IR 05000331/2018005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:August 28, 2018 Mr. Dean Curtland Director of Site Operations NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785 SUBJECT: UPDATED INSPECTION PL AN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000331/2018005)
{{#Wiki_filter:August 28, 2018


==Dear Mr. C urtland:==
==SUBJECT:==
The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 for the Duane Arnold Energy Center. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revis ed. The NRC will contact you as soon as possible to discuss changes to the inspection plan s hould circumstanc es warrant any changes. In additi on to t he baseline inspection , an inspecti on of T I-193, "Reliable Hardened Containment Vents , i s pl anned for t he week o f July 26, 2019. In addition, w e pl an to perform Inspection Procedure 60855.1, "Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants,"
UPDATED INSPECTION PLAN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000331/2018005)
t he w eek o f February 3, 2020.


D. Curtland-2- This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
==Dear Mr. Curtland:==
The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for the Duane Arnold Energy Center. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.
 
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
 
In addition to the baseline inspection, an inspection of TI-193, Reliable Hardened Containment Vents, is planned for the week of July 26, 2019. In addition, we plan to perform Inspection Procedure 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants, the week of February 3, 2020. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.


Please contact me at 630-829-9731 with any questions you have regarding this letter.
Please contact me at 630-829-9731 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Karla Stoedter, Chief Branch 1 Division of Reactor Projects Docket No. 50-331 License No. DPR-49 Enclosure:
/RA/  
Inspection Plan cc: Distribution via LISTSERV


D. Curtland-3- Letter to Dean Curtland from Karla Stoedter dated August 28, 2018 SUBJECT: UPDATED INSPECTION PLAN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000 331/2018005) DISTRIBUTION
Karla Stoedter, Chief Branch 1 Division of Reactor Projects
: Christopher Cook RidsNrrDorlLpl3 RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML18240A309 OFFICE RIII NAME KStoedter:lg DATE 8/28/2018 OFFICIAL RECORD COPY


Duane Arnold
Docket No. 50-331 License No. DPR-49


09/01/2018 - 06/30/2020
Enclosure:
 
Inspection Plan cc: Distribution via LISTSERV
Unit Start End Activity CAC Title Staff Count
 
INSERVICE INSPECTION
 
1 09/04/2018
 
09/27/2018
 
IP 71111.08G
 
000701 Inservice Inspection Activities (BWR)
 
RADIATION PROTECTION BASELINE INSPECTION
 
1 09/10/2018
 
09/14/2018
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
09/10/2018
 
09/14/2018
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
09/10/2018
 
09/14/2018
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
09/10/2018
 
09/14/2018
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
SECURITY BASELINE INSPECTION
 
1 09/17/2018
 
09/21/2018
 
IP 71130.02
 
000734 Access Control
 
09/17/2018
 
09/21/2018
 
IP 71151 001338 Performance Indicator Verification
 
FORCE-ON-FORCE PLANNING & EXERCISE WEEK
 
1 11/05/2018
 
11/09/2018
 
IP 71130.03
 
000735 Contingency Response - Force-On-Force Testing
 
11/26/2018
 
11/30/2018
 
IP 71130.03
 
000735 Contingency Response - Force-On-Force Testing
 
RADIATION PROTECTION BASELINE INSPECTION
 
1 11/26/2018
 
11/30/2018
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
11/26/2018
 
11/30/2018
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
11/26/2018
 
11/30/2018
 
IP 71124.04
 
000728 Occupational Dose Assessment
 
RADIATION PROTECTION BASELINE INSPECTION
 
1 02/11/2019
 
02/15/2019
 
IP 71124.05
 
000729 Radiation Monitoring Instrumentation
 
BIENNIAL PI&R INSPECTION
 
1 02/25/2019
 
03/15/2019
 
IP 71152B 000747 Problem Identification and Resolution
 
SECURITY BASELINE INSPECTION
 
1 03/04/2019
 
03/08/2019
 
IP 71130.02
 
000734 Access Control
 
2019 DAEC Exam
 
1 03/10/2019
 
03/15/2019
 
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
04/07/2019
 
04/19/2019
 
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
 
RADIATION PROTECTION BASELINE INSPECTION
 
1 04/22/2019
 
04/26/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
8/21/2018 8:56:56 AM
 
Page
 
of
 
This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
 
Duane Arnold
 
09/01/2018 - 06/30/2020
 
Unit Start End Activity CAC Title Staff Count
 
EP BASELINE INSPECTION / PI VERIFICATION
 
1 04/29/2019
 
05/03/2019
 
IP 71114.02
 
000717 Alert and Notification System Testing
 
04/29/2019
 
05/03/2019
 
IP 71114.03
 
000718 Emergency Response Organization Staffing and Augmentation System
 
04/29/2019
 
05/03/2019
 
IP 71114.05
 
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
 
04/29/2019
 
05/03/2019
 
IP 71151 001397 Performance Indicator Verification
 
SECURITY BASELINE INSPECTION
 
1 05/22/2019
 
05/24/2019
 
IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations
 
RELIABLE HARDENED CONTAINMENT VENTS TI-193
 
1 07/22/2019
 
07/26/2019
 
TI 2515/193
 
000511 Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard
 
to Reliable Hardened Containment Vents Capable of Operation under Severe Accident
 
Conditions
 
RADIATION PROTECTION BASELINE INSPECTION
 
1 08/12/2019
 
08/16/2019
 
IP 71124.06
 
000730 Radioactive Gaseous and Liquid Effluent Treatment
 
08/12/2019
 
08/16/2019
 
IP 71124.07
 
000731 Radiological Environmental Monitoring Program
 
SECURITY BASELINE INSPECTION
 
1 09/09/2019
 
09/13/2019
 
IP 71130.07
 
000739 Security Training
 
09/09/2019
 
09/13/2019
 
IP 71151 001338 Performance Indicator Verification
 
TRIENNIAL 50.59 INSPECTION
 
1 09/16/2019
 
09/20/2019
 
IP 71111.17T
 
000709 Evaluations of Changes, Tests, and Experiments
 
RADIATION PROTECTION BASELINE INSPECTION
 
1 10/21/2019
 
10/25/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
BIENNIAL REQUAL PROGRAM INSPECTION
 
1 11/18/2019
 
11/22/2019
 
IP 71111.11B
 
000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
 
DESIGN BASES ASSURANCE INSPECTION (TEAM)
 
1 01/13/2020
 
01/17/2020
 
IP 71111.21M
 
000713 Design Bases Assurance Inspection (Teams)
 
01/27/2020
 
01/31/2020
 
IP 71111.21M
 
000713 Design Bases Assurance Inspection (Teams)
 
8/21/2018 8:56:56 AM
 
Page
 
of
 
This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
 
Duane Arnold
 
09/01/2018 - 06/30/2020
 
Unit Start End Activity CAC Title Staff Count
 
ISFSI Cask Loading Inspection 1Q2020
 
1 02/03/2020
 
02/07/2020
 
IP 60855.1
 
000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
 
RP Baseline Inspection
 
1 03/09/2020
 
03/13/2020
 
IP 71124.08
 
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
 
Transportation
 
SECURITY BASELINE INSPECTION
 
1 03/16/2020
 
03/20/2020
 
IP 71130.08
 
000740 Fitness For Duty Program
 
03/16/2020
 
03/20/2020
 
IP 71151 001338 Performance Indicator Verification
 
RP Baseline Inspection
 
1 05/04/2020
 
05/08/2020
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
05/04/2020
 
05/08/2020
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
05/04/2020
 
05/08/2020
 
IP 71124.04
 
000729 Occupational Dose Assessment
 
SECURITY BASELINE INSPECTION
 
1 05/04/2020
 
05/08/2020
 
IP 71130.04
 
000736 Equipment Performance, Testing, and Maintenance
 
8/21/2018 8:56:56 AM
 
Page
 
of
 
This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
IP 22 Inspection Activity Plan Report
}}
}}

Latest revision as of 13:20, 5 January 2025

Updated Inspection Plan for Duane Arnold Energy Center (Report 05000331/2018005)
ML18240A309
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 08/28/2018
From: Karla Stoedter
NRC/RGN-III
To: Dean Curtland
NextEra Energy Duane Arnold
References
IR 2018005
Download: ML18240A309 (6)


Text

August 28, 2018

SUBJECT:

UPDATED INSPECTION PLAN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000331/2018005)

Dear Mr. Curtland:

The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for the Duane Arnold Energy Center. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.

The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to the baseline inspection, an inspection of TI-193, Reliable Hardened Containment Vents, is planned for the week of July 26, 2019. In addition, we plan to perform Inspection Procedure 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants, the week of February 3, 2020. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 630-829-9731 with any questions you have regarding this letter.

Sincerely,

/RA/

Karla Stoedter, Chief Branch 1 Division of Reactor Projects

Docket No. 50-331 License No. DPR-49

Enclosure:

Inspection Plan cc: Distribution via LISTSERV