ML13331A064: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 November 26, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.
-2713   November 26, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.
Glen Allen, VA 23060-6711  
Glen Allen, VA 23060
-6711


==SUBJECT:==
==SUBJECT:==
INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL
INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL - MILLSTONE UNIT 3  
- MILLSTONE UNIT 3 Dear Mr. Heacock
:  The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3
.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to M r. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, "Operator Licensing Examinations Standards for Power Reactors," Revision 9, Supplement 1, during the week of December 9, 2013. The NRC staff will administer the operating tests during the week of December 2, 2013. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review
, I have concluded that the examination meets the guidelines of NUREG
-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG
-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337
-5306. Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.


Sincerely, /RA/ Donald E. Jackson , Chief Operations Branch Division of Reactor Safety Docket No. 50
==Dear Mr. Heacock:==
-423 License No. NPF
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3.
-49 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
Glen Allen, VA 23060
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, Revision 9, Supplement 1, during the week of December 9, 2013. The NRC staff will administer the operating tests during the week of December 2, 2013.
-6711
This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.
Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely,  
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-423 License No. NPF-49
 
Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.
Glen Allen, VA 23060-6711  


==SUBJECT:==
==SUBJECT:==
INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL MILLSTONE UNIT 3 Dear Mr. Heacock
INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL MILLSTONE UNIT 3  
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3
 
.
==Dear Mr. Heacock:==
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to M r. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
-1021, "Operator Licensing Examinations Standards for Power Reactors," Revision 9, Supplement 1, during the week of December 9 , 2013. The NRC staff will administer the operating tests during the week of December 2, 2013. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, Revision 9, Supplement 1, during the week of December 9, 2013. The NRC staff will administer the operating tests during the week of December 2, 2013.
-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337
This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.
-5306.
Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Sincerely, /RA/ Donald E. Jackson, Chief Operations Branch Division of Reactor Safety
Sincerely,  
 
/RA/
Docket No. 50
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-423 License No. NPF-49 cc: via ListServ  
-423 License No. NPF
-49 cc: via ListServ
 
D. Heacock 2  Distribution: via email:
W. Dean, RA D. Lew, DRA D. Roberts, DRP M. Scott, DRP R. Lorson, DRS J. Trapp, DRS D. Jackson, DRS R. McKinley, DRP S. Shaffer, DRP E. Keighley, DRP J. DeBoer, DRP J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI J. Krafty, DRP, RI C. Kowalyshyn, DRP, AA B. Rini, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1
-1 Resource ROPreports Resource Region I Docket Room (with concurrences)
DRS Master Exam File (C. Bixler) (w/concurrences)
P. Presby, Chief Examiner, DRS


DOCUMENT NAME:
D. Heacock 2
G:\DRS\Operations Branch
Distribution: via email:
\PRESBY\Exam FY14-MS3 Dec 13 (U01874)\ExamApproval
W. Dean, RA D. Lew, DRA D. Roberts, DRP M. Scott, DRP R. Lorson, DRS J. Trapp, DRS D. Jackson, DRS R. McKinley, DRP S. Shaffer, DRP E. Keighley, DRP J. DeBoer, DRP J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI J. Krafty, DRP, RI C. Kowalyshyn, DRP, AA B. Rini, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPreports Resource Region I Docket Room (with concurrences)
-W-O-Ltr.docx ADAMS PKG: ML13164A263 ADAMS ACCESSION NO.: ML13331A064 SUNSI Review Non-Sensitive Sensitive   Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB   NAME PPresby/PP CBixler/CB DJackson/DJ   DATE 11/26/2013 11/26/2013 11/26/2013   OFFICIAL RECORD CO PY}}
DRS Master Exam File (C. Bixler)
(w/concurrences)
P. Presby, Chief Examiner, DRS DOCUMENT NAME: G:\\DRS\\Operations Branch\\PRESBY\\Exam FY14-MS3 Dec 13 (U01874)\\ExamApproval-W-O-Ltr.docx ADAMS PKG: ML13164A263 ADAMS ACCESSION NO.: ML13331A064 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME PPresby/PP CBixler/CB DJackson/DJ DATE 11/26/2013 11/26/2013 11/26/2013 OFFICIAL RECORD COPY}}

Latest revision as of 01:06, 11 January 2025

Initial Operator Licensing Operating Test and Written Exam Approval Millstone 3
ML13331A064
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/26/2013
From: Diane Jackson
Operations Branch I
To: Heacock D
Dominion Resources
Jackson D
Shared Package
ML13164A263 List:
References
Download: ML13331A064 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 November 26, 2013 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT:

INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL - MILLSTONE UNIT 3

Dear Mr. Heacock:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, Revision 9, Supplement 1, during the week of December 9, 2013. The NRC staff will administer the operating tests during the week of December 2, 2013.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-423 License No. NPF-49

Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT:

INITIAL OPERATOR LICENSING OPERATING TEST AND WRITTEN EXAMINATION APPROVAL MILLSTONE UNIT 3

Dear Mr. Heacock:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Millstone Unit 3.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. J. Palmer, Director of Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with NUREG-1021, Operator Licensing Examinations Standards for Power Reactors, Revision 9, Supplement 1, during the week of December 9, 2013. The NRC staff will administer the operating tests during the week of December 2, 2013.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

Please contact your Chief Examiner, Mr. P. Presby, at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/

Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-423 License No. NPF-49 cc: via ListServ

D. Heacock 2

Distribution: via email:

W. Dean, RA D. Lew, DRA D. Roberts, DRP M. Scott, DRP R. Lorson, DRS J. Trapp, DRS D. Jackson, DRS R. McKinley, DRP S. Shaffer, DRP E. Keighley, DRP J. DeBoer, DRP J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI J. Krafty, DRP, RI C. Kowalyshyn, DRP, AA B. Rini, RI OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPreports Resource Region I Docket Room (with concurrences)

DRS Master Exam File (C. Bixler)

(w/concurrences)

P. Presby, Chief Examiner, DRS DOCUMENT NAME: G:\\DRS\\Operations Branch\\PRESBY\\Exam FY14-MS3 Dec 13 (U01874)\\ExamApproval-W-O-Ltr.docx ADAMS PKG: ML13164A263 ADAMS ACCESSION NO.: ML13331A064 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME PPresby/PP CBixler/CB DJackson/DJ DATE 11/26/2013 11/26/2013 11/26/2013 OFFICIAL RECORD COPY