IR 05000346/2018410: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:May 2, 2018 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 434499760 SUBJECT: DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410
{{#Wiki_filter:May 2, 2018
 
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410


==Dear Mr. Bezilla,==
==Dear Mr. Bezilla,==
On March 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Inspection at your Davis-Besse Nuclear Power Station and the NRC inspector discussed the results of this inspection with Ms. Brenda Thorbahn and other members of your staff. The results of the inspection are documented in the enclosed report. The NRC inspector did not identify any finding or violation of more-than-minor significance. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part Inspections, Exemptions, Requests for However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire -Related InformationWithhold from public disclosure under 10 CFR in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
March 29, 2018
 
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410


Sincerely,
Dear M
/RA/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Nonpublic Enclosure: IR 05000346/2018410 cc: C. Salz, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV 3 Letter to Mark Bezilla from Steven K. Orth dated May 2, 2018 SUBJECT: DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410 DISTRIBUTION: N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR F. Sullivan, NSIR R. McKinley, RI B. Desai, RII S. West, RIII D. Roberts, RIII J. Groom, RIV DISTRIBUTION w/o encl: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPreports.Resource@nrc.gov  ADAMS Accession Number ML: 18123A490 OFFICE RIII RIII RIII RIII NAME NEgan via email:cl SOrth DATE 04/27/18 05/02/18 OFFICIAL RECORD COPY May 2, 2018 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 434499760 SUBJECT: DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410 Dear M
}}
}}

Latest revision as of 22:57, 5 January 2025

NRC Security Baseline Inspection Report 05000346/2018410 - Cover Letter Only (DRS-N.Egan)
ML18123A490
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/02/2018
From: Steven Orth
Plant Support Branch II
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
IR 2018410
Download: ML18123A490 (3)


Text

May 2, 2018

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410

Dear Mr. Bezilla,

March 29, 2018

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATIONNRC SECURITY BASELINE INSPECTION REPORT 05000346/2018410

Dear M