From November 27-29, 2017, the U.S. Nuclear Regulatory Commission (NRC) conducted an inspection at the Ohio State University Nuclear Reactor Laboratory facility. The enclosed report documents the inspection results, which were discussed on November 29, 2017, with you and members of your staff.
From November 27-29, 2017, the U.S. Nuclear Regulatory Commission (NRC) conducted an inspection at the Ohio State University Nuclear Reactor Laboratory facility. The enclosed report documents the inspection results, which were discussed on November 29, 2017, with you and members of your staff.


The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
 
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified.


No response to this letter is required.
No response to this letter is required.


In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public inspections, exemptions, and requests for withholding," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (Agencywide Documents Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this inspection, please contact Anthony J. Mendiola at (301) 466-4495, or by electronic mail at Anthony.Mendiola@nrc.gov.
In accordance with Title 10 of the Code of Federal Regulations 2.390, Public inspections, exemptions, and requests for withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (Agencywide Documents Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this inspection, please contact Anthony J. Mendiola at (301) 466-4495, or by electronic mail at Anthony.Mendiola@nrc.gov.


Sincerely,
Sincerely,
/RA Elizabeth Reed for/
/RA Elizabeth Reed for/  
Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Licensing Projects Office of Nuclear Reactor Regulation  
 
Anthony J. Mendiola, Chief  
 
Research and Test Reactors Oversight Branch  
 
Division of Licensing Projects  
 
Office of Nuclear Reactor Regulation  


Docket No. 50-150 License No. R-75  
Docket No. 50-150 License No. R-75  


Enclosure:  
Enclosure:
 
As stated  
As stated  


Line 46: Line 54:
Ohio State University Docket No. 50-150  
Ohio State University Docket No. 50-150  


cc: Chief Ohio Department of Health Bureau of Environmental Health and Radiation Protection
cc:  


246 North High Street Columbus, OH 43215  
Chief Ohio Department of Health Bureau of Environmental Health and Radiation Protection 246 North High Street Columbus, OH 43215  


Radiological Branch Chief Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235 2206  
Radiological Branch Chief Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235 2206  
Line 58: Line 66:
Columbus, OH 43210-1278  
Columbus, OH 43210-1278  


Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida  
Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611
 
ML18038B524 *concurrence via email NRC-002 OFFICE NRR/DLP/PROB/RI NRR/DLP/PROB/LA*
NRR/DLP/PROB/BC NAME OFont NParker AMendiola (EReed for)
DATE 2/12/18 2/12/18 2/13/18
 
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION
 
Docket No.:
50-150
 
License No.:
R-75


Gainesville, FL 32611
Report No.:
50-150/2017-201


ML18038B524 *concurrence via email NRC-002 OFFICE NRR/DLP/PROB/RI NRR/DLP/PROB/LA* NRR/DLP/PROB/BC NAME OFont NParker AMendiola (EReed for) DATE 2/12/18 2/12/18 2/13/18 U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION Docket No.: 50-150
Licensee:  


License No.: R-75
Ohio State University


Report No.: 50-150/2017-201
Facility:  


Licensee: Ohio State University
Nuclear Reactor Laboratory


Facility: Nuclear Reactor Laboratory
Location:
Columbus, Ohio


Location: Columbus, Ohio
Dates:  


Dates: November 27-29, 2017  
November 27-29, 2017  


Inspector: Ossy Font
Inspector:  


Approved by: Anthony J.Mendiola, Chief Research and Test Reactors Oversight Branch Division of Licensing Projects Office of Nuclear Reactor Regulation
Ossy Font


EXECUTIVE SUMMARY Ohio State University Nuclear Reactor Laboratory Nuclear Regulatory Commission Inspection Report No. 50-150/2017-201
Approved by:
Anthony J.Mendiola, Chief Research and Test Reactors Oversight Branch Division of Licensing Projects Office of Nuclear Reactor Regulation


The primary focus of this routine, announced inspection was the on-site review of selected aspects of the Ohio State University's (the licensee's) Class II research and test reactor safety program including: (1) organization and staffing; (2) operations logs and records; (3) requalification training; (4) surveillance and limiting conditions for operation; (5) emergency planning; (6) maintenance logs and records, and (7) fuel handling logs and records since the last U.S. Nuclear Regulatory Commission (NRC) inspection of these areas. The licensee's program was acceptably directed toward the protection of public health and safety and in compliance with NRC requirements. No viol ations or deviations were identified.
EXECUTIVE SUMMARY
 
Ohio State University
 
Nuclear Reactor Laboratory
 
Nuclear Regulatory Commission
 
Inspection Report No. 50-150/2017-201
 
The primary focus of this routine, announced inspection was the on-site review of selected aspects of the Ohio State Universitys (the licensees) Class II research and test reactor safety program including: (1) organization and staffing; (2) operations logs and records; (3) requalification training; (4) surveillance and limiting conditions for operation; (5) emergency planning; (6) maintenance logs and records, and (7) fuel handling logs and records since the last U.S. Nuclear Regulatory Commission (NRC) inspection of these areas. The licensee's program was acceptably directed toward the protection of public health and safety and in compliance with NRC requirements. No violations or deviations were identified.


Organization and Staffing  
Organization and Staffing  
* The licensee's organization and staffing qualifications remain in compliance with the requirements specified in the technical specification (TS).
* The licensee's organization and staffing qualifications remain in compliance with the requirements specified in the technical specification (TS).


Operations Logs and Records  
Operations Logs and Records  
* Operational activities were consistent with applicable TS and procedural requirements.
*
Operational activities were consistent with applicable TS and procedural requirements.


Requalification Training  
Requalification Training  
* Operator requalification was being conducted and completed as required by the Operator Requalification Program.
* Operator requalification was being conducted and completed as required by the Operator Requalification Program.


Surveillance and Limiting Conditions for Operation  
Surveillance and Limiting Conditions for Operation  
* The program for surveillance and limiting conditions for operation confirmation was implemented in accordance with TS requirements.
* The program for surveillance and limiting conditions for operation confirmation was implemented in accordance with TS requirements.


Emergency Planning  
Emergency Planning  
* The emergency preparedness program was conduc ted in accordance with the Emergency Plan.
* The emergency preparedness program was conducted in accordance with the Emergency Plan.


Maintenance Logs and Records  
Maintenance Logs and Records  
* Maintenance activities ensured that equipment remained consistent with the safety analysis report and TS requirements.
* Maintenance activities ensured that equipment remained consistent with the safety analysis report and TS requirements.


Fuel Handling Logs and Records  
Fuel Handling Logs and Records  
* Fuel movements and inspections were being completed and documented in accordance with the requirements specified in the TS and by procedure.
* Fuel movements and inspections were being completed and documented in accordance with the requirements specified in the TS and by procedure.
 
Enclosure REPORT DETAILS


Enclosure REPORT DETAILS Summary of Plant Status The Ohio State University's (OSU, the licensee's) five-hundred kilowatt open pool-type reactor continued to be operated in support of undergraduate instruction, laboratory experiments, reactor operator training, and various types of irradiation projects. During the inspection, the reactor was started up and operated, and shut down in accordance with applicable procedures to support these ongoing activities.
Summary of Plant Status  


1. Organization and Staffing a. Inspection Scope (Inspection Procedure [IP] 69001)
The Ohio State Universitys (OSU, the licensees) five-hundred kilowatt open pool-type reactor continued to be operated in support of undergraduate instruction, laboratory experiments, reactor operator training, and various types of irradiation projects. During the inspection, the reactor was started up and operated, and shut down in accordance with applicable procedures to support these ongoing activities.
To ensure that the requirements of technical specification (TS) 6.1, "Organization," were being met, the inspector reviewed:
* Organizational structure (TS Figure 6.1)
* OSU Research Reactor (OSURR) Console Log Book entries from March 9, 2016 (page 7891) to present b. Observations and Findings The inspector determined that the organizational structure at the OSURR facility had not


changed since the previous U.S. Nuclear Regulatory Commission (NRC) inspection. The Associate Director continued to be responsible for the day-to-day operation of the OSURR and ensured that operations were conducted in a safe manner.
1. Organization and Staffing
 
a. Inspection Scope (Inspection Procedure [IP] 69001)
 
To ensure that the requirements of technical specification (TS) 6.1, Organization, were being met, the inspector reviewed:
* Organizational structure (TS Figure 6.1)
*
OSU Research Reactor (OSURR) Console Log Book entries from March 9, 2016 (page 7891) to present
 
b. Observations and Findings
 
The inspector determined that the organizational structure at the OSURR facility had not changed since the previous U.S. Nuclear Regulatory Commission (NRC) inspection.
 
The Associate Director continued to be responsible for the day-to-day operation of the OSURR and ensured that operations were conducted in a safe manner.


The inspector noted that there were three Senior Reactor Operators (SROs) working at the facility and no reactor operators and determined that the minimum shift staffing composition for operation, including on-call personnel, is consistent with the TS.
The inspector noted that there were three Senior Reactor Operators (SROs) working at the facility and no reactor operators and determined that the minimum shift staffing composition for operation, including on-call personnel, is consistent with the TS.


c. Conclusion The licensee's organization and staffing qualifications remain in compliance with the requirements specified in the TS.
c. Conclusion  


2. Operations Logs and Records a. Inspection Scope (IP 69001)
The licensee's organization and staffing qualifications remain in compliance with the requirements specified in the TS.
To ensure that the requirements of TS 6.3, "Procedures," and TS 6.7, "Records," were being met, the inspector reviewed:
* OSURR Console Log Book entries from March 9, 2016 (page 7891) to present
* IM-03, "Pre-Start Checkout," and forms for 2015 - present
* IM-04, "Post-Shutdown Checkout," and forms for 2015 - present * IM-01, "Reactor Operations," Revision 18, dated June 14, 2017 * Request for Reactor Operations procedures and forms for 2015 - present
* Radiation Safety 09, Area Radiation Survey procedures and forms for 2013-present
- 2 -* Administrative Procedure (AP) 13 "Personnel Required for Reactor Operations," Revision 5, dated January 13, 2017
- 16-01, "Neutron Transmission Testing" - 17-08, "Radiation Effects of Borated Silflex" - 17-13, "Radiation Effects on Lexan Samples" b. Observations and Findings The inspector reviewed selected log book entries, request for operations, and pre-start, post-shutdown, and area radiation safety survey forms and determined that logs and records are maintained as required by the licensee's administrative procedures. Records also showed that operational conditions and parameters were consistent with the license and TS requirements. The inspector also observed the reactor staff perform the required pre-start, post-shutdown, and area radiation survey checkout and a reactor startup and shutdown and the completion of the associated records and logs. The inspector determined that reactor operations were carried out following written procedures as required by TS 6.3 and TS 6.7.


c. Conclusion Operational activities were consistent with applicable TS and procedural requirements.
2. Operations Logs and Records


3. Requalification Training a. Inspection Scope (IP 69001)
a. Inspection Scope (IP 69001)  
To ensure that the requirements of the operator requalification program were being


met, the inspector reviewed:  
To ensure that the requirements of TS 6.3, Procedures, and TS 6.7, Records, were being met, the inspector reviewed:  
* AP-07, "Document Distribution" * AP-09, "Reactor Operator/SRO Requalification," Revision 7, approval dated September 25, 1996 * AP-10, "Console Operating Experience Record," and Attachment A
* OSURR Console Log Book entries from March 9, 2016 (page 7891) to present
* Operator physical examination records for the past two years * OSURR Operator Requalification Training Sessions for the past two years
*
* OSURR Operator Requalification Operational Examination Records for the past two years * OSURR Operator Requalification Written Examination Records for the past two years * OSURR Console Operating Experience Records for the past two years
IM-03, Pre-Start Checkout, and forms for 2015 - present
* OSURR Console Log Book entries from March 9, 2016 (page 7891) to present b. Observations and Findings As of the date of the inspection, all the operators' licenses were current. All operators
*
IM-04, Post-Shutdown Checkout, and forms for 2015 - present
*
IM-01, Reactor Operations, Revision 18, dated June 14, 2017
*
Request for Reactor Operations procedures and forms for 2015 - present
*
Radiation Safety 09, Area Radiation Survey procedures and forms for 2013-present  


were enrolled in the licensee's NRC-approv ed requalification and training program and had completed a minimum of four hours of shift functions per quarter. The inspector noted that operators were receiving the required biennial medical examinations. A review of the logs and records showed that training was being conducted in accordance with the program. Requalification program data such as completion of written examinations and operation tests was documented as required. Records of  
- 2 -
- 3 -reactivity manipulations, and other operations activities were being maintained throughout the year.
*
Administrative Procedure (AP) 13 Personnel Required for Reactor Operations, Revision 5, dated January 13, 2017
-
16-01, Neutron Transmission Testing
-
17-08, Radiation Effects of Borated Silflex
-
17-13, Radiation Effects on Lexan Samples


c. Conclusion Operator requalification was being conducted and completed as required by the operator requalification program.
b. Observations and Findings


4. Surveillance and Limiting Conditions for Operation a. Inspection Scope (IP 69001)
The inspector reviewed selected log book entries, request for operations, and pre-start, post-shutdown, and area radiation safety survey forms and determined that logs and records are maintained as required by the licensee's administrative procedures.
To ensure that the requirements of TS 3.0, "Limiting Conditions for Operations," and TS 4.0, "Surveillance Requirements," were being met, the inspector reviewed:  
 
* Surveillance Item Sheets for the past two years * OSURR Console Log Book entries from March 9, 2016 (page 7891) to present  
Records also showed that operational conditions and parameters were consistent with the license and TS requirements. The inspector also observed the reactor staff perform the required pre-start, post-shutdown, and area radiation survey checkout and a reactor startup and shutdown and the completion of the associated records and logs. The inspector determined that reactor operations were carried out following written procedures as required by TS 6.3 and TS 6.7.
* "Annual Report for The Ohio State University Research Reactor, License R-75, Docket 50-150," for the past two years * Surveillance records for the past two years b. Observations and Findings The inspector performed a random sampling of the daily, weekly, monthly, quarterly, semi-annual, and other periodic checks, tests, and verifications for TS required limiting conditions for operation (LCO) and determined that they were completed in the specified time frame and in accordance with licensee procedures. The records and logs reviewed were complete and were being maintained as required. The inspector noted that the licensee maintained an effective record keeping system that helped ensure that all required tests, LCO verifications, and calibrations were completed in a timely manner. All routine periodic surveillance items and tasks were listed on log sheets readily visible and available to all operators. It tracks the previous completion and the most recent one, if done.
 
c. Conclusion
 
Operational activities were consistent with applicable TS and procedural requirements.
 
3. Requalification Training
 
a. Inspection Scope (IP 69001)
 
To ensure that the requirements of the operator requalification program were being met, the inspector reviewed:
* AP-07, Document Distribution
*
AP-09, Reactor Operator/SRO Requalification, Revision 7, approval dated September 25, 1996
*
AP-10, Console Operating Experience Record, and Attachment A
*
Operator physical examination records for the past two years
*
OSURR Operator Requalification Training Sessions for the past two years
*
OSURR Operator Requalification Operational Examination Records for the past two years
*
OSURR Operator Requalification Written Examination Records for the past two years
*
OSURR Console Operating Experience Records for the past two years
*
OSURR Console Log Book entries from March 9, 2016 (page 7891) to present
 
b. Observations and Findings
 
As of the date of the inspection, all the operators licenses were current. All operators were enrolled in the licensees NRC-approved requalification and training program and had completed a minimum of four hours of shift functions per quarter. The inspector noted that operators were receiving the required biennial medical examinations.
 
A review of the logs and records showed that training was being conducted in accordance with the program. Requalification program data such as completion of written examinations and operation tests was documented as required. Records of
 
- 3 -
reactivity manipulations, and other operations activities were being maintained throughout the year.
 
c. Conclusion
 
Operator requalification was being conducted and completed as required by the operator requalification program.
 
4. Surveillance and Limiting Conditions for Operation  
 
a. Inspection Scope (IP 69001)  
 
To ensure that the requirements of TS 3.0, Limiting Conditions for Operations, and TS 4.0, Surveillance Requirements, were being met, the inspector reviewed:  
* Surveillance Item Sheets for the past two years  
*
OSURR Console Log Book entries from March 9, 2016 (page 7891) to present  
*
Annual Report for The Ohio State University Research Reactor, License R-75, Docket 50-150, for the past two years  
*
Surveillance records for the past two years  
 
b. Observations and Findings  
 
The inspector performed a random sampling of the daily, weekly, monthly, quarterly, semi-annual, and other periodic checks, tests, and verifications for TS required limiting conditions for operation (LCO) and determined that they were completed in the specified time frame and in accordance with licensee procedures. The records and logs reviewed were complete and were being maintained as required. The inspector noted that the licensee maintained an effective record keeping system that helped ensure that all required tests, LCO verifications, and calibrations were completed in a timely manner.
 
All routine periodic surveillance items and tasks were listed on log sheets readily visible and available to all operators. It tracks the previous completion and the most recent one, if done.


All the recorded results for the activities reviewed by the inspector were within the TS required parameters.
All the recorded results for the activities reviewed by the inspector were within the TS required parameters.


c. Conclusion The program for Surveillance and LCO confirmation was implemented in accordance with TS requirements.
c. Conclusion  
 
The program for Surveillance and LCO confirmation was implemented in accordance with TS requirements.
 
5.
 
Emergency Planning
 
a. Inspection Scope (IP 69001)


5. Emergency Planning a. Inspection Scope (IP 69001)
To ensure that the requirements of emergency plan (E-Plan) were being met, the inspector reviewed:  
To ensure that the requirements of emergency plan (E-Plan) were being met, the inspector reviewed:  
- 4 -* Emergency Preparedness Plan, March 2017
* Emergency Procedure (01-04)
* Annual Records from for the past two years - E-Plan Training
- Emergency Drill and Critique
- Plan Review
- Inventory of emergency supplies b. Observations and Findings The inspector reviewed the new version of the E-Plan and determined that the effectiveness was not reduced.


The inspector confirmed that the E-Plan was being audited and reviewed annually as required. Implementing procedures were reviewed and revised as needed to effectively implement the E-Plan. Emergency preparedness and response training for reactor staff was completed during operator requalification and documented in the program's records. Emergency equipment (meters, supplies, co mmunications, security, and alarms) was being maintained and inventoried annually as required in the E-Plan.
- 4 -
*
Emergency Preparedness Plan, March 2017
*
Emergency Procedure (01-04)
*
Annual Records from for the past two years
-
E-Plan Training
-
Emergency Drill and Critique
-
Plan Review
-
Inventory of emergency supplies


Emergency drills had been conducted annually as required by the E-Plan. The facility participated in a campus wide drill in 2015 called "Buckeye Thunder." The drill for 2016 was a reactor pool overflow. Drill critiques and recommendations were written following the exercises. The critiques indicated that the E-Plan was being properly implemented and all recommendations made following the drills were subsequently addressed.
b. Observations and Findings


The inspector visited the Columbus Fire Department and discussed there interaction with the facility. The last facility tours took place in 2015. Future tours will be scheduled. The inspector found that they are prepared to respond to an event at the facility.
The inspector reviewed the new version of the E-Plan and determined that the effectiveness was not reduced.


c. Conclusion The emergency preparedness program was conducted in accordance with the E-Plan.
The inspector confirmed that the E-Plan was being audited and reviewed annually as required. Implementing procedures were reviewed and revised as needed to effectively implement the E-Plan. Emergency preparedness and response training for reactor staff was completed during operator requalification and documented in the programs records.


6. Maintenance Logs and Records a. Inspection Scope (IP 69001)
Emergency equipment (meters, supplies, communications, security, and alarms) was being maintained and inventoried annually as required in the E-Plan.
To ensure that maintenance activities associated with the requirements of TS 3.0, "Limiting Conditions for Operations," and TS 4.0, "Surveillance Requirements," were being completed, the inspector reviewed:  
 
* Maintenance Log-Book Volume III and IV  
Emergency drills had been conducted annually as required by the E-Plan. The facility participated in a campus wide drill in 2015 called Buckeye Thunder. The drill for 2016 was a reactor pool overflow. Drill critiques and recommendations were written following the exercises. The critiques indicated that the E-Plan was being properly implemented and all recommendations made following the drills were subsequently addressed.
* OSURR Console Log Book entries from March 9, 2016 (page 7891) to present  
 
* IM-07, "Rod Parameter Testing" * "Control Rod Data" binder * "Annual Report for The Ohio State University Research Reactor, License R-75, Docket 50-150," for the past two years  
The inspector visited the Columbus Fire Department and discussed there interaction with the facility. The last facility tours took place in 2015. Future tours will be scheduled.
- 5 -b. Observations and Findings The inspector reviewed the records regarding scheduled and unscheduled preventive and corrective maintenance activities the past two years. The records contained thorough documentation describing the maintenance activity and the repair setup.
 
The inspector found that they are prepared to respond to an event at the facility.
 
c. Conclusion
 
The emergency preparedness program was conducted in accordance with the E-Plan.
 
6.
 
Maintenance Logs and Records  
 
a. Inspection Scope (IP 69001)  
 
To ensure that maintenance activities associated with the requirements of TS 3.0, Limiting Conditions for Operations, and TS 4.0, Surveillance Requirements, were being completed, the inspector reviewed:  
* Maintenance Log-Book Volume III and IV  
*
OSURR Console Log Book entries from March 9, 2016 (page 7891) to present  
*
IM-07, Rod Parameter Testing  
*
Control Rod Data binder  
*
Annual Report for The Ohio State University Research Reactor, License R-75, Docket 50-150, for the past two years  
 
- 5 -
b. Observations and Findings  
 
The inspector reviewed the records regarding scheduled and unscheduled preventive and corrective maintenance activities the past two years. The records contained thorough documentation describing the maintenance activity and the repair setup.


These records were controlled and maintained in the maintenance and/or operations log as required. After completion of maintenance activities, system operational checks were performed to ensure that the affected systems functioned properly before returning them to service. This was also documented.
These records were controlled and maintained in the maintenance and/or operations log as required. After completion of maintenance activities, system operational checks were performed to ensure that the affected systems functioned properly before returning them to service. This was also documented.


One of the maintenance activities reviewed by the inspector involved a change to the period recorder scram setpoint. This was part of the period/startup rate recorder replacement. A new, more conservative setpoint was set. There was no change to the  
One of the maintenance activities reviewed by the inspector involved a change to the period recorder scram setpoint. This was part of the period/startup rate recorder replacement. A new, more conservative setpoint was set. There was no change to the TS.
 
c. Conclusion
 
Maintenance activities ensured that equipment remained consistent with the safety analysis report (SAR) and TS requirements.


TS. c. Conclusion Maintenance activities ensured that equipment remained consistent with the safety analysis report (SAR) and TS requirements.
7.


7. Fuel Handling a. Inspection Scope (IP 69001)
Fuel Handling  
To ensure that the fuel handling and inspection requirements specified in TS 4.1.2, "Fuel Elements," TS 5.3, "Reactor Core and Fuel," TS 5.4, "Fuel Storage," TS 5.5, "Fuel Handling Tools," TS 6.1.3, "Staffing," and TS 6.3.1, "Reactor Operating Procedures,"


were being met, the inspector reviewed:  
a. Inspection Scope (IP 69001)
* Fuel Inventory Inspection Records for the past two years * Operation and Maintenance (OM) Procedure OM-07, "Fuel Element Inspections," Revision 8, dated November 11, 2016 * OM-02, "Control Rod Annual Inspection," Revision 3, dated October 28, 2016  
 
* AP-05, "Special Nuclear Material Inventory," and Attachment B, "Fuel Element Inspection Form," Revision 5, dated Feb. 25, 2015 * AP-13, "Personnel Required for Reactor Operations," Revision 5, dated January 13, 2017 * OSURR Console Log Book entries from March 9, 2016 (page 7891) to present  
To ensure that the fuel handling and inspection requirements specified in TS 4.1.2, Fuel Elements, TS 5.3, Reactor Core and Fuel, TS 5.4, Fuel Storage, TS 5.5, Fuel Handling Tools, TS 6.1.3, Staffing, and TS 6.3.1, Reactor Operating Procedures, were being met, the inspector reviewed:  
* IM-03, "Pre-Start Checkout"
* Fuel Inventory Inspection Records for the past two years  
* IM-04, "Post-Shutdown Checkout"
*
* IM-05, "Core Reactivity Data" * IM-07, "Rod Parameter Testing" * Internal memorandum number NRC-2016-15, Revision 0, dated March 22, 2017, "Fuel Storage Well Criticality Analysis" b. Observations and Findings The licensee maintained a fuel element record of all their elements. The inspector reviewed selected records for fuel movements conducted for the periodic surveillance measurements and inspection of the reactor fuel and control rods. The movements of elements and their position in the core were maintained and tracked. All fuel  
Operation and Maintenance (OM) Procedure OM-07, Fuel Element Inspections, Revision 8, dated November 11, 2016  
- 6 -movements were noted in the appropriate OSURR Console Log Book. The inspector also verified that the fuel handling tool was secured.
*
OM-02, Control Rod Annual Inspection, Revision 3, dated October 28, 2016  
*
AP-05, Special Nuclear Material Inventory, and Attachment B, Fuel Element Inspection Form, Revision 5, dated Feb. 25, 2015  
*
AP-13, Personnel Required for Reactor Operations, Revision 5, dated January 13, 2017  
*
OSURR Console Log Book entries from March 9, 2016 (page 7891) to present  
*
IM-03, Pre-Start Checkout  
*
IM-04, Post-Shutdown Checkout  
*
IM-05, Core Reactivity Data  
*
IM-07, Rod Parameter Testing  
*
Internal memorandum number NRC-2016-15, Revision 0, dated March 22, 2017, Fuel Storage Well Criticality Analysis  
 
b. Observations and Findings  
 
The licensee maintained a fuel element record of all their elements. The inspector reviewed selected records for fuel movements conducted for the periodic surveillance measurements and inspection of the reactor fuel and control rods. The movements of elements and their position in the core were maintained and tracked. All fuel  
 
- 6 -
movements were noted in the appropriate OSURR Console Log Book. The inspector also verified that the fuel handling tool was secured.


Additionally, a fuel storage analysis was performed and it was determined that with the boral plates installed and the fuel storage racks full with every fuel element on site, keff upper limit is 0.59, below the 0.68 value stated in the SAR.
Additionally, a fuel storage analysis was performed and it was determined that with the boral plates installed and the fuel storage racks full with every fuel element on site, keff upper limit is 0.59, below the 0.68 value stated in the SAR.


c. Conclusion Fuel movements and inspections were being completed and documented in accordance with the requirements specified in the TS and by procedure.
c. Conclusion  
 
Fuel movements and inspections were being completed and documented in accordance with the requirements specified in the TS and by procedure.
 
8.
 
Exit Interview
 
The inspection scope and results were summarized on November 29, 2017, with members of licensee management and staff. The inspector described the areas inspected and discussed in detail the inspection findings. No dissenting comments were received from the licensee.
 
PARTIAL LIST OF PERSONS CONTACTED
 
Licensee Personnel Director, Nuclear Reactor Laboratory A. Kauffman
 
Associate Director, Nuclear Reactor Laboratory and SRO D. Konate


8. Exit Interview The inspection scope and results were summarized on November 29, 2017, with members of licensee management and staff. The inspector described the areas inspected and discussed in detail the inspection findings. No dissenting comments were received from the licensee.
Acting RSO K. Herminghuysen Research Associate and SRO S. White


PARTIAL LIST OF PERSONS CONTACTED Licensee Personnel Director, Nuclear Reactor Laboratory A. Kauffman Associate Director, Nuclear Reactor Laboratory and SRO D. Konate Acting RSO K. Herminghuysen Research Associate and SRO S. White Research Associate and SRO  
Research Associate and SRO  


Other Personnel  
Other Personnel  


J. Kasser Lt. Col., Fire Station 25  
J. Kasser  
 
Lt. Col., Fire Station 25  
 
INSPECTION PROCEDURES USED
 
IP 69001 Class II Non-Power Reactors
 
ITEMS OPENED, CLOSED, AND DISCUSSED
 
Opened
 
None
 
Closed
 
None
 
Discussed
 
None
 
LIST OF ACRONYMS USED
 
AP
 
Administrative Procedure E-Plan
 
Emergency Plan IP
 
Inspection Procedure LCO
 
Limiting Conditions for Operation NRC
 
U.S. Nuclear Regulatory Commission OM
 
Operations and Maintenance Procedure OSU


INSPECTION PROCEDURES USED IP 69001 Class II Non-Power Reactors ITEMS OPENED, CLOSED, AND DISCUSSED Opened None
The Ohio State University OSURR The Ohio State University Research Reactor SRO


Closed None
Senior Reactor Operator TS


Discussed None LIST OF ACRONYMS USED AP Administrative Procedure E-Plan Emergency Plan IP Inspection Procedure LCO Limiting Conditions for Operation NRC U.S. Nuclear Regulatory Commission OM Operations and Maintenance Procedure OSU The Ohio State University OSURR The Ohio State University Research Reactor SRO Senior Reactor Operator TS Technical Specification
Technical Specification
}}
}}

Latest revision as of 00:50, 7 January 2025

Ohio State University - Nuclear Regulatory Commission Safety Inspection Report No. 50-150/2017-201
ML18038B524
Person / Time
Site: Ohio State University
Issue date: 02/13/2018
From: Anthony Mendiola
Division of Licensing Projects
To: Cao L
Ohio State University
Font O, NRR/DLP, 415-2490
References
IR 2017201
Download: ML18038B524 (13)


Text

February 13, 2018

SUBJECT:

OHIO STATE UNIVERSITY - NUCLEAR REGULATORY COMMISSION SAFETY INSPECTION REPORT NO. 50-150/2017-201

Dear Dr. Cao:

From November 27-29, 2017, the U.S. Nuclear Regulatory Commission (NRC) conducted an inspection at the Ohio State University Nuclear Reactor Laboratory facility. The enclosed report documents the inspection results, which were discussed on November 29, 2017, with you and members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no findings of significance were identified.

No response to this letter is required.

In accordance with Title 10 of the Code of Federal Regulations 2.390, Public inspections, exemptions, and requests for withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (Agencywide Documents Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If you have any questions concerning this inspection, please contact Anthony J. Mendiola at (301) 466-4495, or by electronic mail at Anthony.Mendiola@nrc.gov.

Sincerely,

/RA Elizabeth Reed for/

Anthony J. Mendiola, Chief

Research and Test Reactors Oversight Branch

Division of Licensing Projects

Office of Nuclear Reactor Regulation

Docket No. 50-150 License No. R-75

Enclosure:

As stated

cc: See next page

Ohio State University Docket No. 50-150

cc:

Chief Ohio Department of Health Bureau of Environmental Health and Radiation Protection 246 North High Street Columbus, OH 43215

Radiological Branch Chief Ohio Emergency Management Agency 2855 West Dublin Granville Road Columbus, OH 43235 2206

Andrew Kauffman, Associate Director Nuclear Reactor Laboratory Ohio State University 1298 Kinnear Road Columbus, OH 43212

David B. Williams, Dean College of Engineering The Ohio State University 142A Hitchcock Hall 2070 Neil Ave.

Columbus, OH 43210-1278

Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611

ML18038B524 *concurrence via email NRC-002 OFFICE NRR/DLP/PROB/RI NRR/DLP/PROB/LA*

NRR/DLP/PROB/BC NAME OFont NParker AMendiola (EReed for)

DATE 2/12/18 2/12/18 2/13/18

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION

Docket No.:

50-150

License No.:

R-75

Report No.:

50-150/2017-201

Licensee:

Ohio State University

Facility:

Nuclear Reactor Laboratory

Location:

Columbus, Ohio

Dates:

November 27-29, 2017

Inspector:

Ossy Font

Approved by:

Anthony J.Mendiola, Chief Research and Test Reactors Oversight Branch Division of Licensing Projects Office of Nuclear Reactor Regulation

EXECUTIVE SUMMARY

Ohio State University

Nuclear Reactor Laboratory

Nuclear Regulatory Commission

Inspection Report No. 50-150/2017-201

The primary focus of this routine, announced inspection was the on-site review of selected aspects of the Ohio State Universitys (the licensees) Class II research and test reactor safety program including: (1) organization and staffing; (2) operations logs and records; (3) requalification training; (4) surveillance and limiting conditions for operation; (5) emergency planning; (6) maintenance logs and records, and (7) fuel handling logs and records since the last U.S. Nuclear Regulatory Commission (NRC) inspection of these areas. The licensee's program was acceptably directed toward the protection of public health and safety and in compliance with NRC requirements. No violations or deviations were identified.

Organization and Staffing

  • The licensee's organization and staffing qualifications remain in compliance with the requirements specified in the technical specification (TS).

Operations Logs and Records

Operational activities were consistent with applicable TS and procedural requirements.

Requalification Training

  • Operator requalification was being conducted and completed as required by the Operator Requalification Program.

Surveillance and Limiting Conditions for Operation

  • The program for surveillance and limiting conditions for operation confirmation was implemented in accordance with TS requirements.

Emergency Planning

Maintenance Logs and Records

  • Maintenance activities ensured that equipment remained consistent with the safety analysis report and TS requirements.

Fuel Handling Logs and Records

  • Fuel movements and inspections were being completed and documented in accordance with the requirements specified in the TS and by procedure.

Enclosure REPORT DETAILS

Summary of Plant Status

The Ohio State Universitys (OSU, the licensees) five-hundred kilowatt open pool-type reactor continued to be operated in support of undergraduate instruction, laboratory experiments, reactor operator training, and various types of irradiation projects. During the inspection, the reactor was started up and operated, and shut down in accordance with applicable procedures to support these ongoing activities.

1. Organization and Staffing

a. Inspection Scope (Inspection Procedure [IP] 69001)

To ensure that the requirements of technical specification (TS) 6.1, Organization, were being met, the inspector reviewed:

  • Organizational structure (TS Figure 6.1)

OSU Research Reactor (OSURR) Console Log Book entries from March 9, 2016 (page 7891) to present

b. Observations and Findings

The inspector determined that the organizational structure at the OSURR facility had not changed since the previous U.S. Nuclear Regulatory Commission (NRC) inspection.

The Associate Director continued to be responsible for the day-to-day operation of the OSURR and ensured that operations were conducted in a safe manner.

The inspector noted that there were three Senior Reactor Operators (SROs) working at the facility and no reactor operators and determined that the minimum shift staffing composition for operation, including on-call personnel, is consistent with the TS.

c. Conclusion

The licensee's organization and staffing qualifications remain in compliance with the requirements specified in the TS.

2. Operations Logs and Records

a. Inspection Scope (IP 69001)

To ensure that the requirements of TS 6.3, Procedures, and TS 6.7, Records, were being met, the inspector reviewed:

  • OSURR Console Log Book entries from March 9, 2016 (page 7891) to present

IM-03, Pre-Start Checkout, and forms for 2015 - present

IM-04, Post-Shutdown Checkout, and forms for 2015 - present

IM-01, Reactor Operations, Revision 18, dated June 14, 2017

Request for Reactor Operations procedures and forms for 2015 - present

Radiation Safety 09, Area Radiation Survey procedures and forms for 2013-present

- 2 -

Administrative Procedure (AP) 13 Personnel Required for Reactor Operations, Revision 5, dated January 13, 2017

-

16-01, Neutron Transmission Testing

-

17-08, Radiation Effects of Borated Silflex

-

17-13, Radiation Effects on Lexan Samples

b. Observations and Findings

The inspector reviewed selected log book entries, request for operations, and pre-start, post-shutdown, and area radiation safety survey forms and determined that logs and records are maintained as required by the licensee's administrative procedures.

Records also showed that operational conditions and parameters were consistent with the license and TS requirements. The inspector also observed the reactor staff perform the required pre-start, post-shutdown, and area radiation survey checkout and a reactor startup and shutdown and the completion of the associated records and logs. The inspector determined that reactor operations were carried out following written procedures as required by TS 6.3 and TS 6.7.

c. Conclusion

Operational activities were consistent with applicable TS and procedural requirements.

3. Requalification Training

a. Inspection Scope (IP 69001)

To ensure that the requirements of the operator requalification program were being met, the inspector reviewed:

  • AP-07, Document Distribution

AP-09, Reactor Operator/SRO Requalification, Revision 7, approval dated September 25, 1996

AP-10, Console Operating Experience Record, and Attachment A

Operator physical examination records for the past two years

OSURR Operator Requalification Training Sessions for the past two years

OSURR Operator Requalification Operational Examination Records for the past two years

OSURR Operator Requalification Written Examination Records for the past two years

OSURR Console Operating Experience Records for the past two years

OSURR Console Log Book entries from March 9, 2016 (page 7891) to present

b. Observations and Findings

As of the date of the inspection, all the operators licenses were current. All operators were enrolled in the licensees NRC-approved requalification and training program and had completed a minimum of four hours of shift functions per quarter. The inspector noted that operators were receiving the required biennial medical examinations.

A review of the logs and records showed that training was being conducted in accordance with the program. Requalification program data such as completion of written examinations and operation tests was documented as required. Records of

- 3 -

reactivity manipulations, and other operations activities were being maintained throughout the year.

c. Conclusion

Operator requalification was being conducted and completed as required by the operator requalification program.

4. Surveillance and Limiting Conditions for Operation

a. Inspection Scope (IP 69001)

To ensure that the requirements of TS 3.0, Limiting Conditions for Operations, and TS 4.0, Surveillance Requirements, were being met, the inspector reviewed:

  • Surveillance Item Sheets for the past two years

OSURR Console Log Book entries from March 9, 2016 (page 7891) to present

Annual Report for The Ohio State University Research Reactor, License R-75, Docket 50-150, for the past two years

Surveillance records for the past two years

b. Observations and Findings

The inspector performed a random sampling of the daily, weekly, monthly, quarterly, semi-annual, and other periodic checks, tests, and verifications for TS required limiting conditions for operation (LCO) and determined that they were completed in the specified time frame and in accordance with licensee procedures. The records and logs reviewed were complete and were being maintained as required. The inspector noted that the licensee maintained an effective record keeping system that helped ensure that all required tests, LCO verifications, and calibrations were completed in a timely manner.

All routine periodic surveillance items and tasks were listed on log sheets readily visible and available to all operators. It tracks the previous completion and the most recent one, if done.

All the recorded results for the activities reviewed by the inspector were within the TS required parameters.

c. Conclusion

The program for Surveillance and LCO confirmation was implemented in accordance with TS requirements.

5.

Emergency Planning

a. Inspection Scope (IP 69001)

To ensure that the requirements of emergency plan (E-Plan) were being met, the inspector reviewed:

- 4 -

Emergency Preparedness Plan, March 2017

Emergency Procedure (01-04)

Annual Records from for the past two years

-

E-Plan Training

-

Emergency Drill and Critique

-

Plan Review

-

Inventory of emergency supplies

b. Observations and Findings

The inspector reviewed the new version of the E-Plan and determined that the effectiveness was not reduced.

The inspector confirmed that the E-Plan was being audited and reviewed annually as required. Implementing procedures were reviewed and revised as needed to effectively implement the E-Plan. Emergency preparedness and response training for reactor staff was completed during operator requalification and documented in the programs records.

Emergency equipment (meters, supplies, communications, security, and alarms) was being maintained and inventoried annually as required in the E-Plan.

Emergency drills had been conducted annually as required by the E-Plan. The facility participated in a campus wide drill in 2015 called Buckeye Thunder. The drill for 2016 was a reactor pool overflow. Drill critiques and recommendations were written following the exercises. The critiques indicated that the E-Plan was being properly implemented and all recommendations made following the drills were subsequently addressed.

The inspector visited the Columbus Fire Department and discussed there interaction with the facility. The last facility tours took place in 2015. Future tours will be scheduled.

The inspector found that they are prepared to respond to an event at the facility.

c. Conclusion

The emergency preparedness program was conducted in accordance with the E-Plan.

6.

Maintenance Logs and Records

a. Inspection Scope (IP 69001)

To ensure that maintenance activities associated with the requirements of TS 3.0, Limiting Conditions for Operations, and TS 4.0, Surveillance Requirements, were being completed, the inspector reviewed:

  • Maintenance Log-Book Volume III and IV

OSURR Console Log Book entries from March 9, 2016 (page 7891) to present

IM-07, Rod Parameter Testing

Control Rod Data binder

Annual Report for The Ohio State University Research Reactor, License R-75, Docket 50-150, for the past two years

- 5 -

b. Observations and Findings

The inspector reviewed the records regarding scheduled and unscheduled preventive and corrective maintenance activities the past two years. The records contained thorough documentation describing the maintenance activity and the repair setup.

These records were controlled and maintained in the maintenance and/or operations log as required. After completion of maintenance activities, system operational checks were performed to ensure that the affected systems functioned properly before returning them to service. This was also documented.

One of the maintenance activities reviewed by the inspector involved a change to the period recorder scram setpoint. This was part of the period/startup rate recorder replacement. A new, more conservative setpoint was set. There was no change to the TS.

c. Conclusion

Maintenance activities ensured that equipment remained consistent with the safety analysis report (SAR) and TS requirements.

7.

Fuel Handling

a. Inspection Scope (IP 69001)

To ensure that the fuel handling and inspection requirements specified in TS 4.1.2, Fuel Elements, TS 5.3, Reactor Core and Fuel, TS 5.4, Fuel Storage, TS 5.5, Fuel Handling Tools, TS 6.1.3, Staffing, and TS 6.3.1, Reactor Operating Procedures, were being met, the inspector reviewed:

  • Fuel Inventory Inspection Records for the past two years

Operation and Maintenance (OM) Procedure OM-07, Fuel Element Inspections, Revision 8, dated November 11, 2016

OM-02, Control Rod Annual Inspection, Revision 3, dated October 28, 2016

AP-05, Special Nuclear Material Inventory, and Attachment B, Fuel Element Inspection Form, Revision 5, dated Feb. 25, 2015

AP-13, Personnel Required for Reactor Operations, Revision 5, dated January 13, 2017

OSURR Console Log Book entries from March 9, 2016 (page 7891) to present

IM-03, Pre-Start Checkout

IM-04, Post-Shutdown Checkout

IM-05, Core Reactivity Data

IM-07, Rod Parameter Testing

Internal memorandum number NRC-2016-15, Revision 0, dated March 22, 2017, Fuel Storage Well Criticality Analysis

b. Observations and Findings

The licensee maintained a fuel element record of all their elements. The inspector reviewed selected records for fuel movements conducted for the periodic surveillance measurements and inspection of the reactor fuel and control rods. The movements of elements and their position in the core were maintained and tracked. All fuel

- 6 -

movements were noted in the appropriate OSURR Console Log Book. The inspector also verified that the fuel handling tool was secured.

Additionally, a fuel storage analysis was performed and it was determined that with the boral plates installed and the fuel storage racks full with every fuel element on site, keff upper limit is 0.59, below the 0.68 value stated in the SAR.

c. Conclusion

Fuel movements and inspections were being completed and documented in accordance with the requirements specified in the TS and by procedure.

8.

Exit Interview

The inspection scope and results were summarized on November 29, 2017, with members of licensee management and staff. The inspector described the areas inspected and discussed in detail the inspection findings. No dissenting comments were received from the licensee.

PARTIAL LIST OF PERSONS CONTACTED

Licensee Personnel Director, Nuclear Reactor Laboratory A. Kauffman

Associate Director, Nuclear Reactor Laboratory and SRO D. Konate

Acting RSO K. Herminghuysen Research Associate and SRO S. White

Research Associate and SRO

Other Personnel

J. Kasser

Lt. Col., Fire Station 25

INSPECTION PROCEDURES USED

IP 69001 Class II Non-Power Reactors

ITEMS OPENED, CLOSED, AND DISCUSSED

Opened

None

Closed

None

Discussed

None

LIST OF ACRONYMS USED

AP

Administrative Procedure E-Plan

Emergency Plan IP

Inspection Procedure LCO

Limiting Conditions for Operation NRC

U.S. Nuclear Regulatory Commission OM

Operations and Maintenance Procedure OSU

The Ohio State University OSURR The Ohio State University Research Reactor SRO

Senior Reactor Operator TS

Technical Specification