GNRO-2015/00038, Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:GNRO-2015/00038June11,2015 u.s.NuclearRegulatory CommissionAttn:DocumentControlDeskWashington,DC20555-0001 Entergy Operations, Inc.P.o.Box 756PortGibson,MS 39150 Kevin MulliganSiteVice PresidentGrandGulfNuclearStation Tel.(601)437-7500  
{{#Wiki_filter:~
~Entergy GNRO-2015/00038 June 11, 2015 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Operations, Inc.
P.o. Box 756 Port Gibson, MS 39150 Kevin Mulligan Site Vice President Grand Gulf Nuclear Station Tel. (601) 437-7500


==SUBJECT:==
==SUBJECT:==
==REFERENCES:==
Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 1.
U.S. Nuclear Regulatory Commission Letter, "Requests for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application," dated August 28,2013 (Accession No. ML13227A394) 2.
Grand Gulf Nuclear Station Letter, "Response to Requests for Additional Information (RAI) set 47," dated September 23,2013 in letter GNRO-2013/00069 (Accession No. ML13266A368) 3.
U.S. Nuclear Regulatory Commission Regulatory Guide, Regulatory Guide 1.190, dated March 2001 (Accession No. ML010890301) 4.
Grand Gulf Nuclear Station Letter GNRO-2014/00080, "Application to Revise Grand Gulf Nuclear Station Unit 1's Current Fluence Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method," dated November 21,2014.
5.
Response to Request for Supplemental Information dated February 18,2015 in letter GNRO-2015/00011 (ADAMS Accession No. ML15049A536).
6.
Request for Additional Information Regarding Fluence License Amendment Request dated April 3, 2015 (GNRI-2015/00041).
7.
Grand Gulf Nuclear Station Letter GNRO-2015/00031, "Response to Request for Additional Information Regarding Fluence License Amendment Request" dated May 8, 2015.


==REFERENCES:==
Sincerely, GNRO-2015/00038 Page 2 of 3
ResponsetoRequestfor AdditionalInformationRegardingFluenceLicense AmendmentRequest,Requestfor Commitment Grand Gulf NuclearStation,Unit1DocketNo.50-416LicenseNo.NPF-291.U.S.Nuclear Regulatory Commission Letter,"RequestsforAdditionalInformationfortheReviewoftheGrandGulf Nuclear Station,LicenseRenewal Application," dated August 28,2013 (AccessionNo.ML13227A394)2.Grand Gulf NuclearStationLetter,"ResponsetoRequestsfor Additional Information(RAI)set47,"dated September 23,2013 in letter GNRO-2013/00069(AccessionNo.ML13266A368)3.U.S.Nuclear Regulatory CommissionRegulatoryGuide,RegulatoryGuide1.190,datedMarch2001(AccessionNo.ML010890301)4.GrandGulf NuclearStationLetter GNRO-2014/00080,"ApplicationtoReviseGrandGulfNuclearStationUnit1'sCurrentFluence Methodologyfrom0EFPYThroughtheEndofExtendedOperationstoaSingleFluenceMethod,"dated November 21,2014.5.ResponsetoRequestfor SupplementalInformationdatedFebruary 18,2015inletter GNRO-2015/00011 (ADAMS Accession No.ML15049A536).6.Requestfor Additional InformationRegardingFluenceLicense AmendmentRequestdatedApril3,2015 (GNRI-2015/00041).7.GrandGulf NuclearStationLetter GNRO-2015/00031,"ResponsetoRequestfor AdditionalInformationRegardingFluenceLicense AmendmentRequest"datedMay8,2015.
Sincerely, GNRO-2015/00038Page2of3


==DearSirorMadam:==
==Dear Sir or Madam:==
In accordance with the provisions of Section 50.90 of Title 10 Code of Federal Regulations (10 CFR), Entergy Operations, Inc. (Entergy) is submitting response to a Request for Additional Information (RAI) regarding an amendment request to revise the existing license basis for Grand Gulf Nuclear Station (GGNS), Unit 1.
In letter GNRO-2015/00031 dated May 8, 2015, Entergy stated they were currently in discussions with GEH regarding feasibility of taking scrapings and/or installing dosimetry capsules and would provide a response to RAI question 4 in a separate letter within 60 days from the date of the May 8 letter.
RAI question 4 is for the proposed amendment to revise Grand Gulf Nuclear Station, Unit 1's license basis to adopt a single fluence calculation methodology. Response to the RAI is needed to address the Staff's request that GGNS make a Regulatory Commitment to install dosimetry capsules and/or scrapings in order to qualify the 3D fluence method for fluence calculations outside of the beltline region and a second Regulatory Commitment to confirm that future calculated-to-measured (e/M) fluence values at the dosimetry location(s) are reasonably close to one including explicit definition of "reasonably close to one" (e.g. C/M greater than 0.8) and plans to address any substantial disagreements. provides responses to Request for Additional Information (RAI) question 4.
This letter contains new commitments which are identified in Attachment 2. If you have any questions or require additional information, please contact Mr. James Nadeau at (601) 437-2103.
I declare under penalty of perjury that the foregoing is true and correct. Executed on June 11, 2015.
',L
---'-----------S KJM/ras


In accordancewiththe provisions of Section50.90ofTitle10CodeofFederal Regulations(10CFR),Entergy Operations, Inc.(Entergy)is submitting responsetoa Request for AdditionalInformation(RAI) regarding an amendment requesttorevisetheexistinglicensebasisforGrandGulf NuclearStation(GGNS),Unit1.Inletter GNRO-2015/00031datedMay8,2015, Entergystatedtheywere currently indiscussionswithGEH regarding feasibilityoftaking scrapings and/or installing dosimetrycapsulesandwouldprovidea responsetoRAI question4ina separate letterwithin60daysfromthedateoftheMay8letter.
GNRO-2015/00038 Page 3 of 3 cc: with Attachments u.s. Nuclear Regulatory Commission ATTN: Ms. Rebecca Richardson, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11 F1 Washington, DC 20555 cc: without Attachments u.S. Nuclear Regulatory Commission ATTN: Mr. Mark Dapas, (w/2)
RAI question4isforthe proposed amendmenttoreviseGrand Gulf NuclearStation,Unit1'slicensebasistoadoptasingle fluence calculation methodology.
Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U. S. Nuclear Regulatory Commission ATTN: Mr. Alan Wang, NRR/DORL (w/2)
ResponsetotheRAIisneededtoaddressthe Staff'srequestthatGGNSmakea Regulatory Commitmenttoinstall dosimetry capsules and/or scrapingsinorderto qualifythe3D fluencemethodfor fluence calculationsoutsideofthebeltlineregionandasecond Regulatory Commitmenttoconfirmthatfuture calculated-to-measured (e/M)fluencevaluesatthe dosimetry location(s) are reasonably closetoone including explicit definition of"reasonablyclosetoone"(e.g.C/M greaterthan0.8)andplanstoaddressany substantial disagreements.
Mail Stop OWFN 8 B1 Washington, DC 20555-0001 Dr. Mary Currier, M.D., M.P.H State Health Officer Mississippi Department of Health P. O. Box 1700 Jackson, MS 39215-1700 Grand Gulf Nuclear Station GNRO-2015/00038 Response to Request for Additional Information RAI4 of GNRO-2015/00038 Page 1 of 1 RAI 4 from April 3, 2015 (reference 6):
Attachment1provides responses to Request for Additional Information (RAI)question 4.Thislettercontainsnew commitmentswhichare identified in Attachment2.Ifyouhaveany questionsorrequire additional information, please contact Mr.JamesNadeauat(601) 2103.Ideclare underpenaltyofperjurythatthe foregoingistrueandcorrect.
In GNRO-2015/00011, Attachment 1, it is stated that "this letter contains no new commitments."
Executed onJune11,2015.
However, the response to RAI 1a in the same document states:
',L---'-----------
Installing dosimetry capsules and/or taking scrapings in specified areas outside of the beltline region would provide dosimetry data for a future benchmark analysis outside of the beltline region. The uncertainty in the fluence calculations at locations above the top of the core is dominated by uncertainty in the water density. Taking scrapings and/or inserting dosimetry in these locations (during future refueling outages) would not only provide benchmarking data, but it would also provide the data needed to check the output from thermal hydraulics codes that can be used in future improvements of the upper region water density modeling.
S KJM/ras GNRO-2015/00038Page3of3cc:with Attachments u.s.Nuclear Regulatory CommissionATTN:Ms.RebeccaRichardson, Project ManagerProjectsBranch1DivisionofLicenseRenewalOfficeof Nuclear Reactor Regulation U.S.Nuclear Regulatory CommissionMailStop 0-11 F1 Washington,DC20555cc:without Attachments u.S.Nuclear Regulatory CommissionATTN:Mr.MarkDapas,(w/2)
The NRC staff request that Entergy provide a regulatory commitment to install dosimetry capsules and/or scrapings, to qualify the 3D fluence method for fluence calculations outside of the beltline region. Provide details regarding the plans and schedule for installing dosimetry capsules and/or scrapings including the proposed locations for dosimetry capsule installation.
Regional Administrator,RegionIV1600East Lamar BoulevardArlington,TX76011-4511 NRC Senior Resident Inspector Grand Gulf Nuclear StationPortGibson,MS39150U.S.Nuclear Regulatory CommissionATTN:Mr.AlanWang, NRR/DORL (w/2)MailStopOWFN8B1 Washington,DC20555-0001Dr.MaryCurrier,M.D.,M.P.HStateHealth Officer Mississippi DepartmentofHealthP.O.Box1700Jackson,MS 39215-1700 Attachment 1 Grand Gulf Nuclear Station GNRO-2015/00038 Response to Request for Additional Information RAI4 Attachment1of GNRO-2015/00038 Page1of1RAI4fromApril3, 2015 (reference 6): In GNRO-2015/00011
Also, provide a regulatory commitment to confirm that future calculated-to-measured (C/M) fluence values at the dosimetry location(s) are reasonably close to one including explicit definition of "reasonably close to one" (e.g. C/M greater than 0.8) and plans to address any substantial disagreements.
, Attachment1,itis stated that"this letter containsnonew commitments." However, the responsetoRAI1ainthe same document states: Installing dosimetry capsules and/or taking scrapings in specified areas outsideofthe beltline region would provide dosimetry datafora future benchmark analysis outsideofthe beltline region.The uncertaintyinthe fluence calculations at locations abovethetopofthe core is dominated by uncertaintyinthe water density.Taking scrapings and/or inserting dosimetry in these locations (during future refueling outages)would not only provide benchmarking data,butit would also provide the data needed to check the output from thermal hydraulics codes thatcanbeusedin future improvementsofthe upper region water density modeling.The NRC staff request that Entergy provide a regulatory commitment to install dosimetry capsules and/or scrapings, to qualifythe3D fluence method for fluence calculations outsideofthe beltline region.Provide details regarding the plans and schedule for installing dosimetry capsules and/or scrapings including the proposed locations for dosimetry capsule installation.
RAI 4 Response:
Also, provide a regulatory commitment to confirm that future calculated-to-measured (C/M)fluence valuesatthe dosimetry location(s) are reasonably closetoone including explicit definition of"reasonably closetoone"(e.g.C/M greaterthan0.8)and plans to address any substantial disagreements.RAI4 Response: Activities are being scheduled to sample the GGNS shroud,topguide,and possibly other internal componentssuchasfuel bundle bail handles in order to obtain a better water density distribution forthe3D TORT modelandto benchmarkitwith dosimetry materials takenfromthe shroudandtop guide.These activities will provide dosimetry data to qualifytheMPM3D Fluence Calculation Method for fluence calculations outside the beltlineregion.MPMhas provided a proposal to identify the locations and material volumeforthe recommended approximately 15 samplesandwill detail the exact cut locations and provide details concerninghowthe samplesaretobe takenfromthe GGNS structures.
Activities are being scheduled to sample the GGNS shroud, top guide, and possibly other internal components such as fuel bundle bail handles in order to obtain a better water density distribution for the 3D TORT model and to benchmark it with dosimetry materials taken from the shroud and top guide. These activities will provide dosimetry data to qualify the MPM 3D Fluence Calculation Method for fluence calculations outside the beltline region.
Entergy reservestherightto re-evaluate the area above the activefuelin more detail at a later date.Ithasbeen verified that thereisnoneedto sample the vessel since removaloftheclad would lead to corrosion problems,anditisnot needed sinceitis known that thereissolid water between the shroud and vesselandthiscanbe accurately modeled in TORT.Since the objectiveofthe workisto benchmark an advanced modelofthe water density distributioninthe steam dome region, samples are needed at locations where spatial variationisnota significant factorandat various transport distances through the steam.If technical evaluation of collecting samples (Le.drilling holes)from the shroud and/or top guide prohibits sample collection or determines additional actions are required which cannot be performed priortothe 2016 refueling outage, plans will continue to perform those additional actions in order to prepare for sample collection during the 2018 refueling outage.Itis expected that not onlywillthe revised TORT model be substantially improved,butitis also anticipated thatitwillgive calculated-to-measured(C/M)ratios within20%,ashasbeen achieved in the beltline region.Entergy commits to identify the sample locationsandto schedule collection of samples from outside the beltline region.Entergy's objectiveistohavetheC/Mratio within 20%for the structures located abovethecore.This should be achievablewiththe improved water density data thatwillbe obtainedforthe steam dome region.Therefore, Entergy commitstothe objective,withthe expectation that a+/-20%C/M should be achievable with additional analysis.
MPM has provided a proposal to identify the locations and material volume for the recommended approximately 15 samples and will detail the exact cut locations and provide details concerning how the samples are to be taken from the GGNS structures. Entergy reserves the right to re-evaluate the area above the active fuel in more detail at a later date.
Attachment 2 Grand Gulf Nuclear Station GNRO-2015/00038 List of Regulatory Commitments Attachment2to GNRO-2015/00038Page1of1LISTOF REGULATORY COMMITMENTSThistable identifies actions discussedinthis letterforwhich Entergy commitstoperform.Anyotheractions discussedinthis submittal are describedfortheNRC's informationandare not commitments.
It has been verified that there is no need to sample the vessel since removal of the clad would lead to corrosion problems, and it is not needed since it is known that there is solid water between the shroud and vessel and this can be accurately modeled in TORT. Since the objective of the work is to benchmark an advanced model of the water density distribution in the steam dome region, samples are needed at locations where spatial variation is not a significant factor and at various transport distances through the steam. If technical evaluation of collecting samples (Le. drilling holes) from the shroud and/or top guide prohibits sample collection or determines additional actions are required which cannot be performed prior to the 2016 refueling outage, plans will continue to perform those additional actions in order to prepare for sample collection during the 2018 refueling outage.
*",*_i ,i'" A rr
It is expected that not only will the revised TORT model be substantially improved, but it is also anticipated that it will give calculated-to-measured (C/M) ratios within 20%, as has been achieved in the beltline region.
::, ,i:0NE":TIME,:':i,::CONTINUING:", ,.<:...,,':{'.\.\""i.:;:;:.',';,'i::::p:>,
Entergy commits to identify the sample locations and to schedule collection of samples from outside the beltline region.
Entergy's objective is to have the C/M ratio within 20%
for the structures located above the core.
This should be achievable with the improved water density data that will be obtained for the steam dome region. Therefore, Entergy commits to the objective, with the expectation that a +/- 20%
C/M should be achievable with additional analysis.
Grand Gulf Nuclear Station GNRO-2015/00038 List of Regulatory Commitments to GNRO-2015/00038 Page 1 of 1 LIST OF REGULATORY COMMITMENTS This table identifies actions discussed in this letter for which Entergy commits to perform. Any other actions discussed in this submittal are described for the NRC's information and are not commitments.
}):;;"::/~i;;~;!~;ir{!;
*",*_i,i'" A rr 1I:::r\\lT:';:';:f;:',iC~:-' ::,,i:0NE":TIME, :':i,::CONTINUING:",,.<:.."SCHEDULE9"COMJ?I2EmldNi::\\.;::~:?::',
:'~iH'x
'~,I,"..!.~i.
'~::,
.,,':{'.\\.\\""i.:;:;
~:: :.','
ZY'"i;W~;:LI*A.';;j~*;)
~~~lX~~~'3~ ;~;~'~:~~~~~~~.~*b~ ~J3~~J~~~~j~~~~~~!f?]~~!l~;~~1!
?~::~: ~;;: ;,'i
::::p:>,
;d~";:C,:),';
**:~):\\(;.1;;::::t;1;::'.;;'3i;.:',~::~t~{':~:
'.;?;i::,:"
'.;?;i::,:"
Entergy willidentifytheoutsideof./October30,2015thebeltlineregion dosimetry sample locations Entergy will schedule collection of./December 30, 2015samplesfromoutsidethebeltline regionEntergywillconfirmthat future C/M./November 30, 2016 fluencevaluesat the dosimetry sample locations are reasonablyclosetooneEntergywillincludethe definition of./November 30, 2016"reasonablyclosetoone" regarding C/Mfluencevalues at the dosimetry sample locationsEntergywillprovideplans to./December30,2016addressiffuture C/M fluencevaluesat the dosimetry samplelocationsare not reasonably close to one}}
:,,'{;:~;>::;::,:
Entergy will identify the outside of
./
October 30, 2015 the beltline region dosimetry sample locations Entergy will schedule collection of
./
December 30, 2015 samples from outside the beltline region Entergy will confirm that future C/M
./
November 30, 2016 fluence values at the dosimetry sample locations are reasonably close to one Entergy will include the definition of
./
November 30, 2016 "reasonably close to one" regarding C/M fluence values at the dosimetry sample locations Entergy will provide plans to
./
December 30, 2016 address if future C/M fluence values at the dosimetry sample locations are not reasonably close to one}}

Latest revision as of 10:56, 10 January 2025

Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment
ML15162B088
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/11/2015
From: Kevin Mulligan
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2015/00038
Download: ML15162B088 (7)


Text

~

~Entergy GNRO-2015/00038 June 11, 2015 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Entergy Operations, Inc.

P.o. Box 756 Port Gibson, MS 39150 Kevin Mulligan Site Vice President Grand Gulf Nuclear Station Tel. (601) 437-7500

SUBJECT:

REFERENCES:

Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 1.

U.S. Nuclear Regulatory Commission Letter, "Requests for Additional Information for the Review of the Grand Gulf Nuclear Station, License Renewal Application," dated August 28,2013 (Accession No. ML13227A394) 2.

Grand Gulf Nuclear Station Letter, "Response to Requests for Additional Information (RAI) set 47," dated September 23,2013 in letter GNRO-2013/00069 (Accession No. ML13266A368) 3.

U.S. Nuclear Regulatory Commission Regulatory Guide, Regulatory Guide 1.190, dated March 2001 (Accession No. ML010890301) 4.

Grand Gulf Nuclear Station Letter GNRO-2014/00080, "Application to Revise Grand Gulf Nuclear Station Unit 1's Current Fluence Methodology from 0 EFPY Through the End of Extended Operations to a Single Fluence Method," dated November 21,2014.

5.

Response to Request for Supplemental Information dated February 18,2015 in letter GNRO-2015/00011 (ADAMS Accession No. ML15049A536).

6.

Request for Additional Information Regarding Fluence License Amendment Request dated April 3, 2015 (GNRI-2015/00041).

7.

Grand Gulf Nuclear Station Letter GNRO-2015/00031, "Response to Request for Additional Information Regarding Fluence License Amendment Request" dated May 8, 2015.

Sincerely, GNRO-2015/00038 Page 2 of 3

Dear Sir or Madam:

In accordance with the provisions of Section 50.90 of Title 10 Code of Federal Regulations (10 CFR), Entergy Operations, Inc. (Entergy) is submitting response to a Request for Additional Information (RAI) regarding an amendment request to revise the existing license basis for Grand Gulf Nuclear Station (GGNS), Unit 1.

In letter GNRO-2015/00031 dated May 8, 2015, Entergy stated they were currently in discussions with GEH regarding feasibility of taking scrapings and/or installing dosimetry capsules and would provide a response to RAI question 4 in a separate letter within 60 days from the date of the May 8 letter.

RAI question 4 is for the proposed amendment to revise Grand Gulf Nuclear Station, Unit 1's license basis to adopt a single fluence calculation methodology. Response to the RAI is needed to address the Staff's request that GGNS make a Regulatory Commitment to install dosimetry capsules and/or scrapings in order to qualify the 3D fluence method for fluence calculations outside of the beltline region and a second Regulatory Commitment to confirm that future calculated-to-measured (e/M) fluence values at the dosimetry location(s) are reasonably close to one including explicit definition of "reasonably close to one" (e.g. C/M greater than 0.8) and plans to address any substantial disagreements. provides responses to Request for Additional Information (RAI) question 4.

This letter contains new commitments which are identified in Attachment 2. If you have any questions or require additional information, please contact Mr. James Nadeau at (601) 437-2103.

I declare under penalty of perjury that the foregoing is true and correct. Executed on June 11, 2015.

',L

---'-----------S KJM/ras

GNRO-2015/00038 Page 3 of 3 cc: with Attachments u.s. Nuclear Regulatory Commission ATTN: Ms. Rebecca Richardson, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11 F1 Washington, DC 20555 cc: without Attachments u.S. Nuclear Regulatory Commission ATTN: Mr. Mark Dapas, (w/2)

Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U. S. Nuclear Regulatory Commission ATTN: Mr. Alan Wang, NRR/DORL (w/2)

Mail Stop OWFN 8 B1 Washington, DC 20555-0001 Dr. Mary Currier, M.D., M.P.H State Health Officer Mississippi Department of Health P. O. Box 1700 Jackson, MS 39215-1700 Grand Gulf Nuclear Station GNRO-2015/00038 Response to Request for Additional Information RAI4 of GNRO-2015/00038 Page 1 of 1 RAI 4 from April 3, 2015 (reference 6):

In GNRO-2015/00011, Attachment 1, it is stated that "this letter contains no new commitments."

However, the response to RAI 1a in the same document states:

Installing dosimetry capsules and/or taking scrapings in specified areas outside of the beltline region would provide dosimetry data for a future benchmark analysis outside of the beltline region. The uncertainty in the fluence calculations at locations above the top of the core is dominated by uncertainty in the water density. Taking scrapings and/or inserting dosimetry in these locations (during future refueling outages) would not only provide benchmarking data, but it would also provide the data needed to check the output from thermal hydraulics codes that can be used in future improvements of the upper region water density modeling.

The NRC staff request that Entergy provide a regulatory commitment to install dosimetry capsules and/or scrapings, to qualify the 3D fluence method for fluence calculations outside of the beltline region. Provide details regarding the plans and schedule for installing dosimetry capsules and/or scrapings including the proposed locations for dosimetry capsule installation.

Also, provide a regulatory commitment to confirm that future calculated-to-measured (C/M) fluence values at the dosimetry location(s) are reasonably close to one including explicit definition of "reasonably close to one" (e.g. C/M greater than 0.8) and plans to address any substantial disagreements.

RAI 4 Response:

Activities are being scheduled to sample the GGNS shroud, top guide, and possibly other internal components such as fuel bundle bail handles in order to obtain a better water density distribution for the 3D TORT model and to benchmark it with dosimetry materials taken from the shroud and top guide. These activities will provide dosimetry data to qualify the MPM 3D Fluence Calculation Method for fluence calculations outside the beltline region.

MPM has provided a proposal to identify the locations and material volume for the recommended approximately 15 samples and will detail the exact cut locations and provide details concerning how the samples are to be taken from the GGNS structures. Entergy reserves the right to re-evaluate the area above the active fuel in more detail at a later date.

It has been verified that there is no need to sample the vessel since removal of the clad would lead to corrosion problems, and it is not needed since it is known that there is solid water between the shroud and vessel and this can be accurately modeled in TORT. Since the objective of the work is to benchmark an advanced model of the water density distribution in the steam dome region, samples are needed at locations where spatial variation is not a significant factor and at various transport distances through the steam. If technical evaluation of collecting samples (Le. drilling holes) from the shroud and/or top guide prohibits sample collection or determines additional actions are required which cannot be performed prior to the 2016 refueling outage, plans will continue to perform those additional actions in order to prepare for sample collection during the 2018 refueling outage.

It is expected that not only will the revised TORT model be substantially improved, but it is also anticipated that it will give calculated-to-measured (C/M) ratios within 20%, as has been achieved in the beltline region.

Entergy commits to identify the sample locations and to schedule collection of samples from outside the beltline region.

Entergy's objective is to have the C/M ratio within 20%

for the structures located above the core.

This should be achievable with the improved water density data that will be obtained for the steam dome region. Therefore, Entergy commits to the objective, with the expectation that a +/- 20%

C/M should be achievable with additional analysis.

Grand Gulf Nuclear Station GNRO-2015/00038 List of Regulatory Commitments to GNRO-2015/00038 Page 1 of 1 LIST OF REGULATORY COMMITMENTS This table identifies actions discussed in this letter for which Entergy commits to perform. Any other actions discussed in this submittal are described for the NRC's information and are not commitments.

}):;;"::/~i;;~;!~;ir{!;

  • ",*_i,i'" A rr 1I:::r\\lT:';:';:f;:',iC~:-' ::,,i:0NE":TIME, :':i,::CONTINUING:",,.<:.."SCHEDULE9"COMJ?I2EmldNi::\\.;::~:?::',
'~iH'x

'~,I,"..!.~i.

'~::,

.,,':{'.\\.\\""i.:;:;

~:: :.','

ZY'"i;W~;:LI*A.';;j~*;)

~~~lX~~~'3~ ;~;~'~:~~~~~~~.~*b~ ~J3~~J~~~~j~~~~~~!f?]~~!l~;~~1!

?~::~: ~;;: ;,'i

p:>,
d~";
C,:),';
    • ~):\\(;.1;;::::t;1;::'.;;'3i;.:',~::~t~{':~:

'.;?;i::,:"

,,'{;:~;>::;::,:

Entergy will identify the outside of

./

October 30, 2015 the beltline region dosimetry sample locations Entergy will schedule collection of

./

December 30, 2015 samples from outside the beltline region Entergy will confirm that future C/M

./

November 30, 2016 fluence values at the dosimetry sample locations are reasonably close to one Entergy will include the definition of

./

November 30, 2016 "reasonably close to one" regarding C/M fluence values at the dosimetry sample locations Entergy will provide plans to

./

December 30, 2016 address if future C/M fluence values at the dosimetry sample locations are not reasonably close to one