ML19253C943: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML19253C943 | | number = ML19253C943 | ||
| issue date = 11/30/1979 | | issue date = 11/30/1979 | ||
| title = Responds to | | title = Responds to Requesting Util to Submit Schedule for Plant Unique Analysis for Mark I Containment long-term Program.Refers to Mark I Owners Group Voicing Concern on Subj | ||
| author name = Andognini G | | author name = Andognini G | ||
| author affiliation = BOSTON EDISON CO. | | author affiliation = BOSTON EDISON CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = 79-257, NUDOCS 7912120419 | | document report number = 79-257, NUDOCS 7912120419 | ||
| title reference date = 10-31-1979 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 1 | | page count = 1 | ||
| Line 16: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:BOSTON EDISON COMPANY GENERAL offices Boo BOYLsTON STREET BOSTON. MAssAcNusETTs 02199 G. CAmL ANDOGNINI s u P E = i NT E N D E N T | {{#Wiki_filter:BOSTON EDISON COMPANY GENERAL offices Boo BOYLsTON STREET BOSTON. MAssAcNusETTs 02199 G. CAmL ANDOGNINI November 30, 1979 s u P E = i NT E N D E N T NUCLEAR OPERAflONE DEPARTMENT BECo Ltr. #79-257 Mr. Darrell G. Eisenhut, Acting Director Division of Operating Reactors Office of Nuclear Regulatory Commission Washington, D.C. | ||
20555 License No. DPR-35 Docket No. 50-293 Mark I Containment Long-Term Program Ref. (a) NRC letter (D. G. Eisenhut) to Boston Edison Company (G. C. Andognini) titled, " Acceptance Criteria for the Mark I Containment Long-Term Program," dated, October 31, 1979 (b) Mark I Owners Group letter (L. J. Sobin) to NRC (D. G. Eisenhut) titled, " Mark I Containment Program Response to NRC Request for Additional FSTF Tests," | |||
dated November 30, 1979 | dated November 30, 1979 | ||
==Dear Sir:== | ==Dear Sir:== | ||
Reference (a) requested Boston Edison Company to submit a schedule for the plant unique analysis for the Mark I Contiinment Long-Term Program. | Reference (a) requested Boston Edison Company to submit a schedule for the plant unique analysis for the Mark I Contiinment Long-Term Program. | ||
Reference (b) documents the concerns of the Mark I Owners Group in relation to this subject and should be included on the ?ilgrim Nuclear Power Station Docket. | Reference (b) documents the concerns of the Mark I Owners Group in relation to this subject and should be included on the ?ilgrim Nuclear Power Station Docket. | ||
Very truly yours, | Very truly yours, jf f | ||
1539 354 Ao75 5 | |||
jf | /lO | ||
[ | |||
Ao75 5 | 7912120 YN}} | ||
[ | |||
Latest revision as of 08:01, 4 January 2025
| ML19253C943 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 11/30/1979 |
| From: | Andognini G BOSTON EDISON CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| 79-257, NUDOCS 7912120419 | |
| Download: ML19253C943 (1) | |
Text
BOSTON EDISON COMPANY GENERAL offices Boo BOYLsTON STREET BOSTON. MAssAcNusETTs 02199 G. CAmL ANDOGNINI November 30, 1979 s u P E = i NT E N D E N T NUCLEAR OPERAflONE DEPARTMENT BECo Ltr. #79-257 Mr. Darrell G. Eisenhut, Acting Director Division of Operating Reactors Office of Nuclear Regulatory Commission Washington, D.C.
20555 License No. DPR-35 Docket No. 50-293 Mark I Containment Long-Term Program Ref. (a) NRC letter (D. G. Eisenhut) to Boston Edison Company (G. C. Andognini) titled, " Acceptance Criteria for the Mark I Containment Long-Term Program," dated, October 31, 1979 (b) Mark I Owners Group letter (L. J. Sobin) to NRC (D. G. Eisenhut) titled, " Mark I Containment Program Response to NRC Request for Additional FSTF Tests,"
dated November 30, 1979
Dear Sir:
Reference (a) requested Boston Edison Company to submit a schedule for the plant unique analysis for the Mark I Contiinment Long-Term Program.
Reference (b) documents the concerns of the Mark I Owners Group in relation to this subject and should be included on the ?ilgrim Nuclear Power Station Docket.
Very truly yours, jf f
1539 354 Ao75 5
/lO
[
7912120 YN