{{#Wiki_filter:
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
September 18, 2008
EA- 08-248
James R. Douet
Vice President Operations
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS  39150 
SUBJECT:  GRAND GULF NUCLEAR STATION - NRC PHYSICAL SECURITY SPECIAL
INSPECTION REPORT 05000416/2008404:  PRELIMINARY GREATER THAN
GREEN FINDING
Dear Mr. Douet:
This refers to an on-site and in-office special inspection, which concluded on August 20, 2008,
regarding activities at the Grand Gulf Nuclear Station.  This inspection was initiated by the
Nuclear Regulatory Commission (NRC), Region IV, on June 26, 2008, to determine if sensitive
unclassified information (safeguards information) had been improperly controlled in accordance
with NRC requirements.  The enclosed inspection report documents the inspection results,
which were discussed on August 20, 2008, with Mr. William R. Brian, Vice President,
Operations Support, Entergy Operations, Inc., and members of your staff.
This inspection examined activities conducted under your license as they relate to security and
compliance with the Commissions rules and regulations and with the conditions of your license. 
The inspectors reviewed selected procedures, records and files, observed activities, and
interviewed personnel.
This letter discusses a finding that appears to have greater than green security significance, as
described in Section 4OA5 of this report.  This finding was assessed based on the best
available information, including influential assumptions, using the Physical Protection
Significance Determination Process.  The final resolution of this finding will convey the
increment in the importance to security by assigning the corresponding color, which may require
additional NRC inspection.  Compensatory measures are in place while long-term corrective
measures are being implemented.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON  I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125
 
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Entergy Operations, Inc.
- 2 -
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
The finding is also associated with an apparent violation of NRC requirements that is being
considered for escalated enforcement action in accordance with NRC Enforcement Policy.  The
current Enforcement Policy is included on the NRCs Web site at http://www.nrc.gov/reading-
rm/doc-collections/enforcement.
In accordance with NRC Inspection Manual Chapter 0609, Significance Determination
Process, we intend to complete our evaluation using the best available information and issue
our final determination of safety significance within 90 days of the date of this letter.  The
significance determination process encourages an open dialogue between the NRC staff and
the licensee; however, the dialogue should not impact the timeliness of the staffs final
determination.
Before we make a final decision on this matter, we are providing you an opportunity to:
(1) present to the NRC your perspectives on the facts and assumptions, used by the NRC to
arrive at the finding and its significance, at a Regulatory Conference; or (2) submit your position
on the finding to the NRC in writing.  If you request a Regulatory Conference, it should be held
within 30 days of the receipt of this letter and we encourage you to submit supporting
documentation at least one week prior to the conference in an effort to make the conference
more efficient and effective.  If a Regulatory Conference is held, it will be closed to public
observation because of the discussion of security-related information.  If you decide to submit
only a written response, such submittal should be sent to the NRC within 30 days of the receipt
of this letter.  If you decline to request a Regulatory Conference or to submit a written response,
you relinquish your right to appeal the final significance determination process decision, in that
by not doing either, you fail to meet the appeal requirements stated in the Prerequisite and
Limitation sections of Attachment 2 of Inspection Manual Chapter 0609.
Please contact Michael P. Shannon, Chief, Plant Support Branch-1, Division of Reactor Safety,
at 817-860-8215 within 10 business days of the date of receipt of this letter to notify the NRC of
your intentions.  If we have not heard from you within 10 days, we will continue with our
significance determination and enforcement decision and you will be advised by separate
correspondence of the results of our deliberations on this matter.
Since the NRC has not made a final determination in this matter, no Notice of Violation is being
issued for the inspection finding at this time.  In addition, please be advised that the number and
characterization of the apparent violation described in the enclosed inspection report may
change as a result of further NRC review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of the NRCs document system, ADAMS. 
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).  However, because of the security-related concerns
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters
enclosure will not be available for public inspection.
 
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Entergy Operations, Inc.
- 3 -
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for
your response, if any.  This practice will ensure that your response will not be made available
electronically for public inspection in the NRC Public Document Room or from the NRC's
document system, ADAMS.  If safeguards information is necessary to provide an acceptable
response, please provide the level of protection described in 10 CFR 73.21.  Otherwise, mark
your entire response "Security-Related Information Withhold under 10 CFR 2.390" and follow
the instructions for withholding in 10 CFR 2.390(b) (1).
Sincerely,
/RA/
Roy J. Caniano, Director
Division of Reactor Safety
Docket No.:  50-416
License No.: NPF- 29
Nonpublic Enclosure: 
Inspection Report 05000416/2008404
  w/Attachments:  1. Supplemental Information
2. Special Inspection Charter 
cc w/o enclosure:
Senior Vice President
Entergy Nuclear Operations
P.O. Box 31995
Jackson, MS 39286-1995
Senior Vice President and COO
Entergy Operations, Inc. 
P.O. Box 31995
Jackson, MS 39286-1995
Vice President, Oversight
Entergy Services, Inc. 
P.O. Box 31995
Jackson, MS 39286-1995
 
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Entergy Operations, Inc.
- 4 -
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
Senior Manager
Nuclear Safety & Licensing
Entergy Nuclear Operations
P.O. Box 31995
Jackson, MS 39286-1995
Manager, Licensing
Entergy Operations, Inc. 
Grand Gulf Nuclear station
P.O. Box 756
Port Gibson, MS 39150
}}
}}

Latest revision as of 15:02, 14 January 2025

NRC Physical Security Special Inspection Report 05000416-08-404: Preliminary Greater than Green Finding
ML082630406
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/18/2008
From: Caniano R
Division of Reactor Safety IV
To: Douet J
Entergy Operations
Lynn berger
References
EA-08-248, IR-08-404
Download: ML082630406 (4)


See also: IR 05000416/2008404

Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

September 18, 2008

EA- 08-248

James R. Douet

Vice President Operations

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NRC PHYSICAL SECURITY SPECIAL

INSPECTION REPORT 05000416/2008404: PRELIMINARY GREATER THAN

GREEN FINDING

Dear Mr. Douet:

This refers to an on-site and in-office special inspection, which concluded on August 20, 2008,

regarding activities at the Grand Gulf Nuclear Station. This inspection was initiated by the

Nuclear Regulatory Commission (NRC), Region IV, on June 26, 2008, to determine if sensitive

unclassified information (safeguards information) had been improperly controlled in accordance

with NRC requirements. The enclosed inspection report documents the inspection results,

which were discussed on August 20, 2008, with Mr. William R. Brian, Vice President,

Operations Support, Entergy Operations, Inc., and members of your staff.

This inspection examined activities conducted under your license as they relate to security and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures, records and files, observed activities, and

interviewed personnel.

This letter discusses a finding that appears to have greater than green security significance, as

described in Section 4OA5 of this report. This finding was assessed based on the best

available information, including influential assumptions, using the Physical Protection

Significance Determination Process. The final resolution of this finding will convey the

increment in the importance to security by assigning the corresponding color, which may require

additional NRC inspection. Compensatory measures are in place while long-term corrective

measures are being implemented.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Entergy Operations, Inc.

- 2 -

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

The finding is also associated with an apparent violation of NRC requirements that is being

considered for escalated enforcement action in accordance with NRC Enforcement Policy. The

current Enforcement Policy is included on the NRCs Web site at http://www.nrc.gov/reading-

rm/doc-collections/enforcement.

In accordance with NRC Inspection Manual Chapter 0609, Significance Determination

Process, we intend to complete our evaluation using the best available information and issue

our final determination of safety significance within 90 days of the date of this letter. The

significance determination process encourages an open dialogue between the NRC staff and

the licensee; however, the dialogue should not impact the timeliness of the staffs final

determination.

Before we make a final decision on this matter, we are providing you an opportunity to:

(1) present to the NRC your perspectives on the facts and assumptions, used by the NRC to

arrive at the finding and its significance, at a Regulatory Conference; or (2) submit your position

on the finding to the NRC in writing. If you request a Regulatory Conference, it should be held

within 30 days of the receipt of this letter and we encourage you to submit supporting

documentation at least one week prior to the conference in an effort to make the conference

more efficient and effective. If a Regulatory Conference is held, it will be closed to public

observation because of the discussion of security-related information. If you decide to submit

only a written response, such submittal should be sent to the NRC within 30 days of the receipt

of this letter. If you decline to request a Regulatory Conference or to submit a written response,

you relinquish your right to appeal the final significance determination process decision, in that

by not doing either, you fail to meet the appeal requirements stated in the Prerequisite and

Limitation sections of Attachment 2 of Inspection Manual Chapter 0609.

Please contact Michael P. Shannon, Chief, Plant Support Branch-1, Division of Reactor Safety,

at 817-860-8215 within 10 business days of the date of receipt of this letter to notify the NRC of

your intentions. If we have not heard from you within 10 days, we will continue with our

significance determination and enforcement decision and you will be advised by separate

correspondence of the results of our deliberations on this matter.

Since the NRC has not made a final determination in this matter, no Notice of Violation is being

issued for the inspection finding at this time. In addition, please be advised that the number and

characterization of the apparent violation described in the enclosed inspection report may

change as a result of further NRC review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room). However, because of the security-related concerns

contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters

enclosure will not be available for public inspection.

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Entergy Operations, Inc.

- 3 -

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

In accordance with 10 CFR 2.390(b) (1) (ii), the NRC is waiving the affidavit requirements for

your response, if any. This practice will ensure that your response will not be made available

electronically for public inspection in the NRC Public Document Room or from the NRC's

document system, ADAMS. If safeguards information is necessary to provide an acceptable

response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark

your entire response "Security-Related Information Withhold under 10 CFR 2.390" and follow

the instructions for withholding in 10 CFR 2.390(b) (1).

Sincerely,

/RA/

Roy J. Caniano, Director

Division of Reactor Safety

Docket No.: 50-416

License No.: NPF- 29

Nonpublic Enclosure:

Inspection Report 05000416/2008404

w/Attachments: 1. Supplemental Information

2. Special Inspection Charter

cc w/o enclosure:

Senior Vice President

Entergy Nuclear Operations

P.O. Box 31995

Jackson, MS 39286-1995

Senior Vice President and COO

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President, Oversight

Entergy Services, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Entergy Operations, Inc.

- 4 -

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

Senior Manager

Nuclear Safety & Licensing

Entergy Nuclear Operations

P.O. Box 31995

Jackson, MS 39286-1995

Manager, Licensing

Entergy Operations, Inc.

Grand Gulf Nuclear station

P.O. Box 756

Port Gibson, MS 39150