0    0    1    0          1          0            0          0          1              0          0          0 Region 4                  1        0    0    0    0          1          0            0          0          0              0          0          0 1 Unit Sites              3        0    0    2    0          3          0            0          0          2              0          0          0 2 Unit Sites              3        0    3    0    0          3          0            0          0          3              0          0          0 3 Unit Sites              1        0    1    0    0          1          0            0          0          1              0          0          0 BWR                      3        0    2    1    0          3          0            0          0          3              0          0          0 PWR                      4        0    2    1    0          4          0            0          0          3              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        7        0    4    2    0          7          0            0          0          6              0          0          0 Percentage of All    100%        0% 57%  29%    0%      100%            0%          0%          0%          86%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 152 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.06 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  8.0        3.7        4.6          5.4        Region 1                  8.0        3.7        4.6          5.4 Region 2                  0.0        3.0        0.0          1.0        Region 2                  0.0        3.0        0.0          1.0 Region 3                  3.6        3.2        0.0          2.2        Region 3                  3.6        3.2        0.0          2.2 Region 4                  0.0        0.0        4.1          1.4        Region 4                  0.0        0.0        4.1          1.4 1 Unit Sites              2.2        1.9        4.3          2.8        1 Unit Sites              2.2        1.9        4.3          2.8 2 Unit Sites              3.6        1.7        0.0          1.7        2 Unit Sites              3.6        1.7        0.0          1.7 3 Unit Sites              0.0      21.5        0.0          6.4        3 Unit Sites              0.0        21.5        0.0          6.4 BWR                        4.9        6.6        0.0          3.9        BWR                        4.9        6.6        0.0          3.9 PWR                        1.5        0.0        2.7          1.4        PWR                        1.5        0.0        2.7          1.4 Total All Regions          2.8        2.6        1.8          2.4        Total All Regions          2.8        2.6        1.8          2.4 71114.06 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 153 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            250      49          2.9        5.1    269          49          2.9        5.5      220        49        2.9          4.5 Region 2            314      56          3.1        5.6    338          54          3.0        6.3      355        58        3.2          6.1 Region 3            277      45          2.8        6.2    311          47          2.9        6.6      325        47        2.9          6.9 Region 4            228      37          2.8        6.2    243          36          2.8        6.7      242        40        3.1          6.0 1 Unit Sites        303      46          2.9        6.6    319          47          2.9        6.8      296        46        2.9          6.4 2 Unit Sites        661      120          3.1        5.5    725        117          3.0        6.2      721      121        3.1          6.0 3 Unit Sites        105      21          2.6        5.0    117          22          2.8        5.3      125        27        3.4          4.6 BWR                409      70          2.9        5.8    458          72          3.0        6.4      409        79        3.3          5.2 PWR                660      117          3.1        5.6    702        114          3.0        6.2      733      115        3.0          6.4 Total All          1068      187          3.1        5.7    1160        186          3.0        6.2    1142      194        3.2          5.9 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 154 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            739    147        3.0        5.0 Region 2          1007    168        3.2        6.0 Region 3            913    139        3.0        6.6 Region 4            712    113        3.1        6.3 1 Unit Sites        917    139        3.0        6.6 2 Unit Sites      2107    358        3.1        5.9 3 Unit Sites        346      70        3.2        4.9 BWR                1276    221        3.1        5.8 PWR                2094    346        3.1        6.1 Total All          3370    567        3.1        5.9 Regions 9/11/2018 2:22:01 PM                                                                      Page 155 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.07 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.07, "Exercise Evaluation - Hostile Action (HA) Event," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.
Summary of PIM Findings 2015    3 Year Total NCV Green                                  1                  1 Total                                      1                  1 9/11/2018 2:22:01 PM                                                                                                                                            Page 156 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.07 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                  Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  1        0    1    0    0          1          0            0          0          1              0          0          0 1 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 2 Unit Sites              1        0    1    0    0          1          0            0          0          1              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      1        0    1    0    0          1          0            0          0          1              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        1        0    1    0    0          1          0            0          0          1              0          0          0 Percentage of All    100%        0% 100%  0%    0%      100%            0%          0%          0%        100%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 157 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.07 Findings per 1000 Inspection                Inspector Identified Findings per 1000 Inspection Hours                                      Hours Findings /  3 Year                          Findings /    3 Year 1000 hrs  Findings                          1000 hrs    Findings (2015)    /1000 hrs                          (2015)      /1000 hrs Region 1                  0.0          0.0 Region 1                    0.0            0.0 Region 2                  0.0          0.0 Region 2                    0.0            0.0 Region 3                  0.0          0.0 Region 3                    0.0            0.0 Region 4                  0.0          0.0 Region 4                    0.0            0.0 1 Unit Sites              0.0          0.0 1 Unit Sites                0.0            0.0 2 Unit Sites              1.6          1.6 2 Unit Sites                1.6            1.6 3 Unit Sites              0.0          0.0 3 Unit Sites                0.0            0.0 BWR                        0.0          0.0 BWR                        0.0            0.0 PWR                        1.3          1.3 PWR                        1.3            1.3 Total All Regions          0.8          0.8 Total All Regions          0.8            0.8 71114.07 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                          Page 158 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            237        5          1.0        47.4        0          0          0.0        0.0        0        0          0.0          0.0 Region 2            485        6          0.9        80.8        0          0          0.0        0.0        0        0          0.0          0.0 Region 3            477        5          0.8        95.3        0          0          0.0        0.0        0        0          0.0          0.0 Region 4              0        0          0.0        0.0        0          0          0.0        0.0        0        0          0.0          0.0 1 Unit Sites        398        8          1.3        49.7        0          0          0.0        0.0        0        0          0.0          0.0 2 Unit Sites        705      12          1.2        58.8        0          0          0.0        0.0        0        0          0.0          0.0 3 Unit Sites        96        2          1.0        48.0        0          0          0.0        0.0        0        0          0.0          0.0 BWR                437        7          1.0        62.4        0          0          0.0        0.0        0        0          0.0          0.0 PWR                762      15          1.5        50.8        0          0          0.0        0.0        0        0          0.0          0.0 Total All          1199      22          1.4        54.5        0          0          0.0        0.0        0        0          0.0          0.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 159 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            237        5        1.0        47.4 Region 2            485        6        0.9        80.8 Region 3            477        5        0.8        95.3 Region 4              0        0        0.0        0.0 1 Unit Sites        398        8        1.3        49.7 2 Unit Sites        705      12        1.2        58.8 3 Unit Sites        96        2        1.0        48.0 BWR                437        7        0.9        62.4 PWR                762      15        1.4        50.8 Total All          1199      22        1.2        54.5 Regions 9/11/2018 2:22:01 PM                                                                      Page 160 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.08 Revision History Date of Revision      Description of Revision 07/21/2016            IP 71114.08, "Exercise Evaluation - Scenario Review," has been revised to address guidance and editorial changes. Closed feedback form 71114-1925.
Summary of PIM Findings 9/11/2018 2:22:01 PM                                                                                                                                          Page 161 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.08 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  0        0    0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 2 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        0        0    0    0    0          0          0            0          0          0              0          0          0 Percentage of All    100%        0%  0%  0%    0%          0%          0%          0%          0%          0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 162 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71114.08 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0        0.0        0.0          0.0        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              0.0        0.0        0.0          0.0        1 Unit Sites              0.0        0.0        0.0          0.0 2 Unit Sites              0.0        0.0        0.0          0.0        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                        0.0        0.0        0.0          0.0        PWR                        0.0        0.0        0.0          0.0 Total All Regions          0.0        0.0        0.0          0.0        Total All Regions          0.0        0.0        0.0          0.0 71114.08 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 163 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            32        7          1.2        4.6      55          9          1.1        6.1      34        7          1.8          4.9 Region 2            63        9          1.0        7.0    102          8          0.9        12.7      97        9          1.1        10.8 Region 3            54        7          1.0        7.7      44          8          1.1        5.4      36        7          1.0          5.1 Region 4              0        0          0.0        0.0        0          0          0.0        0.0      40        6          1.5          6.6 1 Unit Sites        39      11          1.4        3.5      15          4          1.3        3.6      66      11          1.2          6.0 2 Unit Sites        94      15          1.4        6.2    148          23          1.4        6.4    106        15          1.5          7.1 3 Unit Sites        16        3          1.0        5.4      38          4          0.8        9.5      35        3          1.0        11.7 BWR                  53      10          1.1        5.3      64        13          1.3        4.9      72      10          1.3          7.2 PWR                  96      19          1.6        5.0    137          18          1.4        7.6    135        19          1.5          7.1 Total All          149      29          1.5        5.1    200          31          1.4        6.5    207        29          1.5          7.1 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 164 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            121      23        1.4        5.3 Region 2            262      26        1.1        10.1 Region 3            133      22        1.2        6.1 Region 4            40      18        4.5        2.2 1 Unit Sites        119      26        1.4        4.6 2 Unit Sites        347      53        1.5        6.6 3 Unit Sites        89      10        1.1        8.9 BWR                188      33        1.3        5.7 PWR                367      56        1.5        6.6 Total All          556      89        1.4        6.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 165 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.01 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.01, Radiological Hazard Assessment and Exposure Controls, has been revised as a major editorial revision.
02/19/2016            IP 71124.01, "Radiological Hazard Assessment and Exposure Controls," has been revised based on the 2013 ROP Enhancement project. The revision clarified the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted.
Incorporated feedback forms 71124.01-1636 and 71124.01-2132<br><br>
Summary of PIM Findings 2015              2016          2017      3 Year Total NCV Green                                      11              15              7                33 Total                                          11              15              7                33 9/11/2018 2:22:01 PM                                                                                                                                            Page 166 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.01 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  10        0    1    9    0          4          0            0          0          0            10          0          0 Region 2                  11        0    0  10    0          8          0            0          0          0            11          0          0 Region 3                  6        0    1    5    0          1          0            0          0          0              6          0          0 Region 4                  6        0    1    5    0          3          0            0          0          0              6          0          0 1 Unit Sites              8        0    0    8    0          3          0            0          0          0              8          0          0 2 Unit Sites              20        0    3  16    0          9          0            0          0          0            20          0          0 3 Unit Sites              5        0    0    5    0          4          0            0          0          0              5          0          0 BWR                      21        0    2  19    0          13          0            0          0          0            21          0          0 PWR                      12        0    1  10    0          3          0            0          0          0            12          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        33        0    3  29    0          16          0            0          0          0            33          0          0 Percentage of All    100%        0%  9%  88%    0%        48%          0%          0%          0%          0%        100%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 167 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.01 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  8.2      10.3        1.7          6.5        Region 1                  5.5        1.8        0.0          2.0 Region 2                  6.5        6.3        4.6          5.8        Region 2                  3.3        4.7        4.6          4.2 Region 3                  4.5        5.5        1.8          3.9        Region 3                  2.3        0.0        0.0          0.6 Region 4                  4.7        5.3        4.7          4.9        Region 4                  4.7        0.0        2.3          2.4 1 Unit Sites              1.3        5.0        3.7          3.4        1 Unit Sites              1.3        1.3        1.2          1.3 2 Unit Sites              10.5        6.4        1.6          5.7        2 Unit Sites              6.3        0.8        0.8          2.3 3 Unit Sites              0.0      35.3      16.0          15.5        3 Unit Sites              0.0        23.5        16.0        12.4 BWR                      13.4      10.3        5.9          9.4        BWR                      10.0        4.0        3.5          5.4 PWR                        2.4        5.1        1.5          3.0        PWR                        0.8        0.7        0.7          0.8 Total All Regions          6.0        7.0        3.2          5.3        Total All Regions          3.8        1.9        1.8          2.4 71124.01 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 168 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            364      16          1.0        22.8    567        115          6.8        4.9      584      115        6.8          5.1 Region 2            612      17          0.9        36.0    636        121          6.7        5.3      646      120        6.7          5.4 Region 3            441      15          0.9        29.4    543        105          6.6        5.2      558      105        6.6          5.3 Region 4            425      12          0.9        35.4    378          84          7.0        4.5      428        84        6.5          5.1 1 Unit Sites        492      15          0.9        32.8    486        106          6.6        4.6      502      107        6.7          4.7 2 Unit Sites      1127      38          1.0        29.7    1409        270          7.1        5.2    1411      268        6.9          5.3 3 Unit Sites        223        7          1.0        31.8    229          49          6.1        4.7      303        49        6.1          6.2 BWR                599      23          1.0        26.0    757        168          7.3        4.5      852      162        6.8          5.3 PWR                1243      37          1.0        33.6    1367        257          6.8        5.3    1364      262        6.9          5.2 Total All          1841      60          1.0        30.7    2123        425          7.1        5.0    2216      424        7.0          5.2 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 169 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1515    246        5.1        6.2 Region 2          1894    258        5.0        7.3 Region 3          1541    225        4.9        6.9 Region 4          1230    180        5.0        6.8 1 Unit Sites      1479    228        5.0        6.5 2 Unit Sites      3946    576        5.1        6.9 3 Unit Sites        755    105        5.0        7.2 BWR                2207    353        5.1        6.3 PWR                3973    556        4.9        7.1 Total All          6180    909        5.0        6.8 Regions 9/11/2018 2:22:01 PM                                                                      Page 170 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.02 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.02, Occupational ALARA Planning and Controls, has been revised as a major editorial revision.
03/02/2016            IP 71124.02, "Occupational ALARA Planning and Controls," has been revised based on the 2013 ROP Enhancement project. The revision clarified the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted. Incorporated feedback forms 71124.02-1762 Summary of PIM Findings 2015            2016            2017      3 Year Total FIN Green                                    1              1                1                3 NCV Green                                    0              1                0                1 Total                                        1              2                1                4 9/11/2018 2:22:01 PM                                                                                                                                          Page 171 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.02 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          0          0            0          0          0              1          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  1        0    0    1    0          0          0            0          0          0              1          0          0 Region 4                  2        0    1    1    0          2          0            0          0          0              2          0          0 1 Unit Sites              3        0    1    2    0          2          0            0          0          0              3          0          0 2 Unit Sites              1        0    0    1    0          0          0            0          0          0              1          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      3        0    1    2    0          2          0            0          0          0              3          0          0 PWR                      1        0    0    1    0          0          0            0          0          0              1          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        4        0    1    3    0          2          0            0          0          0              4          0          0 Percentage of All    100%        0% 25%  75%    0%        50%          0%          0%          0%          0%        100%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 172 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.02 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        3.2        0.0          1.1        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        0.0        2.5          0.9        Region 3                  0.0        0.0        0.0          0.0 Region 4                  3.5        2.8        0.0          2.2        Region 4                  3.5        2.8        0.0          2.2 1 Unit Sites              2.5        2.1        1.6          2.0        1 Unit Sites              2.5        2.1        0.0          1.3 2 Unit Sites              0.0        1.1        0.0          0.4        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        2.5        2.2        1.4          1.9        BWR                        2.5        2.2        0.0          1.3 PWR                        0.0        1.1        0.0          0.4        PWR                        0.0        0.0        0.0          0.0 Total All Regions          0.8        1.5        0.7          1.0        Total All Regions          0.8        0.7        0.0          0.5 71124.02 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 173 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            230      11          0.8        20.9    308          42          2.8        7.3    387        61        3.8          6.3 Region 2            367        9          0.9        40.7    340          40          4.4        8.5    408        45        4.5          9.1 Region 3            319      14          0.9        22.8    374          32          2.9        11.7    404        47        3.4          8.6 Region 4            284      12          1.0        23.6    352          30          2.3        11.7    266        38        3.8          7.0 1 Unit Sites        285      12          0.9        23.8    278          26          2.6        10.7    375        53        3.8          7.1 2 Unit Sites        723      27          0.9        26.8    929        101          3.3        9.2    864      113        4.2          7.6 3 Unit Sites        191        7          1.0        27.3    167          17          2.8        9.8    225        25        3.1          9.0 BWR                400      19          1.0        21.1    448          48          2.8        9.3    703        82        3.7          8.6 PWR                798      27          0.9        29.6    926          96          3.3        9.6    761      109        4.2          7.0 Total All          1199      46          1.0        26.1    1374        144          3.2        9.5    1464      191        4.1          7.7 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 174 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            924    114        2.7        8.1 Region 2          1114      94        3.5        11.9 Region 3          1097      93        2.4        11.8 Region 4            901      80        2.4        11.3 1 Unit Sites        938      91        2.6        10.3 2 Unit Sites      2516    241        2.8        10.4 3 Unit Sites        583      49        2.6        11.9 BWR                1551    149        2.6        10.4 PWR                2485    232        2.8        10.7 Total All          4036    381        2.7        10.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 175 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.03 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.03, In-Plant Airborne Radioactivity Control and Mitigation, has been revised as a major editorial revision.
02/24/2016            IP 71124.03, "In-Plant Airborne Radioactivity Control and Mitigation," has been revised in response to the 2013 ROP Enhancement project. The revisions clarify the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how the samples are counted.
Summary of PIM Findings 2015              2016            2017      3 Year Total NCV Green                                      4                4                1                  9 Total                                          4                4                1                  9 9/11/2018 2:22:01 PM                                                                                                                                            Page 176 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.03 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  7        0    1    5    0          5          0            0          0          0              7          0          0 Region 4                  2        0    0    2    0          2          0            0          0          0              2          0          0 1 Unit Sites              4        0    1    2    0          3          0            0          0          0              4          0          0 2 Unit Sites              3        0    0    3    0          2          0            0          0          0              3          0          0 3 Unit Sites              2        0    0    2    0          2          0            0          0          0              2          0          0 BWR                      6        0    1    4    0          5          0            0          0          0              6          0          0 PWR                      3        0    0    3    0          2          0            0          0          0              3          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        9        0    1    7    0          7          0            0          0          0              9          0          0 Percentage of All    100%        0% 11%  78%    0%        78%          0%          0%          0%          0%        100%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 177 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.03 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  31.4      14.4      18.3          21.3        Region 3                  15.7        14.4        18.3        16.0 Region 4                  0.0      10.2        0.0          3.0        Region 4                  0.0        10.2        0.0          3.0 1 Unit Sites              16.0        0.0        9.3          8.0        1 Unit Sites              10.6        0.0        9.3          6.4 2 Unit Sites              3.4        6.1        0.0          3.2        2 Unit Sites              0.0        6.1        0.0          2.1 3 Unit Sites              0.0      62.5        0.0          11.4        3 Unit Sites              0.0        62.5        0.0        11.4 BWR                      16.4      12.1        7.3          11.2        BWR                      11.0        12.1        7.3          9.6 PWR                        3.1        2.5        0.0          1.9        PWR                        0.0        2.5        0.0          1.0 Total All Regions          7.9        5.3        3.4          5.4        Total All Regions          3.9        5.3        3.4          4.2 71124.03 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 178 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            125      13          1.0        9.6    205          34          2.4        6.0      154        30          2.1          5.1 Region 2            167        9          0.9        18.5    128          32          3.6        4.0      180        36          3.6          5.0 Region 3            128        9          1.1        14.2    139          32          2.7        4.4      109        29          3.2          3.8 Region 4            91        5          1.0        18.2      98        20          3.3        4.9      144        28          3.5          5.1 1 Unit Sites        139        9          1.0        15.4    129          25          2.5        5.2      162        35          3.2          4.6 2 Unit Sites        306      21          1.0        14.5    362          78          3.1        4.6      353        74          3.1          4.8 3 Unit Sites        66        6          1.2        10.9      79        15          3.0        5.2        71      14          2.8          5.1 BWR                183      18          1.1        10.1    166          36          2.4        4.6      275        56          2.9          4.9 PWR                327      18          1.0        18.2    404          82          3.4        4.9      312        67          3.4          4.7 Total All          510      36          1.1        14.2    570        118          3.1        4.8      586      123          3.2          4.8 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 179 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            483      77        2.0        6.3 Region 2            474      77        2.9        6.2 Region 3            376      70        2.6        5.4 Region 4            333      53        3.1        6.3 1 Unit Sites        430      69        2.5        6.2 2 Unit Sites      1021    173        2.5        5.9 3 Unit Sites        215      35        2.7        6.2 BWR                623    110        2.2        5.7 PWR                1043    167        2.7        6.2 Total All          1665    277        2.5        6.0 Regions 9/11/2018 2:22:01 PM                                                                      Page 180 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.04 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.04, Occupational Dose Assessment, has been revised as a major editorial revision.
02/19/2016            IP 71124.04, "Occupational Dose Assessment," has been revised based on the 2013 ROP Enhancement project. The revision clarified the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted.<br><br>
Summary of PIM Findings 2015            2016      3 Year Total NCV Green                                  1                1                2 NCVIV N/A                                  1                0                1 Total                                      2                1                3 9/11/2018 2:22:01 PM                                                                                                                                        Page 181 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.04 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  2        0    0    1    0          2          0            0          0          0              2          0          0 Region 4                  1        0    0    1    0          0          0            0          0          0              1          0          0 1 Unit Sites              1        0    0    0    0          1          0            0          0          0              1          0          0 2 Unit Sites              1        0    0    1    0          1          0            0          0          0              1          0          0 3 Unit Sites              1        0    0    1    0          0          0            0          0          0              1          0          0 BWR                      1        0    0    0    0          1          0            0          0          0              1          0          0 PWR                      2        0    0    2    0          1          0            0          0          0              2          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        3        0    0    2    0          2          0            0          0          0              3          0          0 Percentage of All    100%        0%  0%  67%    0%        67%          0%          0%          0%          0%        100%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 182 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.04 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  24.0        0.0        0.0          5.5        Region 3                  24.0        0.0        0.0          5.5 Region 4                  0.0        6.6        0.0          3.2        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              6.5        0.0        0.0          1.7        1 Unit Sites              6.5        0.0        0.0          1.7 2 Unit Sites              3.3        0.0        0.0          1.2        2 Unit Sites              3.3        0.0        0.0          1.2 3 Unit Sites              0.0      41.7        0.0          9.3        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        8.3        0.0        0.0          2.0        BWR                        8.3        0.0        0.0          2.0 PWR                        2.7        2.1        0.0          1.9        PWR                        2.7        0.0        0.0          1.0 Total All Regions          4.1        1.4        0.0          1.9        Total All Regions          4.1        0.0        0.0          1.3 71124.04 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 183 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            149      14          1.0        10.6    209          62          4.4        3.4        52      31          3.9          1.7 Region 2            139        9          0.9        15.4    170          40          4.4        4.2      165        46          5.1          3.6 Region 3            84      10          1.1        8.4    163          39          3.3        4.2      116        37          4.6          3.1 Region 4            115        5          0.8        23.0    152          35          4.4        4.3        50      35        11.7          1.4 1 Unit Sites        118      11          1.1        10.7    152          39          3.9        3.9      131        38          4.2          3.5 2 Unit Sites        320      23          1.0        13.9    450        112          4.3        4.0      196      100          6.7          2.0 3 Unit Sites        49        4          1.0        12.2      92        25          4.2        3.7        55      11          3.7          5.0 BWR                121      17          1.1        7.1    207          63          3.9        3.3      185        59          4.5          3.1 PWR                365      21          1.0        17.4    487        113          4.5        4.3      198        90          6.9          2.2 Total All          486      38          1.1        12.8    694        176          4.4        3.9      382      149          6.0          2.6 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 184 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            410    107        3.1        3.8 Region 2            473      95        3.7        5.0 Region 3            362      86        3.2        4.2 Region 4            317      75        5.0        4.2 1 Unit Sites        400      88        3.3        4.5 2 Unit Sites        966    235        3.7        4.1 3 Unit Sites        195      40        3.6        4.9 BWR                513    139        3.2        3.7 PWR                1049    224        3.8        4.7 Total All          1562    363        3.6        4.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 185 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.05 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.05, Radiation Monitoring Instrumentation, has been revised as a major editorial revision.
04/01/2016            IP 71124.05, "Radiation Monitoring Instrumentation," has been revised in response to the 2013 ROP Enhancement Project. The revision changes how inspection samples are counted.
Summary of PIM Findings 2015              2017    3 Year Total NCV Green                                  4                  0                4 VIO Green                                  0                  1                1 Total                                      4                  1                5 9/11/2018 2:22:01 PM                                                                                                                                          Page 186 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.05 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  2        0    0    1    0          2          0            0          0          0              1          1          0 Region 4                  3        0    2    1    0          3          0            0          0          0              1          2          0 1 Unit Sites              3        0    2    1    0          3          0            0          0          0              1          2          0 2 Unit Sites              2        0    0    1    0          2          0            0          0          0              1          1          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      3        0    2    1    0          3          0            0          0          0              1          2          0 PWR                      2        0    0    1    0          2          0            0          0          0              1          1          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        5        0    2    2    0          5          0            0          0          0              2          3          0 Percentage of All    100%        0% 40%  40%    0%      100%            0%          0%          0%          0%          40%        60%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 187 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.05 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  9.7      10.1        0.0          4.2        Region 3                  9.7        10.1        0.0          4.2 Region 4                  6.9        0.0        5.2          4.5        Region 4                  6.9        0.0        5.2          4.5 1 Unit Sites              6.5        0.0        2.1          3.2        1 Unit Sites              6.5        0.0        2.1          3.2 2 Unit Sites              2.5        1.8        0.0          1.3        2 Unit Sites              2.5        1.8        0.0          1.3 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        8.4        0.0        1.9          3.6        BWR                        8.4        0.0        1.9          3.6 PWR                        1.6        1.6        0.0          1.1        PWR                        1.6        1.6        0.0          1.1 Total All Regions          4.1        1.2        0.9          2.1        Total All Regions          4.1        1.2        0.9          2.1 71124.05 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 188 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            152      11          1.1        13.8    304          30          2.5        10.1    242        23        2.3        10.5 Region 2            318        9          0.9        35.3    269          24          2.7        11.2    241        27        3.4          8.9 Region 3            205        9          1.0        22.8      99          9          2.3        11.0    402        36        2.8        11.2 Region 4            291        7          0.9        41.6    188          13          2.2        14.5    192        21        2.6          9.1 1 Unit Sites        270      10          0.9        27.0    141          12          2.4        11.7    359        33        2.8        10.9 2 Unit Sites        566      21          1.1        27.0    658          58          2.6        11.3    564        56        2.8        10.1 3 Unit Sites        131        5          1.0        26.1      61          6          2.0        10.2    154        18        3.0          8.6 BWR                358      16          1.1        22.4    221          23          2.6        9.6    520        48        2.7        10.8 PWR                608      20          1.0        30.4    639          53          2.7        12.0    557        59        3.1          9.4 Total All          966      36          1.1        26.8    860          76          2.7        11.3    1077      107        3.0        10.1 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 189 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            698      64        2.1        10.9 Region 2            827      60        2.4        13.8 Region 3            707      54        2.3        13.1 Region 4            671      41        2.1        16.4 1 Unit Sites        769      55        2.1        14.0 2 Unit Sites      1788    135        2.3        13.2 3 Unit Sites        346      29        2.4        11.9 BWR                1099      87        2.1        12.6 PWR                1803    132        2.3        13.7 Total All          2902    219        2.2        13.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 190 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.06 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.06, Radioactive Gaseous and Liquid Effluent Treatment, has been revised as a major editorial revision.
04/01/2016            IP 71124.06, "Radioactive Gaseous and Liquid Effluent Treatment," has been revised in response to the 2013 ROP Enhancement Project. The revision changed how inspection samples are counted, and moved the sections on ground water inspections from 71124.06 to 71124.07. It also incorporates effluent monitoring instrumentation from 71124.05 into 71124.06.
Summary of PIM Findings 2015              2016            2017    3 Year Total FIN Green                                  0                0                1                1 NCV Green                                  1                1                2                4 NOV White                                  0                0                1                1 Total                                      1                1                4                6 9/11/2018 2:22:01 PM                                                                                                                                          Page 191 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.06 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  5        1    0    4    0          5          0            0          0          1              1          3          0 Region 4                  1        0    1    0    0          1          0            0          0          0              0          1          0 1 Unit Sites              5        1    1    3    0          5          0            0          0          1              1          3          0 2 Unit Sites              1        0    0    1    0          1          0            0          0          0              0          1          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      3        1    1    1    0          3          0            0          0          1              0          2          0 PWR                      3        0    0    3    0          3          0            0          0          0              1          2          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        6        1    1    4    0          6          0            0          0          1              1          4          0 Percentage of All    100%      17%  17%  67%    0%      100%            0%          0%          0%          17%          17%        67%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 192 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.06 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  3.1        6.1      12.5          7.4        Region 3                  3.1        6.1        9.4          6.2 Region 4                  0.0        0.0        4.1          1.5        Region 4                  0.0        0.0        4.1          1.5 1 Unit Sites              1.9        4.5        7.2          4.6        1 Unit Sites              1.9        4.5        5.4          3.9 2 Unit Sites              0.0        0.0        1.9          0.7        2 Unit Sites              0.0        0.0        1.9          0.7 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        2.9        4.6          2.6        BWR                        0.0        2.9        4.6          2.6 PWR                        1.7        0.0        4.3          2.2        PWR                        1.7        0.0        2.9          1.7 Total All Regions          1.0        1.1        4.4          2.4        Total All Regions          1.0        1.1        3.5          2.0 71124.06 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 193 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            136        8          1.1        17.0    267          45          5.0        5.9      305        54        5.4          5.6 Region 2            242        8          0.9        30.3    288          51          5.1        5.6      258        48        5.3          5.4 Region 3            323      10          0.9        32.3    164          34          5.7        4.8      321        57        5.7          5.6 Region 4            253        7          0.9        36.1    158          25          4.2        6.3      245        42        5.3          5.8 1 Unit Sites        329      10          0.9        32.9    149          28          4.7        5.3      341        62        5.6          5.5 2 Unit Sites        534      18          0.9        29.7    619        109          5.5        5.7      655      115        5.8          5.7 3 Unit Sites        91        5          1.3        18.2    109          18          4.5        6.1      134        24        4.8          5.6 BWR                368      13          1.0        28.3    344          67          6.1        5.1      433        73        5.6          5.9 PWR                586      20          1.0        29.3    533          88          4.9        6.1      696      128        5.8          5.4 Total All          954      33          1.0        28.9    877        155          5.5        5.7    1129      201        5.9          5.6 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 194 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            708    107        4.5        6.6 Region 2            788    107        4.1        7.4 Region 3            808    101        4.0        8.0 Region 4            656      74        3.7        8.9 1 Unit Sites        818    100        3.8        8.2 2 Unit Sites      1808    242        4.2        7.5 3 Unit Sites        334      47        4.3        7.1 BWR                1145    153        4.3        7.5 PWR                1815    236        4.0        7.7 Total All          2960    389        4.1        7.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 195 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.07 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.07, Radiological Environmental Monitoring Program, has been revised as a major editorial revision.
04/01/2016            IP 71124.07, "Radiological Environmental Monitoring Program," has been revised in response to the 2013 ROP Enhancement Project. This revised procedure includes groundwater monitoring inspection requirements transferred from IP 71124.06, and changed the way samples are counted.
Summary of PIM Findings 2015              2016            2017      3 Year Total NCV Green                                  3                1                2                6 NOV N/A                                    1                0                0                1 Total                                      4                1                2                7 9/11/2018 2:22:01 PM                                                                                                                                        Page 196 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.07 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    0    0          1          0            0          0          0              0          1          0 Region 2                  1        0    0    1    0          0          0            0          0          0              1          0          0 Region 3                  2        0    1    1    0          2          0            0          0          0              0          2          0 Region 4                  3        0    0    2    0          3          0            0          0          0              0          3          0 1 Unit Sites              3        0    0    2    0          3          0            0          0          0              0          3          0 2 Unit Sites              4        0    1    2    0          3          0            0          0          0              1          3          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      3        0    0    2    0          3          0            0          0          0              0          3          0 PWR                      4        0    1    2    0          3          0            0          0          0              1          3          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        7        0    1    4    0          6          0            0          0          0              1          6          0 Percentage of All    100%        0% 14%  57%    0%        86%          0%          0%          0%          0%          14%        86%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 197 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.07 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  2.6        0.0        0.0          1.2        Region 1                  2.6        0.0        0.0          1.2 Region 2                  0.0        4.2        0.0          1.5        Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        8.4      13.6          7.9        Region 3                  0.0        4.2        9.1          4.7 Region 4                  12.8        0.0        0.0          5.3        Region 4                  10.1        0.0        0.0          3.7 1 Unit Sites              6.3        4.0        2.4          4.3        1 Unit Sites              4.5        0.0        0.0          1.8 2 Unit Sites              2.0        4.2        3.9          3.4        2 Unit Sites              2.0        2.1        3.9          2.7 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        6.5        3.9        2.5          4.5        BWR                        4.7        0.0        0.0          1.8 PWR                        1.8        3.9        3.6          3.1        PWR                        1.8        1.9        3.6          2.5 Total All Regions          3.9        3.9        3.1          3.6        Total All Regions          3.1        1.3        2.1          2.2 71124.07 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 198 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            387      13          0.9        29.8    172          17          2.8        10.1    307        33          3.0          9.3 Region 2            220        8          0.9        27.5    240          25          2.5        9.6    219        24          2.7          9.1 Region 3            176        7          0.9        25.1    239          24          2.7        10.0    220        22          2.8        10.0 Region 4            198        7          0.9        28.2    119          10          2.0        11.9    218        24          2.7          9.1 1 Unit Sites        248        9          0.9        27.6    199          19          2.4        10.4    235        24          2.7          9.8 2 Unit Sites        630      22          1.0        28.6    449          45          2.8        10.0    631        70          3.0          9.0 3 Unit Sites        103        4          0.8        25.6    122          12          2.4        10.1      99        9          2.3        10.9 BWR                429      15          0.9        28.6    253          28          2.8        9.0    405        42          2.8          9.6 PWR                552      20          1.0        27.6    516          48          2.7        10.8    559        61          3.1          9.2 Total All          980      35          1.0        28.0    769          76          2.8        10.1    964      103          3.0          9.4 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 199 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            866      63        2.2        13.7 Region 2            679      57        2.2        11.9 Region 3            635      53        2.3        12.0 Region 4            534      41        2.1        13.0 1 Unit Sites        681      52        2.1        13.1 2 Unit Sites      1710    137        2.3        12.5 3 Unit Sites        323      25        2.1        12.9 BWR                1087      85        2.1        12.8 PWR                1627    129        2.2        12.6 Total All          2714    214        2.2        12.7 Regions 9/11/2018 2:22:01 PM                                                                      Page 200 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.08 Revision History Date of Revision      Description of Revision 12/21/2017            IP 71124.08, Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation, has been revised as a major editorial revision.
01/26/2016            IP 71124.08, "Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation," has been revised in response to the 2013 ROP Enhancement Project. This major revision clarifies the existing inspection requirements and enhanced the inspection guidance section. The revision also changed how samples are counted.
Summary of PIM Findings 2015            2016              2017      3 Year Total NCV Green                                  4                3                2                  9 NCVIV N/A                                  1                0                0                  1 Total                                      5                3                2                10 9/11/2018 2:22:01 PM                                                                                                                                            Page 201 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.08 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  3        0    3    0    0          3          0            0          0          0              1          2          0 Region 2                  1        0    0    1    0          1          0            0          0          0              0          1          0 Region 3                  2        0    0    2    0          0          0            0          0          0              0          2          0 Region 4                  4        0    0    3    0          2          0            0          0          0              0          3          0 1 Unit Sites              8        0    3    4    0          5          0            0          0          0              1          6          0 2 Unit Sites              1        0    0    1    0          0          0            0          0          0              0          1          0 3 Unit Sites              1        0    0    1    0          1          0            0          0          0              0          1          0 BWR                        8        0    3    4    0          5          0            0          0          0              1          6          0 PWR                        2        0    0    2    0          1          0            0          0          0              0          2          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        10        0    3    6    0          6          0            0          0          0              1          8          0 Percentage of All    100%        0% 30%  60%    0%        60%          0%          0%          0%          0%          10%        80%          0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 202 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71124.08 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  6.5        3.6        0.0          3.4        Region 1                  6.5        3.6        0.0          3.4 Region 2                  0.0        4.0        0.0          1.4        Region 2                  0.0        4.0        0.0          1.4 Region 3                  0.0        9.3        2.5          2.6        Region 3                  0.0        0.0        0.0          0.0 Region 4                  13.6        0.0        4.4          7.4        Region 4                  7.8        0.0        0.0          3.1 1 Unit Sites              11.8        3.3        4.1          6.9        1 Unit Sites              8.4        3.3        0.0          3.9 2 Unit Sites              0.0        2.3        0.0          0.6        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0      19.2        0.0          8.3        3 Unit Sites              0.0        19.2        0.0          8.3 BWR                      11.6        6.7        4.2          7.4        BWR                        7.6        6.7        0.0          4.3 PWR                        1.5        2.0        0.0          1.1        PWR                        1.5        0.0        0.0          0.5 Total All Regions          5.5        3.8        1.7          3.6        Total All Regions          3.8        2.5        0.0          2.0 71124.08 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 203 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            310        8          0.9        38.8    281          48          4.8        5.9      292        48        5.3          6.1 Region 2            219        8          1.0        27.4    251          56          5.6        4.5      224        48        5.3          4.7 Region 3            269        8          0.9        33.6    108          18          4.5        6.0      403        72        5.5          5.6 Region 4            257        8          1.0        32.2    160          30          5.0        5.3      225        42        5.3          5.4 1 Unit Sites        254        7          0.9        36.3    269          48          4.8        5.6      223        42        5.3          5.3 2 Unit Sites        619      20          1.1        31.0    478          91          5.7        5.2      740      138        5.8          5.4 3 Unit Sites        182        5          0.8        36.4      52        13          4.3        4.0      181        30        5.0          6.0 BWR                396      11          0.9        36.0    299          56          5.1        5.3      482        84        5.6          5.7 PWR                659      21          1.1        31.4    500          96          5.6        5.2      662      126        5.7          5.3 Total All          1055      32          1.0        33.0    799        152          5.6        5.3    1144      210        5.8          5.4 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 204 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            883    104        4.0        8.5 Region 2            694    112        4.5        6.2 Region 3            779      98        4.1        7.9 Region 4            642      80        4.0        8.0 1 Unit Sites        746      97        4.0        7.7 2 Unit Sites      1837    249        4.4        7.4 3 Unit Sites        415      48        3.7        8.6 BWR                1176    151        4.1        7.8 PWR                1821    243        4.2        7.5 Total All          2998    394        4.2        7.6 Regions 9/11/2018 2:22:01 PM                                                                      Page 205 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.01 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.01, "Access Authorization," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/20/2015            IP 71130.01, "Access Authorization," has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2015              2017      3 Year Total NCV Green                                    6                3                9 Total                                        6                3                9 9/11/2018 2:22:01 PM                                                                                                                                              Page 206 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.01 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  1        0    0    1    0          0          0            0          0          0              0          0          1 Region 3                  4        0    0    0    0          3          0            0          0          0              0          0          0 Region 4                  4        0    1    2    0          4          0            0          0          0              0          0          2 1 Unit Sites              3        0    0    2    0          3          0            0          0          0              0          0          1 2 Unit Sites              6        0    1    1    0          4          0            0          0          0              0          0          2 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      4        0    0    0    0          3          0            0          0          0              0          0          0 PWR                      5        0    1    3    0          4          0            0          0          0              0          0          3 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        9        0    1    3    0          7          0            0          0          0              0          0          3 Percentage of All    100%        0% 11%  33%    0%        78%          0%          0%          0%          0%            0%          0%      33%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 207 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.01 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0        4.8          2.5        Region 2                  0.0        0.0        0.0          0.0 Region 3                  9.6        0.0        0.0          9.6        Region 3                  7.2        0.0        0.0          7.2 Region 4                  4.9        0.0        5.1          5.0        Region 4                  4.9        0.0        5.1          5.0 1 Unit Sites              3.5        0.0        2.9          3.1        1 Unit Sites              3.5        0.0        2.9          3.1 2 Unit Sites              7.2        0.0        5.7          5.9        2 Unit Sites              5.4        0.0        2.9          3.9 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        8.4        0.0        0.0          5.2        BWR                        6.3        0.0        0.0          3.9 PWR                        2.9        0.0        5.5          3.7        PWR                        2.9        0.0        3.7          2.9 Total All Regions          5.1        0.0        3.9          4.2        Total All Regions          4.3        0.0        2.6          3.3 71130.01 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 208 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            234        8          0.9        29.2    116          4          0.8        28.9    172        7          0.9        24.5 Region 2            113        6          0.9        18.8      73          4          0.8        18.3    210        8          1.0        26.2 Region 3            417      15          0.9        27.8        0          0          0.0        0.0        0        0          0.0          0.0 Region 4            407      12          0.9        33.9        0          0          0.0        0.0    393        12          1.0        32.7 1 Unit Sites        330      11          0.9        30.0      26          1          0.5        25.5    212        6          1.0        35.3 2 Unit Sites        747      27          1.0        27.7    113          5          0.8        22.6    464        18          1.0        25.8 3 Unit Sites        94        3          0.8        31.3      50          2          0.7        25.0      98        3          0.8        32.7 BWR                479      17          0.9        28.2      62          2          0.7        31.0    231        9          0.9        25.7 PWR                692      24          1.0        28.8    127          6          0.9        21.1    543        18          1.1        30.2 Total All          1171      41          1.0        28.6    189          8          0.9        23.6    774        27          1.0        28.7 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 209 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            521      19        1.0        27.4 Region 2            396      18        1.0        22.0 Region 3            417      15        0.9        27.8 Region 4            800      24        1.0        33.3 1 Unit Sites        568      18        1.0        31.5 2 Unit Sites      1324      50        1.0        26.5 3 Unit Sites        242        8        0.9        30.3 BWR                772      28        0.9        27.6 PWR                1361      48        1.0        28.4 Total All          2134      76        1.0        28.1 Regions 9/11/2018 2:22:01 PM                                                                      Page 210 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.02 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.02, "Access Control," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/20/2015            IP 71130.02, "Access Control," has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2015            2016              2017    3 Year Total FIN Green                                    0                0                6                6 NCV Green                                    9                16                8              33 Total                                        9                16              14                39 9/11/2018 2:22:01 PM                                                                                                                                              Page 211 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.02 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  17        0    1  15    0          14          0            0          0          0              0          0        14 Region 2                  4        0    0    4    0          4          0            0          0          0              0          0          3 Region 3                  4        0    0    4    0          3          0            0          0          0              0          0          4 Region 4                  14        0    2  11    0          13          0            0          0          0              0          0          9 1 Unit Sites              22        0    3  18    0          19          0            0          0          0              0          0        17 2 Unit Sites              16        0    0  15    0          14          0            0          0          0              0          0        12 3 Unit Sites              1        0    0    1    0          1          0            0          0          0              0          0          1 BWR                      18        0    2  15    0          15          0            0          0          0              0          0        12 PWR                      21        0    1  19    0          19          0            0          0          0              0          0        18 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        39        0    3  34    0          34          0            0          0          0              0          0        30 Percentage of All    100%        0%  8%  87%    0%        87%          0%          0%          0%          0%            0%          0%      77%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 212 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.02 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  7.9      11.2      15.0          11.9        Region 1                  5.3        5.2        8.9          6.6 Region 2                  2.5        8.0        0.0          3.3        Region 2                  2.5        8.0        0.0          3.3 Region 3                  0.0        5.5        7.6          4.4        Region 3                  0.0        5.5        2.7          2.7 Region 4                  15.0      16.9      12.1          14.9        Region 4                  11.6        12.3        9.1        11.2 1 Unit Sites              7.4      14.7      12.6          11.6        1 Unit Sites              5.0        8.5        7.2          6.9 2 Unit Sites              5.6        7.6        6.2          6.5        2 Unit Sites              4.2        7.6        2.4          4.7 3 Unit Sites              0.0        0.0      15.6          4.3        3 Unit Sites              0.0        0.0        15.6          4.3 BWR                        9.3      11.1        9.6          10.0        BWR                        7.0        5.6        3.5          5.3 PWR                        3.6        9.8        8.7          7.5        PWR                        2.4        8.7        5.6          5.7 Total All Regions          6.1      10.4        9.0          8.5        Total All Regions          4.3        7.6        4.8          5.6 71130.02 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 213 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            381      16          0.9        23.8    384          16          0.9        24.0    450        16        0.9        28.1 Region 2            399      17          1.0        23.5    374          17          0.9        22.0    421        19        1.2        22.2 Region 3            368      15          0.9        24.5    367          15          0.9        24.5    377        15        0.9        25.1 Region 4            258      12          1.0        21.5    326          12          0.9        27.1    220        12        1.1        18.3 1 Unit Sites        384      15          0.9        25.6    387          15          0.9        25.8    355        16        1.1        22.2 2 Unit Sites        845      38          1.0        22.2    885          38          1.0        23.3    919        39        1.1        23.6 3 Unit Sites        176        7          0.9        25.2    179          7          0.9        25.5    193        7        1.0        27.6 BWR                573      23          1.0        24.9    535          23          1.0        23.3    577        24        1.0        24.0 PWR                833      37          1.0        22.5    915          37          1.0        24.7    890        38        1.1        23.4 Total All          1405      60          1.0        23.4    1450          60          1.0        24.2    1467        62        1.1        23.7 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 214 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1214      48        1.0        25.3 Region 2          1195      53        1.1        22.5 Region 3          1111      45        1.0        24.7 Region 4            804      36        1.1        22.3 1 Unit Sites      1126      46        1.0        24.5 2 Unit Sites      2650    115        1.0        23.0 3 Unit Sites        548      21        1.0        26.1 BWR                1685      70        1.0        24.1 PWR                2638    112        1.0        23.6 Total All          4323    182        1.0        23.8 Regions 9/11/2018 2:22:01 PM                                                                      Page 215 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.03 Revision History Date of Revision      Description of Revision 12/22/2016            IP 71130.03, "Contingency Response - Force-on-Force Testing," has been revised to remove Addendum 5, and change the resource estimate hours from 435 to 393.
04/20/2015            IP 71130.03, "Contingency Response - Force-on-Force Testing," has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2015          2016              2017      3 Year Total NCV Green                                  27              20                9                56 Total                                      27              20                9                56 9/11/2018 2:22:01 PM                                                                                                                                            Page 216 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.03 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  13        0    2    6    0          13          0            0          0          0              0          0          6 Region 2                  8        0    2    3    0          8          0            0          0          0              0          0          4 Region 3                  16        0    2  11    0          15          0            0          0          0              0          0        11 Region 4                  17        0    4    7    0          17          0            0          0          0              0          0          6 1 Unit Sites              17        0    4    8    0          16          0            0          0          0              0          0          7 2 Unit Sites              35        0    5  19    0          35          0            0          0          0              0          0        18 3 Unit Sites              2        0    1    0    0          2          0            0          0          0              0          0          2 BWR                      22        0    5    8    0          21          0            0          0          0              0          0          7 PWR                      32        0    5  19    0          32          0            0          0          0              0          0        20 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        54        0  10  27    0          53          0            0          0          0              0          0        27 Percentage of All    100%        0% 19%  50%    0%        98%          0%          0%          0%          0%            0%          0%      50%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 217 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.03 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  2.0        2.7        0.7          1.8        Region 1                  1.6        2.6        0.4          1.3 Region 2                  1.5        1.3        0.5          1.2        Region 2                  1.1        1.3        0.5          0.9 Region 3                  2.5        2.3        2.7          2.5        Region 3                  2.4        2.3        1.6          2.1 Region 4                  2.4        2.6        1.5          2.4        Region 4                  1.6        2.6        1.5          2.0 1 Unit Sites              2.0        2.0        1.4          1.8        1 Unit Sites              1.4        2.0        0.9          1.3 2 Unit Sites              2.1        2.2        1.2          2.0        2 Unit Sites              1.8        2.0        0.7          1.7 3 Unit Sites              0.0        2.4        0.0          1.6        3 Unit Sites              0.0        2.4        0.0          1.6 BWR                        2.3        1.7        1.2          2.0        BWR                        2.0        1.7        0.5          1.5 PWR                        1.9        2.4        1.2          1.9        PWR                        1.3        2.2        0.9          1.5 Total All Regions          2.1        2.2        1.2          1.9        Total All Regions          1.6        2.1        0.8          1.5 71130.03 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 218 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          1932        5          0.8      386.3    1164          6          1.5      194.0    2357        18        2.0      130.9 Region 2          1815        5          0.8      362.9    2330          12          1.7      194.1    2185        14        2.0      156.0 Region 3          1693        5          0.8      338.6    2189          12          1.7      182.4    1257        8        1.6      157.2 Region 4          1895        6          0.9      315.8    1535          8          1.6      191.9    670        5        1.7      134.0 1 Unit Sites      1644        5          0.8      328.8    355          2          1.0      177.4    2914        20        2.0      145.7 2 Unit Sites      5328      15          0.9      355.2    5667          30          1.9      188.9    2333        19        2.1      122.8 3 Unit Sites        362        1          0.5      362.0    1195          6          1.5      199.2    1222        6        1.5      203.6 BWR                3579      10          0.9      357.9    2317          12          1.7      193.1    2050        15        1.9      136.6 PWR                3755      11          0.9      341.3    4900          26          1.9      188.5    4419        30        2.1      147.3 Total All          7334      21          1.0      349.2    7217          38          1.9      189.9    6469        45        2.1      143.8 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 219 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          5453      29        1.7      188.0 Region 2          6329      31        1.7      204.1 Region 3          5139      25        1.6      205.6 Region 4          4100      19        1.5      215.8 1 Unit Sites      4913      27        1.7      182.0 2 Unit Sites      13328      64        1.6      208.3 3 Unit Sites      2779      13        1.6      213.8 BWR                7946      37        1.5      214.8 PWR              13074      67        1.7      195.1 Total All        21020    104        1.7      202.1 Regions 9/11/2018 2:22:01 PM                                                                      Page 220 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.04 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.04, "Equipment Performance, Testing and Maintenance," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/27/2015            IP 71130.04, "Equipment Performance, Testing and Maintenance, has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2015              2016            2017      3 Year Total NCV Green                                  7                10                7                24 NOV N/A                                    1                  0                0                  1 Total                                      8                10                7                25 9/11/2018 2:22:01 PM                                                                                                                                            Page 221 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.04 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  18        0    3  10    0          18          0            0          0          0              0          0        12 Region 2                  2        0    0    2    0          2          0            0          0          0              0          0          2 Region 3                  2        0    0    2    0          2          0            0          0          0              0          0          1 Region 4                  3        0    0    2    0          3          0            0          0          0              0          0          2 1 Unit Sites              11        0    1    7    0          11          0            0          0          0              0          0          6 2 Unit Sites              14        0    2    9    0          14          0            0          0          0              0          0        11 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      13        0    1    9    0          13          0            0          0          0              0          0          8 PWR                      12        0    2    7    0          12          0            0          0          0              0          0          9 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        25        0    3  16    0          25          0            0          0          0              0          0        17 Percentage of All    100%        0% 12%  64%    0%      100%            0%          0%          0%          0%            0%          0%      68%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 222 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.04 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  11.2      15.1      14.9          13.5        Region 1                  9.0        12.1        12.2        11.1 Region 2                  0.0        0.0        7.7          2.4        Region 2                  0.0        0.0        7.7          2.4 Region 3                  1.2        2.6        0.0          1.8        Region 3                  1.2        2.6        0.0          1.8 Region 4                  0.0        4.2        0.0          6.3        Region 4                  0.0        4.2        0.0          6.3 1 Unit Sites              7.5        5.6      10.5          6.8        1 Unit Sites              5.6        4.5        6.8          5.1 2 Unit Sites              3.2        5.7      12.3          5.8        2 Unit Sites              2.3        4.9        11.2          4.9 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        6.3        7.3      12.3          7.5        BWR                        4.5        6.2        9.9          6.0 PWR                        3.7        4.0      11.4          5.0        PWR                        2.7        3.3        9.9          4.0 Total All Regions          5.0        5.3      11.7          6.1        Total All Regions          3.6        4.5        9.9          4.8 71130.04 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 223 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            334        6          0.9        55.6    415          10          0.9        41.5    246        6          0.9        40.9 Region 2            229        6          0.9        38.1    345          10          0.9        34.5    260        7          0.9        37.2 Region 3            841      15          0.9        56.1    783          15          0.9        52.2        0        0          0.0          0.0 Region 4              0        0          0.0        0.0    475          12          1.0        39.6        0        0          0.0          0.0 1 Unit Sites        375        8          0.9        46.9    488          12          1.0        40.7    115        3          0.8        38.4 2 Unit Sites        828      16          0.9        51.8    1312          30          1.0        43.7    307        8          0.9        38.4 3 Unit Sites        200        3          0.8        66.8    217          5          0.8        43.3      83        2          0.7        41.6 BWR                661      12          0.9        55.1    806          18          1.0        44.8    202        5          0.8        40.5 PWR                743      15          0.9        49.5    1211          29          1.0        41.8    304        8          0.9        37.9 Total All          1404      27          1.0        52.0    2017          47          1.0        42.9    506        13          0.9        38.9 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 224 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            994      22        1.0        45.2 Region 2            833      23        1.0        36.2 Region 3          1624      30        1.0        54.1 Region 4            475      12        1.0        39.6 1 Unit Sites        979      23        1.0        42.5 2 Unit Sites      2447      54        1.0        45.3 3 Unit Sites        500      10        0.9        50.0 BWR                1669      35        1.0        47.7 PWR                2257      52        1.0        43.4 Total All          3926      87        1.0        45.1 Regions 9/11/2018 2:22:01 PM                                                                      Page 225 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.05 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.05, "Protective Strategy Evaluation and Performance Evaluation Program," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/27/2015            IP 71130.05, "Protective Strategy Evaluation and Performance Evaluation Program," has been revised to address program applicability. Additionally, inspection requirement 05-02.07.f (the verification of target sets) was removed as it was redundant to the inspection activity being inspected in IP 71130.14.
Procedure completion and resource estimate were changed due to deletion of this inspection requirement. Minor administrative edits were made.
Summary of PIM Findings 2015              2016                2017      3 Year Total NCV Green                                    6                13                    5              24 NCVIV Green                                  0                0                    1              1 NCVIV N/A                                    0                1                    0              1 Total                                        6                14                    6              26 9/11/2018 2:22:01 PM                                                                                                                                                  Page 226 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.05 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  5        0    1    2    0          5          0            0          0          0              0          0          5 Region 2                  4        0    0    4    0          4          0            0          0          0              0          0          1 Region 3                  5        0    1    4    0          4          0            0          0          0              0          0          5 Region 4                  12        0    5    5    0          12          0            0          0          0              0          0          9 1 Unit Sites              14        0    5    7    0          13          0            0          0          0              0          0        11 2 Unit Sites              11        0    2    7    0          11          0            0          0          0              0          0          9 3 Unit Sites              1        0    0    1    0          1          0            0          0          0              0          0          0 BWR                        9        0    1    7    0          8          0            0          0          0              0          0          5 PWR                      17        0    6    8    0          17          0            0          0          0              0          0        15 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        26        0    7  15    0          25          0            0          0          0              0          0        20 Percentage of All    100%        0% 27%  58%    0%        96%          0%          0%          0%          0%            0%          0%      77%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 227 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.05 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        4.5        1.6          2.7        Region 1                  0.0        4.1        1.6          2.3 Region 2                  2.7        2.9        3.5          2.9        Region 2                  2.7        2.9        1.8          2.4 Region 3                  0.0        9.4        4.4          5.7        Region 3                  0.0        3.8        3.3          3.2 Region 4                  5.7        9.6        9.5          8.2        Region 4                  2.5        7.6        9.5          6.0 1 Unit Sites              4.1        7.8        2.9          5.5        1 Unit Sites              1.7        4.8        2.9          3.3 2 Unit Sites              1.9        5.0        4.1          3.6        2 Unit Sites              1.9        4.4        2.6          2.9 3 Unit Sites              3.7        0.0        5.8          4.6        3 Unit Sites              3.7        0.0        5.8          4.6 BWR                        7.3        4.3        2.4          4.3        BWR                        4.9        2.6        2.4          3.0 PWR                        1.3        8.2        4.7          4.6        PWR                        1.3        6.3        3.3          3.3 Total All Regions          2.9        6.6        3.8          4.5        Total All Regions          2.1        4.6        3.0          3.2 71130.05 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 228 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            342        6          1.5        57.0    736          16          1.8        46.0    642        12        1.7        53.5 Region 2          1132      20          1.8        56.6    344          8          1.6        43.0    567        14        1.8        40.5 Region 3            61        2          0.7        30.5    260          6          1.2        43.3    614        21        1.8        29.2 Region 4            393      12          1.5        32.8    395          12          1.7        32.9    210        6        1.5        35.0 1 Unit Sites        521      12          1.5        43.4    531          12          1.5        44.3    315        8        1.6        39.3 2 Unit Sites      1140      22          1.7        51.8    982          26          1.9        37.8    1371        37        1.9        37.0 3 Unit Sites        268        6          1.5        44.6    222          4          1.3        55.4    347        8        1.6        43.4 BWR                411        9          1.3        45.6    784          17          1.7        46.1    820        23        1.8        35.7 PWR                1518      31          1.8        49.0    951          25          1.8        38.0    1213        30        1.9        40.4 Total All          1928      40          1.7        48.2    1735          42          1.8        41.3    2033        53        1.9        38.3 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 229 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1720      34        1.9        50.6 Region 2          2043      42        1.9        48.6 Region 3            935      29        1.6        32.2 Region 4            998      30        1.8        33.3 1 Unit Sites      1366      32        1.7        42.7 2 Unit Sites      3493      85        1.9        41.1 3 Unit Sites        836      18        1.8        46.5 BWR                2015      49        1.7        41.1 PWR                3681      86        1.9        42.8 Total All          5695    135        1.8        42.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 230 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.06 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.06, "Protection of Safeguards Information," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/20/2015            IP 71130.06, "Protection of Safeguards Information," has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2017      3 Year Total NOV White                                    1                1 Total                                        1                1 9/11/2018 2:22:01 PM                                                                                                                                                Page 231 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.06 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  1        1    0    0    0          1          0            0          0          0              0          0          1 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  0        0    0    0    0          0          0            0          0          0              0          0          0 1 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 2 Unit Sites              1        1    0    0    0          1          0            0          0          0              0          0          1 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      0        0    0    0    0          0          0            0          0          0              0          0          0 PWR                      1        1    0    0    0          1          0            0          0          0              0          0          1 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        1        1    0    0    0          1          0            0          0          0              0          0          1 Percentage of All    100%    100%  0%  0%    0%      100%            0%          0%          0%          0%            0%          0%      100%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 232 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.06 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  0.0        0.0      10.2          5.4        Region 2                  0.0        0.0        10.2          5.4 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0        0.0        0.0          0.0        Region 4                  0.0        0.0        0.0          0.0 1 Unit Sites              0.0        0.0        0.0          0.0        1 Unit Sites              0.0        0.0        0.0          0.0 2 Unit Sites              0.0        0.0        7.3          2.7        2 Unit Sites              0.0        0.0        7.3          2.7 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        0.0          0.0        BWR                        0.0        0.0        0.0          0.0 PWR                        0.0        0.0        6.9          2.2        PWR                        0.0        0.0        6.9          2.2 Total All Regions          0.0        0.0        4.7          1.4        Total All Regions          0.0        0.0        4.7          1.4 71130.06 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 233 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            71        8          0.9        8.9      28          4          0.8        6.9      29        7          0.9          4.1 Region 2            59        6          0.9        9.9      26          4          1.0        6.6      98        8          0.9        12.3 Region 3              0        0          0.0        0.0    107          15          0.9        7.2        0        0          0.0          0.0 Region 4            191      12          0.9        15.9      13          0          0.0        0.0      87      12          1.0          7.3 1 Unit Sites        75        6          0.9        12.5      61          6          0.8        10.2      26        6          0.9          4.3 2 Unit Sites        230      18          0.9        12.8    103          14          0.9        7.4    171        18          1.0          9.5 3 Unit Sites        17        2          0.7        8.5      10          3          1.0        3.3      17        3          0.8          5.5 BWR                120        9          0.9        13.3      72        10          0.9        7.2      68        9          0.9          7.6 PWR                202      17          0.9        11.9    103          13          0.9        7.9    146        18          1.0          8.1 Total All          322      26          1.0        12.4    174          23          1.0        7.6    214        27          1.0          7.9 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 234 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            127      19        1.0        6.7 Region 2            184      18        1.0        10.2 Region 3            107      15        0.9        7.2 Region 4            291      24        1.0        12.1 1 Unit Sites        162      18        0.9        9.0 2 Unit Sites        504      50        1.0        10.1 3 Unit Sites        44        8        1.0        5.4 BWR                260      28        0.9        9.3 PWR                450      48        1.0        9.4 Total All          709      76        1.0        9.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 235 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.07 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.07, "Security Training," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/27/2015            IP 71130.07, "Security Training," has been revised to address program applicability. Additionally, inspection requirements for Firearms Preemptive Authority, section 07-02.14.a,b,c. Procedure completion and resource estimate were changed to reflect new requirements. Minor administrative edits were made.
Summary of PIM Findings 2016              2017      3 Year Total NCV Green                                    3                1                4 Total                                        3                1                4 9/11/2018 2:22:01 PM                                                                                                                                                Page 236 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.07 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          1          0            0          0          0              0          0          1 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  1        0    1    0    0          1          0            0          0          0              0          0          1 Region 4                  1        0    0    1    0          1          0            0          0          0              0          0          1 1 Unit Sites              3        0    1    2    0          3          0            0          0          0              0          0          3 2 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      1        0    1    0    0          1          0            0          0          0              0          0          1 PWR                      2        0    0    2    0          2          0            0          0          0              0          0          2 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        3        0    1    2    0          3          0            0          0          0              0          0          3 Percentage of All    100%        0% 33%  67%    0%      100%            0%          0%          0%          0%            0%          0%      100%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 237 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.07 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        3.2        0.0          1.4        Region 1                  0.0        3.2        0.0          1.4 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  0.0        0.0        4.5          2.1        Region 3                  0.0        0.0        2.2          1.0 Region 4                  0.0        2.7        0.0          2.7        Region 4                  0.0        2.7        0.0          2.7 1 Unit Sites              0.0        5.5        3.2          2.9        1 Unit Sites              0.0        5.5        3.2          2.9 2 Unit Sites              0.0        0.0        1.8          0.6        2 Unit Sites              0.0        0.0        0.0          0.0 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        0.0        4.8          1.8        BWR                        0.0        0.0        2.4          0.9 PWR                        0.0        2.9        0.0          1.3        PWR                        0.0        2.9        0.0          1.3 Total All Regions          0.0        2.1        2.3          1.5        Total All Regions          0.0        2.1        1.2          1.1 71130.07 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 238 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            194        6          0.9        32.3    311          11          1.1        28.3    189        6          0.9        31.5 Region 2            145        6          1.0        24.1    260          10          0.9        26.0    224        7          0.9        31.9 Region 3            516      15          0.9        34.4        0          0          0.0        0.0    448        15          0.9        29.9 Region 4              0        0          0.0        0.0    371          12          1.0        30.9        4        0          0.0          0.0 1 Unit Sites        254        8          0.9        31.7    198          7          1.0        28.3    232        8          0.9        29.0 2 Unit Sites        481      16          1.0        30.1    611          22          1.0        27.8    531        17          0.9        31.3 3 Unit Sites        120        3          0.8        39.9    132          4          0.8        33.0    102        3          0.8        33.8 BWR                411      12          0.9        34.3    262          10          1.1        26.2    414        13          0.9        31.8 PWR                443      15          1.0        29.5    680          23          1.0        29.6    451        15          0.9        30.1 Total All          854      27          1.0        31.6    941          33          1.1        28.5    865        28          0.9        30.9 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 239 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            694      23        1.0        30.2 Region 2            628      23        1.0        27.3 Region 3            964      30        1.0        32.1 Region 4            375      12        0.9        31.3 1 Unit Sites        684      23        1.0        29.7 2 Unit Sites      1623      55        1.0        29.5 3 Unit Sites        353      10        0.9        35.3 BWR                1086      35        1.0        31.0 PWR                1574      53        1.0        29.7 Total All          2660      88        1.0        30.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 240 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.08 Revision History Date of Revision      Description of Revision 09/30/2016            IP 71130.08, "Fitness-for-Duty (FFD) Program," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
05/21/2015            IP 71130.08, "Fitness-for-Duty Program," has been revised to address language clarification for 10 CFR 26.139(d) and (e) requirements found in section 02.10 c.3. of this IP; program applicability and minor administrative changes.
Summary of PIM Findings 2015              2016            2017      3 Year Total FIN Green                                    2                  0                0              2 NCV Green                                    0                  0                5              5 NCVIV N/A                                    0                  0                1              1 VIO N/A                                      0                  1                0              1 Total                                        2                  1                6              9 9/11/2018 2:22:01 PM                                                                                                                                              Page 241 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.08 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  2        0    0    2    0          2          0            0          0          0              0          0          0 Region 2                  1        0    0    0    0          1          0            0          0          0              0          0          1 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  6        0    5    0    0          6          0            0          0          0              0          0          6 1 Unit Sites              3        0    1    1    0          3          0            0          0          0              0          0          2 2 Unit Sites              6        0    4    1    0          6          0            0          0          0              0          0          5 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      2        0    1    1    0          2          0            0          0          0              0          0          1 PWR                      7        0    4    1    0          7          0            0          0          0              0          0          6 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        9        0    5    2    0          9          0            0          0          0              0          0          7 Percentage of All    100%        0% 56%  22%    0%      100%            0%          0%          0%          0%            0%          0%      78%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 242 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.08 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  9.2        0.0        0.0          3.9        Region 1                  9.2        0.0        0.0          3.9 Region 2                  0.0      20.8        0.0          3.3        Region 2                  0.0        20.8        0.0          3.3 Region 3                  0.0        0.0        0.0          0.0        Region 3                  0.0        0.0        0.0          0.0 Region 4                  0.0        0.0      15.1          15.1        Region 4                  0.0        0.0        13.4        13.4 1 Unit Sites              8.3        0.0        7.8          7.3        1 Unit Sites              8.3        0.0        7.8          7.3 2 Unit Sites              4.7        7.7        6.2          6.0        2 Unit Sites              4.7        7.7        2.1          3.6 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        8.2        0.0        2.7          3.6        BWR                        8.2        0.0        2.7          3.6 PWR                        4.7        9.2        8.5          7.8        PWR                        4.7        9.2        5.5          5.8 Total All Regions          6.0        5.5        6.5          6.3        Total All Regions          6.0        5.5        4.4          4.9 71130.08 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 243 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            218        8          0.9        27.3    133          4          0.8        33.1    162        7          0.9        23.1 Region 2            116        6          0.9        19.3      48          4          0.8        12.0    140        8          1.0        17.4 Region 3              0        0          0.0        0.0        0          0          0.0        0.0    309        15          0.9        20.6 Region 4              0        0          0.0        0.0        0          0          0.0        0.0    298        12          1.1        24.8 1 Unit Sites        43        2          0.7        21.6      26          1          0.5        25.5    222        11          1.2        20.1 2 Unit Sites        259      11          0.9        23.5    109          5          0.8        21.8    598        27          1.0        22.1 3 Unit Sites        32        1          0.5        32.0      46          2          0.7        23.0      89        4          0.8        22.3 BWR                122        5          0.8        24.5      72          2          0.7        36.0    367        17          0.9        21.6 PWR                212        9          0.9        23.6    109          6          0.9        18.1    542        25          1.1        21.7 Total All          334      14          0.9        23.9    181          8          0.9        22.6    909        42          1.1        21.6 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 244 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            513      19        1.0        27.0 Region 2            304      18        1.0        16.9 Region 3            309      15        0.9        20.6 Region 4            298      12        1.1        24.8 1 Unit Sites        290      14        1.2        20.7 2 Unit Sites        966      43        1.0        22.5 3 Unit Sites        167        7        0.9        23.9 BWR                561      24        0.9        23.4 PWR                863      40        1.0        21.6 Total All          1423      64        1.0        22.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 245 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.11 Revision History Date of Revision      Description of Revision Summary of PIM Findings 2015  2016  3 Year Total NCV Green                                  1    5            6 NCVIV N/A                                  1    0            1 Total                                      2    5            7 9/11/2018 2:22:01 PM                                                                    Page 246 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.11 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  1        0    0    1    0          1          0            0          0          0              0          0          1 Region 2                  2        0    1    0    0          2          0            0          0          0              0          0          0 Region 3                  2        0    0    1    0          2          0            0          0          0              0          0          2 Region 4                  2        0    0    1    0          1          0            0          0          0              0          0          2 1 Unit Sites              4        0    0    2    0          3          0            0          0          0              0          0          3 2 Unit Sites              3        0    1    1    0          3          0            0          0          0              0          0          2 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      2        0    0    2    0          1          0            0          0          0              0          0          2 PWR                      5        0    1    1    0          5          0            0          0          0              0          0          3 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        7        0    1    3    0          6          0            0          0          0              0          0          5 Percentage of All    100%        0% 14%  43%    0%        86%          0%          0%          0%          0%            0%          0%      71%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 247 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.11 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        6.0        0.0          2.6        Region 1                  0.0        6.0        0.0          2.6 Region 2                  24.0        0.0        0.0          9.0        Region 2                  24.0        0.0        0.0          9.0 Region 3                  0.0      20.4        0.0          9.8        Region 3                  0.0        20.4        0.0          9.8 Region 4                  0.0      25.0        0.0          12.2        Region 4                  0.0        12.5        0.0          6.1 1 Unit Sites              6.3      14.5        0.0          9.0        1 Unit Sites              6.3        9.7        0.0          6.7 2 Unit Sites              6.6      12.7        0.0          6.2        2 Unit Sites              6.6        12.7        0.0          6.2 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        0.0        9.0        0.0          4.8        BWR                        0.0        4.5        0.0          2.4 PWR                      10.4      16.2        0.0          8.9        PWR                      10.4        16.2        0.0          8.9 Total All Regions          6.4      12.3        0.0          7.2        Total All Regions          6.4        9.9        0.0          6.2 71130.11 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 248 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            122      75        15.0        1.6    166        105        17.5        1.6        97      75        15.0          1.3 Region 2            83      105        13.1        0.8      62        74        12.3        0.8        78      90        12.9          0.9 Region 3            57      75        15.0        0.8      98        90        15.0        1.1        49      60        12.0          0.8 Region 4            48      30        10.0        1.6      80        75        12.5        1.1        36      60        12.0          0.6 1 Unit Sites        112      105        15.0        1.1      58        60        12.0        1.0        80      60        12.0          1.3 2 Unit Sites        198      180        15.0        1.1    282        224        16.0        1.3      126      180        15.0          0.7 3 Unit Sites          0        0          0.0        0.0      67        60        15.0        1.1        54      45        11.3          1.2 BWR                119      90        12.9        1.3    221        164        16.4        1.3        76      90        12.9          0.8 PWR                192      195        16.3        1.0    185        180        15.0        1.0      183      195        15.0          0.9 Total All          310      285        15.8        1.1    406        344        16.4        1.2      259      285        15.0          0.9 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 249 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            384    255        18.2        1.5 Region 2            223    269        14.2        0.8 Region 3            205    225        16.1        0.9 Region 4            164    165        13.8        1.0 1 Unit Sites        250    225        15.0        1.1 2 Unit Sites        606    584        16.2        1.0 3 Unit Sites        120    105        15.0        1.1 BWR                416    344        15.0        1.2 PWR                559    570        15.8        1.0 Total All          975    914        15.8        1.1 Regions 9/11/2018 2:22:01 PM                                                                      Page 250 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.14 Revision History Date of Revision      Description of Revision 09/12/2017            IP 71130.14, "Review of Power Reactor Target Sets," has been revised to add background and guidance on target sets related to cyber critical digital assets.
09/30/2016            IP 71130.14, "Review of Power Reactor Target Sets," has been revised to adjust the resource estimate to reflect the nominal number of inspection requirements as the target range for completion of this procedure as well as make minor administrative changes.
04/20/2015            IP 71130.14, "Review of Reactor Target Sets," has been revised to address the program applicability and minor administrative changes.
Summary of PIM Findings 2015              2016    3 Year Total NCV Green                                    5              10                  15 Total                                        5              10                  15 9/11/2018 2:22:01 PM                                                                                                                                            Page 251 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.14 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 2                  7        0    0    6    0          7          0            0          0          0              0          0          2 Region 3                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 4                  8        0    2    6    0          8          0            0          0          0              0          0          8 1 Unit Sites              9        0    2    7    0          9          0            0          0          0              0          0          7 2 Unit Sites              4        0    0    3    0          4          0            0          0          0              0          0          2 3 Unit Sites              2        0    0    2    0          2          0            0          0          0              0          0          1 BWR                        8        0    2    5    0          8          0            0          0          0              0          0          6 PWR                        7        0    0    7    0          7          0            0          0          0              0          0          4 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        15        0    2  12    0          15          0            0          0          0              0          0        10 Percentage of All    100%        0% 13%  80%    0%      100%            0%          0%          0%          0%            0%          0%      67%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 252 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71130.14 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  0.0        0.0        0.0          0.0        Region 1                  0.0        0.0        0.0          0.0 Region 2                  18.7      15.9        0.0          13.5        Region 2                  18.7        15.9        0.0        13.5 Region 3                  0.0        0.0      28.2          6.6        Region 3                  0.0        0.0        0.0          0.0 Region 4                  57.1      27.5        0.0          30.7        Region 4                  33.9        25.6        0.0        23.6 1 Unit Sites              10.4      23.2      11.5          17.2        1 Unit Sites              10.4        19.4        0.0        12.4 2 Unit Sites              23.6      10.0        0.0          12.9        2 Unit Sites              14.0        10.0        0.0          8.7 3 Unit Sites              23.8      44.4        0.0          31.0        3 Unit Sites              23.8        44.4        0.0        31.0 BWR                      12.2      24.1      14.2          18.7        BWR                      12.2        19.7        0.0        12.9 PWR                      21.5      14.5        0.0          14.1        PWR                      14.0        14.5        0.0        10.8 Total All Regions        18.4      19.0        4.0          15.8        Total All Regions        13.4        16.3        0.0        11.5 71130.14 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 253 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported    Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours    Samples Normalized Samples                                      Samples                                    Samples Region 1            70      55          9.2        1.3      72        88          9.8        0.8        61        6          0.9        10.1 Region 2            268      79          8.8        3.4    126          83        10.4        1.5      125        24          3.4          5.2 Region 3            81      66        11.0        1.2      36        44          8.8        0.8        36        6          1.0          5.9 Region 4            30      16          5.3        1.8    195        111        11.1        1.8        30        0          0.0          0.0 1 Unit Sites        92      42          8.4        2.2    117          99          9.9        1.2        67        4          0.7        16.8 2 Unit Sites        293      153        10.2        1.9    268        184        11.5        1.5      171        31          2.4          5.5 3 Unit Sites        63      21          7.0        3.0      45        43          8.6        1.0        13        1          0.5        12.5 BWR                164      72          9.0        2.3    153        109        10.9        1.4        71        8          0.9          8.8 PWR                285      144        10.3        2.0    277        217        10.9        1.3      180        28          2.5          6.4 Total All          449      216        10.3        2.1    429        326        11.2        1.3      251        36          1.9          7.0 Regions 9/11/2018 2:22:01 PM                                                                                                                  Page 254 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1            203    149        7.5        1.4 Region 2            519    186        8.5        2.8 Region 3            153    116        7.7        1.3 Region 4            255    127        9.8        2.0 1 Unit Sites        276    145        7.6        1.9 2 Unit Sites        733    368        8.8        2.0 3 Unit Sites        120      65        8.1        1.8 BWR                387    189        7.3        2.0 PWR                742    389        8.8        1.9 Total All          1128    578        8.4        2.0 Regions 9/11/2018 2:22:01 PM                                                                      Page 255 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71151 Revision History Date of Revision      Description of Revision 05/03/2017            IP 71151, "Performance Indicator Verification," has been revised to correct typographical errors. No other changes were made.
12/08/2016            IP 71151, "Performance Indicator Verification," has been revised to reduce the annual resource estimate by half, per Commission direction in SRM SECY                      009, and clarifications for requirements made per OIG Audit 16-A-12 and the inspection report initiative.
Summary of PIM Findings 2015              2016    3 Year Total FIN Green                                      1                0                1 NCV Green                                      1                1                2 NCVIV N/A                                      0                1                1 NOV N/A                                        1                0                1 Total                                          3                2                5 9/11/2018 2:22:01 PM                                                                                                                                              Page 256 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71151 PIM Findings Breakdown All  > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  2        0    0    1    0          1          0            0          1          0              0          0          0 Region 2                  0        0    0    0    0          0          0            0          0          0              0          0          0 Region 3                  2        0    0    1    0          1          1            1          0          0              0          0          0 Region 4                  1        0    0    0    0          1          1            0          0          0              0          0          0 1 Unit Sites              1        0    0    0    0          0          1            0          0          0              0          0          0 2 Unit Sites              4        0    0    2    0          3          1            1          1          0              0          0          0 3 Unit Sites              0        0    0    0    0          0          0            0          0          0              0          0          0 BWR                      2        0    0    1    0          0          1            0          1          0              0          0          0 PWR                      3        0    0    1    0          3          1            1          0          0              0          0          0 Findings                  0        0    0    0    0          0          0            0          0          0              0          0          0 Associated SIT/AIT Total All Regions        5        0    0    2    0          3          2            1          1          0              0          0          0 Percentage of All    100%        0%  0%  40%    0%        60%          40%        20%        20%            0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                  Page 257 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71151 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  1.8        1.5        2.2          1.8        Region 1                  0.0        1.5        0.0          0.6 Region 2                  0.0        0.0        0.0          0.0        Region 2                  0.0        0.0        0.0          0.0 Region 3                  4.5        1.4        0.0          2.1        Region 3                  4.5        0.0        0.0          1.6 Region 4                  1.8        0.0        2.2          1.3        Region 4                  1.8        0.0        0.0          0.6 1 Unit Sites              1.0        1.0        2.5          1.4        1 Unit Sites              1.0        0.0        0.0          0.4 2 Unit Sites              2.7        0.6        0.0          1.1        2 Unit Sites              2.0        0.6        0.0          0.9 3 Unit Sites              0.0        0.0        0.0          0.0        3 Unit Sites              0.0        0.0        0.0          0.0 BWR                        1.9        1.0        2.4          1.7        BWR                        1.0        0.0        0.0          0.3 PWR                        1.9        0.6        0.0          0.9        PWR                        1.9        0.6        0.0          0.9 Total All Regions          1.9        0.7        0.9          1.2        Total All Regions          1.5        0.4        0.0          0.7 71151 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 258 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            552      374        22.0        1.5    672        368        21.6        1.8      464      371        21.8          1.3 Region 2            820      455        25.3        1.8    854        454        25.2        1.9      778      458        25.4          1.7 Region 3            672      343        21.4        2.0    727        357        22.3        2.0      514      344        21.5          1.5 Region 4            560      270        20.8        2.1    528        272        20.9        1.9      459      284        21.8          1.6 1 Unit Sites        556      255        15.9        2.2    665        255        15.9        2.6      442      258        16.1          1.7 2 Unit Sites      1749      958        24.6        1.8    1736        964        24.7        1.8    1498      969        24.8          1.5 3 Unit Sites        299      229        28.6        1.3    380        232        29.0        1.6      275      230        28.8          1.2 BWR                1036      512        21.3        2.0    1035        514        21.4        2.0      833      516        21.5          1.6 PWR                1567      930        24.5        1.7    1746        937        24.7        1.9    1381      941        24.8          1.5 Total All          2603    1442        23.6        1.8    2781        1451        23.8        1.9    2214    1457        23.9          1.5 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 259 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          1688    1113        22.7        1.5 Region 2          2452    1367        26.3        1.8 Region 3          1912    1044        22.7        1.8 Region 4          1546    826        22.3        1.9 1 Unit Sites      1663    768        16.7        2.2 2 Unit Sites      4982    2891        25.1        1.7 3 Unit Sites        953    691        31.4        1.4 BWR                2904    1542        21.7        1.9 PWR                4694    2808        24.8        1.7 Total All          7598    4350        23.8        1.7 Regions 9/11/2018 2:22:01 PM                                                                      Page 260 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152 Revision History Date of Revision      Description of Revision 02/26/2015            IP 71152, "Problem Identification and Resolution," has been revised to relocate Operator Work-around inspection requirement to IP 71111.15; enhanced alignment of 71152-01 INSPECTION OBJECTIVES with IMC 0308 Att. 2 Fig. 37; enhanced IP organization; aligned language to updated IMC 0310 nomenclature; enhanced communications with the NRC Vendor Inspection Center of Expertise for vendor or supplier deficiencies; updated references to external IP's and IMC's and eliminated reference to retired RIS 2005-20; eliminated use of undefined terminology; and enhanced integration of OpE Smart Samples into inspection sample population. This revision addresses, or partially addressed, FBF's 71152-1787, -1836, -1946, -1964, -2012, -2013, and -2022.
Summary of PIM Findings 9/11/2018 2:22:01 PM                                                                                                                                              Page 261 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 2015 2016      2017    3 Year Total AV N/A                  0    0          2              2 AV Preliminary White    0    0          1              1 AV White                0    1          0              1 FIN Green              8  12        10            30 NCV Green              68  60        64            192 NCV N/A                0    2          0              2 NCVIV Green            4    1          0              5 NCVIV N/A              3    3          2              8 NOV Green              0    0          1              1 NOV N/A                1    1          0              2 NOV White              0    0          3              3 VIO Green              2    2          0              4 VIO N/A                3    1          0              4 VIO White              1    1          0              2 Total                  90  84        83            257 9/11/2018 2:22:01 PM                                              Page 262 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  61        3  25  26    0          42          7          28          9          3              1          1          11 Region 2                  51        0  12  26    0          42          6          32          4          0              0          0          0 Region 3                  79        3  20  31    0          51          15          53          3          1              1          0          2 Region 4                  64        2    8  37    1          37          19          38          4          1              0          1          0 1 Unit Sites            109        7  33  50    1          73          24          58          12          0              1          0          8 2 Unit Sites            136        1  30  65    0          92          21          87          8          5              1          2          5 3 Unit Sites              10        0    2    5    0          7          2          6          0          0              0          0          0 BWR                      108        5  32  53    0          65          22          58          12          1              1          0          8 PWR                      147        3  33  67    1        107          25          93          8          4              1          2          5 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        255        8  65  120    1        172          47        151          20          5              2          2          13 Percentage of All    100%        3% 25%  47%    0%        67%          18%        59%          8%          2%            1%          1%        5%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 263 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  3.1        3.4        3.0          3.2        Region 1                  1.9        2.8        1.4          2.1 Region 2                  3.4        3.8        3.3          3.5        Region 2                  2.6        3.2        2.0          2.6 Region 3                  6.6        4.5        6.1          5.7        Region 3                  3.2        2.7        2.6          2.8 Region 4                  6.3        5.5        5.9          5.9        Region 4                  3.1        3.0        3.2          3.1 1 Unit Sites              5.1        4.8        4.9          4.9        1 Unit Sites              2.8        3.5        2.6          3.0 2 Unit Sites              4.4        3.8        4.4          4.2        2 Unit Sites              2.6        2.6        2.0          2.4 3 Unit Sites              2.7        2.8        1.4          2.3        3 Unit Sites              2.1        2.8        0.7          1.9 BWR                        4.7        4.8        4.6          4.7        BWR                        2.3        3.2        2.7          2.8 PWR                        4.4        3.7        4.2          4.1        PWR                        2.8        2.7        1.8          2.4 Total All Regions          4.5        4.1        4.3          4.3        Total All Regions          2.6        2.9        2.2          2.6 71152 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 264 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          6370      138          8.1        46.2    7383        137          8.1        53.9    6564      144        8.5        45.6 Region 2          5736      132          7.3        43.5    5322        119          6.6        44.7    5449      136        7.6        40.1 Region 3          4388      104          6.5        42.2    4905        107          6.7        45.8    4632      104        6.5        44.5 Region 4          3518      86          6.6        40.9    3654          94          7.2        38.9    3702        88        6.8        42.1 1 Unit Sites      4607      114          7.1        40.4    4696        110          6.9        42.7    4684      119        7.4        39.4 2 Unit Sites      11801      287          7.4        41.1  12923        290          7.4        44.6  12322      296        7.6        41.6 3 Unit Sites      3604      59          7.4        61.1    3644          57          7.1        63.9    3342        57        7.1        58.6 BWR                7684      178          7.4        43.2    8403        182          7.6        46.2    7817      187        7.8        41.8 PWR              12328      282          7.4        43.7  12860        275          7.2        46.8  12531      285        7.5        44.0 Total All        20012      460          7.5        43.5  21263        457          7.5        46.5  20347      472        7.7        43.1 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 265 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          20316    419        8.6        48.5 Region 2          16507    387        7.4        42.7 Region 3          13925    315        6.8        44.2 Region 4          10874    268        7.2        40.6 1 Unit Sites      13987    343        7.5        40.8 2 Unit Sites      37045    873        7.6        42.4 3 Unit Sites      10590    173        7.9        61.2 BWR              23904    547        7.7        43.7 PWR              37718    842        7.5        44.8 Total All        61622    1389        7.6        44.4 Regions 9/11/2018 2:22:01 PM                                                                      Page 266 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152B Revision History Date of Revision      Description of Revision 02/26/2015            For the biennial portion of IP 71152. Separate sample sizes/hours, etc.
Summary of PIM Findings 2015              2016            2017    3 Year Total AV N/A                                        0                0                1              1 FIN Green                                    5                2                3              10 FIN N/A                                      4                0                0              4 NCV Green                                    41              21              20              82 NCVIV Green                                  0                1                1              2 NCVIV N/A                                    3                0                3              6 NOV N/A                                      1                0                0              1 NOVIV Green                                  0                0                1              1 VIO Green                                    3                0                0              3 VIO N/A                                      0                1                0              1 Total                                        57              25              29            111 9/11/2018 2:22:01 PM                                                                                      Page 267 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152B PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  32        0  16    9    0          27          5          14          4          2              0          0          1 Region 2                  17        0    5    2    0          17          0          9          0          1              0          0          0 Region 3                  18        0  10    4    0          17          1          13          3          0              0          0          1 Region 4                  42        0  14  21    0          38          5          30          2          0              1          0          2 1 Unit Sites              55        0  26  17    0          51          6          33          4          3              1          0          1 2 Unit Sites              53        0  19  18    0          47          5          32          5          0              0          0          3 3 Unit Sites              1        0    0    1    0          1          0          1          0          0              0          0          0 BWR                      59        0  27  19    0          54          8          35          6          2              1          0          2 PWR                      50        0  18  17    0          45          3          31          3          1              0          0          2 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        109        0  45  36    0          99          11          66          9          3              1          0          4 Percentage of All    100%        0% 41%  33%    0%        91%          10%        61%          8%          3%            1%          0%        4%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 268 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71152B Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs  Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)  /1000 hrs Region 1                  4.5        2.5        1.9          3.1        Region 1                  3.9        1.7        0.8          2.1 Region 2                  1.6        2.8        1.8          2.1        Region 2                  1.2        2.4        1.2          1.6 Region 3                  2.9        2.9        2.8          2.8        Region 3                  2.5        2.4        2.7          2.5 Region 4                  3.8        2.6        3.4          3.4        Region 4                  3.8        1.1        3.3          2.7 1 Unit Sites              4.5        2.3        2.8          3.3        1 Unit Sites              4.3        1.8        2.3          2.7 2 Unit Sites              2.7        3.0        2.4          2.7        2 Unit Sites              2.0        2.0        1.6          1.9 3 Unit Sites              0.0        1.8        0.0          0.9        3 Unit Sites              0.0        1.8        0.0          0.9 BWR                        4.1        2.7        2.8          3.3        BWR                        3.7        2.3        2.0          2.7 PWR                        2.7        2.7        2.2          2.6        PWR                        1.9        1.8        1.7          1.8 Total All Regions          3.4        2.7        2.6          2.9        Total All Regions          2.7        1.9        1.8          2.2 71152B Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                    Page 269 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1          2040      15          1.7      136.0    1733          15          1.9      115.6    2464        18        1.8      136.9 Region 2          2458      18          1.8      136.6    2079          16          1.8      129.9    2410        18        1.8      133.9 Region 3          2021      10          1.0      202.1    1668          7          0.9      238.3    2254        10        1.0      225.4 Region 4          1565      11          1.6      142.3    1777          12          1.5      148.1    1538        12        1.7      128.1 1 Unit Sites      1119        7          1.2      159.8    2356          16          1.6      147.2    1717        9        1.1      190.8 2 Unit Sites      6248      41          1.6      152.4    3791          27          1.6      140.4    6168        43        1.8      143.4 3 Unit Sites        717        6          1.5      119.5    1110          7          1.4      158.6    780        6        1.5      130.0 BWR                3798      24          1.5      158.2    1760          12          1.5      146.6    4542        30        1.8      151.4 PWR                4286      30          1.7      142.9    5497          38          1.7      144.7    4123        28        1.6      147.3 Total All          8084      54          1.6      149.7    7257          50          1.7      145.1    8665        58        1.7      149.4 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 270 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          6237      48        1.9      129.9 Region 2          6947      52        1.9      133.6 Region 3          5942      27        1.0      220.1 Region 4          4879      35        1.8      139.4 1 Unit Sites      5191      32        1.5      162.2 2 Unit Sites      16207    111        1.7      146.0 3 Unit Sites      2608      19        1.7      137.2 BWR              10099      66        1.7      153.0 PWR              13907      96        1.7      144.9 Total All        24006    162        1.7      148.2 Regions 9/11/2018 2:22:01 PM                                                                      Page 271 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71153 Revision History Date of Revision      Description of Revision 12/17/2015            IP 71153, "Follow-up of Events and Notices of Enforcement Discretion," has been revised to change outdated references.
Summary of PIM Findings 2015              2016            2017    3 Year Total AV N/A                                      0                0                1                  1 AV White                                    0                1                0                  1 EDG N/A                                    0                0                1                  1 FIN Green                                  15              19              12                46 FIN N/A                                    0                1                0                  1 FIN White                                  0                1                0                  1 NCV Green                                  49              58              63                170 NCVIV Green                                1                1                1                  3 NCVIV N/A                                  10                5                3                18 NOV N/A                                    1                4                2                  7 NOV White                                  0                0                1                  1 NOVIV N/A                                  0                0                1                  1 VIO White                                  2                1                0                  3 Total                                      78              91              85                254 9/11/2018 2:22:01 PM                                                                                                                        Page 272 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71153 PIM Findings Breakdown All    > Green  PIR  HP  SCWE Inspector Initiating    Mitigating    Barrier  Emergency  Occupational    Public    Security Findings    or                    Identified    Events    Systems    Integrity Preparedness  Radiation    Radiation
                            > SL-IV                                                                                Safety      Safety Region 1                  78        0    9  50    0          34          32          23        15            1              1          1          0 Region 2                  69        1  11  35    1          37          20          34          4          0              0          0          0 Region 3                  51        3  10  26    0          15          17          23          7          0              0          0          1 Region 4                  53        2    4  29    0          22          17          27          6          0              0          0          0 1 Unit Sites            112        2  14  64    0          40          38          45        19            0              1          0          0 2 Unit Sites            121        4  16  66    1          61          44          50        12            1              0          1          1 3 Unit Sites              18        0    4  10    0          7          4          12          1          0              0          0          0 BWR                      126        3  16  73    0          47          43          45        24            1              1          1          0 PWR                      125        3  18  67    1          61          43          62          8          0              0          0          1 Findings                  0        0    0    0    0          0          0          0          0          0              0          0          0 Associated SIT/AIT Total All Regions        251        6  34  140    1        108          86        107        32            1              1          1          1 Percentage of All    100%        2% 14%  56%    0%        43%          34%        43%        13%            0%            0%          0%        0%
Findings 9/11/2018 2:22:01 PM                                                                                                                    Page 273 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 71153 Findings per 1000 Inspection                                              Inspector Identified Findings per 1000 Inspection Hours                                                                      Hours Findings / Findings / Findings /    3 Year                                Findings / Findings / Findings /    3 Year 1000 hrs  1000 hrs  1000 hrs    Findings                                1000 hrs    1000 hrs  1000 hrs    Findings (2015)    (2016)    (2017)    /1000 hrs                                  (2015)    (2016)      (2017)    /1000 hrs Region 1                  20.2      20.0        9.4          14.7        Region 1                  12.3        6.8        5.2          7.9 Region 2                  11.5      21.3      22.3          17.6        Region 2                  6.8        12.2        6.3          8.3 Region 3                  19.7      21.5      18.3          19.8        Region 3                  5.0        5.5        3.8          4.8 Region 4                  20.1      15.3      26.8          20.3        Region 4                  12.3        8.2        7.5          9.4 1 Unit Sites              19.2      19.5      12.9          16.1        1 Unit Sites              7.7        5.5        5.9          6.3 2 Unit Sites              17.1      18.9      19.4          18.3        2 Unit Sites              9.8        9.3        4.7          8.3 3 Unit Sites              11.0      29.6      34.3          20.6        3 Unit Sites              7.6        17.1        10.6        11.0 BWR                      19.9      21.3      14.1          17.3        BWR                        8.1        9.5        5.5          7.6 PWR                      15.3      18.7      19.8          17.6        PWR                        9.4        7.3        5.8          7.8 Total All Regions        17.0      19.8      15.8          17.5        Total All Regions          8.9        8.2        5.6          7.7 71153 Hours & Samples Reported 9/11/2018 2:22:01 PM                                                                                                                      Page 274 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 Calendar Year 2015                          Calendar Year 2016                          Calendar Year 2017 Reported Reported    Average    Hrs/Sample Reported Reported      Average    Hrs/Sample Reported Reported  Average    Hrs/Sample Hours    Samples Normalized                Hours    Samples Normalized                  Hours  Samples Normalized Samples                                      Samples                                    Samples Region 1            972      133          7.8        7.3    1329        194        12.1          6.9    970      111        6.5          8.7 Region 2          1465      98          5.4        14.9    981        112          6.2        8.8    789      119        6.6          6.6 Region 3            800      122          7.6        6.6    733        125          7.8        5.9    779      115        7.2          6.8 Region 4            813      76          5.8        10.7    852          79          6.1        10.8    665        61        4.7        10.9 1 Unit Sites        747      91          5.7        8.2    1030        127          8.5        8.1    1076      102        6.4        10.5 2 Unit Sites      2552      271          6.9        9.4    2067        307          7.9        6.7    1763      260        6.7          6.8 3 Unit Sites        751      67          8.4        11.2    798          76          9.5        10.5    364        44        5.5          8.3 BWR                1608      206          8.6        7.8    1574        262        10.9          6.0    1828      214        8.9          8.5 PWR                2442      223          5.9        10.9    2321        248          6.7        9.4    1375      192        5.1          7.2 Total All          4049      429          7.0        9.4    3895        510          8.5        7.6    3203      406        6.7          7.9 Regions 9/11/2018 2:22:01 PM                                                                                                                Page 275 of 276
 
U.S. Nuclear Regulatory Commission IP 28 Inspection Procedure Analysis 01/01/2015 through 12/31/2017 3 Year Reported Reported    Average  Hrs/Sample Hours    Samples Normalized Samples Region 1          3271    438        9.1        7.5 Region 2          3235    329        6.3        9.8 Region 3          2312    362        7.9        6.4 Region 4          2330    216        5.8        10.8 1 Unit Sites      2853    320        7.1        8.9 2 Unit Sites      6382    838        7.3        7.6 3 Unit Sites      1913    187        8.5        10.2 BWR                5010    682        9.6        7.3 PWR                6137    663        5.9        9.3 Total All        11147    1345        7.4        8.3 Regions 9/11/2018 2:22:01 PM                                                                      Page 276 of 276}}

Latest revision as of 08:18, 5 January 2025

2017-2015 IP 28 Inspection Procedure Analysis
ML18351A130
Person / Time
Issue date: 04/24/2019
From: Aron Lewin
NRC/NRR/DIRS/IRIB
To:
Lewin A, 415-2259, NRR/DIRS
References
Download: ML18351A130 (276)


Text