IR 05000443/2013404: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 06/07/2013 | | issue date = 06/07/2013 | ||
| title = IR 05000443/2013404; 04/29/13 to 05/02/13; Seabrook Station, Unit No. 1; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats Letter Only | | title = IR 05000443/2013404; 04/29/13 to 05/02/13; Seabrook Station, Unit No. 1; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats Letter Only | ||
| author name = Jackson D | | author name = Jackson D | ||
| author affiliation = NRC/RGN-I/DRS/OB | | author affiliation = NRC/RGN-I/DRS/OB | ||
| addressee name = Walsh K | | addressee name = Walsh K | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:June 7, 2013 | ||
==SUBJECT:== | |||
SEABROOK STATION, UNIT NO.1 - TEMPORARY INSTRUCTION 2515/186, | |||
"INSPECTION OF PROCEDURES AND PROCESS FOR RESPONDING TO | |||
POTENTIAL AIRCRAFT THREATS;" INSPECTION REPORT | |||
NO. 05000443/2013404 | |||
==Dear Mr. Walsh:== | ==Dear Mr. Walsh:== | ||
On May 2, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Seabrook Station, Unit No. 1 using Temporary Instruction 2515/186, | On May 2, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Seabrook Station, Unit No. 1 using Temporary Instruction 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. The enclosed inspection report documents the results of the inspection, which were discussed on May 2, 2013, with Mr. Thomas Vehec, Plant General Manager, and other members of your staff. | ||
The objective of this inspection was to assess the implementation procedures and processes of your Seabrook Station, Unit No. 1 that are required by Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States, will be used to evaluate the U.S. nuclear | The objective of this inspection was to assess the implementation procedures and processes of your Seabrook Station, Unit No. 1 that are required by Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States, will be used to evaluate the U.S. nuclear industrys readiness to safely respond to similar events. | ||
These results will also help the NRC to determine if additional regulatory actions are warranted. | |||
The inspection examined activities conducted under your license as they relate to the implementation of 10 CFR 50.54(hh)(1), your compliance with the Commissions rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. | |||
Based on results of this inspection, no NRC-identified or self-revealing findings were identified. | |||
However, five observations related to procedures and communications were identified by the inspectors for your future consideration. The observations were of minor safety significance and were determined not to be violations of regulatory requirements. | |||
Seabrook Station, Unit No. 1. | Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. If you contest any observation or the subject in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Seabrook Station, Unit No. 1. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Should you have any questions regarding this inspection, we will be pleased to discuss the issues with you. | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Division of Reactor Safety Docket No. 50-443 License No. NPF-86 | Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-443 License No. NPF-86 | ||
ML13158A017(Cover letter) ADAMS ACCESSION NUMBER: ML13158A014(Cover letter w/enclosure) NonPublic Designation Category: MD 3.4 NonPublic A.3 Cover Letter X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available Cover Letter w/Enclosure X SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available OFFICE RI/DRS RI/DRS NAME Silk ADeFrancisco DJackson DATE 5/ 31 /13 6/5/13 6/7/13 Nonpublic Enclosure: Inspection Report 05000443/2013404; w/Attachment: Supplemental Information | ML13158A017(Cover letter) | ||
ADAMS ACCESSION NUMBER: ML13158A014(Cover letter w/enclosure) | |||
NonPublic Designation Category: MD 3.4 NonPublic A.3 Cover Letter X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available Cover Letter w/Enclosure X SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available OFFICE RI/DRS RI/DRS | |||
NAME Silk ADeFrancisco DJackson | |||
DATE 5/ 31 /13 6/5/13 6/7/13 Nonpublic Enclosure: Inspection Report 05000443/2013404; w/Attachment: Supplemental Information | |||
cc w/o encl: Distribution via ListServ | cc w/o encl: Distribution via ListServ | ||
cc w/encl; w/OUO-SRI | cc w/encl; w/OUO-SRI: | ||
M. OKeefe, Licensing Manager J. Giarrusso, Division Chief, MA Emergency Management Agency P. Plummer, Acting Director, State of NH Homeland Security A-5 Attachment Distribution w/o encl; w/o SRI: | |||
W. Dean, RA (R1ORAMAIL Resource) | |||
Homeland Security A-5 Attachment Distribution w/o encl; w/o SRI | D. Lew, DRA (R1ORAMAIL Resource) | ||
D. Roberts, DRP (R1DRPMAIL Resource) | |||
D. Lew, DRA (R1ORAMAIL Resource) D. Roberts, DRP (R1DRPMAIL Resource) | |||
M. Layton, DRP (R1DRPMail Resource) | M. Layton, DRP (R1DRPMail Resource) | ||
C. Miller, DRS (R1DRSMail Resource) | C. Miller, DRS (R1DRSMail Resource) | ||
J. Clifford, DRS (R1DRSMail Resource) G. Dentel, DRP R. Barkley, DRP M. Draxton, DRP | J. Clifford, DRS (R1DRSMail Resource) | ||
G. Dentel, DRP R. Barkley, DRP M. Draxton, DRP R. Montgomery, DRP M. Jennerich, DRP, SRI Acting R. Montgomery, DRP, RI Acting A. Cass, DRP, Resident AA D. Huyck, RI, OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource | |||
R. Montgomery, DRP M. Jennerich, DRP, SRI Acting R. Montgomery, DRP, RI Acting A. Cass, DRP, Resident AA | |||
D. Huyck, RI, OEDO RidsNrrPMSeabrook Resource | |||
RidsNrrDorlLpl1-2 Resource ROPreports Resource | |||
H. Peterson, RIII J. Kozal, NSIR A. Lewin, NRR/DIRS | Distribution w/encl; w/SRI: | ||
R. Albert, NSIR S. Coker, NSIR C. Johnson, NSIR B. Desai, DRS, RII R. Skokowski, DRS, RIII M. Haire, DRS, RIV V. Gaddy, RIV B. Bonser, RII H. Peterson, RIII J. Kozal, NSIR A. Lewin, NRR/DIRS | |||
}} | }} | ||
Latest revision as of 07:51, 11 January 2025
| ML13158A017 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/07/2013 |
| From: | Diane Jackson Operations Branch I |
| To: | Walsh K NextEra Energy Seabrook |
| References | |
| IR-13-404 | |
| Download: ML13158A017 (5) | |
Text
June 7, 2013
SUBJECT:
SEABROOK STATION, UNIT NO.1 - TEMPORARY INSTRUCTION 2515/186,
"INSPECTION OF PROCEDURES AND PROCESS FOR RESPONDING TO
POTENTIAL AIRCRAFT THREATS;" INSPECTION REPORT
NO. 05000443/2013404
Dear Mr. Walsh:
On May 2, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Seabrook Station, Unit No. 1 using Temporary Instruction 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. The enclosed inspection report documents the results of the inspection, which were discussed on May 2, 2013, with Mr. Thomas Vehec, Plant General Manager, and other members of your staff.
The objective of this inspection was to assess the implementation procedures and processes of your Seabrook Station, Unit No. 1 that are required by Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States, will be used to evaluate the U.S. nuclear industrys readiness to safely respond to similar events.
These results will also help the NRC to determine if additional regulatory actions are warranted.
The inspection examined activities conducted under your license as they relate to the implementation of 10 CFR 50.54(hh)(1), your compliance with the Commissions rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.
Based on results of this inspection, no NRC-identified or self-revealing findings were identified.
However, five observations related to procedures and communications were identified by the inspectors for your future consideration. The observations were of minor safety significance and were determined not to be violations of regulatory requirements.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. If you contest any observation or the subject in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Seabrook Station, Unit No. 1.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Should you have any questions regarding this inspection, we will be pleased to discuss the issues with you.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-443 License No. NPF-86
ML13158A017(Cover letter)
ADAMS ACCESSION NUMBER: ML13158A014(Cover letter w/enclosure)
NonPublic Designation Category: MD 3.4 NonPublic A.3 Cover Letter X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available Cover Letter w/Enclosure X SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available OFFICE RI/DRS RI/DRS
NAME Silk ADeFrancisco DJackson
DATE 5/ 31 /13 6/5/13 6/7/13 Nonpublic Enclosure: Inspection Report 05000443/2013404; w/Attachment: Supplemental Information
cc w/o encl: Distribution via ListServ
cc w/encl; w/OUO-SRI:
M. OKeefe, Licensing Manager J. Giarrusso, Division Chief, MA Emergency Management Agency P. Plummer, Acting Director, State of NH Homeland Security A-5 Attachment Distribution w/o encl; w/o SRI:
W. Dean, RA (R1ORAMAIL Resource)
D. Lew, DRA (R1ORAMAIL Resource)
D. Roberts, DRP (R1DRPMAIL Resource)
M. Layton, DRP (R1DRPMail Resource)
C. Miller, DRS (R1DRSMail Resource)
J. Clifford, DRS (R1DRSMail Resource)
G. Dentel, DRP R. Barkley, DRP M. Draxton, DRP R. Montgomery, DRP M. Jennerich, DRP, SRI Acting R. Montgomery, DRP, RI Acting A. Cass, DRP, Resident AA D. Huyck, RI, OEDO RidsNrrPMSeabrook Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource
Distribution w/encl; w/SRI:
R. Albert, NSIR S. Coker, NSIR C. Johnson, NSIR B. Desai, DRS, RII R. Skokowski, DRS, RIII M. Haire, DRS, RIV V. Gaddy, RIV B. Bonser, RII H. Peterson, RIII J. Kozal, NSIR A. Lewin, NRR/DIRS