{{#Wiki_filter:ust 24, 2016
{{#Wiki_filter:August 24, 2016


==SUBJECT:==
==SUBJECT:==
NRC INSPECTION REPORT NO. 05000302/201 6 00 2, DUKE ENERGY FLORIDA, INC., CRYSTAL RIVER UNIT 3, CRYSTAL RIVER, FLORIDA
NRC INSPECTION REPORT NO. 05000302/2016002, DUKE ENERGY FLORIDA, INC., CRYSTAL RIVER UNIT 3, CRYSTAL RIVER, FLORIDA


==Dear Mr. Hobbs:==
==Dear Mr. Hobbs:==
On July 28, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an on-site inspection under Inspection Manual Chapter 2561 , "Decommissioning Power Reactor Inspection Program," at the permanently shut down Crystal River Nuclear Plant Unit 3 (CR-3). The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and the conditions of your license. The inspection consisted of observations by the inspector, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with Phyllis Dixon, Decommissioning Technical Support Manager, and other members of the C R-3 staff on July 28, 2016, and are described in the enclosed report. No findings of safety significance were identified.
On July 28, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an on-site inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program," at the permanently shut down Crystal River Nuclear Plant Unit 3 (CR-3). The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and the conditions of your license. The inspection consisted of observations by the inspector, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with Phyllis Dixon, Decommissioning Technical Support Manager, and other members of the CR-3 staff on July 28, 2016, and are described in the enclosed report. No findings of safety significance were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure(s), and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure(s), and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.


Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).
Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).


UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 No reply to this letter is required. Please contact Steve Hammann, at 610-337-5399, if you have any questions regarding this matter.
UNITED STATES NUCLEAR REGULATORY COMMISSION  
 
==REGION I==
2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 No reply to this letter is required. Please contact Steve Hammann, at 610-337-5399, if you have any questions regarding this matter.


Sincerely,
Sincerely,
/RA MRoberts for/
/RA MRoberts for/  
Raymond Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety Enclosure:
 
Inspection Report 05000302/201 6002 cc w/encl:
Raymond Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety  
 
Enclosure:
Inspection Report 05000302/2016002
 
cc w/encl:
Distribution via ListServ
Distribution via ListServ


Line 41: Line 49:
Duke Energy  
Duke Energy  


Crystal River Nuclear Plant NRC Inspection Report No. 05000302/201 6 00 2  An announced CR-3 decommissioning on-site inspection was performed July 26-28, 2016. The inspection included a review of site radiological programs, maintenance and surveillance, and decommissioning performance.
Crystal River Nuclear Plant NRC Inspection Report No. 05000302/2016002


The inspection consisted of observations by the inspector, interviews with Duke Energy personnel, a review of procedures and records, and plant walk-downs. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, "Decommissioning Power Reactor Inspection Program."
An announced CR-3 decommissioning on-site inspection was performed July 26-28, 2016. The inspection included a review of site radiological programs, maintenance and surveillance, and decommissioning performance. The inspection consisted of observations by the inspector, interviews with Duke Energy personnel, a review of procedures and records, and plant walk-downs. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program."


Based on the results of this inspection, no findings of safety significance were identified.
Based on the results of this inspection, no findings of safety significance were identified.


Inspection Report No. 05000302/201 6 00 2
Inspection Report No. 05000302/2016002


=REPORT DETAILS=
=REPORT DETAILS=


1.0 Background On February 20, 2013, Duke Energy sent a letter
1.0 Background  
[Agency Documentation and Management System (ADAMS) Accession Number ML13056A005]
to the NRC certifying the permanent cessation of activities and certifying that the fuel had been permanently removed from the reactor. This met the requirements of 10 Code of Federal Regulations (CFR) 50.82(a)(1)(i) and 50.82(a)(1)(ii).


CR-3 is currently in the SAFSTOR phase of decommissioning as described in Inspection Manual Chapter (IMC) 2561. 2.0 Post Operation Transition Phase Performance and Status Review
On February 20, 2013, Duke Energy sent a letter [Agency Documentation and Management System (ADAMS) Accession Number ML13056A005] to the NRC certifying the permanent cessation of activities and certifying that the fuel had been permanently removed from the reactor. This met the requirements of 10 Code of Federal Regulations (CFR) 50.82(a)(1)(i) and 50.82(a)(1)(ii). CR-3 is currently in the SAFSTOR phase of decommissioning as described in Inspection Manual Chapter (IMC) 2561.
 
2.0 Post Operation Transition Phase Performance and Status Review


====a. Inspection Scope====
====a. Inspection Scope====
[Inspection Procedures (IPs) 62801 , 71801, 83750, 84750, 8 6 750]   The inspector performed a n on-site inspection the week of July 2 6-2 8, 201 6. The inspection consisted of observations by the inspector, interviews with Duke Energy personnel, a review of procedures and records, and plant walk
[Inspection Procedures (IPs) 62801, 71801, 83750, 84750, 86750]  
-downs.
 
The inspector reviewed activities and documentation associated with occupational exposure , radioactive waste management, and effluent and environmental monitoring to determine the effectiveness of site radiological programs. The inspector accompanied a CR-3 radiation protection (RP) technician during a plant walk
-down which included; general area surveys, checking and verifying radiological postings, air sample collection and analysis, checking locked doors and gates, and general housekeeping
. The inspector also toured the instrument calibration lab , instrument/counting room, and chemistry lab. The inspector reviewed 2015 dose totals , radiation work permits , and As Low As Reasonably Achievable (ALARA) work plans to verify radiation work activities were pre-planned effectively to limit worker exposure. The inspector performed a walk
-down of the radwaste system and site effluent monitoring points to ensure CR
-3 properly processes and stores radioactive materials and that radiological environmental monitoring programs (REMP) are effectively implemented. The inspector reviewed procedures, diagrams of effluent monitoring systems, annual REMP report, annual radioactive effluent report, and the Off
-Site Dose Calculation Manual.
 
The inspector also reviewed the work package for the most recent shipment of radwaste to verify compliance with the regulations.


The inspector accompanied a plant systems engineer on a walk
The inspector performed an on-site inspection the week of July 26-28, 2016. The inspection consisted of observations by the inspector, interviews with Duke Energy personnel, a review of procedures and records, and plant walk-downs.
-down of key safety systems and equipment important to the defueled condition of the plant. The inspector observed work activities, reviewed work orders and related procedures for the quarterly preventative maintenance of the "B" chiller to verify that maintenance was being performed within the established frequencies and that the equipment was being properly maintained.


The inspector also met with CR-3 maintenance supervision and discussed staffing levels, how routine maintenance and emergent work is requested, prioritized, and scheduled, and reviewed the current maintenance workload.
The inspector reviewed activities and documentation associated with occupational exposure, radioactive waste management, and effluent and environmental monitoring to determine the effectiveness of site radiological programs. The inspector accompanied a CR-3 radiation protection (RP) technician during a plant walk-down which included; general area surveys, checking and verifying radiological postings, air sample collection and analysis, checking locked doors and gates, and general housekeeping. The inspector also toured the instrument calibration lab, instrument/counting room, and chemistry lab. The inspector reviewed 2015 dose totals, radiation work permits, and As Low As Reasonably Achievable (ALARA) work plans to verify radiation work activities were pre-planned effectively to limit worker exposure. The inspector performed a walk-down of the radwaste system and site effluent monitoring points to ensure CR-3 properly processes and stores radioactive materials and that radiological environmental monitoring programs (REMP) are effectively implemented. The inspector reviewed procedures, diagrams of effluent monitoring systems, annual REMP report, annual radioactive effluent report, and the Off-Site Dose Calculation Manual. The inspector also reviewed the work package for the most recent shipment of radwaste to verify compliance with the regulations. `


The inspector reviewed the backlog of maintenance work to assess the age and prioritization of the items. The inspector reviewed the maintenance rule program, periodic assessment, and scoping and performance criteria.
The inspector accompanied a plant systems engineer on a walk-down of key safety systems and equipment important to the defueled condition of the plant. The inspector observed work activities, reviewed work orders and related procedures for the quarterly preventative maintenance of the B chiller to verify that maintenance was being performed within the established frequencies and that the equipment was being properly maintained. The inspector also met with CR-3 maintenance supervision and discussed staffing levels, how routine maintenance and emergent work is requested, prioritized, and scheduled, and reviewed the current maintenance workload. The inspector reviewed the backlog of maintenance work to assess the age and prioritization of the items. The inspector reviewed the maintenance rule program, periodic assessment, and scoping and performance criteria.


Inspection Report No. 05000302/2016002 The inspector reviewed work orders, work instructions, and procedures for the new fuel assembly shipping project. The inspector observed CR
Inspection Report No. 05000302/2016002  
-3 and Areva, Inc. personnel moving new fuel assemblies into shipping containers to be transported offsite
, and evaluated CR
-3's adherence to procedures.


The inspector also reviewed the shipping paperwork for the first offsite shipment of new fuel assemblies.
The inspector reviewed work orders, work instructions, and procedures for the new fuel assembly shipping project. The inspector observed CR-3 and Areva, Inc. personnel moving new fuel assemblies into shipping containers to be transported offsite, and evaluated CR-3s adherence to procedures. The inspector also reviewed the shipping paperwork for the first offsite shipment of new fuel assemblies.


The inspector interviewed personnel and reviewed documentation related to the demolition and removal of the Ready Warehouse. The inspector reviewed work orders, work plans, engineering change package, and radiological surveys to verify activities were performed in accordance with plant procedures, technical specifications (TS) and the regulations. The inspector also reviewed work orders and procedures for non-radiological hazardous materials removal from the project.
The inspector interviewed personnel and reviewed documentation related to the demolition and removal of the Ready Warehouse. The inspector reviewed work orders, work plans, engineering change package, and radiological surveys to verify activities were performed in accordance with plant procedures, technical specifications (TS) and the regulations. The inspector also reviewed work orders and procedures for non-radiological hazardous materials removal from the project.


====b. Observations and Findings====
====b. Observations and Findings====
The inspector determined that survey records were clear and complete, RP staff effectively controlled work activities, and technician training and qualifications were up to date. The inspectors verified that ALARA plans and in
The inspector determined that survey records were clear and complete, RP staff effectively controlled work activities, and technician training and qualifications were up to date. The inspectors verified that ALARA plans and in-progress ALARA reviews were performed as needed and post-ALARA reviews were performed to assess the effectiveness of radiological controls. The inspector noted that the RP staff may be supplemented with contractors depending on the project. The inspector verified that the annual radiological effluent and the annual REMP reports demonstrated that calculated doses were below regulatory dose criteria of 10 Code of Federal Regulations (CFR) 50, Appendix I. The inspector also determined that waste treatment systems were maintained and operated in accordance with site procedures. The inspector verified that effluent releases to the environment were being properly controlled, monitored, and quantified as required by NRC regulations.
-progress ALARA reviews were performed as needed and post
-ALARA reviews were performed to assess the effectiveness of radiological controls.
 
The inspector noted that the RP staff may be supplemented with contractors depending on the project.
 
The inspector verified that the annual radiological effluent and the annual REMP reports demonstrated that calculated doses were below regulatory dose criteria of 10 Code of Federal Regulations (CFR) 50, Appendix I.


The inspector also determined that waste treatment systems were maintained and operated in accordance with site procedures.
The inspector verified that the maintenance and surveillance program for systems and components had been conducted in accordance with the TS requirements and established procedures. The inspector noted that throughout the inspection period, housekeeping and plant material condition standards were being maintained. The inspector determined that workers followed work plans, surveillance procedures and industrial safety protocols and were aware of job controls specified in work instructions.
 
The inspector verified that effluent releases to the environment were being properly controlled, monitored, and quantified as required by NRC regulations.
 
The inspector verified that the maintenance and surveillance program for systems and components had been conducted in accordance with the TS requirements and established procedures.
 
The inspector noted that throughout the inspection period
, housekeeping and plant material condition standards were being maintaine d. The inspector determined that workers followed work plans, surveillance procedures and industrial safety protocols and were aware of job controls specified in work instructions.


The inspector determined that the maintenance backlog is reviewed by site management on a regular basis.
The inspector determined that the maintenance backlog is reviewed by site management on a regular basis.
Line 108: Line 89:
The inspector noted that the new fuel assembly shipments are being performed in two phases and is scheduled to be completed in early 2017.
The inspector noted that the new fuel assembly shipments are being performed in two phases and is scheduled to be completed in early 2017.


The inspector determined the pre
The inspector determined the pre-and post-radiological surveys of the Ready Warehouse were adequately performed and the demolition and removal of the warehouse was performed in accordance with site procedures and the regulations. The inspector also determined CR-3 and its contracted workforce conducted the warehouse removal in accordance with licensed requirements.
- and post-radiological surveys of the Ready Warehouse were adequately performed and the demolition and removal of the warehouse was performed in accordance with site procedures and the regulations.
 
The inspector also determined CR
-3 and its contracted workforce conducted the warehouse removal in accordance with licensed requirements.


Inspection Report No. 05000302/2016002
Inspection Report No. 05000302/2016002
Line 121: Line 98:
3.0  
3.0  


=====Exit Meeting Summary=====
===Exit Meeting Summary===
On July 28, 201 6 , the inspector presented the inspection results to Phyllis Dixon, Decommissioning Technical Support Manager, and other members of Duke Energy's staff. The inspector confirmed that proprietary information was not removed from the site.
On July 28, 2016, the inspector presented the inspection results to Phyllis Dixon, Decommissioning Technical Support Manager, and other members of Duke Energys staff. The inspector confirmed that proprietary information was not removed from the site.
 
Inspection Report No. 05000302/2016002
 
PARTIAL LIST OF PERSONS CONTACTED
 
Licensee K. Ankrum, Finance B. Akins, Radiation Protection and Chemistry Manager C. Burtoff, Lead RP P. Dixon, Decommissioning Technical Support Manager T. Hobbs, Decommissioning General Manager J. Lane, Systems Engineer J. LaPratt, ISFSI PM R. Macko, Sr. Scientist L. McDougal, Maintenance and Operations PM P. Rose, Licensing K. Shelton, RP Supervisor D. Sumners, RP Tech M. Van Sicklen, Licensing T. Worthington, Supervisor Engineering


Inspection Report No. 05000302/2016002 PARTIAL LIST OF PERSONS CONTACTED Licensee K. Ankrum, Finance B. Akins, Radiation Protection and Chemistry Manager C. Burtoff, Lead RP P. Dixon , Decommissioning Technical Support Manager T. Hobbs , Decommissioning General Manager J. Lane, Systems Engineer J. LaPratt, ISFSI PM R. Macko, Sr. Scientist L. McDougal, Maintenance and Operations PM P. Rose, Licensing K. Shelton, RP Supervisor D. Sumners, RP Tech M. Van Sicklen, Licensing T. Worthington, Supervisor Engineering ITEMS OPEN, CLOSED, AND DISCUSSED None LIST OF  
ITEMS OPEN, CLOSED, AND DISCUSSED  
 
None  
 
LIST OF  


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Audits and Reports
Audits and Reports
2015 Radiation Protection Annual Dose Report
2015 Radiation Protection Annual Dose Report for Members of the Public and Unmonitored
for Members of the Public and Unmonitored
Occupational Individuals in the Restricted Area
Occupational Individuals in the Restricted Area
2016 Prospective Assessment
2016 Prospective Assessment Dose Monitoring Evaluation
Dose Monitoring Evaluation
Benchmark Report AR Numbers: 758358, 2039163
Benchmark Report AR Number s: 758358 , 2039163 Crystal River Dose Report 2015
Crystal River Dose Report 2015
Self-Assessment Report
Self-Assessment Report AR Numbers: 734454-11, 1965865-11, 2008137-11, 2039155,
AR Number s: 734454-11 , 1965865-11 , 2008137-11 , 2039155 ,   1990900-11, 2025556 Procedures
1990900-11, 2025556
Procedures
ADM-0101, Maintenance Rule Program, Rev. 1
ADM-0101, Maintenance Rule Program, Rev. 1
ADM-0105, ALARA Planning, Rev. 2
ADM-0105, ALARA Planning, Rev. 2
A I-1602, ALARA Committee, Rev. 1
AI-1602, ALARA Committee, Rev. 1
AI-504, Guidelines for Key Safety Function, Rev. 49
AI-504, Guidelines for Key Safety Function, Rev. 49
AI-1810, Asbestos Management and Exposure Control Programs, Rev.11
AI-1810, Asbestos Management and Exposure Control Programs, Rev.11
AI-1821, Radioactive
AI-1821, Radioactive Waste Management Program, Rev.0
Waste Management
Program, Rev.0
CP-161, Radiological Environmental Monitoring Program, Rev. 8
CP-161, Radiological Environmental Monitoring Program, Rev. 8
CP-163, Nuclear Chemistry Quality Control, Rev. 11
CP-163, Nuclear Chemistry Quality Control, Rev. 11
CP-9000, Radiological Groundwater Protection, Rev. 1
CP-9000, Radiological Groundwater Protection, Rev. 1
DOS-4010, Internal Dose Assessment, Rev. 1
DOS-4010, Internal Dose Assessment, Rev. 1
DOS-4011, I n Vitro Bioassay, Rev. 0
DOS-4011, In Vitro Bioassay, Rev. 0
FP-304, Receiving New Fuel Containers for Batch 19, Rev. 25
FP-304, Receiving New Fuel Containers for Batch 19, Rev. 25
FP-30 5 , Loading and Shipping Batch 19 Fuel Containers to Off
FP-305, Loading and Shipping Batch 19 Fuel Containers to Off-Site, Rev. 13
-Site, Rev. 13
 
Inspection Report No. 05000302/2016002
Inspection Report No. 05000302/2016002
Procedures
Procedures (Contd)
(Cont'd) FS-278 Mk-B Unused Fuel Inspections, Rev. 3 (Areva, Fuel Field Services)
FS-278 Mk-B Unused Fuel Inspections, Rev. 3 (Areva, Fuel Field Services)
HPS-0001, Radioactive Material Receipt and Shipping Procedure, Rev. 1
HPS-0001, Radioactive Material Receipt and Shipping Procedure, Rev. 1
HPS-1000, Radiation Protection
HPS-1000, Radiation Protection-Conduct of Operations, Rev.2
-Conduct of Operations, Rev.2
RSP-101, Basic Radiological Safety Information and Instructions for Radiation Workers, Rev. 57
RSP-101, Basic Radiological Safety Information and Instructions for Radiation Workers, Rev. 57
SAF-SUBS-00013, Lead Exposure, Rev. 8
SAF-SUBS-00013, Lead Exposure, Rev. 8
WDT-6 , Primary Resin Tank Operations, Rev. 15 WP-210, Sluicing, Loading, Filling, and Venting Waste Disposal Tanks WDT
WDT-6, Primary Resin Tank Operations, Rev. 15
-15 Through
WP-210, Sluicing, Loading, Filling, and Venting Waste Disposal Tanks WDT-15 Through
WDT-21 Dem ineralizer System, Rev 11
WDT-21 Demineralizer System, Rev 11
Completed Surveillance Procedures
Completed Surveillance Procedures and Surveys
and Surveys
Radiological Survey CR3-M-20150303-5, CR3-M-20150309-5, CR3-M-20150316-5, CR3-M-
Radiological Survey CR3
20150316-10, CR3-M-20150413-3, CR3-M-20160613-2, CR3-M-20160625-1, CR3-M-
-M-20150303-5 , CR3-M-20150309-5 , CR3-M-201503 16-5 , CR3-M-   201503 16-10, CR3-M-20150413-3 , CR3-M-20160613-2 , CR3-M-20160625-1 , CR3-M-   20160415-2, CR3-M-201604 26-1, CR3-M-20160 512-2 CR3 Operations Log: CHHE-4A, CHHE-4B, CHHE-4C Equipment Work History:
20160415-2, CR3-M-20160426-1, CR3-M-20160512-2
CHHE-4A, CHHE-4B, CHHE-4C NESHAP Demolition Asbestos Survey, Ready Warehouse Building, August 18, 2015
CR3 Operations Log: CHHE-4A, CHHE-4B, CHHE-4C
Equipment Work History: CHHE-4A, CHHE-4B, CHHE-4C
NESHAP Demolition Asbestos Survey, Ready Warehouse Building, August 18, 2015
Miscellaneous
Miscellaneous
ALARA Committee Meeting Minutes: April 13, 2016; May 5, 2016; June 10, 2016
ALARA Committee Meeting Minutes: April 13, 2016; May 5, 2016; June 10, 2016
ALARA Work Plan
ALARA Work Plan 16-02, 16-03
16-02, 16-03 Crystal River Maintenance Backlog
Crystal River Maintenance Backlog  
: [[contact::D.H. Griffin Wrecking Co.]], Inc., Work Plan, Crystal River Plant, CR
: [[contact::D.H. Griffin Wrecking Co.]], Inc., Work Plan, Crystal River Plant, CR-3 Ready Warehouse
-3 Ready Warehouse
Radioactive Waste Manifest Packages, 0769-04-0002 and 0769-04-0002, Used Steam
Radioactive Waste Manifest
Packages , 0769-04-0002 and 0769-04-0002, Used Steam
Generators
Generators
In-Progress ALARA Evaluation
In-Progress ALARA Evaluations 16-02, 16-03
s 16-02, 16-03 Maintenance Rule Scoping and Performance Criteria
Maintenance Rule Scoping and Performance Criteria
O ff-Site Dose Calculation
Off-Site Dose Calculation Manual, Rev 36
Manual, Rev 36
Post Job ALARA Critique 16-02, 16-03
Post Job ALARA Critique
Quarterly Waste Container Inventory
16-02, 16-03 Quarterly Waste Container Inventory
Radioactive Shipment Record, 16-013
Radioactive Shipment Record, 16
RP Survey Instructions to Support Ready Warehouse Demolition
-013 RP Survey Instructions to Support Ready Warehouse Demolition
Radioactive Waste Manifest Packages, 0769-04-0002, Used Steam Generator
Radioactive Waste Manifest
Standard Work Instruction (SWI-410090A) - Preparing, Shipping and Receiving of 51032-2
Packages, 0769-04-0002, Used Steam Generator
Containers Offsite (Areva)
Standard Work Instruction
Standard Work Instruction (SW50303A) - 51032-2 Shipping Container - Packing Fuel Bundles
(SWI-410090A) - Preparing, Shipping and Receiving of 51032
Offsite (Areva)
-2   Containers Offsite (Areva) Standard Work Instruction
Work Orders
(SW50303A)  
1347909 10 - Ready Warehouse Demolition
- 51032-2 Shipping Container - Packing Fuel Bundles
1347909 03-Perform Lead and Asbestos Sampling and Abatement
Offsite (Areva) Work Orders
20048278 01-CHHE-4A Quarterly Maintenance
1347909 10  
20043379-05 - load batch 19 fuel assemblies  
- Ready Warehouse Demolition
1347909 03
- Perform Lead and Asbestos Sampling and Abatement
20048278 0
1- CHHE-4A Quarterly Maintenance
20043379-05 - load batch 19 fuel assemblies


Inspection Report No. 05000302/2016002
Inspection Report No. 05000302/2016002
LIST OF ACRONYMS USED
LIST OF ACRONYMS USED
ADAMS Agency Documentation and Management System
ADAMS
ALARA As Low As Reasonably Achievable
Agency Documentation and Management System
CFR   Code of Federal Regulations
ALARA
CR-3   Crystal River Unit 3
As Low As Reasonably Achievable
CFR  
 
Code of Federal Regulations
CR-3
Crystal River Unit 3
Duke Energy
Duke Energy
Duke Energy Florida, Inc
Duke Energy Florida, Inc.
. IMC   Inspection Manual Chapter
IMC  
IP   Inspection Procedure
 
NRC   U.S. Nuclear Regulatory Commission
Inspection Manual Chapter
REMP   Radiological Environmental Monitoring Program
IP  
RP   Radiation Protection
 
TS   Technical Specifications
Inspection Procedure
NRC  
 
U.S. Nuclear Regulatory Commission
REMP
Radiological Environmental Monitoring Program
RP  
 
Radiation Protection
TS  
 
Technical Specifications
}}
}}

Latest revision as of 20:47, 9 January 2025

NRC Inspection Report No. 05000302/2016002, Duke Energy Florida, Inc., Crystal River Unit 3, Crystal River, Florida
ML16238A062
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/24/2016
From: Racquel Powell
Division of Nuclear Materials Safety I
To: Hobbs T
Duke Energy Florida
References
IR 2016002
Download: ML16238A062 (11)


Text

August 24, 2016

SUBJECT:

NRC INSPECTION REPORT NO. 05000302/2016002, DUKE ENERGY FLORIDA, INC., CRYSTAL RIVER UNIT 3, CRYSTAL RIVER, FLORIDA

Dear Mr. Hobbs:

On July 28, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an on-site inspection under Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program," at the permanently shut down Crystal River Nuclear Plant Unit 3 (CR-3). The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and the conditions of your license. The inspection consisted of observations by the inspector, interviews with personnel, and a review of procedures and records. The results of the inspection were discussed with Phyllis Dixon, Decommissioning Technical Support Manager, and other members of the CR-3 staff on July 28, 2016, and are described in the enclosed report. No findings of safety significance were identified.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure(s), and your response will be made available electronically for public inspection in the NRC Public Document Room or from the NRC document system (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

Current NRC regulations and guidance are included on the NRC's website at www.nrc.gov; select Radioactive Waste; Decommissioning of Nuclear Facilities; then Regulations, Guidance and Communications. The current Enforcement Policy is included on the NRC's website at www.nrc.gov; select About NRC, Organizations & Functions; Office of Enforcement; Enforcement documents; then Enforcement Policy (Under 'Related Information'). You may also obtain these documents by contacting the Government Printing Office (GPO) toll-free at 1-866-512-1800. The GPO is open from 8:00 a.m. to 5:30 p.m. EST, Monday through Friday (except Federal holidays).

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PA 19406-2713 No reply to this letter is required. Please contact Steve Hammann, at 610-337-5399, if you have any questions regarding this matter.

Sincerely,

/RA MRoberts for/

Raymond Powell, Chief Decommissioning and Technical Support Branch Division of Nuclear Materials Safety

Enclosure:

Inspection Report 05000302/2016002

cc w/encl:

Distribution via ListServ

EXECUTIVE SUMMARY

Duke Energy

Crystal River Nuclear Plant NRC Inspection Report No. 05000302/2016002

An announced CR-3 decommissioning on-site inspection was performed July 26-28, 2016. The inspection included a review of site radiological programs, maintenance and surveillance, and decommissioning performance. The inspection consisted of observations by the inspector, interviews with Duke Energy personnel, a review of procedures and records, and plant walk-downs. The NRC's program for overseeing the safe operation of a shut-down nuclear power reactor is described in Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program."

Based on the results of this inspection, no findings of safety significance were identified.

Inspection Report No. 05000302/2016002

REPORT DETAILS

1.0 Background

On February 20, 2013, Duke Energy sent a letter [Agency Documentation and Management System (ADAMS) Accession Number ML13056A005] to the NRC certifying the permanent cessation of activities and certifying that the fuel had been permanently removed from the reactor. This met the requirements of 10 Code of Federal Regulations (CFR) 50.82(a)(1)(i) and 50.82(a)(1)(ii). CR-3 is currently in the SAFSTOR phase of decommissioning as described in Inspection Manual Chapter (IMC) 2561.

2.0 Post Operation Transition Phase Performance and Status Review

a. Inspection Scope

[Inspection Procedures (IPs) 62801, 71801, 83750, 84750, 86750]

The inspector performed an on-site inspection the week of July 26-28, 2016. The inspection consisted of observations by the inspector, interviews with Duke Energy personnel, a review of procedures and records, and plant walk-downs.

The inspector reviewed activities and documentation associated with occupational exposure, radioactive waste management, and effluent and environmental monitoring to determine the effectiveness of site radiological programs. The inspector accompanied a CR-3 radiation protection (RP) technician during a plant walk-down which included; general area surveys, checking and verifying radiological postings, air sample collection and analysis, checking locked doors and gates, and general housekeeping. The inspector also toured the instrument calibration lab, instrument/counting room, and chemistry lab. The inspector reviewed 2015 dose totals, radiation work permits, and As Low As Reasonably Achievable (ALARA) work plans to verify radiation work activities were pre-planned effectively to limit worker exposure. The inspector performed a walk-down of the radwaste system and site effluent monitoring points to ensure CR-3 properly processes and stores radioactive materials and that radiological environmental monitoring programs (REMP) are effectively implemented. The inspector reviewed procedures, diagrams of effluent monitoring systems, annual REMP report, annual radioactive effluent report, and the Off-Site Dose Calculation Manual. The inspector also reviewed the work package for the most recent shipment of radwaste to verify compliance with the regulations. `

The inspector accompanied a plant systems engineer on a walk-down of key safety systems and equipment important to the defueled condition of the plant. The inspector observed work activities, reviewed work orders and related procedures for the quarterly preventative maintenance of the B chiller to verify that maintenance was being performed within the established frequencies and that the equipment was being properly maintained. The inspector also met with CR-3 maintenance supervision and discussed staffing levels, how routine maintenance and emergent work is requested, prioritized, and scheduled, and reviewed the current maintenance workload. The inspector reviewed the backlog of maintenance work to assess the age and prioritization of the items. The inspector reviewed the maintenance rule program, periodic assessment, and scoping and performance criteria.

Inspection Report No. 05000302/2016002

The inspector reviewed work orders, work instructions, and procedures for the new fuel assembly shipping project. The inspector observed CR-3 and Areva, Inc. personnel moving new fuel assemblies into shipping containers to be transported offsite, and evaluated CR-3s adherence to procedures. The inspector also reviewed the shipping paperwork for the first offsite shipment of new fuel assemblies.

The inspector interviewed personnel and reviewed documentation related to the demolition and removal of the Ready Warehouse. The inspector reviewed work orders, work plans, engineering change package, and radiological surveys to verify activities were performed in accordance with plant procedures, technical specifications (TS) and the regulations. The inspector also reviewed work orders and procedures for non-radiological hazardous materials removal from the project.

b. Observations and Findings

The inspector determined that survey records were clear and complete, RP staff effectively controlled work activities, and technician training and qualifications were up to date. The inspectors verified that ALARA plans and in-progress ALARA reviews were performed as needed and post-ALARA reviews were performed to assess the effectiveness of radiological controls. The inspector noted that the RP staff may be supplemented with contractors depending on the project. The inspector verified that the annual radiological effluent and the annual REMP reports demonstrated that calculated doses were below regulatory dose criteria of 10 Code of Federal Regulations (CFR) 50, Appendix I. The inspector also determined that waste treatment systems were maintained and operated in accordance with site procedures. The inspector verified that effluent releases to the environment were being properly controlled, monitored, and quantified as required by NRC regulations.

The inspector verified that the maintenance and surveillance program for systems and components had been conducted in accordance with the TS requirements and established procedures. The inspector noted that throughout the inspection period, housekeeping and plant material condition standards were being maintained. The inspector determined that workers followed work plans, surveillance procedures and industrial safety protocols and were aware of job controls specified in work instructions.

The inspector determined that the maintenance backlog is reviewed by site management on a regular basis.

The inspector noted that the new fuel assembly shipments are being performed in two phases and is scheduled to be completed in early 2017.

The inspector determined the pre-and post-radiological surveys of the Ready Warehouse were adequately performed and the demolition and removal of the warehouse was performed in accordance with site procedures and the regulations. The inspector also determined CR-3 and its contracted workforce conducted the warehouse removal in accordance with licensed requirements.

Inspection Report No. 05000302/2016002

c. Conclusions

Based on the results of this inspection, no findings of safety significance were identified.

3.0

Exit Meeting Summary

On July 28, 2016, the inspector presented the inspection results to Phyllis Dixon, Decommissioning Technical Support Manager, and other members of Duke Energys staff. The inspector confirmed that proprietary information was not removed from the site.

Inspection Report No. 05000302/2016002

PARTIAL LIST OF PERSONS CONTACTED

Licensee K. Ankrum, Finance B. Akins, Radiation Protection and Chemistry Manager C. Burtoff, Lead RP P. Dixon, Decommissioning Technical Support Manager T. Hobbs, Decommissioning General Manager J. Lane, Systems Engineer J. LaPratt, ISFSI PM R. Macko, Sr. Scientist L. McDougal, Maintenance and Operations PM P. Rose, Licensing K. Shelton, RP Supervisor D. Sumners, RP Tech M. Van Sicklen, Licensing T. Worthington, Supervisor Engineering

ITEMS OPEN, CLOSED, AND DISCUSSED

None

LIST OF

DOCUMENTS REVIEWED

Audits and Reports

2015 Radiation Protection Annual Dose Report for Members of the Public and Unmonitored

Occupational Individuals in the Restricted Area

2016 Prospective Assessment Dose Monitoring Evaluation

Benchmark Report AR Numbers: 758358, 2039163

Crystal River Dose Report 2015

Self-Assessment Report AR Numbers: 734454-11, 1965865-11, 2008137-11, 2039155,

1990900-11, 2025556

Procedures

ADM-0101, Maintenance Rule Program, Rev. 1

ADM-0105, ALARA Planning, Rev. 2

AI-1602, ALARA Committee, Rev. 1

AI-504, Guidelines for Key Safety Function, Rev. 49

AI-1810, Asbestos Management and Exposure Control Programs, Rev.11

AI-1821, Radioactive Waste Management Program, Rev.0

CP-161, Radiological Environmental Monitoring Program, Rev. 8

CP-163, Nuclear Chemistry Quality Control, Rev. 11

CP-9000, Radiological Groundwater Protection, Rev. 1

DOS-4010, Internal Dose Assessment, Rev. 1

DOS-4011, In Vitro Bioassay, Rev. 0

FP-304, Receiving New Fuel Containers for Batch 19, Rev. 25

FP-305, Loading and Shipping Batch 19 Fuel Containers to Off-Site, Rev. 13

Inspection Report No. 05000302/2016002

Procedures (Contd)

FS-278 Mk-B Unused Fuel Inspections, Rev. 3 (Areva, Fuel Field Services)

HPS-0001, Radioactive Material Receipt and Shipping Procedure, Rev. 1

HPS-1000, Radiation Protection-Conduct of Operations, Rev.2

RSP-101, Basic Radiological Safety Information and Instructions for Radiation Workers, Rev. 57

SAF-SUBS-00013, Lead Exposure, Rev. 8

WDT-6, Primary Resin Tank Operations, Rev. 15

WP-210, Sluicing, Loading, Filling, and Venting Waste Disposal Tanks WDT-15 Through

WDT-21 Demineralizer System, Rev 11

Completed Surveillance Procedures and Surveys

Radiological Survey CR3-M-20150303-5, CR3-M-20150309-5, CR3-M-20150316-5, CR3-M-

20150316-10, CR3-M-20150413-3, CR3-M-20160613-2, CR3-M-20160625-1, CR3-M-

20160415-2, CR3-M-20160426-1, CR3-M-20160512-2

CR3 Operations Log: CHHE-4A, CHHE-4B, CHHE-4C

Equipment Work History: CHHE-4A, CHHE-4B, CHHE-4C

NESHAP Demolition Asbestos Survey, Ready Warehouse Building, August 18, 2015

Miscellaneous

ALARA Committee Meeting Minutes: April 13, 2016; May 5, 2016; June 10, 2016

ALARA Work Plan 16-02, 16-03

Crystal River Maintenance Backlog

D.H. Griffin Wrecking Co., Inc., Work Plan, Crystal River Plant, CR-3 Ready Warehouse

Radioactive Waste Manifest Packages, 0769-04-0002 and 0769-04-0002, Used Steam

Generators

In-Progress ALARA Evaluations 16-02, 16-03

Maintenance Rule Scoping and Performance Criteria

Off-Site Dose Calculation Manual, Rev 36

Post Job ALARA Critique 16-02, 16-03

Quarterly Waste Container Inventory

Radioactive Shipment Record,16-013

RP Survey Instructions to Support Ready Warehouse Demolition

Radioactive Waste Manifest Packages, 0769-04-0002, Used Steam Generator

Standard Work Instruction (SWI-410090A) - Preparing, Shipping and Receiving of 51032-2

Containers Offsite (Areva)

Standard Work Instruction (SW50303A) - 51032-2 Shipping Container - Packing Fuel Bundles

Offsite (Areva)

Work Orders

1347909 10 - Ready Warehouse Demolition

1347909 03-Perform Lead and Asbestos Sampling and Abatement

20048278 01-CHHE-4A Quarterly Maintenance

20043379-05 - load batch 19 fuel assemblies

Inspection Report No. 05000302/2016002

LIST OF ACRONYMS USED

ADAMS

Agency Documentation and Management System

ALARA

As Low As Reasonably Achievable

CFR

Code of Federal Regulations

CR-3

Crystal River Unit 3

Duke Energy

Duke Energy Florida, Inc.

IMC

Inspection Manual Chapter

IP

Inspection Procedure

NRC

U.S. Nuclear Regulatory Commission

REMP

Radiological Environmental Monitoring Program

RP

Radiation Protection

TS

Technical Specifications