{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
REGION IV 1600 E. LAMAR BLVD.
REGION IV  
ARLINGTON, TX
1600 E. LAMAR BLVD.  
  76011-4511   March 4, 2014
ARLINGTON, TX 76011-4511  
  Lou Cortopassi, Site Vice President  
Omaha Public Power District
Fort Calhoun Station FC
March 4, 2014  
-2-4  P.O. Box 550
Lou Cortopassi, Site Vice President
Omaha Public Power District  
Fort Calhoun Station FC-2-4   
P.O. Box 550  
Fort Calhoun, NE  68023-0550
SUBJECT:
FORT CALHOUN STATION - REVISION TO NOTIFICATION OF NRC INITIAL
OPERATOR LICENSING EXAMINATION 05000285/2014301
Dear Mr. Cortopassi:
On May 16, 2013, a notification letter was sent to Fort Calhoun Station documenting the
arrangements for the licensing examination during the week of May 19, 2014 (Accession
Number ML13137A194).  Members of the site examination development staff and NRC regional
staff have reviewed this letter recently.  The result is that several of the dates associated with
examination material submittals needed to be revised.  Therefore, this letter serves to document
the revised dates, as well as the revised assignment of Chief Examiner.  These revisions are
based on discussions between Messrs. Dennis Dryden, Senior Operations Training Specialist,
Brian Larson, Chief Examiner, and Sean Hedger, Examiner, during the period from January 28
to February 24, 2014.
To meet the schedule of starting the examination on May 19, 2014, the operating tests and
supporting reference materials identified in Attachment 3 to ES-201 will be due by 
March 31, 2014.  The written examination and supporting reference materials will be due by 
April 7, 2014.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations 
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use.  We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked.  Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled.  In addition, your support for on-site validation of the
examinations is required during the week of April 14, 2014.  The Chief Examiner assigned to the
examination is Steve Garchow.  All other due dates and requests documented in the 
May 16, 2013 letter remain the same.
   
   
Fort Calhoun, NE
  68023-0550  SUBJECT: FORT CALHOUN STATION
- REVISION TO NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000
285/2014 30 1 
Dear Mr. Cortopassi
:  On May 16, 2013, a notification letter was sent to Fort Calhoun Station documenting the


arrangements
L. Cortopassi
  for the licensing examination during the week of May 19, 2014 (Accession Number ML13137A194).  Members of the site examination development staff and NRC regional
- 2 -
staff have reviewed this letter recently.  The result is that several of the dates associated with
   
examination material submittals needed to be revisedTherefore, this letter serves to document the revised dates, as well as the revised assignment of Chief Examiner. These revisions are based on discussions between Messrs. Dennis Dryden, Senior Operations Training Specialist, Brian Larson, Chief Examiner, and Sean Hedger, Examiner, during the period from January 28
This letter contains information collections that are subject to the Paperwork Reduction Act 
to February 24, 2014.
of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under
 
approval number 3150-0018.  The public reporting burden for this collection of information is  
To meet the schedule
estimated to average 50 hours per response, including the time for reviewing instructions,
  of starting the examination on May 19, 2014, t he operating tests and supporting reference
gathering and maintaining the data needed, and completing and reviewing the collection of
  materials identified in Attachment
informationSend comments regarding this burden estimate or any other aspect of these
3 to ES-201 will be due by  
information collections, including suggestions for reducing the burden, to the Records and
  March 31, 2014The written examination and supporting reference materials will be due by
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,  
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter.  Mr. Garchow has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426,
or myself at 817-200-1159.
Sincerely, 
/RA/
Vincent Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket:  50-285
License: DPR-40
 
L. Cortopassi
- 3 -  
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
Acting Deputy Director (Geoffrey.Miller@nrc.gov)
Acting DRS Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Michael.Hay@nrc.gov)
Senior Project Engineer, DRP/F (Nick.Taylor@nrc.gov)
Project Engineer, DRP/F (Chris.Smith@nrc.gov)
FCS Administrative Assistant (Janise.Schwee@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
NRR Project Manager (Lynnea.Wilkins@nrc.gov)
NRR Project Manager (Joseph.Sebrosky@nrc.gov)
RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
TSB Technical Assistant (Loretta.Williams@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
OEWEB Resource (Sue.Bogle@nrc.gov)
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
MC 0350 Panel Chairman (Anton.Vegel@nrc.gov)
MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov)
MC 0350 Panel Member (Michael.Balazik@nrc.gov)
MC 0350 Panel Member (Michael.Markley@nrc.gov)
   
R:\\Reactors\\_FCS\\2014lFCS2014301CNL LT.pdf
ADAMS:    No      Yes
SUNSI Review Complete
Reviewer Initials:  VG
  Publicly Available
  Non-Sensitive
  Non-publicly Available
  Sensitive
OE:OB
C:OB
SHedger
VGaddy
/RA/
/RA/
3/4/14
3/4/14
   
   
   
April 7, 2014.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outlines, examinations, and tests
before they are submitted to the NRC for review and approval. All materials shall be complete
and read y-to-use.  We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked.  Any delay in receiving the required examination
s and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations
to be rescheduled.
  In addition, your support for on
-site validation of the examinations is required during the week of April 14, 2014.  The Chief Examiner assigned to the examination is Steve Garchow.  All other due dates and requests documented in the
May 16, 2013 letter remain the same.
 
   
L. Cortopassi
- 2 -  This letter contains information collections that are subject to the Paperwork Reduction Act  of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under
approval number
3150-0018.  The public reporting burden for
this collection of information is estimated to average
50 hours per response, including
the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T
-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will b
e available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access
and Management System (ADAMS).  ADAMS is accessible
from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading
-rm/adams.html. 
Thank you for your cooperation in this matter.
Mr. Garchow has been advised of the policies
and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Garchow at 817-200-1426 ,  or myself at 817
-200-1 159.        Sincerely,  /RA/        Vince nt Gaddy, Chief Operations Branch
      Division of Reactor Safety
 
Docket:  50
-285 License:  DPR
-40 
L. Cortopassi
- 3 -  Electronic distribution by RIV
: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov
) DRP Deputy Director (Troy.Pruett@nrc.gov)
Acting Deputy Director (Geoffrey.Miller@nrc.gov)
Acting DRS Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Michael.Hay@nrc.gov)
Senior Project Engineer, DRP/F (Nick.Taylor@nrc.gov)
Project Engineer, DRP/F (Chris.Smith@nrc.gov)
FCS Administrative Assistant (Janise.Schwee@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
NRR Project
Manager (Lynnea.Wilkins@nrc.gov)
NRR Project Manager (Joseph.Sebrosky@nrc.gov)
RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov
) TSB Technical Assistant (Loretta.Williams@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
OEWEB Resource (Sue.Bogle@nrc.gov)
RIV/ETA: OEDO
(Ernesto.Quinones@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
   
   
MC 0350 Panel Chairman (Anton.Vegel@nrc.gov)
OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov)
MC 0350 Panel Member (Michael.Balazik@nrc.gov)
MC 0350 Panel Member (Michael.Markley@nrc.gov)
 
 
R:\Reactors\_FCS\201 4lFCS2014301CNL LT.pdf
ADAMS:    No      Yes  SUNSI Review Complete
Reviewer Initials: 
VG    Publicly Available  Non-Sensitive    Non-publicly Available
  Sensitive OE:OB C: OB    SHedger VGaddy    /RA/ /RA/    3/4/14 3/4/14    OFFICIAL RECORD COPY  
  T=Telephone          E=E
-mail        F=Fax
}}
}}

Latest revision as of 22:54, 10 January 2025

IR 05000285-14-301, 02/16/2013, Fort Calhoun, Revision to Notification of NRC Initial Operator
ML14063A624
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/04/2014
From: Vincent Gaddy
Operations Branch IV
To: Cortopassi L
Omaha Public Power District
Gaddy V
References
50-285/14-301
Download: ML14063A624 (3)


See also: IR 05000285/2014301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511

March 4, 2014

Lou Cortopassi, Site Vice President

Omaha Public Power District

Fort Calhoun Station FC-2-4

P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION - REVISION TO NOTIFICATION OF NRC INITIAL

OPERATOR LICENSING EXAMINATION 05000285/2014301

Dear Mr. Cortopassi:

On May 16, 2013, a notification letter was sent to Fort Calhoun Station documenting the

arrangements for the licensing examination during the week of May 19, 2014 (Accession

Number ML13137A194). Members of the site examination development staff and NRC regional

staff have reviewed this letter recently. The result is that several of the dates associated with

examination material submittals needed to be revised. Therefore, this letter serves to document

the revised dates, as well as the revised assignment of Chief Examiner. These revisions are

based on discussions between Messrs. Dennis Dryden, Senior Operations Training Specialist,

Brian Larson, Chief Examiner, and Sean Hedger, Examiner, during the period from January 28

to February 24, 2014.

To meet the schedule of starting the examination on May 19, 2014, the operating tests and

supporting reference materials identified in Attachment 3 to ES-201 will be due by

March 31, 2014. The written examination and supporting reference materials will be due by

April 7, 2014. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of April 14, 2014. The Chief Examiner assigned to the

examination is Steve Garchow. All other due dates and requests documented in the

May 16, 2013 letter remain the same.

L. Cortopassi

- 2 -

This letter contains information collections that are subject to the Paperwork Reduction Act

of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018. The public reporting burden for this collection of information is

estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments regarding this burden estimate or any other aspect of these

information collections, including suggestions for reducing the burden, to the Records and

FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Garchow has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426,

or myself at 817-200-1159.

Sincerely,

/RA/

Vincent Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-285

License: DPR-40

L. Cortopassi

- 3 -

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Steven.Reynolds@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Acting Deputy Director (Geoffrey.Miller@nrc.gov)

Acting DRS Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (John.Kirkland@nrc.gov)

Resident Inspector (Jacob.Wingebach@nrc.gov)

Branch Chief, DRP/F (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/F (Nick.Taylor@nrc.gov)

Project Engineer, DRP/F (Chris.Smith@nrc.gov)

FCS Administrative Assistant (Janise.Schwee@nrc.gov)

RIV Public Affairs Officer (Victor.Dricks@nrc.gov)

RIV Public Affairs Officer (Lara.Uselding@nrc.gov)

NRR Project Manager (Lynnea.Wilkins@nrc.gov)

NRR Project Manager (Joseph.Sebrosky@nrc.gov)

RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RIV RITS Coordinator (Marisa.Herrera@nrc.gov)

TSB Technical Assistant (Loretta.Williams@nrc.gov)

RIV Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

OEWEB Resource (Sue.Bogle@nrc.gov)

RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

MC 0350 Panel Chairman (Anton.Vegel@nrc.gov)

MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov)

MC 0350 Panel Member (Michael.Balazik@nrc.gov)

MC 0350 Panel Member (Michael.Markley@nrc.gov)

R:\\Reactors\\_FCS\\2014lFCS2014301CNL LT.pdf

ADAMS: No Yes

SUNSI Review Complete

Reviewer Initials: VG

Publicly Available

Non-Sensitive

Non-publicly Available

Sensitive

OE:OB

C:OB

SHedger

VGaddy

/RA/

/RA/

3/4/14

3/4/14

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax