ML18058B725: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18058B725
| number = ML18058B725
| issue date = 02/27/2018
| issue date = 02/27/2018
| title = Ltr 02/27/18 Palisades Nuclear Plant Acknowledgement of Disputed Violation of NRC Inspection Report 05000255/2017007 (DRS-J. Gilliam)
| title = Acknowledgement of Disputed Violation of NRC Inspection Report 05000255/2017007 (DRS-J. Gilliam)
| author name = Jeffers M
| author name = Jeffers M
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS  60532-4352  February 27, 2018 EA-18-013 Mr. Charles Arnone Vice President, Operations Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI  490439530 SUBJECT:  PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2017007  Dear Mr. Arnone: This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC), dated January 29, 2018, that provided a response to our Inspection Report issued on December 29, 2017, concerning activities conducted at your Palisades Nuclear Plant.  The letter we received contested a Non-Cited Violation (NCV) documented in Palisades Inspection Report 05000255/2017007.  Failure to Periodically Test the Emergency Diesel Generators Capacity to Start and Accelerate Design Basis S We are currently reviewing your basis for contesting the above NCV.  The NRC seeks to be thorough and timely in the review of licensee responses.  Accordingly, we will inform you as soon as we complete our evaluation. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR Sincerely,  /RA/   Mark Jeffers, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50255 License No. DPR20 cc:  Distribution via LISTSERV
{{#Wiki_filter:UNITED STATES  
Letter to Charles Arnone from Mark Jeffers dated February 27, 2018 SUBJECT:  PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000255/2017007  DISTRIBUTION: Jeremy Bowen RidsNrrPMPalisades Resource RidsNrrDorlLpl3 RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII                             ADAMS Accession Number ML:  18058B725 OFFICE RIII  RIII  RIII  RIII  NAME JGilliam:cl RSkosowski MJeffers  DATE 02/26/18 02/26/18 02/27/18  OFFICIAL RECORD COPY
NUCLEAR REGULATORY COMMISSION  
REGION III  
2443 WARRENVILLE RD. SUITE 210  
LISLE, ILLINOIS  60532-4352  
   
February 27, 2018  
EA-18-013  
Mr. Charles Arnone  
Vice President, Operations  
Entergy Nuclear Operations, Inc.  
Palisades Nuclear Plant  
27780 Blue Star Memorial Highway  
Covert, MI  49043-9530
SUBJECT:  PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION  
OF NRC INSPECTION REPORT 05000255/2017007   
Dear Mr. Arnone:  
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),  
dated January 29, 2018, that provided a response to our Inspection Report issued on  
December 29, 2017, concerning activities conducted at your Palisades Nuclear Plant.  The  
letter we received contested a Non-Cited Violation (NCV) documented in Palisades Inspection  
Report 05000255/2017007.  The contested NCV is Failure to Periodically Test the Emergency  
Diesel Generators Capacity to Start and Accelerate Design Basis Sequenced Loads. 
We are currently reviewing your basis for contesting the above NCV.  The NRC seeks to be  
thorough and timely in the review of licensee responses.  Accordingly, we will inform you as  
soon as we complete our evaluation.  
This letter will be made available for public inspection and copying at  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,  
   
/RA/  
Mark Jeffers, Chief  
Engineering Branch 2  
Division of Reactor Safety  
Docket No. 50-255
License No. DPR-20
cc:  Distribution via LISTSERV  
 
Letter to Charles Arnone from Mark Jeffers dated February 27, 2018  
SUBJECT:  PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION  
OF NRC INSPECTION REPORT 05000255/2017007   
DISTRIBUTION:  
Jeremy Bowen  
RidsNrrPMPalisades Resource  
RidsNrrDorlLpl3  
RidsNrrDirsIrib Resource  
Steven West  
Darrell Roberts  
Richard Skokowski  
Allan Barker  
DRPIII  
DRSIII  
ADAMS Accession Number ML:  18058B725  
OFFICE  
RIII  
   
RIII  
   
RIII  
   
RIII  
   
NAME  
JGilliam:cl  
RSkosowski  
MJeffers  
   
DATE  
02/26/18  
02/26/18  
02/27/18  
   
OFFICIAL RECORD COPY
}}
}}

Latest revision as of 07:57, 6 January 2025

Acknowledgement of Disputed Violation of NRC Inspection Report 05000255/2017007 (DRS-J. Gilliam)
ML18058B725
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/27/2018
From: Jeffers M
NRC/RGN-III/DRS/EB2
To: Arnone C
Entergy Nuclear Operations
References
EA-18-013 IR 2017007
Download: ML18058B725 (2)


See also: IR 05000255/2017007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, ILLINOIS 60532-4352

February 27, 2018

EA-18-013

Mr. Charles Arnone

Vice President, Operations

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant

27780 Blue Star Memorial Highway

Covert, MI 49043-9530

SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION

OF NRC INSPECTION REPORT 05000255/2017007

Dear Mr. Arnone:

This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),

dated January 29, 2018, that provided a response to our Inspection Report issued on

December 29, 2017, concerning activities conducted at your Palisades Nuclear Plant. The

letter we received contested a Non-Cited Violation (NCV) documented in Palisades Inspection

Report 05000255/2017007. The contested NCV is Failure to Periodically Test the Emergency

Diesel Generators Capacity to Start and Accelerate Design Basis Sequenced Loads.

We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be

thorough and timely in the review of licensee responses. Accordingly, we will inform you as

soon as we complete our evaluation.

This letter will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mark Jeffers, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-255

License No. DPR-20

cc: Distribution via LISTSERV

Letter to Charles Arnone from Mark Jeffers dated February 27, 2018

SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION

OF NRC INSPECTION REPORT 05000255/2017007

DISTRIBUTION:

Jeremy Bowen

RidsNrrPMPalisades Resource

RidsNrrDorlLpl3

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Richard Skokowski

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number ML: 18058B725

OFFICE

RIII

RIII

RIII

RIII

NAME

JGilliam:cl

RSkosowski

MJeffers

DATE

02/26/18

02/26/18

02/27/18

OFFICIAL RECORD COPY