ML100350070: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:February 18, 2010  
{{#Wiki_filter:February 18, 2010 Mr. Michael J. Curley Director, Nuclear Reactor Facility Worchester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280  
 
Mr. Michael J. Curley Director, Nuclear Reactor Facility Worchester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280  


==SUBJECT:==
==SUBJECT:==
APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009
APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009  


==Dear Mr. Curley:==
==Dear Mr. Curley:==
By {{letter dated|date=December 8, 2009|text=letter dated December 8, 2009}}, you requested the U.S. Nuclear Regulatory Commissions (NRCs) review and comment on Worcester Polytechnic Institute (WPI) Revision 2, Transportation Plan (TP) in support of the removal of the fuel during WPIs decommissioning of its nuclear reactor.
The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov.
Sincerely,
/RA/
Rebecca Tadesse, Branch Chief Materials Decommissioning Branch Decommissioning and Uranium Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-134 License No.: R-61


By letter dated December 8, 2009, you requested the U.S. Nuclear Regulatory Commission's (NRC's) review and comment on Worcester Polytechnic Institute (WPI) Revision 2, Transportation Plan (TP) in support of the removal of the fuel during WPI's decommissioning of its nuclear reactor.
Mr. Michael J. Curley Director, Nuclear Reactor Facility Worchester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280  
 
The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable.
 
In accordance with 10 CFR 2.390 of the NRC
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC
=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
 
If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov. Sincerely,
 
  /RA/
Rebecca Tadesse, Branch Chief Materials Decommissioning Branch Decommissioning and Uranium Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs
 
Docket No.:  50-134 License No.:  R-61 Mr. Michael J. Curley Director, Nuclear Reactor Facility Worchester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280  


==SUBJECT:==
==SUBJECT:==
APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009
APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009  


==Dear Mr. Curley:==
==Dear Mr. Curley:==
 
By {{letter dated|date=December 8, 2009|text=letter dated December 8, 2009}}, you requested the U.S. Nuclear Regulatory Commissions (NRCs) review and comment on Worcester Polytechnic Institute (WPI) Revision 2, Transportation Plan (TP) in support of the removal of the fuel during WPIs decommissioning of its nuclear reactor.
By letter dated December 8, 2009, you requested the U.S. Nuclear Regulatory Commission's (NRC's) review and comment on Worcester Polytechnic Institute (WPI) Revision 2, Transportation Plan (TP) in support of the removal of the fuel during WPI's decommissioning of its nuclear reactor.  
The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable.
 
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable.  
If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov.
 
Sincerely, Rebecca Tadesse, Branch Chief Materials Decommissioning Branch Decommissioning and Uranium Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-134 License No.: R-61 DISTRIBUTION:
In accordance with 10 CFR 2.390 of the NRC
RidsRgn4MailCenter ML100350070 OFFICE MDB/PM MDB/LA MDB/HP NAME TCarter SMichonski RTadesse DATE 1/17/2010 2/17/2010 2/18/2010 OFFICIAL RECORD COPY}}
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC
=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).  
 
If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov. Sincerely,  
 
Rebecca Tadesse, Branch Chief Materials Decommissioning Branch Decommissioning and Uranium Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs  
 
Docket No.: 50-134 License No.: R-61  
 
DISTRIBUTION
RidsRgn4MailCenter ML100350070 OFFICE MDB/PM MDB/LA MDB/HP NAME TCarter SMichonski RTadesse DATE 1/17/2010 2/17/2010 2/18/2010 OFFICIAL RECORD COPY}}

Latest revision as of 06:45, 14 January 2025

Michael Curley Ltr Approval for Worcester Polytechnic Institute Revision 2, Transportation Plan Dated December 8, 2009
ML100350070
Person / Time
Site: 05000134
Issue date: 02/18/2010
From: Tadesse R
NRC/FSME/DWMEP/DURLD/MDB
To: Curley M
Worcester Polytechnic Institute
Ted Carter, 415-5543
References
Download: ML100350070 (2)


Text

February 18, 2010 Mr. Michael J. Curley Director, Nuclear Reactor Facility Worchester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280

SUBJECT:

APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009

Dear Mr. Curley:

By letter dated December 8, 2009, you requested the U.S. Nuclear Regulatory Commissions (NRCs) review and comment on Worcester Polytechnic Institute (WPI) Revision 2, Transportation Plan (TP) in support of the removal of the fuel during WPIs decommissioning of its nuclear reactor.

The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov.

Sincerely,

/RA/

Rebecca Tadesse, Branch Chief Materials Decommissioning Branch Decommissioning and Uranium Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-134 License No.: R-61

Mr. Michael J. Curley Director, Nuclear Reactor Facility Worchester Polytechnic Institute 100 Institute Road Worcester, MA 01609-2280

SUBJECT:

APPROVAL FOR WORCESTER POLYTECHNIC INSTITUTE REVISION 2, TRANSPORTATION PLAN DATED DECEMBER 8, 2009

Dear Mr. Curley:

By letter dated December 8, 2009, you requested the U.S. Nuclear Regulatory Commissions (NRCs) review and comment on Worcester Polytechnic Institute (WPI) Revision 2, Transportation Plan (TP) in support of the removal of the fuel during WPIs decommissioning of its nuclear reactor.

The NRC staff reviewed and concludes that the WPI transportation plan for a one time shipment provides reasonable assurance that the requirements in 10 CFR 73.67 (g) continues to be met and finds it acceptable.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC=s Agency wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

If you have any questions regarding this review, please contact Ted Carter at (301) 415-5543, or by e-mail, to Ted.Carter@nrc.gov.

Sincerely, Rebecca Tadesse, Branch Chief Materials Decommissioning Branch Decommissioning and Uranium Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-134 License No.: R-61 DISTRIBUTION:

RidsRgn4MailCenter ML100350070 OFFICE MDB/PM MDB/LA MDB/HP NAME TCarter SMichonski RTadesse DATE 1/17/2010 2/17/2010 2/18/2010 OFFICIAL RECORD COPY