ML18005B087: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML18005B088
| number = ML18005B088
| issue date = 10/02/1989
| issue date = 10/02/1989
| title = Forwards Response to NRC 890831 Questions Re Suppl to Cycle 3 Reload Amend Request.Util Currently Performing Addl Steam Generator Tube Rupture Analyses,Based on Revised Operator Action Times Described in Util 890519 Ltr
| title = Proposed Tech Specs Re Cycle 3 Reload & Rev to Min Containment Backpressure Calculation
| author name =  
| author name =  
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 17:02, 6 March 2020

Forwards Response to NRC 890831 Questions Re Suppl to Cycle 3 Reload Amend Request.Util Currently Performing Addl Steam Generator Tube Rupture Analyses,Based on Revised Operator Action Times Described in Util 890519 Ltr
Date released: 08/31/2018 Download: ML18005B087


Proposed Tech Specs Re Cycle 3 Reload & Rev to Min Containment Backpressure Calculation
ML18005B088
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/02/1989
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18005B088 (10)
Forwards Response to NRC 890831 Questions Re Suppl to Cycle 3 Reload Amend Request.Util Currently Performing Addl Steam Generator Tube Rupture Analyses,Based on Revised Operator Action Times Described in Util 890519 Ltr
ML18005B086
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/02/1989
From: Cutter A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18005B086 (22)