==Dear Mr. Nazar:==
==Dear Mr. Nazar:==
On June 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Generating Station, Units 3 and 4. On June 30, 2017, the NRC inspectors discussed the results of this inspection with Mr. Stamp, Plant General Manager, and other members of your staff. The results of this inspection are documented in the enclosed  
On June 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Generating Station, Units 3 and 4. On June 30, 2017, the NRC inspectors discussed the results of this inspection with Mr. Stamp, Plant General Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
 
report.


The NRC inspectors did not identify any finding or violation of more than minor significance.
The NRC inspectors did not identify any finding or violation of more than minor significance.


This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,
Sincerely,
/RA/ LaDonna B. Suggs, Chief Reactor Projects Branch 3 Division of Reactor Projects  
/RA/  
 
LaDonna B. Suggs, Chief  
 
Reactor Projects Branch 3  
 
Division of Reactor Projects  


Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41  
Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41  


Enclosure: IR 05000250/2017403 and 05000251/2017403  
Enclosure:
 
IR 05000250/2017403 and 05000251/2017403 w/Attachment: Supplemental Information  
w/Attachment: Supplemental Information  


cc w/encl.: See page 3 cc w/o encl.: Distribution via ListServ
cc w/encl.: See page 3 cc w/o encl.: Distribution via ListServ
}}
}}

Latest revision as of 14:55, 8 January 2025

NRC Material Control and Accounting (Mc&A) Inspection Report 05000250/2017403, 05000251/2017403
ML17220A039
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/08/2017
From: Ladonna Suggs
NRC/RGN-II/DRP/RPB3
To: Nazar M
Florida Power & Light Co
References
IR 2017403
Download: ML17220A039 (4)


Text

August 8, 2017

SUBJECT:

TURKEY POINT NUCLEAR GENERATING STATION - NRC MATERIAL CONTROL AND ACCOUNTING (MC&A) INSPECTION REPORT 05000250/2017403, 05000251/2017403

Dear Mr. Nazar:

On June 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Turkey Point Generating Station, Units 3 and 4. On June 30, 2017, the NRC inspectors discussed the results of this inspection with Mr. Stamp, Plant General Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

LaDonna B. Suggs, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Docket Nos.: 50-250, 50-251 License Nos.: DPR-31, DPR-41

Enclosure:

IR 05000250/2017403 and 05000251/2017403 w/Attachment: Supplemental Information

cc w/encl.: See page 3 cc w/o encl.: Distribution via ListServ