| issue date = 08/20/2014
| issue date = 08/20/2014
| title = NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000275/2014406 and 05000323/2014406
| title = NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000275/2014406 and 05000323/2014406
| author name = Dixon J L
| author name = Dixon J
| author affiliation = NRC/RGN-IV/DRS
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:" " August 20, 2014  
{{#Wiki_filter:ust 20, 2014


Mr. Edward D. Halpin, Senior Vice President
==SUBJECT:==
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC TEMPORARY INSTRUCTION 2201/004, "INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY MILESTONES 1-7," INSPECTION REPORT 05000275/2014406 AND 05000323/2014406


and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6
==Dear Mr. Halpin:==
 
On July 28, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security temporary instruction inspection at the Diablo Canyon Power Plant, Units 1 and 2. The inspection covered the implementation of interim milestones, as outlined in your approved cyber security plan and described in Temporary Instruction 2201/004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7." The enclosed inspection report documents the inspection results, which were discussed on July 28, 2014, with Mr. B. Allen, Site Vice President, and other members of your staff.
Avila Beach, CA 93424


SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC TEMPORARY INSTRUCTION 2201/004, "INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY MILESTONES 1-7," INSPECTION REPORT 05000275/2014406 AND 05000323/2014406
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.


==Dear Mr. Halpin:==
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
On July 28, 2014, the U.S. Nuclear Regulator y Commission (NRC) completed a security temporary instruction inspection at the Diablo Canyon Power Plant, Units 1 and 2. The inspection covered the implementation of interim milestones, as outlined in your approved cyber security plan and described in Temporary Instruction 2201/004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7." The enclosed inspection report documents the inspection results, which were discussed on July 28, 2014, with Mr. B. Allen, Site Vice President, and other members of your staff.


The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
NRC inspectors documented three findings of very low safety significance in this report. These findings involved violations of NRC requirements. Inspectors also documented three licensee-identified violations which were determined to be of very low safety significance.


NRC inspectors documented three findings of very low safety significance in this report. These findings involved violations of NRC requirements. Inspectors also documented three licensee-identified violations which were determined to be of very low safety significance. These violations are listed in Section 4OA7 of this report. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.
These violations are listed in Section 4OA7 of this report. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.


UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 These issues were discussed and reviewed during a Security Issues Forum (SIF) conducted on July 9, 2014. The results of the SIF Panel review concluded that although these issues constituted violations of Title 10 of the Code of Federal Regulations (10 CFR), Part 73, Section 54, "Protection of Digital Computer and Communication Systems and Networks," the NRC is exercising enforcement discretion. The NRC is exercising enforcement discretion for these violations because they meet the criteria established in an NRC Memorandum from Barry C. Westreich, Director, Cyber Security Directorate, Office of Nuclear Security and Incident Response, to each regional office and Director, Division of Reactor Safety, Subject: Enhanced Guidance for Licensee Near-Term Corrective Actions to Address Cyber Security Inspection Findings and Licensee Eligibility for "Good-Faith" Attempt Discretion, dated July 1, 2013.
" " These issues were discussed and reviewed during a Security Issues Forum (SIF) conducted on July 9, 2014. The results of the SIF Panel review concluded that although these issues constituted violations of Title 10 of the Code of Federal Regulations (10 CFR), Part 73, Section 54, "Protection of Digital Computer and Communication Systems and Networks," the NRC is exercising enforcement discretion. The NRC is exercising enforcement discretion for these violations because they meet the criteria established in an NRC Memorandum from Barry C. Westreich, Director, Cyber Security Directorate, Office of Nuclear Security and Incident Response, to each regional office and Director, Division of Reactor Safety, Subject: Enhanced Guidance for Licensee Near-Term Corrective Actions to Address Cyber Security Inspection Findings and Licensee Eligibility for "Good-Faith" Attempt Discretion, dated July 1, 2013.


Consistent with the NRC Memorandum, when you complete and close corrective actions associated with these violations, you are request ed to provide written notification to the NRC's regional office as to the method and date of closure of the corrective actions for the identified violations.
Consistent with the NRC Memorandum, when you complete and close corrective actions associated with these violations, you are requested to provide written notification to the NRC's regional office as to the method and date of closure of the corrective actions for the identified violations.


If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Diablo Canyon Power Plant.
If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Diablo Canyon Power Plant.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The material enclo sed herewith, however, contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The material enclosed herewith, however, contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Sincerely,
Sincerely,
/RA/  
/RA/
 
John L. Dixon, Jr., Acting Chief Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82 Nonpublic Enclosure:
John L. Dixon, Jr., Acting Chief Engineering Branch 2  
NRC Inspection Report 05000275/2014406 and 05000323/2014406 w/Attachment: Supplemental Information cc w/enclosure:
 
Mr. Michael V. Priebe Nuclear Security Director Pacific Gas and Electric Company Diablo Canyon Power Plant Mail Code 104/5/508 P.O. Box 56 Avila Beach, CA 93424 Electronic Distribution for Diablo Canyon Power Plant ML14232A821 REPORT w/Encl.
Division of Reactor Safety Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82  
 
Nonpublic Enclosure: NRC Inspection Report 05000275/2014406 and 05000323/2014406 w/Attachment: Supplemental Information  
 
cc w/enclosure:  
 
Mr. Michael V. Priebe Nuclear Security Director Pacific Gas and Electric Company  
 
Diablo Canyon Power Plant  
 
Mail Code 104/5/508 P.O. Box 56 Avila Beach, CA 93424  
 
Electronic Distribution for Diablo Canyon Power Plant  
 
ML14232A821 REPORT w/Encl. SUNSI Review By: STG ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4 Non-Public Cover Letter w/o Encl. SUNSI Review By: STG ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SRI/EB2 NSE:ORA/RCB CSS:NSIR/CSD SRA:NSIR/ DSO/STSB C:DRP/PBA C:DRS/EB2 NAME SGraves/dch DLivermore MFernandez LJones WWalker JDixon SIGNATURE /RA/ Email Email /RA/ /RA/ /RA/ DATE 7/28/14 8/4/14 7/28/14 8/19/14 8/19/14 8/20/14 Letter and Inspection Report to Edward from John L. Dixon, Jr., dated August 20, 2014 SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC TEMPORARY INSTRUCTION 2201/004, "INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY MILESTONES 1-7," INSPECTION REPORT 05000275/2014406 AND 05000323/2014406


Electronic Distribution by RIV w/enclosure
SUNSI Review ADAMS  Publicly Available Non-Sensitive Keyword:
: Director, Cyber Security Directorate (Barry.Westreich@nrc.gov) Deputy Director, Cyber Security Directorate (Russell.Felts@nrc.gov)
By: STG  Yes No Non-Publicly Sensitive MD 3.4 Non-Public Available Cover Letter w/o Encl.


SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: STG  Yes No Non-Publicly Available Sensitive RGN-002 OFFICE SRI/EB2 NSE:ORA/RCB CSS:NSIR/CSD SRA:NSIR/ C:DRP/PBA C:DRS/EB2 DSO/STSB NAME SGraves/dch DLivermore MFernandez LJones WWalker JDixon SIGNATURE /RA/ Email Email /RA/ /RA/ /RA/
DATE 7/28/14 8/4/14 7/28/14 8/19/14 8/19/14 8/20/14 Letter and Inspection Report to Edward from John L. Dixon, Jr., dated August 20, 2014 SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC TEMPORARY INSTRUCTION 2201/004, "INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY MILESTONES 1-7," INSPECTION REPORT 05000275/2014406 AND 05000323/2014406 Electronic Distribution by RIV w/enclosure:
Director, Cyber Security Directorate (Barry.Westreich@nrc.gov)
Deputy Director, Cyber Security Directorate (Russell.Felts@nrc.gov)
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Branch Chief, RI DRS/EB3 (John Rogge@nrc.gov)  
Branch Chief, RI DRS/EB3 (John Rogge@nrc.gov)
 
Branch Chief, RII DRS/EB2 (Scott.Shaeffer@nrc.gov)
Branch Chief, RII DRS/EB2 (Scott.Shaeffer@nrc.gov) Branch Chief, RIII DRS/EB3 (Robert.Daley@nrc.gov) Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
Branch Chief, RIII DRS/EB3 (Robert.Daley@nrc.gov)
Cyber Security Specialist (Mario.Fernandez@nrc.gov)  
Senior Resident Inspector (Thomas.Hipschman@nrc.gov)
 
Cyber Security Specialist (Mario.Fernandez@nrc.gov)
Security Risk Analyst (Larry.Jones@nrc.gov)
Security Risk Analyst (Larry.Jones@nrc.gov)
Nuclear Systems Engineer (Dan.Livermore@nrc.gov)
Nuclear Systems Engineer (Dan.Livermore@nrc.gov)
Electronic Distribution by RIV w/o enclosure
Electronic Distribution by RIV w/o enclosure:
: Regional Administrator (Marc.Dapas@nrc.gov)
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov)
Acting DRP Deputy Director (Michael.Hay@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)
Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)
Project Engineer, DRP/A (Brian.Cummings@nrc.gov)
Project Engineer, DRP/A (Brian.Cummings@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Peter.Bamford@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)  
Project Manager (Peter.Bamford@nrc.gov)
 
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)
ROPreports
ROPreports
}}
}}

Latest revision as of 01:13, 4 November 2019

NRC Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000275/2014406 and 05000323/2014406
ML14232A821
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/20/2014
From: John Dixon
Division of Reactor Safety IV
To: Halpin E
Pacific Gas & Electric Co
References
IR-2014-406
Download: ML14232A821 (5)


Text

ust 20, 2014

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC TEMPORARY INSTRUCTION 2201/004, "INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY MILESTONES 1-7," INSPECTION REPORT 05000275/2014406 AND 05000323/2014406

Dear Mr. Halpin:

On July 28, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security temporary instruction inspection at the Diablo Canyon Power Plant, Units 1 and 2. The inspection covered the implementation of interim milestones, as outlined in your approved cyber security plan and described in Temporary Instruction 2201/004, "Inspection of Implementation of Interim Cyber Security Milestones 1-7." The enclosed inspection report documents the inspection results, which were discussed on July 28, 2014, with Mr. B. Allen, Site Vice President, and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

NRC inspectors documented three findings of very low safety significance in this report. These findings involved violations of NRC requirements. Inspectors also documented three licensee-identified violations which were determined to be of very low safety significance.

These violations are listed in Section 4OA7 of this report. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.

" " These issues were discussed and reviewed during a Security Issues Forum (SIF) conducted on July 9, 2014. The results of the SIF Panel review concluded that although these issues constituted violations of Title 10 of the Code of Federal Regulations (10 CFR), Part 73, Section 54, "Protection of Digital Computer and Communication Systems and Networks," the NRC is exercising enforcement discretion. The NRC is exercising enforcement discretion for these violations because they meet the criteria established in an NRC Memorandum from Barry C. Westreich, Director, Cyber Security Directorate, Office of Nuclear Security and Incident Response, to each regional office and Director, Division of Reactor Safety, Subject: Enhanced Guidance for Licensee Near-Term Corrective Actions to Address Cyber Security Inspection Findings and Licensee Eligibility for "Good-Faith" Attempt Discretion, dated July 1, 2013.

Consistent with the NRC Memorandum, when you complete and close corrective actions associated with these violations, you are requested to provide written notification to the NRC's regional office as to the method and date of closure of the corrective actions for the identified violations.

If you contest the violations or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Diablo Canyon Power Plant.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). The material enclosed herewith, however, contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

John L. Dixon, Jr., Acting Chief Engineering Branch 2 Division of Reactor Safety Docket Nos.: 50-275; 50-323 License Nos.: DPR-80; DPR-82 Nonpublic Enclosure:

NRC Inspection Report 05000275/2014406 and 05000323/2014406 w/Attachment: Supplemental Information cc w/enclosure:

Mr. Michael V. Priebe Nuclear Security Director Pacific Gas and Electric Company Diablo Canyon Power Plant Mail Code 104/5/508 P.O. Box 56 Avila Beach, CA 93424 Electronic Distribution for Diablo Canyon Power Plant ML14232A821 REPORT w/Encl.

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: STG Yes No Non-Publicly Sensitive MD 3.4 Non-Public Available Cover Letter w/o Encl.

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: STG Yes No Non-Publicly Available Sensitive RGN-002 OFFICE SRI/EB2 NSE:ORA/RCB CSS:NSIR/CSD SRA:NSIR/ C:DRP/PBA C:DRS/EB2 DSO/STSB NAME SGraves/dch DLivermore MFernandez LJones WWalker JDixon SIGNATURE /RA/ Email Email /RA/ /RA/ /RA/

DATE 7/28/14 8/4/14 7/28/14 8/19/14 8/19/14 8/20/14 Letter and Inspection Report to Edward from John L. Dixon, Jr., dated August 20, 2014 SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC TEMPORARY INSTRUCTION 2201/004, "INSPECTION OF IMPLEMENTATION OF INTERIM CYBER SECURITY MILESTONES 1-7," INSPECTION REPORT 05000275/2014406 AND 05000323/2014406 Electronic Distribution by RIV w/enclosure:

Director, Cyber Security Directorate (Barry.Westreich@nrc.gov)

Deputy Director, Cyber Security Directorate (Russell.Felts@nrc.gov)

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Branch Chief, RI DRS/EB3 (John Rogge@nrc.gov)

Branch Chief, RII DRS/EB2 (Scott.Shaeffer@nrc.gov)

Branch Chief, RIII DRS/EB3 (Robert.Daley@nrc.gov)

Senior Resident Inspector (Thomas.Hipschman@nrc.gov)

Cyber Security Specialist (Mario.Fernandez@nrc.gov)

Security Risk Analyst (Larry.Jones@nrc.gov)

Nuclear Systems Engineer (Dan.Livermore@nrc.gov)

Electronic Distribution by RIV w/o enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Michael.Hay@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Acting Senior Project Engineer, DRP/A (Theresa.Buchanan@nrc.gov)

Project Engineer, DRP/A (Brian.Cummings@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Peter.Bamford@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)

ROPreports