ML091410688: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_TfLW4TNHItaD LAR MXM- I IUNr John Richmond From: Richard Conte, Sent: Friday, October 03, 2008 11:13 AM To: John Richmond; Kay Gallagher Cc: Michael Modes; Glenn Meyer; Marsha Gamberoni; Darrell Roberts; Doug Tifft; Heather Jones  
{{#Wiki_filter:_TfLW4TNHItaD LAR MXM-I IUNr John Richmond From:
Richard Conte, Sent:
Friday, October 03, 2008 11:13 AM To:
John Richmond; Kay Gallagher Cc:
Michael Modes; Glenn Meyer; Marsha Gamberoni; Darrell Roberts; Doug Tifft; Heather Jones


==Subject:==
==Subject:==
LET'S PROJECT MANAGE OC AND BV -WE ARE GOING TO NEED THE ORG. RE: OC Sandbed access Doug I would like you to help out on OC and Heather BV -See john for your roles.Kay need a DRS Action Item with the following subtasks: "Effectively manage the OC license renewal commitments review (detailed inspection planing and related gov. P-and public outreach)" JR/GM many sub-sub tasks might be needed for each of these subtask. If so, go with a project plan like BV. '4 Outside of the scope L Outside of the scope 2. By Oct. 22, conduct briefing for inspection plan and related outreach -obtain final comments on Outage Comm Plan (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.)3. By Nov. 5, conduct Prebief on inspection results (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.) -distribute draft of quick look letter 4. By Nov. 6, conduct exit on site -BC and TL (potential weekend work if OC SU is Nov. 11 or sooner) DDD optional or if needed for crisis.5. By Nov. 10 -final quick look letter -sign out within day (startup assumed to be 11/11) -note same DRS players involved in BV LR exit 6. By Nov. 11 Implement comm plan for quick look letter (startup assumed to be 11/11) -note same DRS players involved in BV LR exit 4.Outside of the scope 8BY Dec. 17 Issue IR and implement related Comm Plan " 0 From: John Richmond Sent: Friday, October 03, 2008 9:22 AM To: Michael Modes; Timothy OHara Cc: Richard Conte  
LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE: OC Sandbed access Doug I would like you to help out on OC and Heather BV - See john for your roles.
Kay need a DRS Action Item with the following subtasks:
"Effectively manage the OC license renewal commitments review (detailed inspection planing and related gov.
P-and public outreach)"
JR/GM many sub-sub tasks might be needed for each of these subtask. If so, go with a project plan like BV.  
'4 Outside of the scope L
Outside of the scope
: 2. By Oct. 22, conduct briefing for inspection plan and related outreach - obtain final comments on Outage Comm Plan (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.)
: 3. By Nov. 5, conduct Prebief on inspection results (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.) -
distribute draft of quick look letter
: 4. By Nov. 6, conduct exit on site - BC and TL (potential weekend work if OC SU is Nov. 11 or sooner) DDD optional or if needed for crisis.
: 5. By Nov. 10 - final quick look letter - sign out within day (startup assumed to be 11/11) - note same DRS players involved in BV LR exit
: 6. By Nov. 11 Implement comm plan for quick look letter (startup assumed to be 11/11) - note same DRS players involved in BV LR exit 4.
Outside of the scope 8BY Dec. 17 Issue IR and implement related Comm Plan "0
From: John Richmond Sent: Friday, October 03, 2008 9:22 AM To: Michael Modes; Timothy OHara Cc: Richard Conte


==Subject:==
==Subject:==
OC Sandbed access The mock-up training was very useful. They made a concrete block, same shape and dimension as a sliced section of the drywell, then used their boring tool to cut a tunnel (19" or 20" diameter, 8 to 12 foot long) into the sandbed region, to prove the tool would work. Plywood sheeting takes the place of the steel liner.
OC Sandbed access The mock-up training was very useful. They made a concrete block, same shape and dimension as a sliced section of the drywell, then used their boring tool to cut a tunnel (19" or 20" diameter, 8 to 12 foot long) into the sandbed region, to prove the tool would work. Plywood sheeting takes the place of the steel liner.
Once you're inside, I think it's only 17 or 18 inches wide. I would not recommend anyone try to enter the sandbed cavity if they have a chest size larger than mine or Tim's. It might be reasonable to crawl through the tunnel and stick your head inside for a look see. And if you're even a little uneasy in tight spaces, forget it!2 Received:
 
from R1CLSTRO1 .nrc.gov ([148.184.99.7])
Once you're inside, I think it's only 17 or 18 inches wide. I would not recommend anyone try to enter the sandbed cavity if they have a chest size larger than mine or Tim's. It might be reasonable to crawl through the tunnel and stick your head inside for a look see. And if you're even a little uneasy in tight spaces, forget it!
by R1 MS01 .nrc.gov ([148.184.99.10])
2
with mapi; Fri, 3 Oct 2008 11:13:20 -0400 Content-Type:
 
application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding:
Received: from R1CLSTRO1.nrc.gov ([148.184.99.7]) by R1 MS01.nrc.gov
binary From: Richard Conte <Richard.Conte@nrc.gov>
([148.184.99.10]) with mapi; Fri, 3 Oct 2008 11:13:20 -0400 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: Richard Conte <Richard.Conte@nrc.gov>
To: John Richmond <John.Richmond@nrc.gov>, Kay Gallagher<Kay.Gallagher@nrc.gov>
To: John Richmond <John.Richmond@nrc.gov>, Kay Gallagher
CC: Michael Modes <Michael.
<Kay.Gallagher@nrc.gov>
Modes@nrc.gov>, Glenn Meyer <Glenn.Meyer@nrc.gov>, Marsha Gamberoni  
CC: Michael Modes <Michael. Modes@nrc.gov>, Glenn Meyer <Glenn.Meyer@nrc.gov>,
<Marsha.Gamberoni@nrc.gov>, Darrell Roberts<Darrell.
Marsha Gamberoni <Marsha.Gamberoni@nrc.gov>, Darrell Roberts
Roberts@nrc.gov>, Doug Tifft <Doug.Tifft@nrc.gov>, Heather Jones<Heather.Jones@nrc.gov>
<Darrell. Roberts@nrc.gov>, Doug Tifft <Doug.Tifft@nrc.gov>, Heather Jones
Date: Fri, 3 Oct 2008 11:13:19 -0400  
<Heather.Jones@nrc.gov>
Date: Fri, 3 Oct 2008 11:13:19 -0400


==Subject:==
==Subject:==
LET'S PROJECT MANAGE OC AND BV -WE ARE GOING TO NEED THE ORG. RE: OC Sandbed access Thread-Topic:
LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE:
LET'S PROJECT MANAGE OC AND BV -WE ARE GOING TO NEED THE ORG.RE: OC Sandbed access Thread-Index:
OC Sandbed access Thread-Topic: LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG.
AcklWwCSi8knN PezRIeZUk/YNIZeZAAC8OYQ Message-ID:  
RE: OC Sandbed access Thread-Index: AcklWwCSi8knN PezRIeZUk/YNIZeZAAC8OYQ Message-ID: <2856BC46 F6A308418F033D973BBOEE72969750439C@R1CLSTRO1.nrc.gov>
<2856BC46 F6A308418F033D973BBOEE72969750439C@R1CLSTRO1 .nrc.gov>


==References:==
==References:==
 
<2856BC46F6A308418F033D973BBOEE72969744F33B@R1 CLSTRO1.nrc.gov>
<2856BC46F6A308418F033D973BBOEE72969744F33B@R1 CLSTRO1 .nrc.gov>In-Reply-To:  
In-Reply-To: <2856BC46F6A308418F033D973BBOEE72969744F33B@R1CLSTRO1.nrc.gov>
<2856BC46F6A308418F033D973BBOEE72969744F33B@R1CLSTRO1.nrc.gov>
Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach:
Accept-Language:
X-MS-Exchange-Organization-SCL: -1 X-MS-TN EF-Correlator:
en-US Content-Language:
<2856BC46F6A308418F033D973BBOEE72969750439C@R1 CLSTR01.nrc.gov>
en-US X-MS-Has-Attach:
MIME-Version: 1.0}}
X-MS-Exchange-Organization-SCL:  
-1 X-MS-TN EF-Correlator:
<2856BC46F6A308418F033D973BBOEE72969750439C@R1 CLSTR01 .nrc.gov>MIME-Version:
1.0}}

Latest revision as of 11:43, 14 January 2025

E-mail from R. Conte of USNRC to J. Richmond and K. Gallagher of USNRC, Regarding Project Manage Oc and Bv, Regarding Oc Sandbed Access
ML091410688
Person / Time
Site: Oyster Creek
Issue date: 10/03/2008
From: Conte R
NRC Region 1
To: Gallagher K, Richmond J
NRC Region 1
References
FOIA/PA-2009-0070
Download: ML091410688 (3)


Text

_TfLW4TNHItaD LAR MXM-I IUNr John Richmond From:

Richard Conte, Sent:

Friday, October 03, 2008 11:13 AM To:

John Richmond; Kay Gallagher Cc:

Michael Modes; Glenn Meyer; Marsha Gamberoni; Darrell Roberts; Doug Tifft; Heather Jones

Subject:

LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE: OC Sandbed access Doug I would like you to help out on OC and Heather BV - See john for your roles.

Kay need a DRS Action Item with the following subtasks:

"Effectively manage the OC license renewal commitments review (detailed inspection planing and related gov.

P-and public outreach)"

JR/GM many sub-sub tasks might be needed for each of these subtask. If so, go with a project plan like BV.

'4 Outside of the scope L

Outside of the scope

2. By Oct. 22, conduct briefing for inspection plan and related outreach - obtain final comments on Outage Comm Plan (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.)
3. By Nov. 5, conduct Prebief on inspection results (DLR, SLO, PAO, PB6, DDD-DRS, EDO corn & coord.) -

distribute draft of quick look letter

4. By Nov. 6, conduct exit on site - BC and TL (potential weekend work if OC SU is Nov. 11 or sooner) DDD optional or if needed for crisis.
5. By Nov. 10 - final quick look letter - sign out within day (startup assumed to be 11/11) - note same DRS players involved in BV LR exit
6. By Nov. 11 Implement comm plan for quick look letter (startup assumed to be 11/11) - note same DRS players involved in BV LR exit 4.

Outside of the scope 8BY Dec. 17 Issue IR and implement related Comm Plan "0

From: John Richmond Sent: Friday, October 03, 2008 9:22 AM To: Michael Modes; Timothy OHara Cc: Richard Conte

Subject:

OC Sandbed access The mock-up training was very useful. They made a concrete block, same shape and dimension as a sliced section of the drywell, then used their boring tool to cut a tunnel (19" or 20" diameter, 8 to 12 foot long) into the sandbed region, to prove the tool would work. Plywood sheeting takes the place of the steel liner.

Once you're inside, I think it's only 17 or 18 inches wide. I would not recommend anyone try to enter the sandbed cavity if they have a chest size larger than mine or Tim's. It might be reasonable to crawl through the tunnel and stick your head inside for a look see. And if you're even a little uneasy in tight spaces, forget it!

2

Received: from R1CLSTRO1.nrc.gov ([148.184.99.7]) by R1 MS01.nrc.gov

([148.184.99.10]) with mapi; Fri, 3 Oct 2008 11:13:20 -0400 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: Richard Conte <Richard.Conte@nrc.gov>

To: John Richmond <John.Richmond@nrc.gov>, Kay Gallagher

<Kay.Gallagher@nrc.gov>

CC: Michael Modes <Michael. Modes@nrc.gov>, Glenn Meyer <Glenn.Meyer@nrc.gov>,

Marsha Gamberoni <Marsha.Gamberoni@nrc.gov>, Darrell Roberts

<Darrell. Roberts@nrc.gov>, Doug Tifft <Doug.Tifft@nrc.gov>, Heather Jones

<Heather.Jones@nrc.gov>

Date: Fri, 3 Oct 2008 11:13:19 -0400

Subject:

LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG. RE:

OC Sandbed access Thread-Topic: LET'S PROJECT MANAGE OC AND BV - WE ARE GOING TO NEED THE ORG.

RE: OC Sandbed access Thread-Index: AcklWwCSi8knN PezRIeZUk/YNIZeZAAC8OYQ Message-ID: <2856BC46 F6A308418F033D973BBOEE72969750439C@R1CLSTRO1.nrc.gov>

References:

<2856BC46F6A308418F033D973BBOEE72969744F33B@R1 CLSTRO1.nrc.gov>

In-Reply-To: <2856BC46F6A308418F033D973BBOEE72969744F33B@R1CLSTRO1.nrc.gov>

Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach:

X-MS-Exchange-Organization-SCL: -1 X-MS-TN EF-Correlator:

<2856BC46F6A308418F033D973BBOEE72969750439C@R1 CLSTR01.nrc.gov>

MIME-Version: 1.0