{{#Wiki_filter:September 11, 2009  
{{#Wiki_filter:September 11, 2009  
Docket No. 05000171License No.DPR-
Docket No.  
1
05000171
License No.DPR-1
Mr. Charles G. Pardee   
Mr. Charles G. Pardee   
Senior Vice President, Exelon Generation Company LLC  
Senior Vice President, Exelon Generation Company LLC  
Line 26: Line 28:
Warrenville, IL  60555  
Warrenville, IL  60555  
   
   
SUBJECT: NRC INSPECTION REPORT NO. 05000171/2009007, EXELON GENERATION COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION, UNIT 1,  
SUBJECT:  
NRC INSPECTION REPORT NO. 05000171/2009007, EXELON GENERATION  
COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION, UNIT 1,  
DELTA, PENNSYLVANIA  
DELTA, PENNSYLVANIA  
   
   
Dear Mr. Pardee:  
Dear Mr. Pardee:  
   
   
On August 10-12, 2009, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety  
On August 10-12, 2009, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety  
Line 38: Line 41:
conditions.  The inspection consisted of observations by the inspector, interviews with personnel,  
conditions.  The inspection consisted of observations by the inspector, interviews with personnel,  
and a selective examination of representative records.  The findings of the inspection were  
and a selective examination of representative records.  The findings of the inspection were  
discussed with William Maguire of your organization, and members of the Exelon management and staff on August 12, 2009, at the conclusion of the inspection.  The enclosed report presents  
discussed with William Maguire of your organization, and members of the Exelon management  
and staff on August 12, 2009, at the conclusion of the inspection.  The enclosed report presents  
the results of this inspection.  
the results of this inspection.  
   
   
Within the scope of this inspection, no violations were identified.   
Within the scope of this inspection, no violations were identified.   
   
   
In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter, its  
In accordance with 10 CFR Part 2.390 of the NRCs Rules of Practice, a copy of this letter, its  
enclosure, and your response (if any) will be available electronically for public ins
enclosure, and your response (if any) will be available electronically for public inspection in the  
pection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's
NRC Public Document Room or from the Publicly Available Records component of the NRCs
document system (ADAMS).  ADAMS is accessible from the NRC Web Site at  
document system (ADAMS).  ADAMS is accessible from the NRC Web Site at  
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Line 53: Line 55:
No reply to this letter is required.  Please contact Laurie Kauffman at (610) 337-5323 or  
No reply to this letter is required.  Please contact Laurie Kauffman at (610) 337-5323 or  
laurie.kauffman@nrc.gov if you have any questions regarding this matter.   
laurie.kauffman@nrc.gov if you have any questions regarding this matter.   
  Sincerely,  
   
  Original signed by Kathy Modes For
Sincerely,  
 
   
Original signed by Kathy Modes For  
Judith A. Joustra, Chief  
Judith A. Joustra, Chief  
Decommissioning Branch  
Decommissioning Branch  
Line 62: Line 66:
Enclosure: NRC Inspection Report No. 05000171/2009007  
Enclosure: NRC Inspection Report No. 05000171/2009007  
   w/Attachment: Supplemental Information  
   w/Attachment: Supplemental Information  
cc w/encl:
see next page
 
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PENNSYLVANIA 19406-1415


C. Pardee
   
   
   
   
cc w/encl: see next page
2
  NUCLEAR REGULATORY
cc w/encl:  
COMMISSIONREGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415
C. Crane, President and Chief Operating Officer, Exelon Corporation   
 
C. Pardee 
2cc w/encl: C. Crane, President and Chief Operating Officer, Exelon Corporation   
M. Pacilio, Chief Operating Officer, Exelon Nuclear   
M. Pacilio, Chief Operating Officer, Exelon Nuclear   
W. Maguire, Site Vice President, Peach Bottom   
W. Maguire, Site Vice President, Peach Bottom   
Line 91: Line 103:
Public Service Commission of Maryland, Engineering Division  
Public Service Commission of Maryland, Engineering Division  
Board of Supervisors, Peach Bottom Township  
Board of Supervisors, Peach Bottom Township  
B. O'Connor, Council Administrator of Harford County Council  
B. OConnor, Council Administrator of Harford County Council  
Mr. & Mrs. Dennis Hieber
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance  
t, Peach Bottom Alliance E. Epstein, TMI - Alert   
E. Epstein, TMI - Alert   
J. Johnsrud, National Energy Committee, Sierra Club  
J. Johnsrud, National Energy Committee, Sierra Club  
Mr. & Mrs. Kip Adams  
Mr. & Mrs. Kip Adams  
Line 102: Line 114:
S. Ayers, Emergency Planner, Harford County Div of Emergency Operations  
S. Ayers, Emergency Planner, Harford County Div of Emergency Operations  
R. Brooks, Cecil County Dept of Emergency Services   
R. Brooks, Cecil County Dept of Emergency Services   
Commonwealth of Pennsylvania
Commonwealth of Pennsylvania  
 
September 11, 2009  
September 11, 2009  
  Docket No. 05000171License No. DPR-12  
   
 
Docket No.  
05000171
License No.  
DPR-12  
   
   
Mr. Charles G. Pardee   
Mr. Charles G. Pardee   
Line 113: Line 129:
Warrenville, IL  60555  
Warrenville, IL  60555  
   
   
SUBJECT: NRC INSPECTION REPORT NO. 05000171/2009007, EXELON GENERATION COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION, UNIT 1,  
SUBJECT:  
NRC INSPECTION REPORT NO. 05000171/2009007, EXELON GENERATION  
COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION, UNIT 1,  
DELTA, PENNSYLVANIA  
DELTA, PENNSYLVANIA  
   
   
Dear Mr. Pardee:  
Dear Mr. Pardee:  
   
   
On August 10-12, 2009, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety  
On August 10-12, 2009, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety  
Line 125: Line 142:
conditions.  The inspection consisted of observations by the inspector, interviews with personnel,  
conditions.  The inspection consisted of observations by the inspector, interviews with personnel,  
and a selective examination of representative records.  The findings of the inspection were  
and a selective examination of representative records.  The findings of the inspection were  
discussed with William Maguire of your organization, and members of the Exelon management and staff on August 12, 2009, at the conclusion of the inspection.  The enclosed report presents  
discussed with William Maguire of your organization, and members of the Exelon management  
and staff on August 12, 2009, at the conclusion of the inspection.  The enclosed report presents  
the results of this inspection.  
the results of this inspection.  
   
   
Within the scope of this inspection, no violations were identified.   
Within the scope of this inspection, no violations were identified.   
   
   
In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter, its  
In accordance with 10 CFR Part 2.390 of the NRCs Rules of Practice, a copy of this letter, its  
enclosure, and your response (if any) will be available electronically for public ins
enclosure, and your response (if any) will be available electronically for public inspection in the  
pection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's
NRC Public Document Room or from the Publicly Available Records component of the NRCs
document system (ADAMS).  ADAMS is accessible from the NRC Web Site at  
document system (ADAMS).  ADAMS is accessible from the NRC Web Site at  
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Line 140: Line 156:
No reply to this letter is required.  Please contact Laurie Kauffman at (610) 337-5323 or  
No reply to this letter is required.  Please contact Laurie Kauffman at (610) 337-5323 or  
laurie.kauffman@nrc.gov if you have any questions regarding this matter.   
laurie.kauffman@nrc.gov if you have any questions regarding this matter.   
  Sincerely,   
   
Original signed by Kathy Modes For
Sincerely,  
 
   
Original signed by Kathy Modes For  
Judith A. Joustra, Chief  
Judith A. Joustra, Chief  
Decommissioning Branch  
Decommissioning Branch  
Line 149: Line 167:
Enclosure: NRC Inspection Report No. 05000171/2009007  
Enclosure: NRC Inspection Report No. 05000171/2009007  
   w/Attachment: Supplemental Information  
   w/Attachment: Supplemental Information  
cc w/encl:
see next page
Distribution
See next page
DOCUMENT NAME:  G:\\WordDocs\\Current\\Insp Letter\\LDPR-12.2009007.doc
SUNSI Review Complete:  JJoustra
After declaring this document AAn Official Agency Record@ it will be released to the Public.
To receive a copy of this document, indicate in the box: AC@ = Copy w/o attach/encl  AE@ = Copy w/ attach/encl  AN@ = No copy                                                ML092540134
OFFICE
DNMS/RI   
N
DNMS/RI
DNMS/RI
NAME
LKauffman/LKauffman
JJoustra/KDM f JAJ/
DATE
09/10/2009
09/11/2009
OFFICIAL RECORD COPY


C. Pardee
   
   
cc w/encl: see next page
2
  Distribution
Distribution:  
See next page DOCUMENT NAME:  G:\WordDocs\Current\Insp Letter\LDPR-12.2009007.doc SUNSI Review Complete:
S. Collins, RA  
  JJoustra After declaring this document
AAn Official Agency Record
@ it will be released to the Public. To receive a copy of this document, indicate in the box:
A C@ = Copy w/o attach/encl 
A E@ = Copy w/ attach/encl 
A N@ = No copy                                                ML092540134
OFFICE  DNMS/RI   
N  DNMS/RI  DNMS/RI 
    NAME LKauffman/LKauffman JJoustra/KDM f JAJ/ 
DATE 09/10/2009 09/11/2009  OFFICIAL RECORD COPY 
C. Pardee 
2Distribution:
S. Collins, RA  
M. Dapas, DRA  
M. Dapas, DRA  
D. Lew, DRP  
D. Lew, DRP  

Latest revision as of 09:24, 14 January 2025

IR 05000171-09-007, on 08/12/2009, for Peach Bottom Atomic Power Station, Unit 1, Delta, PA, Safestor Inspection. Transmittal Letter
ML092540134
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/11/2009
From: Joustra J
Division of Nuclear Materials Safety I
To: Pardee C
Exelon Generation Co
References
IR-09-007
Download: ML092540134 (4)


See also: IR 05000171/2009007

Text

September 11, 2009

Docket No.

05000171

License No.DPR-1

Mr. Charles G. Pardee

Senior Vice President, Exelon Generation Company LLC

President and Chief Nuclear Officer, Exelon Nuclear

4300 Winfield Rd.

Warrenville, IL 60555

SUBJECT:

NRC INSPECTION REPORT NO. 05000171/2009007, EXELON GENERATION

COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION, UNIT 1,

DELTA, PENNSYLVANIA

Dear Mr. Pardee:

On August 10-12, 2009, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety

inspection at the Peach Bottom Atomic Power Station, Unit 1 of activities authorized by the

above listed NRC license. The inspection was an examination of your licensed activities as they

relate to radiation safety and to compliance with the Commission's regulations and the license

conditions. The inspection consisted of observations by the inspector, interviews with personnel,

and a selective examination of representative records. The findings of the inspection were

discussed with William Maguire of your organization, and members of the Exelon management

and staff on August 12, 2009, at the conclusion of the inspection. The enclosed report presents

the results of this inspection.

Within the scope of this inspection, no violations were identified.

In accordance with 10 CFR Part 2.390 of the NRCs Rules of Practice, a copy of this letter, its

enclosure, and your response (if any) will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records component of the NRCs

document system (ADAMS). ADAMS is accessible from the NRC Web Site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

No reply to this letter is required. Please contact Laurie Kauffman at (610) 337-5323 or

laurie.kauffman@nrc.gov if you have any questions regarding this matter.

Sincerely,

Original signed by Kathy Modes For

Judith A. Joustra, Chief

Decommissioning Branch

Division of Nuclear Materials Safety

Enclosure: NRC Inspection Report No. 05000171/2009007

w/Attachment: Supplemental Information

cc w/encl:

see next page

NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA, PENNSYLVANIA 19406-1415

C. Pardee

2

cc w/encl:

C. Crane, President and Chief Operating Officer, Exelon Corporation

M. Pacilio, Chief Operating Officer, Exelon Nuclear

W. Maguire, Site Vice President, Peach Bottom

J. Grimes, Senior Vice President, Mid-Atlantic

R. Hovey, Senior Vice President, Nuclear Oversight

G. Stathes, Plant Manager, Peach Bottom

J. Armstrong, Regulatory Assurance Manager, Peach Bottom

J. Bardurski, Manager, Financial Control & Co-Owner Affairs

R. Franssen, Director, Operations

P. Cowan, Director, Licensing

D. Helker, Licensing

K. Jury, Vice President, Licensing and Regulatory Affairs

J. Bradley Fewell, Associate General Counsel, Exelon

T. Wasong, Director, Training

Correspondence Control Desk

D. Allard, Director, Bureau of Radiation Protection, PA Department of Environmental Protection

S. Gray, Administrator, Maryland Power Plant Research Program

S. Pattison, Secretary, SLO, Maryland Department of the Environment

M. Griffen, Maryland Department of Environment

Public Service Commission of Maryland, Engineering Division

Board of Supervisors, Peach Bottom Township

B. OConnor, Council Administrator of Harford County Council

Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance

E. Epstein, TMI - Alert

J. Johnsrud, National Energy Committee, Sierra Club

Mr. & Mrs. Kip Adams

R. Fletcher, Dir, MD Environmental Program Manager, Radiological Health Program

Director, Nuclear Safety Project, Union of Concerned Scientists

R. Ayers, Deputy Mgr, Harford County Div of Emergency Operations

E. Crist, Harford County Div of Emergency Operations

S. Ayers, Emergency Planner, Harford County Div of Emergency Operations

R. Brooks, Cecil County Dept of Emergency Services

Commonwealth of Pennsylvania

September 11, 2009

Docket No.

05000171

License No.

DPR-12

Mr. Charles G. Pardee

Senior Vice President, Exelon Generation Company LLC

President and Chief Nuclear Officer, Exelon Nuclear

4300 Winfield Rd.

Warrenville, IL 60555

SUBJECT:

NRC INSPECTION REPORT NO. 05000171/2009007, EXELON GENERATION

COMPANY, LLC, PEACH BOTTOM ATOMIC POWER STATION, UNIT 1,

DELTA, PENNSYLVANIA

Dear Mr. Pardee:

On August 10-12, 2009, the U.S. Nuclear Regulatory Commission (NRC) conducted a safety

inspection at the Peach Bottom Atomic Power Station, Unit 1 of activities authorized by the

above listed NRC license. The inspection was an examination of your licensed activities as they

relate to radiation safety and to compliance with the Commission's regulations and the license

conditions. The inspection consisted of observations by the inspector, interviews with personnel,

and a selective examination of representative records. The findings of the inspection were

discussed with William Maguire of your organization, and members of the Exelon management

and staff on August 12, 2009, at the conclusion of the inspection. The enclosed report presents

the results of this inspection.

Within the scope of this inspection, no violations were identified.

In accordance with 10 CFR Part 2.390 of the NRCs Rules of Practice, a copy of this letter, its

enclosure, and your response (if any) will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records component of the NRCs

document system (ADAMS). ADAMS is accessible from the NRC Web Site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

No reply to this letter is required. Please contact Laurie Kauffman at (610) 337-5323 or

laurie.kauffman@nrc.gov if you have any questions regarding this matter.

Sincerely,

Original signed by Kathy Modes For

Judith A. Joustra, Chief

Decommissioning Branch

Division of Nuclear Materials Safety

Enclosure: NRC Inspection Report No. 05000171/2009007

w/Attachment: Supplemental Information

cc w/encl:

see next page

Distribution

See next page

DOCUMENT NAME: G:\\WordDocs\\Current\\Insp Letter\\LDPR-12.2009007.doc

SUNSI Review Complete: JJoustra

After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: AC@ = Copy w/o attach/encl AE@ = Copy w/ attach/encl AN@ = No copy ML092540134

OFFICE

DNMS/RI

N

DNMS/RI

DNMS/RI

NAME

LKauffman/LKauffman

JJoustra/KDM f JAJ/

DATE

09/10/2009

09/11/2009

OFFICIAL RECORD COPY

C. Pardee

2

Distribution:

S. Collins, RA

M. Dapas, DRA

D. Lew, DRP

J. Clifford, DRP

J. Kinneman, DNMS

D. Collins, DNMS

J. Joustra, DNMS

L. Kauffman, DNMS

P. Krohn, DRP

R. Fuhrmeister, DRP

A. Rosebrook, DRP

E. Torres, DRP

J. Bream, DRP

F. Bower, DRP, SRI

M. Brown, DRP, RI

S. Schmitt, DRP, OA

L. Trocine, RI OEDO

H. Chernoff, NRR

R. Nelson, NRR

J. Hughey, PM NRR

P. Bamford, Backup NRR

K. Banovac, FSME

D. Persinko, FSME

ROPreports@nrc.gov