=Text=
=Text=
{{#Wiki_filter:ber 22, 2011
{{#Wiki_filter:November 22, 2011


==SUBJECT:==
==SUBJECT:==
TEXAS ENGINEERING EXPERIMENT STATION, NRC ROUTINE INSPECTION REPORT NO. 50-128/2011-201
TEXAS ENGINEERING EXPERIMENT STATION, NRC ROUTINE INSPECTION  


==Dear Dr. O'Neil:==
REPORT NO. 50-128/2011-201
On October 31 to November 3, 2011, the U. S. Nuclear Regulatory Commission (NRC, the Commission) conducted an inspection at your Nuclear Science Center TRIGA Research Reactor Facility. The enclosed report documents the inspection results, which were discussed on November 3, 2011, with Dr. W. D. Reece, Director of the Nuclear Science Center, and other members of your staff.


The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission
==Dear Dr. ONeil:==
=s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified.
November 3, 2011


In accordance with Title 10 of the Code of Federal Regulations Section 2.390 "Public inspections, exemptions and requests for withholding" a copy of this letter, its enclosure, and your response (if any) will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (Agencywide Documents Access and Management System (ADAMS)).
==SUBJECT:==
Adams is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
TEXAS ENGINEERING EXPERIMENT STATION, NRC ROUTINE INSPECTION


Should you have any questions concerning this inspection, please contact Mr. Mike Morlang at (301) 415-4092 or by electronic mail at Gary.Morlang@nrc.gov.
REPORT NO. 50-128/2010-201  
 
Sincerely,
/RA/ Johnny H. Eads Jr., Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
 
Docket No. 50-128 License No. R-83
 
Enclosure: NRC Inspection Report No. 50-128/2011-201
 
cc w/encl: Please see next page Texas A&M University System Docket No. 50-128 cc: Mayor, City of College Station P.O. Box Drawer 9960 College Station, TX 77840-3575
 
Governor's Budget and Planning Office P.O. Box 13561 Austin, TX 78711 Texas A&M University System ATTN: Dr. Warren D. Reece, Director Nuclear Science Center Texas Engineering Experiment Station 1095 Nuclear Science Road, M/S 3575 College Station, Texas 77843
 
Texas A&M University System ATTN: Jim Remlinger, Associate Director Nuclear Science Center Texas Engineering Experiment Station 1095 Nuclear Science Road, M/S 3575 College Station, Texas 77843 Radiation Program Officer Bureau of Radiation Control Radiation Control Program MC 2835 PO Box 149347 Austin, TX 78756-9347 Susan M. Jablonski Technical Advisor Office of Permitting, Remediation & Registration Texas Commission on Environmental Quality P.O. Box 13087, MS 122 Austin, TX 78711-3087 ber 22, 2011
 
==SUBJECT:==
TEXAS ENGINEERING EXPERIMENT STATION, NRC ROUTINE INSPECTION REPORT NO. 50-128/2010-201  


Dear D
Dear D
}}
}}

Latest revision as of 22:09, 12 January 2025

IR 05000128-11-201 on October 31 to November 3, 2011 at Texas Engineering and Experiment Station (Texas a & M Triga) - NRC Inspection Report No. 50-128/2011-201
ML113250004
Person / Time
Site: 05000128
Issue date: 11/22/2011
From: Johnny Eads
Research and Test Reactors Branch B
To: O'Neil D
Texas A&M Univ
Morlang, G M, NRR/DPR, 415-4092
References
IR-11-201
Download: ML113250004 (17)


Text

November 22, 2011

SUBJECT:

TEXAS ENGINEERING EXPERIMENT STATION, NRC ROUTINE INSPECTION

REPORT NO. 50-128/2011-201

Dear Dr. ONeil:

November 3, 2011

SUBJECT:

TEXAS ENGINEERING EXPERIMENT STATION, NRC ROUTINE INSPECTION

REPORT NO. 50-128/2010-201

Dear D