{{#Wiki_filter:Crystal River Inspection / Activity Plan 03/01/2006-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 03/02/2006 11:19:09 Report 22 | {{#Wiki_filter:Crystal River Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 03/02/2006 11:19:09 Report 22 | ||
PS2-EP | |||
- EP EXERCISE Baseline Inspections 04/24/2006 04/28/2006 | |||
7111401 IP Exercise Evaluation Baseline Inspections 04/24/2006 04/28/2006 | |||
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/24/2006 04/28/2006 | |||
71151 IP Performance Indicator Verification | |||
DRP-PIR | |||
- PI&R PRE-INSP VISIT Baseline Inspections 05/15/2006 05/19/2006 | |||
71152B IP Identification and Resolution of Problems | |||
DRP | |||
- PI&R Baseline Inspections 06/05/2006 06/23/2006 | |||
71152B IP Identification and Resolution of Problems | |||
EB3-HS | |||
- HEAT SINK Baseline Inspections 07/09/2006 07/13/2006 | |||
7111107B IP Heat Sink Performance | |||
PSB1-RP | |||
- RP PUBLIC PRE-INSP VISIT Baseline Inspections 11/13/2006 11/15/2006 | |||
7112101 IP Access Control to Radiologically Significant Areas | |||
EB1-MODS | |||
- MODIFICATIONS/10CFR50.59 Baseline Inspections 12/04/2006 12/08/2006 | |||
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 12/04/2006 12/08/2006 | |||
7111117B IP Permanent Plant Modifications | |||
PSB1-RP | |||
- RP PUBLIC BASELINE Baseline Inspections 12/04/2006 12/08/2006 | |||
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/04/2006 12/08/2006 | |||
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 12/04/2006 12/08/2006 | |||
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 12/04/2006 12/08/2006 | |||
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 12/04/2006 12/08/2006 | |||
71151 IP Performance Indicator Verification | |||
PS2-EP | |||
- EP INSP Baseline Inspections 04/23/2007 04/27/2007 | |||
7111402 IP Alert and Notification System Testing Baseline Inspections 04/23/2007 04/27/2007 | |||
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 04/23/2007 04/27/2007 | |||
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/23/2007 04/27/2007 | |||
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 04/23/2007 04/27/2007 | |||
71151 IP Performance Indicator Verification | |||
PSB1-RP | |||
- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 09/04/2007 09/06/2007 | |||
7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures. | |||
Enclosure | |||
}} | }} | ||
Latest revision as of 11:14, 15 January 2025
| ML060610266 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/02/2006 |
| From: | Division Reactor Projects II |
| To: | |
| Shared Package | |
| ML060610250 | List: |
| References | |
| IR-06-001 | |
| Download: ML060610266 (1) | |
Text
Crystal River Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 03/02/2006 11:19:09 Report 22
PS2-EP
- EP EXERCISE Baseline Inspections 04/24/2006 04/28/2006
7111401 IP Exercise Evaluation Baseline Inspections 04/24/2006 04/28/2006
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/24/2006 04/28/2006
71151 IP Performance Indicator Verification
DRP-PIR
- PI&R PRE-INSP VISIT Baseline Inspections 05/15/2006 05/19/2006
71152B IP Identification and Resolution of Problems
- PI&R Baseline Inspections 06/05/2006 06/23/2006
71152B IP Identification and Resolution of Problems
EB3-HS
- HEAT SINK Baseline Inspections 07/09/2006 07/13/2006
7111107B IP Heat Sink Performance
PSB1-RP
- RP PUBLIC PRE-INSP VISIT Baseline Inspections 11/13/2006 11/15/2006
7112101 IP Access Control to Radiologically Significant Areas
EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 12/04/2006 12/08/2006
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 12/04/2006 12/08/2006
7111117B IP Permanent Plant Modifications
PSB1-RP
- RP PUBLIC BASELINE Baseline Inspections 12/04/2006 12/08/2006
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 12/04/2006 12/08/2006
7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 12/04/2006 12/08/2006
7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 12/04/2006 12/08/2006
7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 12/04/2006 12/08/2006
71151 IP Performance Indicator Verification
PS2-EP
- EP INSP Baseline Inspections 04/23/2007 04/27/2007
7111402 IP Alert and Notification System Testing Baseline Inspections 04/23/2007 04/27/2007
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 04/23/2007 04/27/2007
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 04/23/2007 04/27/2007
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 04/23/2007 04/27/2007
71151 IP Performance Indicator Verification
PSB1-RP
- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 09/04/2007 09/06/2007
7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
Enclosure