| title = NRC Emergency Preparedness Annual Inspection Report 05000275/2013502 and 05000323/2013502
| title = NRC Emergency Preparedness Annual Inspection Report 05000275/2013502 and 05000323/2013502
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:July 17, 2014  
{{#Wiki_filter:July 17, 2014


Mr. Edward Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company
==SUBJECT:==
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2013502 AND 05000323/2013502


Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6
==Dear Mr. Halpin:==
December 31, 2013


Avila Beach, CA 93424 SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2013502 AND  
==SUBJECT:==
 
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2013502 AND 05000323/2013502
05000323/2013502


==Dear Mr. Halpin:==
==Dear Mr. Halpin:==
On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000275/2013502 and 05000323/2013502. The inspection results associated with the 2013-502 reports are documented in integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.
On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000275/2013502 and 05000323/2013502. The inspection results associated with the 2013-502 reports are documented in integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,
Sincerely,
/RA/
/RA/  
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
 
Dockets: 50-275; 50-323
 
Licenses: DPR-80; DPR-82
 
Electronic Distribution Diablo Canyon Power Plant UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511


July 17, 2014
Mark S. Haire, Chief


Mr. Edward Senior Vice President and
Plant Support Branch 1


Chief Nuclear Officer Pacific Gas and Electric Company
Division of Reactor Safety


Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82


SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2013502 AND
Electronic Distribution Diablo Canyon Power Plant


05000323/2013502
Distribution:
M. Haire P. Elkmann L. Williams


==Dear Mr. Halpin:==
DOCUMENT NAME: R:\\_REACTORS\\_DC\\DC2013502-LTR-pje.docx ML14198A633 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000275/2013502 and 05000323/2013502. The inspection results associated with the 2013-502 reports are documented in integrated Resident Inspector Reports
RGN-002 OFFICE C:PSB1


2013-002, 2013-003, 2013-004, and 2013-005.
NAME MHaire/dch
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety


Dockets: 50-275; 50-323
SIGNATURE
/RA/


Licenses: DPR-80; DPR-82
DATE 7/17/14


Electronic Distribution Diablo Canyon Power Plant Distribution
OFFICIAL RECORD COPY
: M. Haire P. Elkmann L. Williams DOCUMENT NAME: R:\_REACTORS\_DC\DC2013502-LTR-pje.docx ML14198A633 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1 NAME MHaire/dch SIGNATURE /RA/ DATE 7/17/14 OFFICIAL RECORD COPY
}}
}}

Latest revision as of 17:53, 10 January 2025

NRC Emergency Preparedness Annual Inspection Report 05000275/2013502 and 05000323/2013502
ML14198A633
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/17/2014
From: Mark Haire
Division of Reactor Safety IV
To: Halpin E
Pacific Gas & Electric Co
References
IR-13-502
Download: ML14198A633 (2)


Text

July 17, 2014

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2013502 AND 05000323/2013502

Dear Mr. Halpin:

December 31, 2013

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2013502 AND 05000323/2013502

Dear Mr. Halpin:

On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000275/2013502 and 05000323/2013502. The inspection results associated with the 2013-502 reports are documented in integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark S. Haire, Chief

Plant Support Branch 1

Division of Reactor Safety

Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82

Electronic Distribution Diablo Canyon Power Plant

Distribution:

M. Haire P. Elkmann L. Williams

DOCUMENT NAME: R:\\_REACTORS\\_DC\\DC2013502-LTR-pje.docx ML14198A633 SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:

RGN-002 OFFICE C:PSB1

NAME MHaire/dch

SIGNATURE

/RA/

DATE 7/17/14

OFFICIAL RECORD COPY