{{#Wiki_filter:June 13, 2019 MEMORANDUM TO:           Christopher M. Regan, Deputy Director Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM:                     Chris Allen, Project Manager     /RA/
{{#Wiki_filter:June 13, 2019 MEMORANDUM TO:
Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards
Christopher M. Regan, Deputy Director Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM:
Chris Allen, Project Manager /RA/
Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF JUNE 6, 2019 PUBLIC MEETING WITH GENERAL ELECTRIC HITACHI TO DISCUSS AMENDING THE MODEL NO.
OF JUNE 6, 2019 PUBLIC MEETING WITH GENERAL ELECTRIC HITACHI TO DISCUSS AMENDING THE MODEL NO.
2000 CERTIFICATE OF COMPLIANCE TO SHIP ACCIDENT TOLERANT FUEL
2000 CERTIFICATE OF COMPLIANCE TO SHIP ACCIDENT TOLERANT FUEL  


===Background===
===
Background===
This was a category 1 public meeting between General Electric Hitachi (GEH), and the U.S.
This was a category 1 public meeting between General Electric Hitachi (GEH), and the U.S.
Nuclear Regulatory Commission (NRC) staff to discuss amending the Model No. 2000 Certificate of Compliance to ship irradiated accident tolerant fuel. Regulatory commitments were not made at the meeting. The meeting was noticed on May 22, 2019 (Agencywide Documents Access and Management System Accession No. ML19133A155). The list of meeting attendees is provided in Enclosure 1. The publicly available meeting presentation slides are provided as Enclosure 3.
Nuclear Regulatory Commission (NRC) staff to discuss amending the Model No. 2000 Certificate of Compliance to ship irradiated accident tolerant fuel. Regulatory commitments were not made at the meeting. The meeting was noticed on May 22, 2019 (Agencywide Documents Access and Management System Accession No. ML19133A155). The list of meeting attendees is provided in Enclosure 1. The publicly available meeting presentation slides are provided as Enclosure 3.
Line 33: Line 35:
The discussion followed the agenda provided in Enclosure 2. After the conclusion of the public portion of the meeting, GEH discussed proposed changes for each chapter of the safety analysis report.
The discussion followed the agenda provided in Enclosure 2. After the conclusion of the public portion of the meeting, GEH discussed proposed changes for each chapter of the safety analysis report.
The NRC and GEH extensively discussed the proposed contents (e.g., maximum quantity of material, minimum active fuel height, etc.), and the bases used to develop the fuel parameters presented. The NRC and GEH also discussed in detail the assumptions associated with source term development (e.g., modeling gadolinium-oxide in ORIGEN-ARP) and shielding analyses (e.g., geometry assumptions for dose rate calculations) as well as calculation tools associated with the proposed amendment. In addition, the NRC and GEH discussed the cladding performance under both normal conditions of transport and hypothetical accident conditions.
The NRC and GEH extensively discussed the proposed contents (e.g., maximum quantity of material, minimum active fuel height, etc.), and the bases used to develop the fuel parameters presented. The NRC and GEH also discussed in detail the assumptions associated with source term development (e.g., modeling gadolinium-oxide in ORIGEN-ARP) and shielding analyses (e.g., geometry assumptions for dose rate calculations) as well as calculation tools associated with the proposed amendment. In addition, the NRC and GEH discussed the cladding performance under both normal conditions of transport and hypothetical accident conditions.
CONTACT:       Chris Allen, NMSS/DSFM 301-415-6877
CONTACT:
Chris Allen, NMSS/DSFM 301-415-6877  


C. Regan                                  From these discussions, GEH identified several areas requiring further clarification either in the proposed certificate of compliance, the amended safety analysis report or both. In addition, NRC staff identified from these discussions that GEH had incorporated flexibility in identifying the maximum amount of material to be loaded for the transportation package user. Therefore, NRC staff cautioned GEH that approval of the amendment would be based upon the design work performed by GEH and not upon the work to be done by the transportation package user.
From these discussions, GEH identified several areas requiring further clarification either in the proposed certificate of compliance, the amended safety analysis report or both. In addition, NRC staff identified from these discussions that GEH had incorporated flexibility in identifying the maximum amount of material to be loaded for the transportation package user. Therefore, NRC staff cautioned GEH that approval of the amendment would be based upon the design work performed by GEH and not upon the work to be done by the transportation package user.
Although GEH contended that several safety analysis report chapters would not be affected by the proposed amendment, NRC staff nevertheless encouraged GEH to evaluate the proposed changes for cross cutting issues which could potentially affect these chapters. After discussing submittal timing and a need date for issuance of the amendment, the meeting was adjourned.
Although GEH contended that several safety analysis report chapters would not be affected by the proposed amendment, NRC staff nevertheless encouraged GEH to evaluate the proposed changes for cross cutting issues which could potentially affect these chapters. After discussing submittal timing and a need date for issuance of the amendment, the meeting was adjourned.
Docket No.: 71-9228 EPID No. L-2018-LRM-0090
Docket No.: 71-9228 EPID No. L-2018-LRM-0090  


==Enclosures:==
==Enclosures:==
Line 44: Line 47:
: 3. Meeting Slides
: 3. Meeting Slides


C. Regan                               3
C. Regan 3  


==SUMMARY==
==SUMMARY==
OF JUNE 6, 2019 PUBLIC MEETING WITH GENERAL ELECTRIC HITACHI TO DISCUSS AMENDING THE MODEL NO. 2000 CERTIFICATE OF COMPLIANCE TO SHIP ACCIDENT TOLERANT FUEL, DATE: June 13, 2019 DISTRIBUTION:
OF JUNE 6, 2019 PUBLIC MEETING WITH GENERAL ELECTRIC HITACHI TO DISCUSS AMENDING THE MODEL NO. 2000 CERTIFICATE OF COMPLIANCE TO SHIP ACCIDENT TOLERANT FUEL, DATE: June 13, 2019 DISTRIBUTION:
DSFM r/f     NRC attendees Filename: G:\SFST\Allen\Part 71\ATF\Pre-Application Meetings\MeetingSummary.docx ADAMS Package No.: ML19176A087       Memo: ML19176A085       Slides: ML19134A258 OFC:       SFM                 SFM                 SFM NAME:       WAllen             SFigueroa           JMcKirgan DATE:       6/10/19             6/11/19             6/13/19 OFFICIAL RECORD COPY
DSFM r/f NRC attendees Filename: G:\\SFST\\Allen\\Part 71\\ATF\\Pre-Application Meetings\\MeetingSummary.docx ADAMS Package No.: ML19176A087 Memo: ML19176A085 Slides: ML19134A258 OFC:
SFM SFM SFM NAME:
WAllen SFigueroa JMcKirgan DATE:
6/10/19 6/11/19 6/13/19 OFFICIAL RECORD COPY


MEETING ATTENDEES John McKirgan               NRC Meraj Rahimi               NRC Ricardo Torres             NRC Chris Allen                 NRC Jimmy Chang                 NRC Drew Barto                 NRC Ricardo Rodriguez           NRC Tae Ahn                     NRC Antonio Rigato             NRC Jimmy Chang                 NRC Carlos Martinez             GEH Christopher Kmiec           GEH Scott Pfeffer               GEH Don Hartsock               GEH Russ Fawcett               GNF Eric Kirstein               GEH Fran Bolger                 GEH Fariz Abdul Rahman         GEH Dave Hindera               GNF Marv Lewis             Public Citizen Enclosure 1
MEETING ATTENDEES John McKirgan NRC Meraj Rahimi NRC Ricardo Torres NRC Chris Allen NRC Jimmy Chang NRC Drew Barto NRC Ricardo Rodriguez NRC Tae Ahn NRC Antonio Rigato NRC Jimmy Chang NRC Carlos Martinez GEH Christopher Kmiec GEH Scott Pfeffer GEH Don Hartsock GEH Russ Fawcett GNF Eric Kirstein GEH Fran Bolger GEH Fariz Abdul Rahman GEH Dave Hindera GNF Marv Lewis Public Citizen  


AGENDA Meeting between General Electric Hitachi (GEH) and the Nuclear Regulatory Commission June 6, 2019 11:00 P.M. - 5:00 P.M.
AGENDA Meeting between General Electric Hitachi (GEH) and the Nuclear Regulatory Commission June 6, 2019 11:00 P.M. - 5:00 P.M.
Two White Flint 6-B-2 Open Session (60 minutes)
Two White Flint 6-B-2 Open Session (60 minutes)  
* Introductions
 
* Purpose of Meeting
===Introductions===
* Summary of Previous GEH and NRC Meetings
Purpose of Meeting Summary of Previous GEH and NRC Meetings General Overview of the GE2000 Safety Analysis Report Amendment Strategy Closed Session: (Balance of Time)
* General Overview of the GE2000 Safety Analysis Report Amendment Strategy Closed Session: (Balance of Time)
Chapter by Chapter Review of Technical Approach Proposed GE2000 Certificate of Compliance Mark-ups Submittal Strategy and Timing  
* Chapter by Chapter Review of Technical Approach
* Proposed GE2000 Certificate of Compliance Mark-ups
* Submittal Strategy and Timing Enclosure 2


Meeting Presentation Slides Enclosure 3}}
Meeting Presentation Slides}}

Latest revision as of 01:45, 5 January 2025

Memorandum to C. Regan Summary of June 6, 2019, Public Meeting with General Electric Hitachi to Discuss Amending the Model No. 2000 Certificate of Compliance to Ship Accident Tolerant Fuel
ML19176A085
Person / Time
Site: 07109228
Issue date: 06/13/2019
From: William Allen
Spent Fuel Licensing Branch
To: Christopher Regan
Division of Spent Fuel Management
Allen W
References
EPID L-2018-LRM-0090
Download: ML19176A085 (5)


Text

June 13, 2019 MEMORANDUM TO:

Christopher M. Regan, Deputy Director Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM:

Chris Allen, Project Manager /RA/

Spent Fuel Licensing Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards

SUBJECT:

SUMMARY

OF JUNE 6, 2019 PUBLIC MEETING WITH GENERAL ELECTRIC HITACHI TO DISCUSS AMENDING THE MODEL NO.

2000 CERTIFICATE OF COMPLIANCE TO SHIP ACCIDENT TOLERANT FUEL

=

Background===

This was a category 1 public meeting between General Electric Hitachi (GEH), and the U.S.

Nuclear Regulatory Commission (NRC) staff to discuss amending the Model No. 2000 Certificate of Compliance to ship irradiated accident tolerant fuel. Regulatory commitments were not made at the meeting. The meeting was noticed on May 22, 2019 (Agencywide Documents Access and Management System Accession No. ML19133A155). The list of meeting attendees is provided in Enclosure 1. The publicly available meeting presentation slides are provided as Enclosure 3.

Meeting Summary On June 6, 2019, NRC staff held a partially closed public meeting with GEH representatives.

The discussion followed the agenda provided in Enclosure 2. After the conclusion of the public portion of the meeting, GEH discussed proposed changes for each chapter of the safety analysis report.

The NRC and GEH extensively discussed the proposed contents (e.g., maximum quantity of material, minimum active fuel height, etc.), and the bases used to develop the fuel parameters presented. The NRC and GEH also discussed in detail the assumptions associated with source term development (e.g., modeling gadolinium-oxide in ORIGEN-ARP) and shielding analyses (e.g., geometry assumptions for dose rate calculations) as well as calculation tools associated with the proposed amendment. In addition, the NRC and GEH discussed the cladding performance under both normal conditions of transport and hypothetical accident conditions.

CONTACT:

Chris Allen, NMSS/DSFM 301-415-6877

From these discussions, GEH identified several areas requiring further clarification either in the proposed certificate of compliance, the amended safety analysis report or both. In addition, NRC staff identified from these discussions that GEH had incorporated flexibility in identifying the maximum amount of material to be loaded for the transportation package user. Therefore, NRC staff cautioned GEH that approval of the amendment would be based upon the design work performed by GEH and not upon the work to be done by the transportation package user.

Although GEH contended that several safety analysis report chapters would not be affected by the proposed amendment, NRC staff nevertheless encouraged GEH to evaluate the proposed changes for cross cutting issues which could potentially affect these chapters. After discussing submittal timing and a need date for issuance of the amendment, the meeting was adjourned.

Docket No.: 71-9228 EPID No. L-2018-LRM-0090

Enclosures:

1. Meeting Attendees
2. Agenda
3. Meeting Slides

C. Regan 3

SUMMARY

OF JUNE 6, 2019 PUBLIC MEETING WITH GENERAL ELECTRIC HITACHI TO DISCUSS AMENDING THE MODEL NO. 2000 CERTIFICATE OF COMPLIANCE TO SHIP ACCIDENT TOLERANT FUEL, DATE: June 13, 2019 DISTRIBUTION:

DSFM r/f NRC attendees Filename: G:\\SFST\\Allen\\Part 71\\ATF\\Pre-Application Meetings\\MeetingSummary.docx ADAMS Package No.: ML19176A087 Memo: ML19176A085 Slides: ML19134A258 OFC:

SFM SFM SFM NAME:

WAllen SFigueroa JMcKirgan DATE:

6/10/19 6/11/19 6/13/19 OFFICIAL RECORD COPY

MEETING ATTENDEES John McKirgan NRC Meraj Rahimi NRC Ricardo Torres NRC Chris Allen NRC Jimmy Chang NRC Drew Barto NRC Ricardo Rodriguez NRC Tae Ahn NRC Antonio Rigato NRC Jimmy Chang NRC Carlos Martinez GEH Christopher Kmiec GEH Scott Pfeffer GEH Don Hartsock GEH Russ Fawcett GNF Eric Kirstein GEH Fran Bolger GEH Fariz Abdul Rahman GEH Dave Hindera GNF Marv Lewis Public Citizen

AGENDA Meeting between General Electric Hitachi (GEH) and the Nuclear Regulatory Commission June 6, 2019 11:00 P.M. - 5:00 P.M.

Two White Flint 6-B-2 Open Session (60 minutes)

Introductions

Purpose of Meeting Summary of Previous GEH and NRC Meetings General Overview of the GE2000 Safety Analysis Report Amendment Strategy Closed Session: (Balance of Time)

Chapter by Chapter Review of Technical Approach Proposed GE2000 Certificate of Compliance Mark-ups Submittal Strategy and Timing