NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014401 AND | NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014401 AND 05000499/2014401) | ||
05000499/2014401) | |||
==Dear Mr. Koehl:== | ==Dear Mr. Koehl:== | ||
On February 17, 2015, the NRC completed its end-of-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the | On February 17, 2015, the NRC completed its end-of-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility. | ||
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2016. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will | The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2016. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility. | ||
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. | While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. | ||
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking, and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). | UNITED STATES NUCLEAR REGULATORY COMMISSION | ||
==REGION IV== | |||
1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking, and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). | |||
Please contact me at (817) 200-1527 with any questions you have regarding this letter. | Please contact me at (817) 200-1527 with any questions you have regarding this letter. | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety | Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety | ||
Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Enclosure: | Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 | ||
Enclosure: | |||
Inspection Plan | Inspection Plan | ||
ML15057A661 Letter w/encl: SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4 Non-Public A.3 Letter w/o encl: | ML15057A661 Letter w/encl: | ||
SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE C:PSB1 C:DRP/B C:PSB1 | SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: | ||
MD 3.4 Non-Public A.3 Letter w/o encl: | |||
SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: | |||
NRC-002 OFFICE C:PSB1 C:DRP/B C:PSB1 | |||
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014401 AND 05000499/2014401) | NAME MHaire/dch NO'Keefe MHaire | ||
Electronic distribution by RIV w/enclosure | |||
SIGNATURE | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
DATE 2/25/15 2/25/15 3/2/15 Letter to Dennis from Mark S. Haire, dated March 4, 2015 | |||
SUBJECT: | |||
NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014401 AND 05000499/2014401) | |||
Electronic distribution by RIV w/enclosure: | |||
Security Specialist/NSIR (Eric.Wharton@nrc.gov) | |||
Security Specialist/NSIR (Niry.Simonian@nrc.gov) | |||
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) | Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) | ||
Security Specialist/NSIR (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov) Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov) | Security Specialist/NSIR (Douglas.Garner@nrc.gov) | ||
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) Senior Resident Inspector (Alfred.Sanchez@nrc.gov) | Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov) | ||
Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov) | |||
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) | |||
Senior Resident Inspector (Alfred.Sanchez@nrc.gov) | |||
Electronic distribution by RIV w/o enclosure | Electronic distribution by RIV w/o enclosure: | ||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | ||
DRP Director (Troy.Pruett@nrc.gov) | DRP Director (Troy.Pruett@nrc.gov) | ||
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) | Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov) | ||
DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Alfred.Sanchez@nrc.gov) | DRS Director (Anton.Vegel@nrc.gov) | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Alfred.Sanchez@nrc.gov) | |||
Resident Inspector (Nicholas.Hernandez@nrc.gov) | Resident Inspector (Nicholas.Hernandez@nrc.gov) | ||
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) | Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) | ||
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) Project Engineer, DRP/B (Steven.Janicki@nrc.gov) | Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | ||
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov) | |||
Project Engineer, DRP/B (Steven.Janicki@nrc.gov) | |||
STP Administrative Assistant (Lynn.Wright@nrc.gov) | STP Administrative Assistant (Lynn.Wright@nrc.gov) | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) | Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
Public Affairs Officer (Lara.Uselding@nrc.gov) | Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
Project Manager (Lisa.Regner@nrc.gov) | |||
Project Manager (Lisa.Regner@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) | Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) | ||
Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | Technical Support Assistant (Loretta.Williams@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Michael.Waters@nrc.gov) | RIV/ETA: OEDO (Michael.Waters@nrc.gov) | ||
ROPReports | ROPReports | ||
}} | }} | ||
Latest revision as of 14:07, 10 January 2025
| ML15057A661 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/04/2015 |
| From: | Mark Haire Plant Support Branch-1 |
| To: | Koehl D South Texas |
| References | |
| IR 2014401 | |
| Download: ML15057A661 (4) | |
Text
March 4, 2015
SUBJECT:
NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014401 AND 05000499/2014401)
Dear Mr. Koehl:
On February 17, 2015, the NRC completed its end-of-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2016. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking, and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80
Enclosure:
Inspection Plan
ML15057A661 Letter w/encl:
SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
MD 3.4 Non-Public A.3 Letter w/o encl:
SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
NRC-002 OFFICE C:PSB1 C:DRP/B C:PSB1
NAME MHaire/dch NO'Keefe MHaire
SIGNATURE
/RA/
/RA/
/RA/
DATE 2/25/15 2/25/15 3/2/15 Letter to Dennis from Mark S. Haire, dated March 4, 2015
SUBJECT:
NON-PUBLIC SECURITY INSPECTION PLAN FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBERS 05000498/2014401 AND 05000499/2014401)
Electronic distribution by RIV w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB2 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Electronic distribution by RIV w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Nicholas.Hernandez@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)