{{#Wiki_filter:JEvangelos Marinos -FYI: External Caldon Flow Meter Issue at Palo Verde Page 1 From: To: Wermiel, Jared Date:  
{{#Wiki_filter:JEvangelos Marinos - FYI: External Caldon Flow Meter Issue at Palo Verde Page 1 From:
To:
Wermiel, Jared Date:


==Subject:==
==Subject:==
Stephen Dembek Ahmed, lqbal; Calvo, Jose; Cwalina, Gregory; Dick, George; Marinos, Evangelos; Wed, Jun 9, 2004 2:52 PM FYI: External Caldon Flow Meter Issue at Palo Verde Palo Verde uses the external Caldon flow meter to measure feedwater flow at its 3 plants. They use this meter instead of the venturies.
Stephen Dembek Ahmed, lqbal; Calvo, Jose; Cwalina, Gregory; Dick, George; Marinos, Evangelos; Wed, Jun 9, 2004 2:52 PM FYI: External Caldon Flow Meter Issue at Palo Verde Palo Verde uses the external Caldon flow meter to measure feedwater flow at its 3 plants. They use this meter instead of the venturies. They have not received the UFM power uprate amendment so they still have the 2% margin.
They have not received the UFM power uprate amendment so they still have the 2% margin.Yesterday, Caldon informed Palo Verde that they discovered a problem at River Bend with the use of this UFM instrument and that Palo Verde's configuration is similar to River Bend's so the problem may exist at Palo Verde. The problem results in a 0.8% non-conservative error. As a conservative measure, Palo Verde has switched back to using the venturies which has resulted in a 1-3% power decrease at the operating units (1 & 2).Palo Verde expects a letter from Caldon today with a better explanation of the problem.That's all I know about this issue for now.Steve CC: Berkow, Herbert; Fields, Mel; Gramm, Robert; Leeds, Eric; Marsh, Tad/I -1 3,p}}
Yesterday, Caldon informed Palo Verde that they discovered a problem at River Bend with the use of this UFM instrument and that Palo Verde's configuration is similar to River Bend's so the problem may exist at Palo Verde. The problem results in a 0.8% non-conservative error. As a conservative measure, Palo Verde has switched back to using the venturies which has resulted in a 1-3% power decrease at the operating units (1 & 2).
Palo Verde expects a letter from Caldon today with a better explanation of the problem.
That's all I know about this issue for now.
Steve CC:
Berkow, Herbert; Fields, Mel; Gramm, Robert; Leeds, Eric; Marsh, Tad
/I - 1 3,p}}

Latest revision as of 21:51, 14 January 2025

Email from S. Dembek, NRR to I. Ahmed, NRR, J. Calvo, NRR, G. Cwalina, NRR, G. Dick, NRR, E. Marinos, NRR and J. Wermiel, NRR on External Caldon Flow Meter Issue at Palo Verde
ML072681168
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/09/2004
From: Stephen Dembek
Office of Nuclear Reactor Regulation
To: Ahmed I, Calvo J, Cwalina G, Dick G, Marinos E, Wermiel J
Office of Nuclear Reactor Regulation
References
FOIA/PA-2007-0255
Download: ML072681168 (1)


Text

JEvangelos Marinos - FYI: External Caldon Flow Meter Issue at Palo Verde Page 1 From:

To:

Wermiel, Jared Date:

Subject:

Stephen Dembek Ahmed, lqbal; Calvo, Jose; Cwalina, Gregory; Dick, George; Marinos, Evangelos; Wed, Jun 9, 2004 2:52 PM FYI: External Caldon Flow Meter Issue at Palo Verde Palo Verde uses the external Caldon flow meter to measure feedwater flow at its 3 plants. They use this meter instead of the venturies. They have not received the UFM power uprate amendment so they still have the 2% margin.

Yesterday, Caldon informed Palo Verde that they discovered a problem at River Bend with the use of this UFM instrument and that Palo Verde's configuration is similar to River Bend's so the problem may exist at Palo Verde. The problem results in a 0.8% non-conservative error. As a conservative measure, Palo Verde has switched back to using the venturies which has resulted in a 1-3% power decrease at the operating units (1 & 2).

Palo Verde expects a letter from Caldon today with a better explanation of the problem.

That's all I know about this issue for now.

Steve CC:

Berkow, Herbert; Fields, Mel; Gramm, Robert; Leeds, Eric; Marsh, Tad

/I - 1 3,p