ML15126A114: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:SAFEGUARDS INFORMATION
{{#Wiki_filter:SAFEGUARDS INFORMATION  
  SAFEGUARDS INFORMATION
 
SAFEGUARDS INFORMATION  
  May 28, 2015  
   
May 28, 2015  
   
   
   
   
   
   
Mr. Michael Kiley, Site Vice President   
Mr. Michael Kiley, Site Vice President   
 
Turkey Point Nuclear Generating Station  
Turkey Point Nuclear Generating Station Florida Power & Light Company   
Florida Power & Light Company   
9760 SW 344 Street  
9760 SW 344 Street  
Florida City, FL  33035  
Florida City, FL  33035  
   
   
SUBJECT: TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 - NRC SECURITY INSPECTION REPORT 05000250/2015201 AND  
SUBJECT:  
TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 - NRC  
SECURITY INSPECTION REPORT 05000250/2015201 AND  
05000251/2015201  
05000251/2015201  
   
   
Dear Mr. Kiley:  
Dear Mr. Kiley:  
 
On April 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Nuclear Generating Station, Units 3 and 4, and discussed the  
On April 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security  
inspection at your Turkey Point Nuclear Generating Station, Units 3 and 4, and discussed the  
results of this inspection with Mr. Mitch Guth and other members of your staff.  Inspectors  
results of this inspection with Mr. Mitch Guth and other members of your staff.  Inspectors  
documented the results of this inspection in the enclosed inspection report.  
documented the results of this inspection in the enclosed inspection report.  
   
   
NRC inspectors documented one finding of very low security significance (Green) in this report.  This finding involved a violation of NRC requirements.  The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.  
NRC inspectors documented one finding of very low security significance (Green) in this report.   
 
This finding involved a violation of NRC requirements.  The NRC is treating this violation as a  
non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.  
   
   
If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:  Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region
If you contest this violation or the significance of this NCV, you should provide a response within  
II; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission,  
30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear  
Regulatory Commission, ATTN:  Document Control Desk, Washington DC 20555-0001; with  
copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and  
Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission,  
Washington, DC 20555-0001; and the NRC resident inspector at the Turkey Point Nuclear  
Washington, DC 20555-0001; and the NRC resident inspector at the Turkey Point Nuclear  
Generating Station, Units 3 and 4.  
Generating Station, Units 3 and 4.  
 
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your  
If you disagree with a cross-cutting aspect assignment in this report, you should provide a  
response within 30 days of the date of this inspection report, with the basis for your  
disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security,  
disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security,  
and Incident Response; and the NRC resident inspector at the Turkey Point Nuclear Generating  
and Incident Response; and the NRC resident inspector at the Turkey Point Nuclear Generating  
Station, Units 3 and 4.  
Station, Units 3 and 4.  
 
   
   
   
   
   
   
  The enclosure transmitted herewith contains Safeguards Information.  When separated from the enclosure, this transmittal document is decontrolled.
   
SAFEGUARDS INFORMATION
M. Kiley -2-  
  SAFEGUARDS INFORMATION
The enclosure transmitted herewith contains Safeguards Information.  When separated from  
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding,"
the enclosure, this transmittal document is decontrolled.  
of the NRC's "Rules of Practice," a copy of  
 
this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management  
SAFEGUARDS INFORMATION  
System (ADAMS).  ADAMS  
M. Kiley  
is accessible from the NRC  
-2-  
Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).  
  However, the material enclosed herewith contains Safeguards Information as defined by   
SAFEGUARDS INFORMATION  
10 CFR 73.21 "Protection of Safeguards Information; Performance Requirements," and its  
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public  
disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act  of 1954, as amended.  Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS  
Inspections, Exemptions, Request for Withholding, of the NRC's "Rules of Practice," a copy of  
this letter will be available electronically for public inspection in the NRCs Public Document  
Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide  
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC  
Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
   
However, the material enclosed herewith contains Safeguards Information as defined by   
10 CFR 73.21 Protection of Safeguards Information; Performance Requirements, and its  
disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act   
of 1954, as amended.  Therefore, the material in the enclosure will not be made available  
electronically for public inspection in the NRC Public Document Room or from the PARS  
component of NRC's ADAMS.  If you choose to provide a response and Safeguards Information  
component of NRC's ADAMS.  If you choose to provide a response and Safeguards Information  
 
is necessary to provide an acceptable response, please provide the level of protection  
is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.  Otherwise, if Security-Related Information is necessary to provide  
described in 10 CFR 73.21.  Otherwise, if Security-Related Information is necessary to provide  
an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).  In accordance with   
an acceptable response, please mark your entire response Security-Related Information -  
 
Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)  
10 CFR 2.390(b)(1)(ii), the NRC is waiving the  
and follow the instructions for withholding in 10 CFR 2.390(b)(1).  In accordance with   
affidavit requirements for your response.  
10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.  
  Sincerely,  
   
Sincerely,  
   
   
/RA/
   
   
/RA/  Robert C. Johnson, Chief  
Robert C. Johnson, Chief  
 
Security Performance Evaluation Branch  
Security Performance Evaluation Branch  
Division of Security Operations Office of Nuclear Security and Incident Response  
Division of Security Operations  
Office of Nuclear Security and Incident Response  
   
   
Docket Nos. 50-250, 50-251  
Docket Nos. 50-250, 50-251  
License Nos. DPR-31, DPR-41  
License Nos. DPR-31, DPR-41  
 
Nonpublic Enclosure:  Inspection Report 05000250/2015201 and 05000251/2015201  w/Attachments:  Supplemental Information  
Nonpublic Enclosure:  Inspection Report 05000250/2015201 and 05000251/2015201  
  w/Attachments:  Supplemental Information  
   
   
cc w/encl:  Timothy Eck, Security Manager  
cc w/encl:  Timothy Eck, Security Manager  
 
 




   ML15126A114
   ML15126A114  
OFFICE NSIR/DSO NSIR/DSO NSIR/DSO RII NSIR/DSO/SPEB NAME P. Coughlin
OFFICE  
J. Clark D. Johnson B. Desai D. Cardenas for/C. Johnson DATE 5/5/15 5/19/15  5/19/15 5/28/15 5/28/15
NSIR/DSO  
NSIR/DSO  
NSIR/DSO  
RII  
NSIR/DSO/SPEB  
NAME  
P. Coughlin  
J. Clark  
D. Johnson  
B. Desai  
D. Cardenas for/C. Johnson  
DATE  
5/5/15  
5/19/15  
   5/19/15  
5/28/15  
5/28/15
}}
}}

Latest revision as of 12:13, 10 January 2025

IR 05000250/2015201 and 05000251/2015201, on 04,30,2015, Turkey Point Units 3 & 4 Security Baseline Inspection Report Cover Letter
ML15126A114
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/28/2015
From: Rachel Johnson
Division of Security Operations
To: Kiley M
Florida Power & Light Co
Coughlin P
References
IR 2015201
Download: ML15126A114 (3)


See also: IR 05000250/2015201

Text

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

May 28, 2015

Mr. Michael Kiley, Site Vice President

Turkey Point Nuclear Generating Station

Florida Power & Light Company

9760 SW 344 Street

Florida City, FL 33035

SUBJECT:

TURKEY POINT NUCLEAR GENERATING STATION, UNITS 3 AND 4 - NRC

SECURITY INSPECTION REPORT 05000250/2015201 AND

05000251/2015201

Dear Mr. Kiley:

On April 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security

inspection at your Turkey Point Nuclear Generating Station, Units 3 and 4, and discussed the

results of this inspection with Mr. Mitch Guth and other members of your staff. Inspectors

documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a

non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV, you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with

copies to the Regional Administrator, Region II; the Director, Office of Nuclear Security and

Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001; and the NRC resident inspector at the Turkey Point Nuclear

Generating Station, Units 3 and 4.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report, with the basis for your

disagreement, to the Regional Administrator, Region II; the Director, Office of Nuclear Security,

and Incident Response; and the NRC resident inspector at the Turkey Point Nuclear Generating

Station, Units 3 and 4.

The enclosure transmitted herewith contains Safeguards Information. When separated from

the enclosure, this transmittal document is decontrolled.

SAFEGUARDS INFORMATION

M. Kiley

-2-

SAFEGUARDS INFORMATION

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Request for Withholding, of the NRC's "Rules of Practice," a copy of

this letter will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC

Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Safeguards Information as defined by

10 CFR 73.21 Protection of Safeguards Information; Performance Requirements, and its

disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act

of 1954, as amended. Therefore, the material in the enclosure will not be made available

electronically for public inspection in the NRC Public Document Room or from the PARS

component of NRC's ADAMS. If you choose to provide a response and Safeguards Information

is necessary to provide an acceptable response, please provide the level of protection

described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide

an acceptable response, please mark your entire response Security-Related Information -

Withhold from Public Disclosure Under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with

10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Robert C. Johnson, Chief

Security Performance Evaluation Branch

Division of Security Operations

Office of Nuclear Security and Incident Response

Docket Nos. 50-250, 50-251

License Nos. DPR-31, DPR-41

Nonpublic Enclosure: Inspection Report 05000250/2015201 and 05000251/2015201

w/Attachments: Supplemental Information

cc w/encl: Timothy Eck, Security Manager

ML15126A114

OFFICE

NSIR/DSO

NSIR/DSO

NSIR/DSO

RII

NSIR/DSO/SPEB

NAME

P. Coughlin

J. Clark

D. Johnson

B. Desai

D. Cardenas for/C. Johnson

DATE

5/5/15

5/19/15

5/19/15

5/28/15

5/28/15