ML061000729: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-James Noggle -FW. Well Summaries
{{#Wiki_filter:-James Noggle - FW. Well Summaries
_ _iagiei1 From: "Croulet, Donald" <dcroule@entergy.com>
_iagiei1 From:  
To: "Conroy, Pat" <PConroy~entergy.com>, "Cox, Mark R" <mcox90Oenter .com>,"'Timothy Rice"' <tbrice @ gw.dec.state.ny.us>, "Janicki, John" <JJanick@entergy.com>, "'jdn @ nrc.gov"'<jdn &#xa9; n -c.gov>, "Jones, T. R." <tjones2 &#xa9; entergy.com>
"Croulet, Donald" <dcroule@entergy.com>
Date: 12/15/05 5:09PM  
To:  
"Conroy, Pat" <PConroy~entergy.com>, "Cox, Mark R" <mcox90Oenter.com>,
"'Timothy Rice"' <tbrice @ gw.dec.state.ny.us>, "Janicki, John" <JJanick@entergy.com>, "'jdn @ nrc.gov"'
<jdn &#xa9; n -c.gov>, "Jones, T. R." <tjones2 &#xa9; entergy.com>
Date:
12/15/05 5:09PM


==Subject:==
==Subject:==
FW: Well Summaries From: Lavera, Ron Sent: Tt ursday, December 15, 2005 3:29 PM To: Croulet, Donald; Axelson, William L  
FW: Well Summaries From: Lavera, Ron Sent: Tt ursday, December 15, 2005 3:29 PM To: Croulet, Donald; Axelson, William L


==Subject:==
==Subject:==
Well Summaries Don Would you please forward these to the NRC and DEC/DOH.Thanks Ron<<mwexecsummSort by-Date-Dec_15_2005.doc>>
Well Summaries Don Would you please forward these to the NRC and DEC/DOH.
Thanks Ron
<<mwexecsummSort by-Date-Dec_15_2005.doc>>
<<mw_execsummSortby-Well-Dec_15_2005.doc>>
<<mw_execsummSortby-Well-Dec_15_2005.doc>>
RLaVera entergy.com  
RLaVera entergy.com <mailto:RLaVera @entergy.com>
<mailto:RLaVera  
3914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
@entergy.com>
Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 3uchanan, NY 10511-0308 0J9T)
3914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 3uchanan, NY 10511-0308 0J9T)
 
On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 9/28-29/05 MW-107 NEM NDIHTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO____1 1 1 Transformer Yard 212,000 pCi/l HTO 10/5/05 MW-lll Transformer Yard 188,000 pCi/HI-ITO
On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 9/28-29/05 MW-107 NEM NDIHTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO
]0/6/05 U3-1 U3 Discharge Canal 417 pCi/A HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCiA HTO U3-TI U3 South Turbine 703 pCiA HTO U3-T2 U3 North Turbine 1,590 pCi/l HTO 10/14/05 MW-lll Transformer Yard 682 pCi/I HTO (heavy rain)MW- 11 .Transformer Yard 632 pCi/l HT0 (back-up)10/21/05 MW-lll Transformer Yard 284,000 pCi/I HTO 10121105 U3-1 U3 Discharge Canal ND/ITO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher 399 pCi/l HTO U3-T1 U3 South Turbine ND/ITO U3-T2 U3 North Turbine 1,470 pCi/l HTO 10128/05 MW-IllI Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/05 MW-lll Transformer Yard 302,000 pCi/A HOT U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO I GAaxelson\mw_execsumm.doc On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 1:1/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/05 MW-111 Transforner Yard 246,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/A HFTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/l HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO 11/18/05 MW-11l Transformer Yard 171,000 pCi/l HTO 11/22/05 MW- 11I Transformer Yard 180,000 pCi/I HTO U3-1 U3 Distharge .Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine ND/HTO 12/02/05 MW-111 Transformer Yard 125,000 pCi/l HTO 12/02/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCi/A HTO U3-T2 U3 North Turbine 1,329 pCi/l HTO 12/2/05 MW-38 End of IP-3 Discharge 15000 pCi/Il HTO -False Canal Concrete Positive due to sample__ _ _contamination.
____1 1 1 Transformer Yard 212,000 pCi/l HTO 10/5/05 MW-lll Transformer Yard 188,000 pCi/HI-ITO
12/5/05 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/6/05 MW-38 End of IP-3 Discharge ND/HTO._ Canal Concrete 12/08/05 MW-111 Transformer Yard 270,000 pCi/I HTO MH-3 Transformer Yard 894 pCi/l HTO MH-5 Transformer Yard 2,020 pCi/l HTO MH-6 Transformer Yard 37,100 pCi/l HTO 1:2/13/05 MV-34 Transformer Yard 63,900 pCi/l HTO MW-35 Transformer Yard 42,300 pCi/I HTO 2 G:\axeIson\mw_execsumm.doc On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Monitoring Wells I Locations Off-Site Date Location Results 10/18/05 Croton Reservoir ND/HTO -Gamma Camp Field Reservoir ND/HTO -Gamma 10/20/05 Gypsum ND/HTO -Gamma Algonquin ND/HTO -Gamma 5 th Street Well ND/HTO -Gamma 10/25/05 Rock Quarry ND/HTO -Gamma].1/8/05 5 th Street Well ND/IHTO -Gamma 11/30/05 Gypsum ND/HTO Algonquin 5 th Street Well Rock Quarry Croton Reservoir Camp Field Reservoir 3 G:\axeIson\mw_execsumm.doc On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th--)!
]0/6/05 U3-1 U3 Discharge Canal 417 pCi/A HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCiA HTO U3-TI U3 South Turbine 703 pCiA HTO U3-T2 U3 North Turbine 1,590 pCi/l HTO 10/14/05 MW-lll Transformer Yard 682 pCi/I HTO (heavy rain)
f":-; .'ID Date Location Sample Results M-1-3 12/8/2005 Transformer Yard 894 pCi/l HTO MI-S 12/8/2005 Transformer Yard 2,020 pCi/l HTO MHI-6 12/8/2005 Transformer Yard 37,100 pCi/i HTO ID Date Location Sample Results MW-30 11/22/2005 FSB Leakage Area -Note: Well development 464, 000 to 600, 000 pCi/l NOT completed HTO ID j Date Location j Sample Results,,,,, l MWN-34 12/13/2005 Transformer Yard 63,900 Ci/I HTO MWN-35 12/13/2005 Transformer Yard 42,300 pCi/I HTO ID Date Location Sample Results MWN-38 12/2/2005 End of IP-3 15000 pCi/l HTO -False Discharge Canal Positive due to sample Concrete contamination.
MW-11.
MWN-38 12/5/2005 End of IP-3 Discharge Canal Concrete ND/HTO MNP-38 12/6/2005 End of IP-3 Discharge Canal_ Concrete ND/HTO MWEXE-2.DOC Page 1 of 5 On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results MW-111 9/28/2005 Transformer Yard 212,000 pCi/l HTO MLW- 11 10/5/2005 Transformer Yard 188,000 pCi/l HTO MW-il1 10/14/2005 Transformer Yard 682 pCi/l HTO (heavy rain)M.W-1 I1 10/14/2005 Transformer Yard 632 pCi/l HTO (back-up)MW- 11 10/21/2005 Transformer Yard 284,000 pCi/l HTO M.W-11l 10/28/2005 Transformer Yard 218,000 pCi/l HTO M.W- 11 11/4/2005 Transformer Yard 302,000 pCi/Q HOT M.W-111 11/10/2005 Transformer Yard 246,000 pCi/l HTO MW-111 11/18/2005 Transformer Yard 171,000 pCi/l HTO MW-ill 11/22/2005 Transformer Yard 180,000 pCi/l HTO ,';qr-.W-Ill 12/02/2005 Transformer Yard 125,000 pCiAl HTO MW-11l 12/08/2005 Transformer Yard 270,000 pCi/l HTO ID Date Location Sample Results MW-107 9/28/2005 NEM NDIHT0 MW-108 9/28/2005 GT-N ND/HTO MW-108 11/4/05 GT-1 ND/HTO MW-109 9/28/2005 GT-1 ND/HTO MW-109 11/04/2005 GT-1 ND/HTO_.I MWEXE-2.DOC Page 2 of 5 On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results U3-1 10/6/2005 U3 Discharge Canal 417 pCi/l HTO U'-1 10/21/2005 U3 Discharge Canal ND/HTO UJ-1 10/28/2005 U3 Discharge Canal ND/HTO U';-1 11/4/2005 U3 Discharge Canal ND/HTO U';-1 11/10/2005 U3 Discharge Canal ND/HTO U_;__ 11/22/2005 U3 Discharge Canal ND/HTO U;-1 12/2/05 U3 Discharge Canal ND/HTO U2i-2 10/6/2005 U3 Discharge Canal 960 pCi/l HTO U2i-2 10/21/2005 U3 Discharge Canal ND/HTO'V I 10/28/2005 U3 Discharge Canal ND/HTO.4 4 F,),:,!; .....-& 4. 4 Ui-2 11/4/2005 U3 Discharge Canal ND/HTO U2;-2 11/10/2005 U3 Discharge Canal ND/HTO U2;-2 11/22/2005 U3 Discharge Canal ND/HTO U3-2 12/2/05 U3 Discharge Canal ND/HTO U-;-3 10/6/2005 U3 Discharge Canal 439 pCi/l HTO Ur-3 10/21/2005 U3 Discharge Canal ND/HTO U- -3 10/28/2005 U3 Discharge Canal ND/HTO U-'-3 11/4/2005 U3 Discharge Canal ND/HTO U$ -3 11/10/2005 U3 Discharge Canal 471 pCi/l HTO U3.-3 11/22/2005 U3 Discharge Canal ND/HTO Ur-3 12/2/05 U3 Discharge Canal ND/HTO U2.4 U3 Condensate 399 pCi/l HTO 10/21/2005 Polisher U2-4 U3 Condensate 405 pCi/l HTO 10/28/2005 Polisher U2-4 U3 Condensate ND/HTO 11/4/2005 Polisher U2-4 U3 Condensate ND/HTO 11/10/2005 Polisher U-4 U3 Condensate ND/HTO 11/22/2005 Polisher U3-4 U3 Condensate ND/HTO 12/2/05 Polisher U3-T1 10/6/2005 U3 South Turbine 703 pCi/K HTO U3-T1 10/21/2005 U3 South Turbine ND/HTO MWEXE-2.DOC Page 3 of 5 On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th U3-T1 10/28/2005 U3 South Turbine ND/HTO U.;-T1 11/4/2005 U3 South Turbine ND/HTO U'-T1 11/10/2005 U3 South Turbine 563 pCi/l HTO U3-T1 11/22/2005 U3 South Turbine ND/HTO U3-T1 12/2/05 U3 South Turbine 498 pCi/I HTO U$3-T2 10/6/2005 U3 North Turbine 1,590 pCi/l HTO U-$-T2 10/21/2005 U3 North Turbine 1,470 pCi/I HTO U2i-T2 10/28/2005 U3 North Turbine 1,280 pCi/i HTO U-;-T2 11/4/2005 U3 North Turbine 1,190 pCi/i HTO U$-T2 11/10/2005 U3 North Turbine 1,640 pCi/I HTO Ut:-T2 11/22/2005 U3 North Turbine ND/HTO U$-T2 12/2/05 U3 North Turbine 1,329 pCill HTO MWEXE-2.DOC Page 4 of 5 On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th MW-111 Tritium 350,000 300,000 250,000 I C._&deg; 200,000 0.Q E.150,000 I._100,000 50,000 0 i., 1 I I I , 4'i, A _ .1.: -i I : t A-., I I-------------
Transformer Yard 632 pCi/l HT0 (back-up) 10/21/05 MW-lll Transformer Yard 284,000 pCi/I HTO 10121105 U3-1 U3 Discharge Canal ND/ITO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher 399 pCi/l HTO U3-T1 U3 South Turbine ND/ITO U3-T2 U3 North Turbine 1,470 pCi/l HTO 10128/05 MW-IllI Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/05 MW-lll Transformer Yard 302,000 pCi/A HOT U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO I
r- I I I I I-- pCUI HTO to 0 04 C)oto o 0 o 0 o o_ i to o to o 0 0 o 0 0 o 0 0 to to o 0 C.) C)o _Date tO 0)T)o o CD C')co_N~l o 0 o o 0 N 1 iz MWEXE-2.DOC j ..Page.15 of 5 I I}}
GAaxelson\\mw_execsumm.doc
 
On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 1:1/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/05 MW-111 Transforner Yard 246,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/A HFTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/l HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO 11/18/05 MW-11l Transformer Yard 171,000 pCi/l HTO 11/22/05 MW-11I Transformer Yard 180,000 pCi/I HTO U3-1 U3 Distharge.Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine ND/HTO 12/02/05 MW-111 Transformer Yard 125,000 pCi/l HTO 12/02/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCi/A HTO U3-T2 U3 North Turbine 1,329 pCi/l HTO 12/2/05 MW-38 End of IP-3 Discharge 15000 pCi/Il HTO - False Canal Concrete Positive due to sample
_contamination.
12/5/05 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/6/05 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/08/05 MW-111 Transformer Yard 270,000 pCi/I HTO MH-3 Transformer Yard 894 pCi/l HTO MH-5 Transformer Yard 2,020 pCi/l HTO MH-6 Transformer Yard 37,100 pCi/l HTO 1:2/13/05 MV-34 Transformer Yard 63,900 pCi/l HTO MW-35 Transformer Yard 42,300 pCi/I HTO 2
G:\\axeIson\\mw_execsumm.doc
 
On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Monitoring Wells I Locations Off-Site Date Location Results 10/18/05 Croton Reservoir ND/HTO - Gamma Camp Field Reservoir ND/HTO - Gamma 10/20/05 Gypsum ND/HTO - Gamma Algonquin ND/HTO - Gamma 5th Street Well ND/HTO - Gamma 10/25/05 Rock Quarry ND/HTO - Gamma
].1/8/05 5 th Street Well ND/IHTO - Gamma 11/30/05 Gypsum ND/HTO Algonquin 5 th Street Well Rock Quarry Croton Reservoir Camp Field Reservoir 3
G:\\axeIson\\mw_execsumm.doc
 
On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th
- - )! :1-4';'; f":-;.'
ID Date Location Sample Results M-1-3 12/8/2005 Transformer Yard 894 pCi/l HTO MI-S 12/8/2005 Transformer Yard 2,020 pCi/l HTO MHI-6 12/8/2005 Transformer Yard 37,100 pCi/i HTO ID Date Location Sample Results MW-30 11/22/2005 FSB Leakage Area -
Note: Well development 464, 000 to 600, 000 pCi/l NOT completed HTO ID j
Date Location j
Sample Results,,,,,
l MWN-34 12/13/2005 Transformer Yard 63,900 Ci/I HTO MWN-35 12/13/2005 Transformer Yard 42,300 pCi/I HTO ID Date Location Sample Results MWN-38 12/2/2005 End of IP-3 15000 pCi/l HTO - False Discharge Canal Positive due to sample Concrete contamination.
MWN-38 12/5/2005 End of IP-3 Discharge Canal Concrete ND/HTO MNP-38 12/6/2005 End of IP-3 Discharge Canal Concrete ND/HTO MWEXE-2.DOC Page 1 of 5
 
On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results MW-111 9/28/2005 Transformer Yard 212,000 pCi/l HTO MLW-11 10/5/2005 Transformer Yard 188,000 pCi/l HTO MW-il1 10/14/2005 Transformer Yard 682 pCi/l HTO (heavy rain)
M.W-1 I1 10/14/2005 Transformer Yard 632 pCi/l HTO (back-up)
MW-11 10/21/2005 Transformer Yard 284,000 pCi/l HTO M.W-11l 10/28/2005 Transformer Yard 218,000 pCi/l HTO M.W-11 11/4/2005 Transformer Yard 302,000 pCi/Q HOT M.W-111 11/10/2005 Transformer Yard 246,000 pCi/l HTO MW-111 11/18/2005 Transformer Yard 171,000 pCi/l HTO MW-ill 11/22/2005 Transformer Yard 180,000 pCi/l HTO,';qr-
.W-Ill 12/02/2005 Transformer Yard 125,000 pCiAl HTO MW-11l 12/08/2005 Transformer Yard 270,000 pCi/l HTO ID Date Location Sample Results MW-107 9/28/2005 NEM NDIHT0 MW-108 9/28/2005 GT-N ND/HTO MW-108 11/4/05 GT-1 ND/HTO MW-109 9/28/2005 GT-1 ND/HTO MW-109 11/04/2005 GT-1 ND/HTO
_.I MWEXE-2.DOC Page 2 of 5
 
On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results U3-1 10/6/2005 U3 Discharge Canal 417 pCi/l HTO U'-1 10/21/2005 U3 Discharge Canal ND/HTO UJ-1 10/28/2005 U3 Discharge Canal ND/HTO U';-1 11/4/2005 U3 Discharge Canal ND/HTO U';-1 11/10/2005 U3 Discharge Canal ND/HTO U_;__
11/22/2005 U3 Discharge Canal ND/HTO U;-1 12/2/05 U3 Discharge Canal ND/HTO U2i-2 10/6/2005 U3 Discharge Canal 960 pCi/l HTO U2i-2 10/21/2005 U3 Discharge Canal ND/HTO
'V I 10/28/2005 U3 Discharge Canal ND/HTO 4
4 F,),:,!;
: 4.
4 Ui-2 11/4/2005 U3 Discharge Canal ND/HTO U2;-2 11/10/2005 U3 Discharge Canal ND/HTO U2;-2 11/22/2005 U3 Discharge Canal ND/HTO U3-2 12/2/05 U3 Discharge Canal ND/HTO U-;-3 10/6/2005 U3 Discharge Canal 439 pCi/l HTO Ur-3 10/21/2005 U3 Discharge Canal ND/HTO U- -3 10/28/2005 U3 Discharge Canal ND/HTO U-'-3 11/4/2005 U3 Discharge Canal ND/HTO U$ -3 11/10/2005 U3 Discharge Canal 471 pCi/l HTO U3.-3 11/22/2005 U3 Discharge Canal ND/HTO Ur-3 12/2/05 U3 Discharge Canal ND/HTO U2.4 U3 Condensate 399 pCi/l HTO 10/21/2005 Polisher U2-4 U3 Condensate 405 pCi/l HTO 10/28/2005 Polisher U2-4 U3 Condensate ND/HTO 11/4/2005 Polisher U2-4 U3 Condensate ND/HTO 11/10/2005 Polisher U-4 U3 Condensate ND/HTO 11/22/2005 Polisher U3-4 U3 Condensate ND/HTO 12/2/05 Polisher U3-T1 10/6/2005 U3 South Turbine 703 pCi/K HTO U3-T1 10/21/2005 U3 South Turbine ND/HTO MWEXE-2.DOC Page 3 of 5
 
On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th U3-T1 10/28/2005 U3 South Turbine ND/HTO U.;-T1 11/4/2005 U3 South Turbine ND/HTO U'-T1 11/10/2005 U3 South Turbine 563 pCi/l HTO U3-T1 11/22/2005 U3 South Turbine ND/HTO U3-T1 12/2/05 U3 South Turbine 498 pCi/I HTO U$3-T2 10/6/2005 U3 North Turbine 1,590 pCi/l HTO U-$-T2 10/21/2005 U3 North Turbine 1,470 pCi/I HTO U2i-T2 10/28/2005 U3 North Turbine 1,280 pCi/i HTO U-;-T2 11/4/2005 U3 North Turbine 1,190 pCi/i HTO U$-T2 11/10/2005 U3 North Turbine 1,640 pCi/I HTO Ut:-T2 11/22/2005 U3 North Turbine ND/HTO U$-T2 12/2/05 U3 North Turbine 1,329 pCill HTO MWEXE-2.DOC Page 4 of 5
 
On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th MW-111 Tritium 350,000 300,000 250,000 I
C._
&deg; 200,000 0.Q E.
150,000 I._
100,000 50,000 0
i., 1 I
I I, 4
'i, A
_.1.
: -i I :
t A-.,
I I
- ------------ r-I I
I I
I pCUI HTO to 0
04 C) oto o
0 o
0 o
o i
to o
to o
0 0
o 0
0 o
0 0
to to o
0 C.)
C) o Date tO 0)
T) o o
CD C')
co
_N~l o
0 o
o 0
N 1
iz MWEXE-2.DOC j.._
Page.15 of 5 I I}}

Latest revision as of 10:02, 15 January 2025

E-mail from D. Croulet of Entergy to Various, Regarding Well Summaries
ML061000729
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 12/15/2005
From: Croulet D
Entergy Nuclear Operations
To: Noggle J
Division of Reactor Safety I
References
FOIA/PA-2006-0081
Download: ML061000729 (9)


Text

-James Noggle - FW. Well Summaries

_iagiei1 From:

"Croulet, Donald" <dcroule@entergy.com>

To:

"Conroy, Pat" <PConroy~entergy.com>, "Cox, Mark R" <mcox90Oenter.com>,

"'Timothy Rice"' <tbrice @ gw.dec.state.ny.us>, "Janicki, John" <JJanick@entergy.com>, "'jdn @ nrc.gov"'

<jdn © n -c.gov>, "Jones, T. R." <tjones2 © entergy.com>

Date:

12/15/05 5:09PM

Subject:

FW: Well Summaries From: Lavera, Ron Sent: Tt ursday, December 15, 2005 3:29 PM To: Croulet, Donald; Axelson, William L

Subject:

Well Summaries Don Would you please forward these to the NRC and DEC/DOH.

Thanks Ron

<<mwexecsummSort by-Date-Dec_15_2005.doc>>

<<mw_execsummSortby-Well-Dec_15_2005.doc>>

RLaVera entergy.com <mailto:RLaVera @entergy.com>

3914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 3uchanan, NY 10511-0308 0J9T)

On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 9/28-29/05 MW-107 NEM NDIHTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO

____1 1 1 Transformer Yard 212,000 pCi/l HTO 10/5/05 MW-lll Transformer Yard 188,000 pCi/HI-ITO

]0/6/05 U3-1 U3 Discharge Canal 417 pCi/A HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCiA HTO U3-TI U3 South Turbine 703 pCiA HTO U3-T2 U3 North Turbine 1,590 pCi/l HTO 10/14/05 MW-lll Transformer Yard 682 pCi/I HTO (heavy rain)

MW-11.

Transformer Yard 632 pCi/l HT0 (back-up) 10/21/05 MW-lll Transformer Yard 284,000 pCi/I HTO 10121105 U3-1 U3 Discharge Canal ND/ITO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher 399 pCi/l HTO U3-T1 U3 South Turbine ND/ITO U3-T2 U3 North Turbine 1,470 pCi/l HTO 10128/05 MW-IllI Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/05 MW-lll Transformer Yard 302,000 pCi/A HOT U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO I

GAaxelson\\mw_execsumm.doc

On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Date ID Location Sample Results 1:1/3-4/05 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/05 MW-111 Transforner Yard 246,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/A HFTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/l HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO 11/18/05 MW-11l Transformer Yard 171,000 pCi/l HTO 11/22/05 MW-11I Transformer Yard 180,000 pCi/I HTO U3-1 U3 Distharge.Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine ND/HTO 12/02/05 MW-111 Transformer Yard 125,000 pCi/l HTO 12/02/05 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U34 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCi/A HTO U3-T2 U3 North Turbine 1,329 pCi/l HTO 12/2/05 MW-38 End of IP-3 Discharge 15000 pCi/Il HTO - False Canal Concrete Positive due to sample

_contamination.

12/5/05 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/6/05 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/08/05 MW-111 Transformer Yard 270,000 pCi/I HTO MH-3 Transformer Yard 894 pCi/l HTO MH-5 Transformer Yard 2,020 pCi/l HTO MH-6 Transformer Yard 37,100 pCi/l HTO 1:2/13/05 MV-34 Transformer Yard 63,900 pCi/l HTO MW-35 Transformer Yard 42,300 pCi/I HTO 2

G:\\axeIson\\mw_execsumm.doc

On-Site Monitoring Wells Sorted by Date Executive Summary 12/15/05 Monitoring Wells I Locations Off-Site Date Location Results 10/18/05 Croton Reservoir ND/HTO - Gamma Camp Field Reservoir ND/HTO - Gamma 10/20/05 Gypsum ND/HTO - Gamma Algonquin ND/HTO - Gamma 5th Street Well ND/HTO - Gamma 10/25/05 Rock Quarry ND/HTO - Gamma

].1/8/05 5 th Street Well ND/IHTO - Gamma 11/30/05 Gypsum ND/HTO Algonquin 5 th Street Well Rock Quarry Croton Reservoir Camp Field Reservoir 3

G:\\axeIson\\mw_execsumm.doc

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th

- - )! :1-4';'; f":-;.'

ID Date Location Sample Results M-1-3 12/8/2005 Transformer Yard 894 pCi/l HTO MI-S 12/8/2005 Transformer Yard 2,020 pCi/l HTO MHI-6 12/8/2005 Transformer Yard 37,100 pCi/i HTO ID Date Location Sample Results MW-30 11/22/2005 FSB Leakage Area -

Note: Well development 464, 000 to 600, 000 pCi/l NOT completed HTO ID j

Date Location j

Sample Results,,,,,

l MWN-34 12/13/2005 Transformer Yard 63,900 Ci/I HTO MWN-35 12/13/2005 Transformer Yard 42,300 pCi/I HTO ID Date Location Sample Results MWN-38 12/2/2005 End of IP-3 15000 pCi/l HTO - False Discharge Canal Positive due to sample Concrete contamination.

MWN-38 12/5/2005 End of IP-3 Discharge Canal Concrete ND/HTO MNP-38 12/6/2005 End of IP-3 Discharge Canal Concrete ND/HTO MWEXE-2.DOC Page 1 of 5

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results MW-111 9/28/2005 Transformer Yard 212,000 pCi/l HTO MLW-11 10/5/2005 Transformer Yard 188,000 pCi/l HTO MW-il1 10/14/2005 Transformer Yard 682 pCi/l HTO (heavy rain)

M.W-1 I1 10/14/2005 Transformer Yard 632 pCi/l HTO (back-up)

MW-11 10/21/2005 Transformer Yard 284,000 pCi/l HTO M.W-11l 10/28/2005 Transformer Yard 218,000 pCi/l HTO M.W-11 11/4/2005 Transformer Yard 302,000 pCi/Q HOT M.W-111 11/10/2005 Transformer Yard 246,000 pCi/l HTO MW-111 11/18/2005 Transformer Yard 171,000 pCi/l HTO MW-ill 11/22/2005 Transformer Yard 180,000 pCi/l HTO,';qr-

.W-Ill 12/02/2005 Transformer Yard 125,000 pCiAl HTO MW-11l 12/08/2005 Transformer Yard 270,000 pCi/l HTO ID Date Location Sample Results MW-107 9/28/2005 NEM NDIHT0 MW-108 9/28/2005 GT-N ND/HTO MW-108 11/4/05 GT-1 ND/HTO MW-109 9/28/2005 GT-1 ND/HTO MW-109 11/04/2005 GT-1 ND/HTO

_.I MWEXE-2.DOC Page 2 of 5

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th ID Date Location Sample Results U3-1 10/6/2005 U3 Discharge Canal 417 pCi/l HTO U'-1 10/21/2005 U3 Discharge Canal ND/HTO UJ-1 10/28/2005 U3 Discharge Canal ND/HTO U';-1 11/4/2005 U3 Discharge Canal ND/HTO U';-1 11/10/2005 U3 Discharge Canal ND/HTO U_;__

11/22/2005 U3 Discharge Canal ND/HTO U;-1 12/2/05 U3 Discharge Canal ND/HTO U2i-2 10/6/2005 U3 Discharge Canal 960 pCi/l HTO U2i-2 10/21/2005 U3 Discharge Canal ND/HTO

'V I 10/28/2005 U3 Discharge Canal ND/HTO 4

4 F,),:,!;

4.

4 Ui-2 11/4/2005 U3 Discharge Canal ND/HTO U2;-2 11/10/2005 U3 Discharge Canal ND/HTO U2;-2 11/22/2005 U3 Discharge Canal ND/HTO U3-2 12/2/05 U3 Discharge Canal ND/HTO U-;-3 10/6/2005 U3 Discharge Canal 439 pCi/l HTO Ur-3 10/21/2005 U3 Discharge Canal ND/HTO U- -3 10/28/2005 U3 Discharge Canal ND/HTO U-'-3 11/4/2005 U3 Discharge Canal ND/HTO U$ -3 11/10/2005 U3 Discharge Canal 471 pCi/l HTO U3.-3 11/22/2005 U3 Discharge Canal ND/HTO Ur-3 12/2/05 U3 Discharge Canal ND/HTO U2.4 U3 Condensate 399 pCi/l HTO 10/21/2005 Polisher U2-4 U3 Condensate 405 pCi/l HTO 10/28/2005 Polisher U2-4 U3 Condensate ND/HTO 11/4/2005 Polisher U2-4 U3 Condensate ND/HTO 11/10/2005 Polisher U-4 U3 Condensate ND/HTO 11/22/2005 Polisher U3-4 U3 Condensate ND/HTO 12/2/05 Polisher U3-T1 10/6/2005 U3 South Turbine 703 pCi/K HTO U3-T1 10/21/2005 U3 South Turbine ND/HTO MWEXE-2.DOC Page 3 of 5

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th U3-T1 10/28/2005 U3 South Turbine ND/HTO U.;-T1 11/4/2005 U3 South Turbine ND/HTO U'-T1 11/10/2005 U3 South Turbine 563 pCi/l HTO U3-T1 11/22/2005 U3 South Turbine ND/HTO U3-T1 12/2/05 U3 South Turbine 498 pCi/I HTO U$3-T2 10/6/2005 U3 North Turbine 1,590 pCi/l HTO U-$-T2 10/21/2005 U3 North Turbine 1,470 pCi/I HTO U2i-T2 10/28/2005 U3 North Turbine 1,280 pCi/i HTO U-;-T2 11/4/2005 U3 North Turbine 1,190 pCi/i HTO U$-T2 11/10/2005 U3 North Turbine 1,640 pCi/I HTO Ut:-T2 11/22/2005 U3 North Turbine ND/HTO U$-T2 12/2/05 U3 North Turbine 1,329 pCill HTO MWEXE-2.DOC Page 4 of 5

On-Site Monitoring Wells Sorted by Well Location Executive Summary December 15th MW-111 Tritium 350,000 300,000 250,000 I

C._

° 200,000 0.Q E.

150,000 I._

100,000 50,000 0

i., 1 I

I I, 4

'i, A

_.1.

-i I :

t A-.,

I I

- ------------ r-I I

I I

I pCUI HTO to 0

04 C) oto o

0 o

0 o

o i

to o

to o

0 0

o 0

0 o

0 0

to to o

0 C.)

C) o Date tO 0)

T) o o

CD C')

co

_N~l o

0 o

o 0

N 1

iz MWEXE-2.DOC j.._

Page.15 of 5 I I