IR 05000244/2017005: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 5: | Line 5: | ||
| author name = Dimitriadis A | | author name = Dimitriadis A | ||
| author affiliation = NRC/RGN-I/DRP/PB1 | | author affiliation = NRC/RGN-I/DRP/PB1 | ||
| addressee name = Hanson B | | addressee name = Hanson B | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000244 | | docket = 05000244 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:August 28, 2017 | ||
==SUBJECT:== | |||
UPDATED INSPECTION PLAN FOR R. E. GINNA NUCLEAR POWER | |||
PLANT - INSPECTION REPORT 05000244/2017005 | |||
==Dear Mr. Hanson:== | ==Dear Mr. Hanson:== | ||
The enclosed inspection plan lists the inspections scheduled through June 30 , | The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for your R. E. Ginna Nuclear Power Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. | ||
-publicly available correspondence. | |||
In addition to normal baseline inspection, the NRC will be performing infrequent | In addition to normal baseline inspection, the NRC will be performing infrequent inspections under Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, and Inspection Procedure 71003, Post-Approved Site Inspection for License Renewal. | ||
-Approved Site Inspection for License Renewal. | |||
Please contact me at 610-337-6953 with any questions you have regarding this letter. | Please contact me at 610-337-6953 with any questions you have regarding this letter. | ||
Sincerely, | Sincerely, | ||
/RA/ Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket No. 50-244 License No | /RA/ | ||
Inspection Plan cc: Distribution via ListServ | Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects | ||
Docket No. | |||
50-244 License No. | |||
DPR-18 | |||
Enclosure: | |||
Inspection Plan | |||
cc: Distribution via ListServ | |||
ML17241A040 | |||
SUNSI Review | |||
Non-Sensitive Sensitive | |||
Publicly Available Non-Publicly Available | |||
OFFICE RI/DRP RI/DRP | |||
NAME ARosebrook ADimitriadis | |||
DATE 8/15/17 8/28/17 | |||
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Ginna Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 2 08/09/2017 12:29:12 7111107T | |||
- TRIENNIAL HEAT SINK | |||
1 IP Heat Sink Performance 7111107T 07/31/2017 08/04/2017 EP | |||
- EP EXERCISE INSPECTION | |||
1 IP Exercise Evaluation 7111401 08/21/2017 08/25/2017 | |||
IP Performance Indicator Verification 71151 08/21/2017 08/25/2017 7111121N | |||
- EQ PROGRAM | |||
1 IP Design Bases Assurance Inspection (Programs) | |||
7111121N 08/07/2017 08/11/2017 | |||
IP Design Bases Assurance Inspection (Programs) | |||
7111121N 08/21/2017 08/25/2017 HP | |||
- RADIATION SAFETY - REMP & PIV | |||
1 IP Radiological Environmental Monitoring Program 71124.07 09/11/2017 09/15/2017 | |||
IP Occupational Exposure Control Effectiveness 71151-OR01 09/11/2017 09/15/2017 | |||
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 09/11/2017 09/15/2017 50.59 | |||
- EVALS OF CHANGES, TESTS, & EXPERIMENTS | |||
1 IP screenings and/or applicability determinations 7111117T-5059scrn 09/25/2017 09/29/2017 71152 | |||
- SAMPLE: REVIEW RC AND CA MAIN STM SV'S | |||
1 IP Performance Indicator Verification 71151 12/04/2017 12/08/2017 71152B | |||
- PI&R BIENNIAL | |||
1 IP Problem Identification and Resolution 71152B 03/05/2018 03/09/2018 | |||
IP Problem Identification and Resolution 71152B 03/19/2018 03/23/2018 8/27EXAM | |||
- GINNA INITIAL OL EXAM | |||
1 FY18 GINNA EXAM (AUGUST 2018) | |||
U01977 07/30/2018 08/03/2018 | |||
FY18 GINNA EXAM (AUGUST 2018) | |||
U01977 08/27/2018 09/07/2018 HP | |||
- RADIATION SAFETY - ALARA | |||
1 IP Occupational ALARA Planning and Controls 71124.02 03/19/2018 03/23/2018 71124.08 | |||
- RADWASTE | |||
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/16/2018 04/20/2018 7111105T | |||
- TRIENNIAL FIRE PROTECTION | |||
1 IP Fire Protection [Triennial] | |||
7111105T 06/04/2018 06/08/2018 | |||
IP Fire Protection [Triennial] | |||
7111105T 06/18/2018 06/22/2018 HP | |||
- RADIATION SAFETY - AIRBORNE | |||
1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/25/2018 06/29/2018 EP | |||
- EP PROGRAM INSPECTION | |||
1 IP Alert and Notification System Testing 7111402 07/30/2018 08/03/2018 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Ginna Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 2 08/09/2017 12:29:12 EP | |||
- EP PROGRAM INSPECTION | |||
1 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 07/30/2018 08/03/2018 | |||
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/30/2018 08/03/2018 | |||
IP Performance Indicator Verification 71151 07/30/2018 08/03/2018 HP | |||
- RADIATION SAFETY - DOSIMETRY | |||
1 IP Occupational Dose Assessment 71124.04 07/23/2018 07/27/2018 REQUAL | |||
- GINNA REQUAL INSP W/ P/F RESULTS | |||
1 IP Licensed Operator Requalification Program - Annual Review 7111111A 12/10/2018 12/14/2018 | |||
IP Licensed Operator Requalification Program 7111111B 12/10/2018 12/14/2018 HP | |||
- RADIATION SAFETY - RAD HAZ | |||
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/22/2018 10/26/2018 | |||
IP Occupational ALARA Planning and Controls 71124.02 10/22/2018 10/26/2018 | |||
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/22/2018 10/26/2018 | |||
IP Occupational Exposure Control Effectiveness 71151-OR01 10/22/2018 10/26/2018 | |||
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 10/22/2018 10/26/2018 U1 ISI | |||
- UNIT 1 INSERVICE INSPECTION | |||
1 IP Inservice Inspection Activities - PWR 7111108P 10/29/2018 11/09/2018 LR PH 4 | |||
- GINNA LICENSE RENEWAL PHASE 4 | |||
1 IP Post-Approval Site Inspection for License Renewal 71003 03/11/2019 03/15/2019 HP | |||
- RADIATION SAFETY - RAD HAZ | |||
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/25/2019 03/29/2019 HP | |||
- RADIATION SAFETY - INSTRUMENTS | |||
1 IP Radiation Monitoring Instrumentation 71124.05 05/13/2019 05/17/2019 ISFSI | |||
- ISFSI OPERATIONAL INSPECTION | |||
1 IP Operation Of An ISFSI 60855 06/10/2019 06/14/2019 | |||
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/10/2019 06/14/2019 DBAI-T | |||
- DESIGN BASES ASSURANCE INSP - TEAMS | |||
1 IP Design Bases Assurance Inspection (Teams) | |||
7111121M 06/10/2019 06/14/2019 | |||
IP Design Bases Assurance Inspection (Teams) | |||
7111121M 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Latest revision as of 12:44, 8 January 2025
| ML17241A040 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 08/28/2017 |
| From: | Anthony Dimitriadis Reactor Projects Branch 1 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| References | |
| IR 2017005 | |
| Download: ML17241A040 (4) | |
Text
August 28, 2017
SUBJECT:
UPDATED INSPECTION PLAN FOR R. E. GINNA NUCLEAR POWER
PLANT - INSPECTION REPORT 05000244/2017005
Dear Mr. Hanson:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for your R. E. Ginna Nuclear Power Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to normal baseline inspection, the NRC will be performing infrequent inspections under Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, and Inspection Procedure 71003, Post-Approved Site Inspection for License Renewal.
Please contact me at 610-337-6953 with any questions you have regarding this letter.
Sincerely,
/RA/
Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects
Docket No.
50-244 License No.
Enclosure:
Inspection Plan
cc: Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DRP RI/DRP
NAME ARosebrook ADimitriadis
DATE 8/15/17 8/28/17
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Ginna Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 2 08/09/2017 12:29:12 7111107T
- TRIENNIAL HEAT SINK
1 IP Heat Sink Performance 7111107T 07/31/2017 08/04/2017 EP
- EP EXERCISE INSPECTION
1 IP Exercise Evaluation 7111401 08/21/2017 08/25/2017
IP Performance Indicator Verification 71151 08/21/2017 08/25/2017 7111121N
- EQ PROGRAM
1 IP Design Bases Assurance Inspection (Programs)
7111121N 08/07/2017 08/11/2017
IP Design Bases Assurance Inspection (Programs)
7111121N 08/21/2017 08/25/2017 HP
- RADIATION SAFETY - REMP & PIV
1 IP Radiological Environmental Monitoring Program 71124.07 09/11/2017 09/15/2017
IP Occupational Exposure Control Effectiveness 71151-OR01 09/11/2017 09/15/2017
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 09/11/2017 09/15/2017 50.59
- EVALS OF CHANGES, TESTS, & EXPERIMENTS
1 IP screenings and/or applicability determinations 7111117T-5059scrn 09/25/2017 09/29/2017 71152
- SAMPLE: REVIEW RC AND CA MAIN STM SV'S
1 IP Performance Indicator Verification 71151 12/04/2017 12/08/2017 71152B
- PI&R BIENNIAL
1 IP Problem Identification and Resolution 71152B 03/05/2018 03/09/2018
IP Problem Identification and Resolution 71152B 03/19/2018 03/23/2018 8/27EXAM
- GINNA INITIAL OL EXAM
1 FY18 GINNA EXAM (AUGUST 2018)
U01977 07/30/2018 08/03/2018
FY18 GINNA EXAM (AUGUST 2018)
U01977 08/27/2018 09/07/2018 HP
- RADIATION SAFETY - ALARA
1 IP Occupational ALARA Planning and Controls 71124.02 03/19/2018 03/23/2018 71124.08
- RADWASTE
1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/16/2018 04/20/2018 7111105T
- TRIENNIAL FIRE PROTECTION
1 IP Fire Protection [Triennial]
7111105T 06/04/2018 06/08/2018
IP Fire Protection [Triennial]
7111105T 06/18/2018 06/22/2018 HP
- RADIATION SAFETY - AIRBORNE
1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/25/2018 06/29/2018 EP
- EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 07/30/2018 08/03/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Ginna Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 2 08/09/2017 12:29:12 EP
- EP PROGRAM INSPECTION
1 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 07/30/2018 08/03/2018
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/30/2018 08/03/2018
IP Performance Indicator Verification 71151 07/30/2018 08/03/2018 HP
- RADIATION SAFETY - DOSIMETRY
1 IP Occupational Dose Assessment 71124.04 07/23/2018 07/27/2018 REQUAL
- GINNA REQUAL INSP W/ P/F RESULTS
1 IP Licensed Operator Requalification Program - Annual Review 7111111A 12/10/2018 12/14/2018
IP Licensed Operator Requalification Program 7111111B 12/10/2018 12/14/2018 HP
- RADIATION SAFETY - RAD HAZ
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/22/2018 10/26/2018
IP Occupational ALARA Planning and Controls 71124.02 10/22/2018 10/26/2018
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/22/2018 10/26/2018
IP Occupational Exposure Control Effectiveness 71151-OR01 10/22/2018 10/26/2018
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 10/22/2018 10/26/2018 U1 ISI
- UNIT 1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 10/29/2018 11/09/2018 LR PH 4
- GINNA LICENSE RENEWAL PHASE 4
1 IP Post-Approval Site Inspection for License Renewal 71003 03/11/2019 03/15/2019 HP
- RADIATION SAFETY - RAD HAZ
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/25/2019 03/29/2019 HP
- RADIATION SAFETY - INSTRUMENTS
1 IP Radiation Monitoring Instrumentation 71124.05 05/13/2019 05/17/2019 ISFSI
- ISFSI OPERATIONAL INSPECTION
1 IP Operation Of An ISFSI 60855 06/10/2019 06/14/2019
IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/10/2019 06/14/2019 DBAI-T
- DESIGN BASES ASSURANCE INSP - TEAMS
1 IP Design Bases Assurance Inspection (Teams)
7111121M 06/10/2019 06/14/2019
IP Design Bases Assurance Inspection (Teams)
7111121M 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.