{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 1, 2012 Mr. Dennis R. Madison Vice President Southern Nuclear Operating Company, Inc. | ||
Southern Nuclear Operating Company, Inc. | |||
Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513 | Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513 | ||
==SUBJECT:== | ==SUBJECT:== | ||
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE | CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR EDWIN I. HATCH NUCLEAR PLANT | ||
==Dear Mr. Madison:== | ==Dear Mr. Madison:== | ||
In a {{letter dated|date=July 11, 2012|text=letter dated July 11, 2012}}, your staff responded to Regulatory Issue Summary 2012-07 and requested we schedule initial license operator examinations for Edwin I. Hatch Nuclear Plant. | |||
In a letter dated July 11, 2012, your staff responded to Regulatory Issue Summary 2012-07 and requested we schedule initial license operator examinations for Edwin I. Hatch Nuclear Plant. | |||
Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows: | Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows: | ||
Plant / Station 2013 2014 Date | Plant / Station 2013 2014 Date Applicants Date Applicants Hatch 9/2 16 NR NR NR - None requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter. | ||
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks. | |||
If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule. | |||
A supplementary letter will be sent to each stations training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at 404-997-4436. | |||
D. Madison 2 | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
Sincerely, | |||
/RA/ | |||
Terrence Reis, Director Division of Reactor Safety Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5 cc: (See page 3) | |||
xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA RA NAME SCHAAF WIDMANN FRANKE CHRISTENSEN DATE 10/25/2012 11/1/2012 11/1/2012 11/1/2012 11/ /2012 11/ /2012 11/ /2012 E-MAIL COPY? | |||
YES NO YES NO YES NO YES NO YES NO YES NO YES NO | |||
D. Madison 3 | |||
cc: | |||
C. Russ Dedrickson Fleet Support Supervisor Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution David R. Vineyard Plant Manager Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Todd L. Youngblood Vice President Fleet Oversight Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Leigh Perry SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution D. G. Bost Chief Nuclear Officer Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution T. A. Lynch Vice President Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution B. D. McKinney, Jr. | |||
Regulatory Response Manager Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Bradley J. Adams Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr. | |||
Southern Nuclear Operating Company, Inc. | Southern Nuclear Operating Company, Inc. | ||
Electronic Mail Distribution | Electronic Mail Distribution (cc contd - See page 4) | ||
D. Madison 4 | |||
(cc contd) | |||
Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution W. E. Duvall Site Support Manager Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA 31513 Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant Oglethorpe Power Corporation Electronic Mail Distribution Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution Jerry Ranalli Municipal Electric Authority of Georgia Power Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution Arthur H. Domby, Esq. | |||
Troutman Sanders Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Chuck Mueller Manager Policy and Radiation Program Georgia Department of Natural Resources Electronic Mail Distribution Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513 Amy Whaley Resident Manager Electronic Mail Distribution Southern Nuclear Operating Company, Inc. | |||
ATTN: Mr. Steve Grantham Training Manager Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513 | |||
D. Madison 4 (cc | |||
W. E. Duvall | |||
Site Support Manager Edwin I. Hatch Nuclear Plant Electronic Mail Distribution | |||
Senior Resident Inspector U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA | |||
Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant Oglethorpe Power Corporation Electronic Mail Distribution | |||
Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution | |||
Jerry Ranalli Municipal Electric Authority of Georgia Power Electronic Mail Distribution | |||
Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution | |||
Arthur H. Domby, Esq. | |||
Troutman Sanders Electronic Mail Distribution | |||
James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division | |||
Georgia Department of Natural Resources Electronic Mail Distribution | |||
Chuck Mueller Manager Policy and Radiation Program Georgia Department of Natural Resources Electronic Mail Distribution | |||
Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution | |||
Mr. Steven M. Jackson | |||
Senior Engineer - Power | |||
Reece McAlister | |||
Executive Secretary Georgia Public Service Commission Electronic Mail Distribution | |||
Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA | |||
Amy Whaley | |||
Resident Manager Electronic Mail Distribution | |||
Southern Nuclear Operating Company, Inc. | |||
ATTN: Mr. Steve Grantham Training Manager | |||
Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513 | |||
Letter to Dennis R. Madison from Terrence Reis dated November 1, 2012. | Letter to Dennis R. Madison from Terrence Reis dated November 1, 2012. | ||
==SUBJECT:== | ==SUBJECT:== | ||
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE | CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR EDWIN I. HATCH NUCLEAR PLANT Distribution: | ||
ORA, RII T. Reis H. Christensen M. Widmann M. Franke K. Schaaf J. Vincent J. Kirby F. Ehrhardt J. McHale Document Control Desk - Licensing RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource}} | |||
Distribution | |||
M. Franke | |||
K. Schaaf J. Vincent J. Kirby F. Ehrhardt | |||
J. McHale Document Control Desk - Licensing RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource}} | |||
Latest revision as of 21:21, 11 January 2025
| ML12307A328 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 11/01/2012 |
| From: | Reis T Division of Reactor Safety II |
| To: | Madison D Southern Nuclear Operating Co |
| References | |
| Download: ML12307A328 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 1, 2012 Mr. Dennis R. Madison Vice President Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR EDWIN I. HATCH NUCLEAR PLANT
Dear Mr. Madison:
In a letter dated July 11, 2012, your staff responded to Regulatory Issue Summary 2012-07 and requested we schedule initial license operator examinations for Edwin I. Hatch Nuclear Plant.
Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:
Plant / Station 2013 2014 Date Applicants Date Applicants Hatch 9/2 16 NR NR NR - None requested On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.
If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.
A supplementary letter will be sent to each stations training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at 404-997-4436.
D. Madison 2
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Terrence Reis, Director Division of Reactor Safety Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5 cc: (See page 3)
xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA RA NAME SCHAAF WIDMANN FRANKE CHRISTENSEN DATE 10/25/2012 11/1/2012 11/1/2012 11/1/2012 11/ /2012 11/ /2012 11/ /2012 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
D. Madison 3
cc:
C. Russ Dedrickson Fleet Support Supervisor Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution David R. Vineyard Plant Manager Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Todd L. Youngblood Vice President Fleet Oversight Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Leigh Perry SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution D. G. Bost Chief Nuclear Officer Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution T. A. Lynch Vice President Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution B. D. McKinney, Jr.
Regulatory Response Manager Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Bradley J. Adams Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr.
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution (cc contd - See page 4)
D. Madison 4
(cc contd)
Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution W. E. Duvall Site Support Manager Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA 31513 Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant Oglethorpe Power Corporation Electronic Mail Distribution Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution Jerry Ranalli Municipal Electric Authority of Georgia Power Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution Arthur H. Domby, Esq.
Troutman Sanders Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Chuck Mueller Manager Policy and Radiation Program Georgia Department of Natural Resources Electronic Mail Distribution Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513 Amy Whaley Resident Manager Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
ATTN: Mr. Steve Grantham Training Manager Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
Letter to Dennis R. Madison from Terrence Reis dated November 1, 2012.
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR EDWIN I. HATCH NUCLEAR PLANT Distribution:
ORA, RII T. Reis H. Christensen M. Widmann M. Franke K. Schaaf J. Vincent J. Kirby F. Ehrhardt J. McHale Document Control Desk - Licensing RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource