LR-N12-0204, 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insight: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:LR-N12-0204 July 9,2012 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 OPSEG Nuclear LLC 10 CFR 50.54(f) | ||
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 | |||
==Subject:== | |||
Salem Nuclear Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354 PSEG Nuclear LLC's 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 ofthe Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | |||
==References:== | |||
(1 ) | |||
NRC Letter, Request for Information Pursuant to Title 10 of the (2) | |||
Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 NRC Letter, Endorsement of Electric Power Research Institute (EPRI) | |||
Draft Report 1025286, "Seismic Walkdown Guidance," dated May 31, 2012 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. This letter provides the PSEG Nuclear LLC (PSEG) 120-day response to Reference 1 for Seismic Recommendation 2.3 for Salem Nuclear Generating Station, Units 1 and 2 (Salem), and for Hope Creek Generating Station (Hope Creek). | |||
For Seismic Recommendation 2.3 (walkdowns), Enclosure 3 of Reference 1 states that each licensee will confirm that they intend to use the NRC-endorsed seismic walkdown procedure or provide to the NRC a description of the process that will be used to conduct the walkdowns and develop the needed information. | |||
LR-N12-0204 July 9,2012 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 OPSEG Nuclear LLC 10 CFR 50.54(f) | |||
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 | |||
==Subject:== | |||
Salem Nuclear Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354 PSEG Nuclear LLC's 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 ofthe Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | |||
==References:== | |||
(1 ) | |||
NRC Letter, Request for Information Pursuant to Title 10 of the (2) | |||
Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 NRC Letter, Endorsement of Electric Power Research Institute (EPRI) | |||
Draft Report 1025286, "Seismic Walkdown Guidance," dated May 31, 2012 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. This letter provides the PSEG Nuclear LLC (PSEG) 120-day response to Reference 1 for Seismic Recommendation 2.3 for Salem Nuclear Generating Station, Units 1 and 2 (Salem), and for Hope Creek Generating Station (Hope Creek). | |||
For Seismic Recommendation 2.3 (walkdowns), Enclosure 3 of Reference 1 states that each licensee will confirm that they intend to use the NRC-endorsed seismic walkdown procedure or provide to the NRC a description of the process that will be used to conduct the walkdowns and develop the needed information. | |||
LR-N12-0204 Page 2 10 CFR 50.54(f) | |||
PSEG confirms that it will use the seismic walkdown guidance (EPRI 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic") as endorsed by Reference 2 to conduct the walkdowns and develop the needed information at Salem and Hope Creek. | |||
This letter contains no new regulatory commitments. | |||
Should you have any questions concerning the content of this letter, please contact Ms. Emily Maguire at (856) 339-1023. | |||
I declare under penalty of perjury that the foregoing is true and correct. | |||
Executed on | |||
.., /.,/'.z | |||
------~~~-------- | |||
(Date) | |||
Robert C. Braun Senior Vice President, Nuclear Operations cc: | |||
Mr. W. Dean, Administrator, Region I, NRC Mr. J. Hughey, Project Manager, NRC NRC Senior Resident Inspector, Salem NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Manager IV, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. K. Yearwood, Hope Creek Commitment Tracking Coordinator Mr. T. Cachaza, Salem Commitment Tracking Coordinator LR-N12-0204 Page 2 10 CFR 50.54(f) | |||
PSEG confirms that it will use the seismic walkdown guidance (EPRI 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic") as endorsed by Reference 2 to conduct the walkdowns and develop the needed information at Salem and Hope Creek. | |||
This letter contains no new regulatory commitments. | |||
Should you have any questions concerning the content of this letter, please contact Ms. Emily Maguire at (856) 339-1023. | |||
I declare under penalty of perjury that the foregoing is true and correct. | |||
Executed on | |||
.., /.,/'.z | |||
------~~~-------- | |||
(Date) | |||
Robert C. Braun Senior Vice President, Nuclear Operations cc: | |||
Mr. W. Dean, Administrator, Region I, NRC Mr. J. Hughey, Project Manager, NRC NRC Senior Resident Inspector, Salem NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Manager IV, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. K. Yearwood, Hope Creek Commitment Tracking Coordinator Mr. T. Cachaza, Salem Commitment Tracking Coordinator}} | |||
Latest revision as of 01:05, 12 January 2025
| ML12192A214 | |
| Person / Time | |
|---|---|
| Site: | Salem, Hope Creek |
| Issue date: | 07/09/2012 |
| From: | Braun R Public Service Enterprise Group |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| LR-N12-0204 | |
| Download: ML12192A214 (2) | |
Text
LR-N12-0204 July 9,2012 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 OPSEG Nuclear LLC 10 CFR 50.54(f)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
Subject:
Salem Nuclear Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354 PSEG Nuclear LLC's 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 ofthe Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
References:
(1 )
NRC Letter, Request for Information Pursuant to Title 10 of the (2)
Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 NRC Letter, Endorsement of Electric Power Research Institute (EPRI)
Draft Report 1025286, "Seismic Walkdown Guidance," dated May 31, 2012 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. This letter provides the PSEG Nuclear LLC (PSEG) 120-day response to Reference 1 for Seismic Recommendation 2.3 for Salem Nuclear Generating Station, Units 1 and 2 (Salem), and for Hope Creek Generating Station (Hope Creek).
For Seismic Recommendation 2.3 (walkdowns), Enclosure 3 of Reference 1 states that each licensee will confirm that they intend to use the NRC-endorsed seismic walkdown procedure or provide to the NRC a description of the process that will be used to conduct the walkdowns and develop the needed information.
LR-N12-0204 July 9,2012 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, NJ 08038-0236 OPSEG Nuclear LLC 10 CFR 50.54(f)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
Subject:
Salem Nuclear Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRC Docket Nos. 50-272 and 50-311 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354 PSEG Nuclear LLC's 120-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 ofthe Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
References:
(1 )
NRC Letter, Request for Information Pursuant to Title 10 of the (2)
Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 NRC Letter, Endorsement of Electric Power Research Institute (EPRI)
Draft Report 1025286, "Seismic Walkdown Guidance," dated May 31, 2012 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference 1 to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 3 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic. This letter provides the PSEG Nuclear LLC (PSEG) 120-day response to Reference 1 for Seismic Recommendation 2.3 for Salem Nuclear Generating Station, Units 1 and 2 (Salem), and for Hope Creek Generating Station (Hope Creek).
For Seismic Recommendation 2.3 (walkdowns), Enclosure 3 of Reference 1 states that each licensee will confirm that they intend to use the NRC-endorsed seismic walkdown procedure or provide to the NRC a description of the process that will be used to conduct the walkdowns and develop the needed information.
LR-N12-0204 Page 2 10 CFR 50.54(f)
PSEG confirms that it will use the seismic walkdown guidance (EPRI 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic") as endorsed by Reference 2 to conduct the walkdowns and develop the needed information at Salem and Hope Creek.
This letter contains no new regulatory commitments.
Should you have any questions concerning the content of this letter, please contact Ms. Emily Maguire at (856) 339-1023.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on
.., /.,/'.z
~~~--------
(Date)
Robert C. Braun Senior Vice President, Nuclear Operations cc:
Mr. W. Dean, Administrator, Region I, NRC Mr. J. Hughey, Project Manager, NRC NRC Senior Resident Inspector, Salem NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Manager IV, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. K. Yearwood, Hope Creek Commitment Tracking Coordinator Mr. T. Cachaza, Salem Commitment Tracking Coordinator LR-N12-0204 Page 2 10 CFR 50.54(f)
PSEG confirms that it will use the seismic walkdown guidance (EPRI 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic") as endorsed by Reference 2 to conduct the walkdowns and develop the needed information at Salem and Hope Creek.
This letter contains no new regulatory commitments.
Should you have any questions concerning the content of this letter, please contact Ms. Emily Maguire at (856) 339-1023.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on
.., /.,/'.z
~~~--------
(Date)
Robert C. Braun Senior Vice President, Nuclear Operations cc:
Mr. W. Dean, Administrator, Region I, NRC Mr. J. Hughey, Project Manager, NRC NRC Senior Resident Inspector, Salem NRC Senior Resident Inspector, Hope Creek Mr. P. Mulligan, Manager IV, NJBNE Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. K. Yearwood, Hope Creek Commitment Tracking Coordinator Mr. T. Cachaza, Salem Commitment Tracking Coordinator