{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 July 6,2012 Mr, Kevin Walsh Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P,O. Box 300 Seabrook, NH 03874 SEABROOK STATION, UNIT 1 -CORRECTION TO REQUEST FOR RELIEF 31R-2 FOR PRESSURIZER SUPPORTS (TAC NO. ME7258) | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 July 6,2012 Mr, Kevin Walsh Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P,O. Box 300 Seabrook, NH 03874 | ||
==SUBJECT:== | |||
SEABROOK STATION, UNIT 1 - CORRECTION TO REQUEST FOR RELIEF 31R-2 FOR PRESSURIZER SUPPORTS (TAC NO. ME7258) | |||
==Dear Mr. Walsh:== | ==Dear Mr. Walsh:== | ||
By letter dated September 26, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11277A269), NextEra Energy Seabrook, LLC (NextEra or licensee) submitted request for relief 31R-2 for the third 1 O-year inservice inspection (lSI) interval. | By {{letter dated|date=September 26, 2011|text=letter dated September 26, 2011}}, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11277A269), NextEra Energy Seabrook, LLC (NextEra or licensee) submitted request for relief 31R-2 for the third 1 O-year inservice inspection (lSI) interval. | ||
program at the Seabrook Station, Unit 1 (Seabrook) from certain examination requirements of the American Society of Mechanical Engineers (AS ME) Boiler and Pressure Vessel Code (Code). Specifically, the licensee requested relief from the ASME Code, Section XI requIrements for the pressurizer vessel welded attachments and component supports. | program at the Seabrook Station, Unit 1 (Seabrook) from certain examination requirements of the American Society of Mechanical Engineers (AS ME) Boiler and Pressure Vessel Code (Code). Specifically, the licensee requested relief from the ASME Code, Section XI requIrements for the pressurizer vessel welded attachments and component supports. The request is for the remainder of the third 1 O-year lSI interval. | ||
The request is for the remainder of the third 1 O-year lSI interval. | The U.S. Nuclear Regulatory Commission (NRC) staff approved the relief request by {{letter dated|date=June 28, 2012|text=letter dated June 28,2012}} (ADAMS Accession No. ML120860397). | ||
The U.S. Nuclear Regulatory Commission (NRC) staff approved the relief request by letter dated June 28,2012 (ADAMS Accession No. ML120860397). | Subsequently, it was discovered that there were two typographical errors in the last sentence of Section 3.4 on page 3 of the safety evaluation (SE). Section 3.4 was a quote from your submittal dated September 26, 2011, and it referred to Figure 3IR-2-1. The NRC staff incorrectly typed 31 R-2 instead of 3IR-2, The NRC staff tried to clarify where Figure 3IR-2-1 was located by putting the incoming submittal date in brackets. However, the NRC staff incorrectly typed the wrong year of the submittal; the NRC staff incorrectly typed September 26, 2012, instead of September 26, 2011. | ||
Subsequently, it was discovered that there were two typographical errors in the last sentence of Section 3.4 on page 3 of the safety evaluation (SE). Section 3.4 was a quote from your submittal dated September 26, 2011, and it referred to Figure 3IR-2-1. The NRC staff incorrectly typed 31 R-2 instead of 3IR-2, The NRC staff tried to clarify where Figure 3IR-2-1 was located by putting the incoming submittal date in brackets. | If you have any questions, please contact John G. Lamb at 301-415-3100 or via e-mail at John,Lamb@nrc.gov. | ||
However, the NRC staff incorrectly typed the wrong year of the submittal; the NRC staff incorrectly typed September 26, 2012, instead of September 26, 2011. If you have any questions, please contact John G. Lamb at 301-415-3100 or via e-mail at John,Lamb@nrc.gov. Lamb, Senior Project Manager Licensing Branch 1-2 of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No, 50-443 cc: Distribution via Listserv July 6,2012 Mr. Kevin Walsh Site Vice President clo Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 SEABROOK STATION, UNIT 1 -CORRECTION TO REQUEST FOR RELIEF 31R-2 FOR PRESSURIZER SUPPORTS (TAC NO. ME7258) | Si1~/j~ | ||
J~ Lamb, Senior Project Manager PI~~t Licensing Branch 1-2 Di~sion of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No, 50-443 cc: | |||
Distribution via Listserv | |||
July 6,2012 Mr. Kevin Walsh Site Vice President clo Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 | |||
==SUBJECT:== | |||
SEABROOK STATION, UNIT 1 - CORRECTION TO REQUEST FOR RELIEF 31R-2 FOR PRESSURIZER SUPPORTS (TAC NO. ME7258) | |||
==Dear Mr. Walsh:== | ==Dear Mr. Walsh:== | ||
By letter dated September 26, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11277A269), NextEra Energy Seabrook, LLC (NextEra or licensee) submitted request for relief 31R-2 for the third 10-year inservice inspection (lSI) interval program at the Seabrook Station, Unit 1 (Seabrook) from certain examination requirements of the American Society of Mechanical Engineers (AS ME) Boiler and Pressure Vessel Code (Code). Specifically, the licensee requested relief from the ASME Code, Section XI requirements for the pressurizer vessel welded attachments and component supports. | By {{letter dated|date=September 26, 2011|text=letter dated September 26, 2011}}, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11277A269), NextEra Energy Seabrook, LLC (NextEra or licensee) submitted request for relief 31R-2 for the third 10-year inservice inspection (lSI) interval program at the Seabrook Station, Unit 1 (Seabrook) from certain examination requirements of the American Society of Mechanical Engineers (AS ME) Boiler and Pressure Vessel Code (Code). Specifically, the licensee requested relief from the ASME Code, Section XI requirements for the pressurizer vessel welded attachments and component supports. The request is for the remainder of the third 10-year lSI interval. | ||
The request is for the remainder of the third 10-year lSI interval. | The U.S. Nuclear Regulatory Commission (NRC) staff approved the relief request by {{letter dated|date=June 28, 2012|text=letter dated June 28, 2012}} (ADAMS Accession No. ML120860397). | ||
The U.S. Nuclear Regulatory Commission (NRC) staff approved the relief request by letter dated June 28, 2012 (ADAMS Accession No. ML120860397). | Subsequently, it was discovered that there were two typographical errors in the last sentence of Section 3.4 on page 3 of the safety evaluation (SE). Section 3.4 was a quote from your submittal dated September 26, 2011, and it referred to Figure 3IR-2-1. The NRC staff incorrectly typed 31 R-2 instead of 3IR-2. The NRC staff tried to clarify where Figure 3IR-2-1 was located by putting the incoming submittal date in brackets. However, the NRC staff incorrectly typed the wrong year of the submittal; the NRC staff incorrectly typed September 26,2012, instead of September 26,2011. | ||
Subsequently, it was discovered that there were two typographical errors in the last sentence of Section 3.4 on page 3 of the safety evaluation (SE). Section 3.4 was a quote from your submittal dated September 26, 2011, and it referred to Figure 3IR-2-1. The NRC staff incorrectly typed 31 R-2 instead of 3IR-2. The NRC staff tried to clarify where Figure 3IR-2-1 was located by putting the incoming submittal date in brackets. | If you have any questions, please contact John G. Lamb at 301-415-3100 or via e-mail at John. Lamb@nrc.gov. | ||
However, the NRC staff incorrectly typed the wrong year of the submittal; the NRC staff incorrectly typed September 26,2012, instead of September 26,2011. If you have any questions, please contact John G. Lamb at 301-415-3100 or via e-mail at John. Lamb@nrc.gov. | Sincerely, IraJ John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv DISLRIBUIIQH PUBLIC LPLI-2 r/f RidsAcrsAcnw_MailCTR Resource RidsNrrDeEvib Resource RidsNrrDorlDpr Resource RidsNrrDorlLpll-2 Resource RidsNrrLAABaxter Resource RidsNrrPMSeabrook Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource MMcCoppin, EDO RI SCumblidge, NRR ADAMS Accession No. ML12187A044 | ||
Sincerely, IraJ John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv | 'via email | ||
I. NAME JLamb ABaxter* | .0F'rl~ ~'=fJ~1-2/~rv1~ | ||
OFFICIAL AGENCY RECORD}} | NR~/LPu::2Ii::'Al§R/LPLI-2/~~~~'=fJ*~=~.=~~='?=.~=_.~ | ||
I. | |||
NAME JLamb ABaxter* | |||
IMKhanna I JLamb | |||
.J i | |||
DATE 07/05/12 | |||
. liil05/1~~=-~ 07/06/12~-==--To7l00t12-----J OFFICIAL AGENCY RECORD}} | |||
Latest revision as of 01:16, 12 January 2025
| ML12187A044 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 07/06/2012 |
| From: | John Lamb Plant Licensing Branch 1 |
| To: | Walsh K NextEra Energy Seabrook |
| Lamb J | |
| References | |
| TAC ME7258 | |
| Download: ML12187A044 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 July 6,2012 Mr, Kevin Walsh Site Vice President c/o Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P,O. Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT 1 - CORRECTION TO REQUEST FOR RELIEF 31R-2 FOR PRESSURIZER SUPPORTS (TAC NO. ME7258)
Dear Mr. Walsh:
By letter dated September 26, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11277A269), NextEra Energy Seabrook, LLC (NextEra or licensee) submitted request for relief 31R-2 for the third 1 O-year inservice inspection (lSI) interval.
program at the Seabrook Station, Unit 1 (Seabrook) from certain examination requirements of the American Society of Mechanical Engineers (AS ME) Boiler and Pressure Vessel Code (Code). Specifically, the licensee requested relief from the ASME Code,Section XI requIrements for the pressurizer vessel welded attachments and component supports. The request is for the remainder of the third 1 O-year lSI interval.
The U.S. Nuclear Regulatory Commission (NRC) staff approved the relief request by letter dated June 28,2012 (ADAMS Accession No. ML120860397).
Subsequently, it was discovered that there were two typographical errors in the last sentence of Section 3.4 on page 3 of the safety evaluation (SE). Section 3.4 was a quote from your submittal dated September 26, 2011, and it referred to Figure 3IR-2-1. The NRC staff incorrectly typed 31 R-2 instead of 3IR-2, The NRC staff tried to clarify where Figure 3IR-2-1 was located by putting the incoming submittal date in brackets. However, the NRC staff incorrectly typed the wrong year of the submittal; the NRC staff incorrectly typed September 26, 2012, instead of September 26, 2011.
If you have any questions, please contact John G. Lamb at 301-415-3100 or via e-mail at John,Lamb@nrc.gov.
Si1~/j~
J~ Lamb, Senior Project Manager PI~~t Licensing Branch 1-2 Di~sion of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No, 50-443 cc:
Distribution via Listserv
July 6,2012 Mr. Kevin Walsh Site Vice President clo Michael O'Keefe Seabrook Station NextEra Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT 1 - CORRECTION TO REQUEST FOR RELIEF 31R-2 FOR PRESSURIZER SUPPORTS (TAC NO. ME7258)
Dear Mr. Walsh:
By letter dated September 26, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11277A269), NextEra Energy Seabrook, LLC (NextEra or licensee) submitted request for relief 31R-2 for the third 10-year inservice inspection (lSI) interval program at the Seabrook Station, Unit 1 (Seabrook) from certain examination requirements of the American Society of Mechanical Engineers (AS ME) Boiler and Pressure Vessel Code (Code). Specifically, the licensee requested relief from the ASME Code,Section XI requirements for the pressurizer vessel welded attachments and component supports. The request is for the remainder of the third 10-year lSI interval.
The U.S. Nuclear Regulatory Commission (NRC) staff approved the relief request by letter dated June 28, 2012 (ADAMS Accession No. ML120860397).
Subsequently, it was discovered that there were two typographical errors in the last sentence of Section 3.4 on page 3 of the safety evaluation (SE). Section 3.4 was a quote from your submittal dated September 26, 2011, and it referred to Figure 3IR-2-1. The NRC staff incorrectly typed 31 R-2 instead of 3IR-2. The NRC staff tried to clarify where Figure 3IR-2-1 was located by putting the incoming submittal date in brackets. However, the NRC staff incorrectly typed the wrong year of the submittal; the NRC staff incorrectly typed September 26,2012, instead of September 26,2011.
If you have any questions, please contact John G. Lamb at 301-415-3100 or via e-mail at John. Lamb@nrc.gov.
Sincerely, IraJ John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443 cc: Distribution via Listserv DISLRIBUIIQH PUBLIC LPLI-2 r/f RidsAcrsAcnw_MailCTR Resource RidsNrrDeEvib Resource RidsNrrDorlDpr Resource RidsNrrDorlLpll-2 Resource RidsNrrLAABaxter Resource RidsNrrPMSeabrook Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource MMcCoppin, EDO RI SCumblidge, NRR ADAMS Accession No. ML12187A044
'via email
.0F'rl~ ~'=fJ~1-2/~rv1~
NR~/LPu::2Ii::'Al§R/LPLI-2/~~~~'=fJ*~=~.=~~='?=.~=_.~
I.
NAME JLamb ABaxter*
IMKhanna I JLamb
.J i
DATE 07/05/12
. liil05/1~~=-~ 07/06/12~-==--To7l00t12-----J OFFICIAL AGENCY RECORD