IR 05000259/2014301: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 21: | Line 21: | ||
==SUBJECT:== | ==SUBJECT:== | ||
BROWNS FERRY NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000259/2014301, 05000260/2014301, AND | BROWNS FERRY NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000259/2014301, 05000260/2014301, AND 05000296/2014301 | ||
05000296/2014301 | |||
==Dear Mr. Shea:== | ==Dear Mr. Shea:== | ||
| Line 33: | Line 31: | ||
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1. | The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1. | ||
In accordance with 10 CFR 2.390 of the | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4662 | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety | |||
Eugene F. Guthrie, Chief | |||
Operations Branch 2 | |||
Division of Reactor Safety | |||
Docket Nos: 50-259, 50-260, 50-296 License Nos: DPR-33, DPR-52, DPR-68 | Docket Nos: 50-259, 50-260, 50-296 License Nos: DPR-33, DPR-52, DPR-68 | ||
===Enclosures:=== | ===Enclosures:=== | ||
1. Report Details | 1. Report Details 2. Simulator Fidelity Report | ||
REGION II== | |||
Docket No.: | |||
50-259, 50-260, and 50-296 | |||
License No.: | |||
DPR-33, DPR-52, and DPR-68 | |||
Report No.: | |||
05000259/2014301, 05000260/2014301, and 05000296/2014301 | |||
Licensee: | |||
Tennessee Valley Authority (TVA), LLC | |||
Facility: | |||
Browns Ferry Nuclear Plant, Units 1, 2, and 3 | |||
Location: | |||
Athens, AL 35611 | |||
Dates: | |||
Operating Test - April 28 - May 1, 2014 | |||
Written Examination - May 9, 2014 | |||
Examiners: | |||
Bruno Caballero, Chief Examiner, Senior Operations Engineer | |||
David Lanyi, Operations Engineer | |||
Gerard Laska, Senior Operations Examiner Joseph Viera, Examiner in training | |||
Approved by: | |||
Eugene F. Guthrie, Chief | |||
Operations Branch 2 | |||
Division of Reactor Safety | |||
SUMMARY OF FINDINGS | |||
ER 05000259/2014301, 05000260/2014301, 05000296/2014301; operating test April 28 - May 1, 2014 & written exam May 9, 2014; Browns Ferry Nuclear Plant, Operator License Examinations. | ER 05000259/2014301, 05000260/2014301, 05000296/2014301; operating test April 28 - May 1, 2014 & written exam May 9, 2014; Browns Ferry Nuclear Plant, Operator License Examinations. | ||
| Line 70: | Line 98: | ||
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable. | Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable. | ||
Members of the Browns Ferry Nuclear Plant staff developed both the operating tests and the | Members of the Browns Ferry Nuclear Plant staff developed both the operating tests and the written examination. | ||
written examination. | |||
The NRC administered the operating tests during the period April 28 - May 1, 2014. Members of the Browns Ferry Nuclear Plant training staff administered the written examination on May 9, 2014. All applicants passed the operating test and/or written examination, as applicable. All applicants were issued licenses commensurate | The NRC administered the operating tests during the period April 28 - May 1, 2014. Members of the Browns Ferry Nuclear Plant training staff administered the written examination on May 9, 2014. All applicants passed the operating test and/or written examination, as applicable. All applicants were issued licenses commensurate with the level of examination administered. | ||
There were no post-examination comments. | There were no post-examination comments. | ||
| Line 80: | Line 106: | ||
No findings were identified. | No findings were identified. | ||
REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope | REPORT DETAILS | ||
4. | |||
OTHER ACTIVITIES | |||
4OA5 Operator Licensing Examinations | |||
a. | |||
Inspection Scope | |||
evaluated the submitted written examination questions (Reactor Operator (RO) and Senior Reactor Operator (SRO) questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved Knowledge/Ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria in Revision 9, Supplement 1, of NUREG-1021, | The NRC evaluated the submitted operating test by combining the scenario events and Job Performance Measures (JPMs) in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (Reactor Operator (RO) and Senior Reactor Operator (SRO) questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved Knowledge/Ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria in Revision 9, Supplement 1, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors. | ||
The NRC reviewed the | The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests. | ||
The NRC administered the operating tests during the period April 28 - May 1, 2014. The NRC examiners evaluated five RO applicants and two SRO applicants using the guidelines contained in NUREG-1021. Members of the Browns Ferry Nuclear Plant training staff administered the written examination on May 9, 2014. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Browns Ferry Nuclear Plant, met the requirements specified in 10 CFR Part 55, | The NRC administered the operating tests during the period April 28 - May 1, 2014. | ||
The NRC examiners evaluated five RO applicants and two SRO applicants using the guidelines contained in NUREG-1021. Members of the Browns Ferry Nuclear Plant training staff administered the written examination on May 9, 2014. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Browns Ferry Nuclear Plant, met the requirements specified in 10 CFR Part 55, Operators Licenses. | |||
The NRC evaluated the performance or fidelity of the simulation facility during the preparation or conduct of the operating tests. | The NRC evaluated the performance or fidelity of the simulation facility during the preparation or conduct of the operating tests. | ||
b | b. | ||
Findings | |||
No findings were identified. | |||
Members of the Browns Ferry Nuclear Plant training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials. The NRC determined, using the acceptance criteria in NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination. | |||
No issues related to examination security were identified during preparation and administration of the examination. | |||
Five RO applicants and two SRO applicants passed both the operating test and written examination. Two SRO applicants, who previously passed an operating test, passed the written examination. Five RO applicants and four SRO applicants were issued licenses. | Five RO applicants and two SRO applicants passed both the operating test and written examination. Two SRO applicants, who previously passed an operating test, passed the written examination. Five RO applicants and four SRO applicants were issued licenses. | ||
| Line 101: | Line 142: | ||
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training. | Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training. | ||
The licensee did not submit any post-examination comments. A copy of the final written examination and answer key, with all changes incorporated, may be accessed not earlier than May 5, 2016, in the ADAMS system (ADAMS Accession Number(s) ML14141A519 and ML14142A161. | The licensee did not submit any post-examination comments. A copy of the final written examination and answer key, with all changes incorporated, may be accessed not earlier than May 5, 2016, in the ADAMS system (ADAMS Accession Number(s) | ||
ML14141A519 and ML14142A161. | |||
4OA6 Meetings, Including Exit | 4OA6 Meetings, Including Exit | ||
Exit Meeting Summary | |||
Daniel L. Hughes, Senior Manager, | On May 1, 2014, the NRC examination team discussed generic issues associated with the operating test with Daniel L. Hughes, Senior Operations Manager, and members of the Browns Ferry Nuclear Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified. | ||
KEY POINTS OF CONTACT | |||
Licensee personnel | |||
Daniel L. Hughes, Senior Manager, Operations Steve Austin, Site Licensing Engineer Eric Bates, Site Licensing Engineer Chris Vaughn, Operations Training Manager Donald C. Binkley, Jr., Operations Initial Training Supervisor Douglas Hakenewerth, Operations Facility Representative | |||
None Enclosure 2 SIMULATOR FIDELITY REPORT Facility Licensee: Browns Ferry Nuclear Plant | NRC personnel | ||
None | |||
Enclosure 2 SIMULATOR FIDELITY REPORT | |||
Facility Licensee: Browns Ferry Nuclear Plant | |||
Facility Docket No.: 50-259, 50-260, 50-296 | Facility Docket No.: 50-259, 50-260, 50-296 | ||
| Line 125: | Line 173: | ||
While conducting the simulator portion of the operating test, examiners observed the following: | While conducting the simulator portion of the operating test, examiners observed the following: | ||
Item Description | Item Description | ||
PER 846183 | |||
The Unit 3 simulator lighting was darker than the actual Unit 3 control room lighting. | |||
DCR B1529 The LPCI MG Set Removal Modification was not incorporated on the Unit 3 simulator; e.g., simulator annunciator window 9-8C, W24 (480 V RMOV Bd 3B or 3E Transfer) was not applicable to the actual Unit 3 control room. | DCR B1529 The LPCI MG Set Removal Modification was not incorporated on the Unit 3 simulator; e.g., simulator annunciator window 9-8C, W24 (480 V RMOV Bd 3B or 3E Transfer) was not applicable to the actual Unit 3 control room. | ||
PER 879775 | PER 879775 PIP-02-03 (BFN Electrical Distribution Diagram) was included in both simulators even though the diagram did not reflect the LPCI MG Set Removal modification. | ||
}} | }} | ||
Latest revision as of 20:28, 10 January 2025
| ML14156A462 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 06/05/2014 |
| From: | Eugene Guthrie Division of Reactor Safety II |
| To: | James Shea Tennessee Valley Authority |
| References | |
| 50-259/14-301, 50-260/14-301, 50-296/14-301 | |
| Download: ML14156A462 (9) | |
Text
June 5, 2014
SUBJECT:
BROWNS FERRY NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000259/2014301, 05000260/2014301, AND 05000296/2014301
Dear Mr. Shea:
During the period April 28 - May 1, 2014, the Nuclear Regulatory Commission (NRC)
administered operating tests to employees of your company who had applied for licenses to operate the Browns Ferry Nuclear Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on May 9, 2014.
All applicants passed both the operating test and written examination. There were no post examination comments. A Simulator Fidelity Report is included in this report as Enclosure 2.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4662
Sincerely,
/RA/
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos: 50-259, 50-260, 50-296 License Nos: DPR-33, DPR-52, DPR-68
Enclosures:
1. Report Details 2. Simulator Fidelity Report
REGION II==
Docket No.:
50-259, 50-260, and 50-296
License No.:
Report No.:
05000259/2014301, 05000260/2014301, and 05000296/2014301
Licensee:
Tennessee Valley Authority (TVA), LLC
Facility:
Browns Ferry Nuclear Plant, Units 1, 2, and 3
Location:
Athens, AL 35611
Dates:
Operating Test - April 28 - May 1, 2014
Written Examination - May 9, 2014
Examiners:
Bruno Caballero, Chief Examiner, Senior Operations Engineer
David Lanyi, Operations Engineer
Gerard Laska, Senior Operations Examiner Joseph Viera, Examiner in training
Approved by:
Eugene F. Guthrie, Chief
Operations Branch 2
Division of Reactor Safety
SUMMARY OF FINDINGS
ER 05000259/2014301, 05000260/2014301, 05000296/2014301; operating test April 28 - May 1, 2014 & written exam May 9, 2014; Browns Ferry Nuclear Plant, Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the Browns Ferry Nuclear Plant staff developed both the operating tests and the written examination.
The NRC administered the operating tests during the period April 28 - May 1, 2014. Members of the Browns Ferry Nuclear Plant training staff administered the written examination on May 9, 2014. All applicants passed the operating test and/or written examination, as applicable. All applicants were issued licenses commensurate with the level of examination administered.
There were no post-examination comments.
No findings were identified.
REPORT DETAILS
4.
OTHER ACTIVITIES
4OA5 Operator Licensing Examinations
a.
Inspection Scope
The NRC evaluated the submitted operating test by combining the scenario events and Job Performance Measures (JPMs) in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (Reactor Operator (RO) and Senior Reactor Operator (SRO) questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved Knowledge/Ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria in Revision 9, Supplement 1, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC administered the operating tests during the period April 28 - May 1, 2014.
The NRC examiners evaluated five RO applicants and two SRO applicants using the guidelines contained in NUREG-1021. Members of the Browns Ferry Nuclear Plant training staff administered the written examination on May 9, 2014. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Browns Ferry Nuclear Plant, met the requirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance or fidelity of the simulation facility during the preparation or conduct of the operating tests.
b.
Findings
No findings were identified.
Members of the Browns Ferry Nuclear Plant training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials. The NRC determined, using the acceptance criteria in NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.
No issues related to examination security were identified during preparation and administration of the examination.
Five RO applicants and two SRO applicants passed both the operating test and written examination. Two SRO applicants, who previously passed an operating test, passed the written examination. Five RO applicants and four SRO applicants were issued licenses.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee did not submit any post-examination comments. A copy of the final written examination and answer key, with all changes incorporated, may be accessed not earlier than May 5, 2016, in the ADAMS system (ADAMS Accession Number(s)
ML14141A519 and ML14142A161.
4OA6 Meetings, Including Exit
Exit Meeting Summary
On May 1, 2014, the NRC examination team discussed generic issues associated with the operating test with Daniel L. Hughes, Senior Operations Manager, and members of the Browns Ferry Nuclear Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT
Licensee personnel
Daniel L. Hughes, Senior Manager, Operations Steve Austin, Site Licensing Engineer Eric Bates, Site Licensing Engineer Chris Vaughn, Operations Training Manager Donald C. Binkley, Jr., Operations Initial Training Supervisor Douglas Hakenewerth, Operations Facility Representative
NRC personnel
None
Enclosure 2 SIMULATOR FIDELITY REPORT
Facility Licensee: Browns Ferry Nuclear Plant
Facility Docket No.: 50-259, 50-260, 50-296
Operating Test Administered: April 28 - May 1, 2014
This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, examiners observed the following:
Item Description
PER 846183
The Unit 3 simulator lighting was darker than the actual Unit 3 control room lighting.
DCR B1529 The LPCI MG Set Removal Modification was not incorporated on the Unit 3 simulator; e.g., simulator annunciator window 9-8C, W24 (480 V RMOV Bd 3B or 3E Transfer) was not applicable to the actual Unit 3 control room.
PER 879775 PIP-02-03 (BFN Electrical Distribution Diagram) was included in both simulators even though the diagram did not reflect the LPCI MG Set Removal modification.