| {{#Wiki_filter:August 28, 2018 Mr. Dean Curtland Director of Site Operations NextEra Energy Duane Arnold, LLC 3277 DAEC Road Palo, IA 52324-9785 SUBJECT: UPDATED INSPECTION PL AN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000331/2018005) | | {{#Wiki_filter:August 28, 2018 |
|
| |
|
| ==Dear Mr. C urtland:== | | ==SUBJECT:== |
| The enclosed inspection plan lists the inspections scheduled through June 30 , 20 20 for the Duane Arnold Energy Center. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revis ed. The NRC will contact you as soon as possible to discuss changes to the inspection plan s hould circumstanc es warrant any changes. In additi on to t he baseline inspection , an inspecti on of T I-193, "Reliable Hardened Containment Vents , i s pl anned for t he week o f July 26, 2019. In addition, w e pl an to perform Inspection Procedure 60855.1, "Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants,"
| | UPDATED INSPECTION PLAN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000331/2018005) |
| t he w eek o f February 3, 2020.
| |
|
| |
|
| D. Curtland-2- This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
| | ==Dear Mr. Curtland:== |
| | The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for the Duane Arnold Energy Center. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. |
| | |
| | The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. |
| | |
| | In addition to the baseline inspection, an inspection of TI-193, Reliable Hardened Containment Vents, is planned for the week of July 26, 2019. In addition, we plan to perform Inspection Procedure 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants, the week of February 3, 2020. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. |
|
| |
|
| Please contact me at 630-829-9731 with any questions you have regarding this letter. | | Please contact me at 630-829-9731 with any questions you have regarding this letter. |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ Karla Stoedter, Chief Branch 1 Division of Reactor Projects Docket No. 50-331 License No. DPR-49 Enclosure: | | /RA/ |
| Inspection Plan cc: Distribution via LISTSERV
| |
|
| |
|
| D. Curtland-3- Letter to Dean Curtland from Karla Stoedter dated August 28, 2018 SUBJECT: UPDATED INSPECTION PLAN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000 331/2018005) DISTRIBUTION
| | Karla Stoedter, Chief Branch 1 Division of Reactor Projects |
| : Christopher Cook RidsNrrDorlLpl3 RidsNrrPMDuaneArnold Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML18240A309 OFFICE RIII NAME KStoedter:lg DATE 8/28/2018 OFFICIAL RECORD COPY
| |
|
| |
|
| Duane Arnold
| | Docket No. 50-331 License No. DPR-49 |
|
| |
|
| 09/01/2018 - 06/30/2020
| | Enclosure: |
| | | Inspection Plan cc: Distribution via LISTSERV |
| Unit Start End Activity CAC Title Staff Count
| |
| | |
| INSERVICE INSPECTION
| |
| | |
| 1 09/04/2018
| |
| | |
| 09/27/2018
| |
| | |
| IP 71111.08G
| |
| | |
| 000701 Inservice Inspection Activities (BWR)
| |
| | |
| RADIATION PROTECTION BASELINE INSPECTION
| |
| | |
| 1 09/10/2018
| |
| | |
| 09/14/2018
| |
| | |
| IP 71124.01
| |
| | |
| 000725 Radiological Hazard Assessment and Exposure Controls
| |
| | |
| 09/10/2018
| |
| | |
| 09/14/2018
| |
| | |
| IP 71124.02
| |
| | |
| 000726 Occupational ALARA Planning and Controls
| |
| | |
| 09/10/2018
| |
| | |
| 09/14/2018
| |
| | |
| IP 71124.03
| |
| | |
| 000727 In-Plant Airborne Radioactivity Control and Mitigation
| |
| | |
| 09/10/2018
| |
| | |
| 09/14/2018
| |
| | |
| IP 71124.04
| |
| | |
| 000728 Occupational Dose Assessment
| |
| | |
| SECURITY BASELINE INSPECTION
| |
| | |
| 1 09/17/2018
| |
| | |
| 09/21/2018
| |
| | |
| IP 71130.02
| |
| | |
| 000734 Access Control
| |
| | |
| 09/17/2018
| |
| | |
| 09/21/2018
| |
| | |
| IP 71151 001338 Performance Indicator Verification
| |
| | |
| FORCE-ON-FORCE PLANNING & EXERCISE WEEK
| |
| | |
| 1 11/05/2018
| |
| | |
| 11/09/2018
| |
| | |
| IP 71130.03
| |
| | |
| 000735 Contingency Response - Force-On-Force Testing
| |
| | |
| 11/26/2018
| |
| | |
| 11/30/2018
| |
| | |
| IP 71130.03
| |
| | |
| 000735 Contingency Response - Force-On-Force Testing
| |
| | |
| RADIATION PROTECTION BASELINE INSPECTION
| |
| | |
| 1 11/26/2018
| |
| | |
| 11/30/2018
| |
| | |
| IP 71124.01
| |
| | |
| 000725 Radiological Hazard Assessment and Exposure Controls
| |
| | |
| 11/26/2018
| |
| | |
| 11/30/2018
| |
| | |
| IP 71124.03
| |
| | |
| 000727 In-Plant Airborne Radioactivity Control and Mitigation
| |
| | |
| 11/26/2018
| |
| | |
| 11/30/2018
| |
| | |
| IP 71124.04
| |
| | |
| 000728 Occupational Dose Assessment
| |
| | |
| RADIATION PROTECTION BASELINE INSPECTION
| |
| | |
| 1 02/11/2019
| |
| | |
| 02/15/2019
| |
| | |
| IP 71124.05
| |
| | |
| 000729 Radiation Monitoring Instrumentation
| |
| | |
| BIENNIAL PI&R INSPECTION
| |
| | |
| 1 02/25/2019
| |
| | |
| 03/15/2019
| |
| | |
| IP 71152B 000747 Problem Identification and Resolution
| |
| | |
| SECURITY BASELINE INSPECTION
| |
| | |
| 1 03/04/2019
| |
| | |
| 03/08/2019
| |
| | |
| IP 71130.02
| |
| | |
| 000734 Access Control
| |
| | |
| 2019 DAEC Exam
| |
| | |
| 1 03/10/2019
| |
| | |
| 03/15/2019
| |
| | |
| OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
| |
| | |
| 04/07/2019
| |
| | |
| 04/19/2019
| |
| | |
| EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
| |
| | |
| RADIATION PROTECTION BASELINE INSPECTION
| |
| | |
| 1 04/22/2019
| |
| | |
| 04/26/2019
| |
| | |
| IP 71124.02
| |
| | |
| 000726 Occupational ALARA Planning and Controls
| |
| | |
| 8/21/2018 8:56:56 AM
| |
| | |
| Page
| |
| | |
| of
| |
| | |
| This report does not include INPO and OUTAGE activities.
| |
| | |
| This report shows only on-site and announced inspection procedures.
| |
| | |
| IP 22 Inspection Activity Plan Report
| |
| | |
| Duane Arnold
| |
| | |
| 09/01/2018 - 06/30/2020
| |
| | |
| Unit Start End Activity CAC Title Staff Count
| |
| | |
| EP BASELINE INSPECTION / PI VERIFICATION
| |
| | |
| 1 04/29/2019
| |
| | |
| 05/03/2019
| |
| | |
| IP 71114.02
| |
| | |
| 000717 Alert and Notification System Testing
| |
| | |
| 04/29/2019
| |
| | |
| 05/03/2019
| |
| | |
| IP 71114.03
| |
| | |
| 000718 Emergency Response Organization Staffing and Augmentation System
| |
| | |
| 04/29/2019
| |
| | |
| 05/03/2019
| |
| | |
| IP 71114.05
| |
| | |
| 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
| |
| | |
| 04/29/2019
| |
| | |
| 05/03/2019
| |
| | |
| IP 71151 001397 Performance Indicator Verification
| |
| | |
| SECURITY BASELINE INSPECTION
| |
| | |
| 1 05/22/2019
| |
| | |
| 05/24/2019
| |
| | |
| IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations
| |
| | |
| RELIABLE HARDENED CONTAINMENT VENTS TI-193
| |
| | |
| 1 07/22/2019
| |
| | |
| 07/26/2019
| |
| | |
| TI 2515/193
| |
| | |
| 000511 Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard
| |
| | |
| to Reliable Hardened Containment Vents Capable of Operation under Severe Accident
| |
| | |
| Conditions
| |
| | |
| RADIATION PROTECTION BASELINE INSPECTION
| |
| | |
| 1 08/12/2019
| |
| | |
| 08/16/2019
| |
| | |
| IP 71124.06
| |
| | |
| 000730 Radioactive Gaseous and Liquid Effluent Treatment
| |
| | |
| 08/12/2019
| |
| | |
| 08/16/2019
| |
| | |
| IP 71124.07
| |
| | |
| 000731 Radiological Environmental Monitoring Program
| |
| | |
| SECURITY BASELINE INSPECTION
| |
| | |
| 1 09/09/2019
| |
| | |
| 09/13/2019
| |
| | |
| IP 71130.07
| |
| | |
| 000739 Security Training
| |
| | |
| 09/09/2019
| |
| | |
| 09/13/2019
| |
| | |
| IP 71151 001338 Performance Indicator Verification
| |
| | |
| TRIENNIAL 50.59 INSPECTION
| |
| | |
| 1 09/16/2019
| |
| | |
| 09/20/2019
| |
| | |
| IP 71111.17T
| |
| | |
| 000709 Evaluations of Changes, Tests, and Experiments
| |
| | |
| RADIATION PROTECTION BASELINE INSPECTION
| |
| | |
| 1 10/21/2019
| |
| | |
| 10/25/2019
| |
| | |
| IP 71124.01
| |
| | |
| 000725 Radiological Hazard Assessment and Exposure Controls
| |
| | |
| BIENNIAL REQUAL PROGRAM INSPECTION
| |
| | |
| 1 11/18/2019
| |
| | |
| 11/22/2019
| |
| | |
| IP 71111.11B
| |
| | |
| 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
| |
| | |
| DESIGN BASES ASSURANCE INSPECTION (TEAM)
| |
| | |
| 1 01/13/2020
| |
| | |
| 01/17/2020
| |
| | |
| IP 71111.21M
| |
| | |
| 000713 Design Bases Assurance Inspection (Teams)
| |
| | |
| 01/27/2020
| |
| | |
| 01/31/2020
| |
| | |
| IP 71111.21M
| |
| | |
| 000713 Design Bases Assurance Inspection (Teams)
| |
| | |
| 8/21/2018 8:56:56 AM
| |
| | |
| Page
| |
| | |
| of
| |
| | |
| This report does not include INPO and OUTAGE activities.
| |
| | |
| This report shows only on-site and announced inspection procedures.
| |
| | |
| IP 22 Inspection Activity Plan Report
| |
| | |
| Duane Arnold
| |
| | |
| 09/01/2018 - 06/30/2020
| |
| | |
| Unit Start End Activity CAC Title Staff Count
| |
| | |
| ISFSI Cask Loading Inspection 1Q2020
| |
| | |
| 1 02/03/2020
| |
| | |
| 02/07/2020
| |
| | |
| IP 60855.1
| |
| | |
| 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
| |
| | |
| RP Baseline Inspection
| |
| | |
| 1 03/09/2020
| |
| | |
| 03/13/2020
| |
| | |
| IP 71124.08
| |
| | |
| 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
| |
| | |
| Transportation
| |
| | |
| SECURITY BASELINE INSPECTION
| |
| | |
| 1 03/16/2020
| |
| | |
| 03/20/2020
| |
| | |
| IP 71130.08
| |
| | |
| 000740 Fitness For Duty Program
| |
| | |
| 03/16/2020
| |
| | |
| 03/20/2020
| |
| | |
| IP 71151 001338 Performance Indicator Verification
| |
| | |
| RP Baseline Inspection
| |
| | |
| 1 05/04/2020
| |
| | |
| 05/08/2020
| |
| | |
| IP 71124.01
| |
| | |
| 000725 Radiological Hazard Assessment and Exposure Controls
| |
| | |
| 05/04/2020
| |
| | |
| 05/08/2020
| |
| | |
| IP 71124.03
| |
| | |
| 000727 In-Plant Airborne Radioactivity Control and Mitigation
| |
| | |
| 05/04/2020
| |
| | |
| 05/08/2020
| |
| | |
| IP 71124.04
| |
| | |
| 000729 Occupational Dose Assessment
| |
| | |
| SECURITY BASELINE INSPECTION
| |
| | |
| 1 05/04/2020
| |
| | |
| 05/08/2020
| |
| | |
| IP 71130.04
| |
| | |
| 000736 Equipment Performance, Testing, and Maintenance
| |
| | |
| 8/21/2018 8:56:56 AM
| |
| | |
| Page
| |
| | |
| of
| |
| | |
| This report does not include INPO and OUTAGE activities.
| |
| | |
| This report shows only on-site and announced inspection procedures.
| |
| | |
| IP 22 Inspection Activity Plan Report
| |
| }} | | }} |
Text
August 28, 2018
SUBJECT:
UPDATED INSPECTION PLAN FOR DUANE ARNOLD ENERGY CENTER (REPORT 05000331/2018005)
Dear Mr. Curtland:
The enclosed inspection plan lists the inspections scheduled through June 30, 2020, for the Duane Arnold Energy Center. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised.
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In addition to the baseline inspection, an inspection of TI-193, Reliable Hardened Containment Vents, is planned for the week of July 26, 2019. In addition, we plan to perform Inspection Procedure 60855.1, Operation of an ISFSI Independent Spent Fuel Storage Installation at Operating Plants, the week of February 3, 2020. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at 630-829-9731 with any questions you have regarding this letter.
Sincerely,
/RA/
Karla Stoedter, Chief Branch 1 Division of Reactor Projects
Docket No. 50-331 License No. DPR-49
Enclosure:
Inspection Plan cc: Distribution via LISTSERV